IFB Drawings King Ridge.pdf

PDF 8 MB Posted

Attached to
KING RIDGE SUBSTATION - CONSTRUCTION
Solicitation number
IFB-118011
Issued by
Bristol City, Virginia

About this file

This is an Invitation for Bid (IFB) drawing package for the King Ridge Substation construction project issued by the BVU Authority in Bristol, Virginia. The project includes furnishing materials and installing below-grade substation facilities such as foundations, grounding systems, conduit/cable routing, and oil containment systems, along with installation of owner-furnished equipment including structural steel, electrical bus and jumpers, switches, potential transformers, and 69 kV circuit breakers. The drawing index contains 25 detailed construction drawings covering single-line diagrams, general arrangement plans for both additions and removals, electrical equipment layouts, equipment sections A through J, foundation plans and details for power transformers, concrete specifications, transformer oil containment basin designs, grounding plans, conduit routing plans, and oil containment tank details. The drawings are designated "Issued for Construction Bidding" as of March 16, 2026, and were prepared by Power Centric Solutions LLC for the BVU Authority.

The drawings provide comprehensive technical specifications for concrete construction (4,000 PSI compressive strength minimum, ASTM A-615 Grade 60 reinforcing steel), foundation details with anchor bolt specifications, oil containment basin construction with waterproofing requirements, galvanized steel grating and support structures, and extensive grounding systems utilizing 4/0 soft-drawn stranded copper conductors. All conduit is specified as PVC Schedule 40 below grade and Schedule 80 above grade with minimum 24-inch burial depth. The project incorporates multiple transformer foundations, circuit breaker foundations, voltage regulator installations, and a 6,000-gallon fiberglass oil containment tank with supporting infrastructure. Concrete finishes include smooth form finish for exposed surfaces and broom finish for exterior paving, with all exposed edges chamfered at 1 inch and various reinforcement spacing requirements detailed throughout the specifications.

View the file

Other files

File Type Posted
For Bid - King Ridge.pdf PDF
For Bid - King Ridge.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

KING RIDGE SUBSTATION CONSTRUCTION DRAWING INDEX

1142-03-100 SINGLE LINE DIAGRAM

1142-03-200 GENERAL ARRANGEMENT PLAN - ADDITION

1142-03-200R GENERAL ARRANGEMENT PLAN - REMOVAL

1142-03-300 ELECTRICAL EQUIPMENT PLAN - ADDITION

1142-03-300R ELECTRICAL EQUIPMENT PLAN - REMOVAL

1142-03-301 EQUIPMENT SECTION A - ADDITION

1142-03-301R EQUIPMENT SECTIONS A, B, & C - REMOVAL

1142-03-302 EQUIPMENT SECTIONS B, C, D, & E - ADDITION

1142-03-303 EQUIPMENT SECTIONS F, G, H, & J - ADDITION

1142-03-400 FOUNDATION PLAN - ADDITION

1142-03-400R FOUNDATION PLAN - REMOVAL

1142-03-401 FOUNDATION DETAIL A POWER TRANSFORMER

1142-03-402 CONCRETE MATERIAL AND CONSTRUCTION SPECIFICATIONS

1142-03-403 FOUNDATION DETAIL A

1142-03-404 FOUNDATION DETAIL B

1142-03-405 TRANSFORMER OIL CONTAINMENT

1142-03-406 TRANSFORMER OIL CONTAINMENT BASIN

1142-03-407 OIL CONTAINMENT SECTIONS & DETAILS

1142-03-500 GROUNDING PLAN - ADDITION

1142-03-501 CONDUIT PLAN

1142-03-502 CONDUIT AND GROUNDING DETAILS

1142-03-503 CIRCUIT LIST

1142-03-504 OIL CONTAINMENT PLAN

1142-03-505 OIL CONTAINMENT TANK DETAILS

ISSUED FOR

BIDDING ONLY

NOT FOR

CONSTRUCTION

POWER

CENTRIC

SOLUTIONS

REFERENCE

38396B01 ONE LINE DIAGRAM

38396C01 SUBSTATION PLAN

38396C02 SUBSTATION SECTIONS

38396C03 UABC DETAILS

38396D01 ANCHOR BOLT PLAN

38396DO2 FOUNDATION DETAILS

38396E01 GROUNDING PLAN

38396E02 EQUIPMENT GROUNDING DETAILS

38396E03 FENCE DETAILS

38396G01 ERECTION DIAGRAM

38396G02 ERECTION DIAGRAM

38396H01 STEEL DETAILS

38396H02 STEEL DETAILS

38396H03 STEEL DETAILS

38396H04 STEEL DETAILS

38396H05 STEEL DETAILS

38396H06 STEEL DETAILS

38396H07 STEEL DETAILS

38396H08 STEEL DETAILS

38396H09 STEEL DETAILS

38396H10 STEEL DETAILS

38396H11 STEEL DETAILS

38396H12 STEEL DETAILS

AutoCAD SHX Text

DRAW:

AutoCAD SHX Text

DATE

AutoCAD SHX Text

REV

AutoCAD SHX Text

APP'D

AutoCAD SHX Text

CHK'D

AutoCAD SHX Text

REVISION DESCRIPTION

AutoCAD SHX Text

DRAWING NUMBER:

AutoCAD SHX Text JMILNER - 3/11/2026 - 13:05 - T:\EG\EG-PD\BVUASUBS\BVUASUBS-00001\1142-03 KING RIDGE SUBSTATION\WORK PRODUCTS\CAD\1142-03-000.DWG : SUBSTATION DRAWING INDEX - 3/11/2026 - 13:05 - T:\EG\EG-PD\BVUASUBS\BVUASUBS-00001\1142-03 KING RIDGE SUBSTATION\WORK PRODUCTS\CAD\1142-03-000.DWG : SUBSTATION DRAWING INDEX3/11/2026 - 13:05 - T:\EG\EG-PD\BVUASUBS\BVUASUBS-00001\1142-03 KING RIDGE SUBSTATION\WORK PRODUCTS\CAD\1142-03-000.DWG : SUBSTATION DRAWING INDEX - 13:05 - T:\EG\EG-PD\BVUASUBS\BVUASUBS-00001\1142-03 KING RIDGE SUBSTATION\WORK PRODUCTS\CAD\1142-03-000.DWG : SUBSTATION DRAWING INDEX13:05 - T:\EG\EG-PD\BVUASUBS\BVUASUBS-00001\1142-03 KING RIDGE SUBSTATION\WORK PRODUCTS\CAD\1142-03-000.DWG : SUBSTATION DRAWING INDEX - T:\EG\EG-PD\BVUASUBS\BVUASUBS-00001\1142-03 KING RIDGE SUBSTATION\WORK PRODUCTS\CAD\1142-03-000.DWG : SUBSTATION DRAWING INDEXT:\EG\EG-PD\BVUASUBS\BVUASUBS-00001\1142-03 KING RIDGE SUBSTATION\WORK PRODUCTS\CAD\1142-03-000.DWG : SUBSTATION DRAWING INDEX1142-03-000.DWG : SUBSTATION DRAWING INDEX : SUBSTATION DRAWING INDEXSUBSTATION DRAWING INDEX

AutoCAD SHX Text

COPYRIGHT 2021, POWER CENTRIC SOLUTIONS LLC., ALL RIGHTS RESERVED

AutoCAD SHX Text

CHK'D:

AutoCAD SHX Text

APP'D:

AutoCAD SHX Text

DATE:

AutoCAD SHX Text

SCALE:

AutoCAD SHX Text 1142-03-000

AutoCAD SHX Text

BVU AUTHORITY

AutoCAD SHX Text

BRISTOL, VA

AutoCAD SHX Text

KING RIDGE SUBSTATION

AutoCAD SHX Text

DRAWING INDEX

AutoCAD SHX Text

JLM

AutoCAD SHX Text

KRA

AutoCAD SHX Text

KRA

AutoCAD SHX Text

NTS

AutoCAD SHX Text 4.8.24

AutoCAD SHX Text

AutoCAD SHX Text 10.15.25

AutoCAD SHX Text

JRM

AutoCAD SHX Text

KRA

AutoCAD SHX Text

ISSUED FOR SUBSTATION MATERIAL BIDDING

AutoCAD SHX Text

AutoCAD SHX Text 03.16.26

AutoCAD SHX Text

JRM

AutoCAD SHX Text

KRA

AutoCAD SHX Text

ISSUED FOR CONSTRUCTION BIDDING

A1

T2 63SP/49A/29T

A2

T1 TRIP 63SP/49A/29T

A3

A4

SP

A5

SP

A6

6186 TRIP

B1

6286 TRIP

B2

B3

654 LSDC 27DC

B4

B5

B6

C1

C2

C3

C4

C5

C6

PNL1 RELAY FAIL ALARM

PNL2 RELAY FAIL ALARM

PNL3 RELAY FAIL ALARM

PNL6 RELAY FAIL ALARM

SEL-2523

654 LGA 63GA

PNL4 RELAY FAIL ALARM

PNL5 RELAY FAIL ALARM

D3

SP

D4

SP

SP

D5

SP

D6

SP

E1

SP

E2

SP

E3

SP

E4

E5

E6

SP

F1

F2

F3

F4

F5

F6

SP

SP

SP

SP

SP

SP

D1

BATTERY ALARM

D2

BATTERY CHAR FAIL ALARM

SP

SEL-3515

3151G

SEL-787

2TS2

2TS2

MFM1

2TS1

SEL-787

SEL-3515

3251G

27DC

SEL-787

6229D

329D

6129D

2T S1

2T S5

2T S3

MFM2

SEL-351S

SEL-351S

M

2151N

2TS6

2TS5

5TS6

63SP 6229P

49T

26T 6229T

63SP6129P

49T

26T6129T

1TS1

3TS2

3TS2

3TS13TS6

3TS5

SEL-351S

SEL-351S

329D

5TS5

5T S3

5T S4

3T S5

3T S3

3T S1

4TS1 4TS104TS4 4TS7

4TS124TS64TS3 4TS9

TRIP & L.O. TO

214, 224, 234, 244,654 & 664

2TS7 TRIP & L.O. TO

214, 224, 234, 244,654 & 664

3TS7

MAIN BUS

TRANSFER BUS

:5

:5

0:

0:

0:

600:5

:5

:5

:5

:5

:5

:5

:5

:5

600:5

:5

:5

214 224 234 244

69 KV VIRGINIA HILLS

LA

48KV MCOV

LA

48KV MCOV

13KV69KV-

15/20/25 MVA

VIRGINIA TRANSFORMER

TRANSFORMER 2

LA LA

8.4KV

213 223 233 243

225 235 245

229 239 249

LA

10KV

LA

10KV

LA

10KV

LA

10KV

69 KV INDUSTRIAL

Z=6.94% 13KV68.8kV - 13.09kV

15/20/25 MVA

TRANSFORMER 1

M

ET

ER

IN

G

7.2kV:120VAC

600:5

VOLTAGE REGULATORS

7620/13200 VOLTS

3 X 667/686 kVA

3A15KVA

S.S. TRANS.

(3) POT. TFM.

7.2KV-

120V

0:

0:

0:

:5

:5

:5

:5

M

2151N

M

2151N

M

2151N

27DC

TRIP & L.O.

FROM

6186 & 6286

TRIP & L.O.

FROM

6186 & 6286

TRIP & L.O.

FROM

6186 & 6286

TRIP & L.O.

FROM

6186 & 6286

TRANSFORMER

POTENTIAL

1-1 Ø

40, 250:115/67.08 VOLTS

3-1 Ø

0:

TRANSFORMER

POTENTIAL

1-1 Ø

40, 250:115/67.08 VOLTS

TRANSFORMER

POTENTIAL

40, 250:115/67.08 VOLTS

HEVI-DUTY

2000 A

(3) POT. TFM.

7.2KV-

120V

1200A

1200A

683-1

VY

1TS7

:5

:5

0:

M

ET

ER

IN

G

7.2kV:120VAC

600:5

VBZ VAZ

SEL-451

:5

:5

T1 CRIT. 71QA/63PR/63LC/63LT/63HT

T2 CRIT. 63PR/49A/26A/71L

664 LSDC 27DC

664 LGA 63GA

ISSUED FOR

BIDDING ONLY

NOT FOR

CONSTRUCTION

POWER

CENTRIC

SOLUTIONS

LEGEND:

EXISTING

ADD

AutoCAD SHX Text X

AutoCAD SHX Text

GROUP OPERATED

AutoCAD SHX Text

DISCONNECT SWITCH

AutoCAD SHX Text

GROUP OPERATED DISCONNECT

AutoCAD SHX Text

SWITCH WITH ARCING HORNS

AutoCAD SHX Text

GROUP OPERATED DISCONNECT

AutoCAD SHX Text

SWITCH WITH QUICK BREAK

AutoCAD SHX Text

ARCING HORNS

AutoCAD SHX Text

SURGE ARRESTOR

AutoCAD SHX Text

BUSHING CURRENT TRANSFORMER

AutoCAD SHX Text

WOUND CURRENT TRANSFORMER

AutoCAD SHX Text

VOLTAGE TRANSFORMER

AutoCAD SHX Text

LOCATED IN SUBSTATION YARD

AutoCAD SHX Text

TEST SWITCH

AutoCAD SHX Text

PK TEST BLOCK

AutoCAD SHX Text

RELAY OR METER

AutoCAD SHX Text

CIRCUIT BREAKER

AutoCAD SHX Text

APPARATUS TERMINAL

AutoCAD SHX Text

HOOKSTICK DISCONNECT SWITCH

AutoCAD SHX Text

49 TRANSFORMER THERMAL RELAY

AutoCAD SHX Text

50 INST. OVERCURRENT ELEMENT

AutoCAD SHX Text

51 TIME OVERCURRENT ELEMENT

AutoCAD SHX Text

MCOV MAX. CONTINUOUS OPER. VOLTAGE

AutoCAD SHX Text

63 FAULT PRESSURE RELAY

AutoCAD SHX Text

MFM MULTIFUNCTION METER

AutoCAD SHX Text

T TRANSFORMER

AutoCAD SHX Text

MR MULTI-RATIO

AutoCAD SHX Text

SA SURGE ARRESTER

AutoCAD SHX Text

VM VOLTMETER

AutoCAD SHX Text

86 LOCKOUT RELAY

AutoCAD SHX Text

%%UABBREVIATIONS:

AutoCAD SHX Text

AM AMMETER

AutoCAD SHX Text

AUX AUXILIARY

AutoCAD SHX Text

CO CUTOUT

AutoCAD SHX Text

79 RECLOSING RELAY

AutoCAD SHX Text

52 CIRCUIT BREAKER

AutoCAD SHX Text

71 OIL LEVEL SWITCH

AutoCAD SHX Text

%%UDEVICE NUMBERS:

AutoCAD SHX Text

TCO TRIP CUTOUT

AutoCAD SHX Text

SP SUDDEN PRESSURE

AutoCAD SHX Text

26 LIQUID THERMAL RELAY

AutoCAD SHX Text

29 TRIP CUTOUT

AutoCAD SHX Text

43 MANUAL TRANSFER SWITCH

AutoCAD SHX Text

62 TIME DELAY RELAY

AutoCAD SHX Text

87 DIFFERENTIAL RELAY

AutoCAD SHX Text

A AMPERE

AutoCAD SHX Text

B BUS

AutoCAD SHX Text

N NEUTRAL

AutoCAD SHX Text

PT POTENTIAL TRANSFORMER

AutoCAD SHX Text

CT CURRENT TRANSFORMER

AutoCAD SHX Text

FUSE CUTOUT

AutoCAD SHX Text

DC CIRCUIT

AutoCAD SHX Text

PT CIRCUIT

AutoCAD SHX Text

CT CIRCUIT

AutoCAD SHX Text

GROUP OPERATED SWITCH WITH LOAD-BREAK FEATURE (VACUUM)

AutoCAD SHX Text

DRAW:

AutoCAD SHX Text

DATE

AutoCAD SHX Text

REV

AutoCAD SHX Text

APP'D

AutoCAD SHX Text

CHK'D

AutoCAD SHX Text

REVISION DESCRIPTION

AutoCAD SHX Text

DRAWING NUMBER:

AutoCAD SHX Text JMILNER - 3/10/2026 - 14:59 - T:\EG\EG-PD\BVUASUBS\BVUASUBS-00001\1142-03 KING RIDGE SUBSTATION\WORK PRODUCTS\CAD\1142-03-100.DWG : SINGLE LINE DIAGRAM - 3/10/2026 - 14:59 - T:\EG\EG-PD\BVUASUBS\BVUASUBS-00001\1142-03 KING RIDGE SUBSTATION\WORK PRODUCTS\CAD\1142-03-100.DWG : SINGLE LINE DIAGRAM3/10/2026 - 14:59 - T:\EG\EG-PD\BVUASUBS\BVUASUBS-00001\1142-03 KING RIDGE SUBSTATION\WORK PRODUCTS\CAD\1142-03-100.DWG : SINGLE LINE DIAGRAM - 14:59 - T:\EG\EG-PD\BVUASUBS\BVUASUBS-00001\1142-03 KING RIDGE SUBSTATION\WORK PRODUCTS\CAD\1142-03-100.DWG : SINGLE LINE DIAGRAM14:59 - T:\EG\EG-PD\BVUASUBS\BVUASUBS-00001\1142-03 KING RIDGE SUBSTATION\WORK PRODUCTS\CAD\1142-03-100.DWG : SINGLE LINE DIAGRAM - T:\EG\EG-PD\BVUASUBS\BVUASUBS-00001\1142-03 KING RIDGE SUBSTATION\WORK PRODUCTS\CAD\1142-03-100.DWG : SINGLE LINE DIAGRAMT:\EG\EG-PD\BVUASUBS\BVUASUBS-00001\1142-03 KING RIDGE SUBSTATION\WORK PRODUCTS\CAD\1142-03-100.DWG : SINGLE LINE DIAGRAM1142-03-100.DWG : SINGLE LINE DIAGRAM : SINGLE LINE DIAGRAMSINGLE LINE DIAGRAM

AutoCAD SHX Text

COPYRIGHT 2020, POWER CENTRIC SOLUTIONS LLC., ALL RIGHTS RESERVED

AutoCAD SHX Text

CHK'D:

AutoCAD SHX Text

APP'D:

AutoCAD SHX Text

DATE:

AutoCAD SHX Text

SCALE:

AutoCAD SHX Text 1142-03-100

AutoCAD SHX Text

BVU AUTHORITY

AutoCAD SHX Text

BRISTOL, VA

AutoCAD SHX Text

KING RIDGE SUBSTATION

AutoCAD SHX Text

SINGLE LINE DIAGRAM

AutoCAD SHX Text

JLM

AutoCAD SHX Text

KRA

AutoCAD SHX Text

KRA

AutoCAD SHX Text

NTS

AutoCAD SHX Text 4.8.24

AutoCAD SHX Text

AutoCAD SHX Text 10.15.25

AutoCAD SHX Text

JRM

AutoCAD SHX Text

KRA

AutoCAD SHX Text

ISSUED FOR SUBSTATION MATERIAL BIDDING

AutoCAD SHX Text

AutoCAD SHX Text 03.16.26

AutoCAD SHX Text

JRM

AutoCAD SHX Text

KRA

ISSUED FOR

BIDDING ONLY

NOT FOR

CONSTRUCTION

POWER

CENTRIC

SOLUTIONS

LEGEND:

EXISTING

ADD

C B A

A

C

PHASING

200'-0"

120'-4"

172'-0"

78'-10"

139'-11"

116'-6"

50'-4"

BASELINE "A"

BA

SE

LI

N

E "B

C O

N

TR

O L

BU

IL

D

IN

G

OIL CONTAINMENT

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

SCALE IN FEET

AutoCAD SHX Text

DRAW:

AutoCAD SHX Text

DATE

AutoCAD SHX Text

REV

AutoCAD SHX Text

APP'D

AutoCAD SHX Text

CHK'D

AutoCAD SHX Text

REVISION DESCRIPTION

AutoCAD SHX Text

DRAWING NUMBER:

AutoCAD SHX Text JMILNER - 3/10/2026 - 15:07 - T:\EG\EG-PD\BVUASUBS\BVUASUBS-00001\1142-03 KING RIDGE SUBSTATION\WORK PRODUCTS\CAD\1142-03-200.DWG : GENERAL ARRANGEMENT PLAN - 3/10/2026 - 15:07 - T:\EG\EG-PD\BVUASUBS\BVUASUBS-00001\1142-03 KING RIDGE SUBSTATION\WORK PRODUCTS\CAD\1142-03-200.DWG : GENERAL ARRANGEMENT PLAN3/10/2026 - 15:07 - T:\EG\EG-PD\BVUASUBS\BVUASUBS-00001\1142-03 KING RIDGE SUBSTATION\WORK PRODUCTS\CAD\1142-03-200.DWG : GENERAL ARRANGEMENT PLAN - 15:07 - T:\EG\EG-PD\BVUASUBS\BVUASUBS-00001\1142-03 KING RIDGE SUBSTATION\WORK PRODUCTS\CAD\1142-03-200.DWG : GENERAL ARRANGEMENT PLAN15:07 - T:\EG\EG-PD\BVUASUBS\BVUASUBS-00001\1142-03 KING RIDGE SUBSTATION\WORK PRODUCTS\CAD\1142-03-200.DWG : GENERAL ARRANGEMENT PLAN - T:\EG\EG-PD\BVUASUBS\BVUASUBS-00001\1142-03 KING RIDGE SUBSTATION\WORK PRODUCTS\CAD\1142-03-200.DWG : GENERAL ARRANGEMENT PLANT:\EG\EG-PD\BVUASUBS\BVUASUBS-00001\1142-03 KING RIDGE SUBSTATION\WORK PRODUCTS\CAD\1142-03-200.DWG : GENERAL ARRANGEMENT PLAN1142-03-200.DWG : GENERAL ARRANGEMENT PLAN : GENERAL ARRANGEMENT PLANGENERAL ARRANGEMENT PLAN

AutoCAD SHX Text

COPYRIGHT 2020, POWER CENTRIC SOLUTIONS LLC., ALL RIGHTS RESERVED

AutoCAD SHX Text

CHK'D:

AutoCAD SHX Text

APP'D:

AutoCAD SHX Text

DATE:

AutoCAD SHX Text

SCALE:

AutoCAD SHX Text 1142-03-200

AutoCAD SHX Text

BVU AUTHORITY

AutoCAD SHX Text

BRISTOL, VA

AutoCAD SHX Text

KING RIDGE SUBSTATION

AutoCAD SHX Text

GENERAL ARRANGEMENT PLAN

AutoCAD SHX Text

ADDITION

AutoCAD SHX Text

JRM

AutoCAD SHX Text 1"=20'

AutoCAD SHX Text 3.10.22

AutoCAD SHX Text

AutoCAD SHX Text 10.15.25

AutoCAD SHX Text

JRM

AutoCAD SHX Text

KRA

AutoCAD SHX Text

ISSUED FOR SUBSTATION MATERIAL BIDDING

AutoCAD SHX Text

AutoCAD SHX Text 03.16.26

AutoCAD SHX Text

JRM

AutoCAD SHX Text

KRA

NOT FOR

CONSTRUCTION

POWER

CENTRIC

SOLUTIONS

LEGEND:

EXISTING

REMOVE

C B A

A

C

PHASING

200'-0"

120'-4"

172'-0"

78'-10"

139'-11"

116'-6"

50'-4"

BASELINE "A"

BA

SE

LI

N

E "B

C O

N

TR

O L

BU

IL

D

IN

G

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

SCALE IN FEET

AutoCAD SHX Text

DRAW:

AutoCAD SHX Text

DATE

AutoCAD SHX Text

REV

AutoCAD SHX Text

APP'D

AutoCAD SHX Text

CHK'D

AutoCAD SHX Text

REVISION DESCRIPTION

AutoCAD SHX Text

DRAWING NUMBER:

AutoCAD SHX Text JMILNER - 3/10/2026 - 15:10 - T:\EG\EG-PD\BVUASUBS\BVUASUBS-00001\1142-03 KING RIDGE SUBSTATION\WORK PRODUCTS\CAD\1142-03-200R.DWG : GENERAL ARRANGEMENT PLAN - REMOVAL - 3/10/2026 - 15:10 - T:\EG\EG-PD\BVUASUBS\BVUASUBS-00001\1142-03 KING RIDGE SUBSTATION\WORK PRODUCTS\CAD\1142-03-200R.DWG : GENERAL ARRANGEMENT PLAN - REMOVAL3/10/2026 - 15:10 - T:\EG\EG-PD\BVUASUBS\BVUASUBS-00001\1142-03 KING RIDGE SUBSTATION\WORK PRODUCTS\CAD\1142-03-200R.DWG : GENERAL ARRANGEMENT PLAN - REMOVAL - 15:10 - T:\EG\EG-PD\BVUASUBS\BVUASUBS-00001\1142-03 KING RIDGE SUBSTATION\WORK PRODUCTS\CAD\1142-03-200R.DWG : GENERAL ARRANGEMENT PLAN - REMOVAL15:10 - T:\EG\EG-PD\BVUASUBS\BVUASUBS-00001\1142-03 KING RIDGE SUBSTATION\WORK PRODUCTS\CAD\1142-03-200R.DWG : GENERAL ARRANGEMENT PLAN - REMOVAL - T:\EG\EG-PD\BVUASUBS\BVUASUBS-00001\1142-03 KING RIDGE SUBSTATION\WORK PRODUCTS\CAD\1142-03-200R.DWG : GENERAL ARRANGEMENT PLAN - REMOVALT:\EG\EG-PD\BVUASUBS\BVUASUBS-00001\1142-03 KING RIDGE SUBSTATION\WORK PRODUCTS\CAD\1142-03-200R.DWG : GENERAL ARRANGEMENT PLAN - REMOVAL1142-03-200R.DWG : GENERAL ARRANGEMENT PLAN - REMOVAL : GENERAL ARRANGEMENT PLAN - REMOVALGENERAL ARRANGEMENT PLAN - REMOVAL

AutoCAD SHX Text

COPYRIGHT 2020, POWER CENTRIC SOLUTIONS LLC., ALL RIGHTS RESERVED

AutoCAD SHX Text

CHK'D:

AutoCAD SHX Text

APP'D:

AutoCAD SHX Text

DATE:

AutoCAD SHX Text

SCALE:

AutoCAD SHX Text 1142-03-200R

AutoCAD SHX Text

BVU AUTHORITY

AutoCAD SHX Text

BRISTOL, VA

AutoCAD SHX Text

KING RIDGE SUBSTATION

AutoCAD SHX Text

GENERAL ARRANGEMENT PLAN

AutoCAD SHX Text

REMOVAL

AutoCAD SHX Text

JRM

AutoCAD SHX Text 1"=20'

AutoCAD SHX Text 3.10.22

AutoCAD SHX Text

AutoCAD SHX Text 10.15.25

AutoCAD SHX Text

JRM

AutoCAD SHX Text

KRA

AutoCAD SHX Text

ISSUED FOR SUBSTATION MATERIAL BIDDING

AutoCAD SHX Text

AutoCAD SHX Text 03.16.26

AutoCAD SHX Text

JRM

AutoCAD SHX Text

KRA

BASELINE "A"

BA

SE

LI

N

E "B

C

3'-0"

2'-0"

5'-0"

7'-0"

7'-0"

25'-0"

25'-0"

B 302G

F

16'-0"

16'-0"

ISSUED FOR

BIDDING ONLY

NOT FOR

CONSTRUCTION

POWER

CENTRIC

SOLUTIONS

9'-0"

14'-0" 14'-0" 6'-0" 5'-0"

13'-0"

7'-0"

7'-0"

D

16'-0"

29'-3"

16'-0"

LEGEND:

EXISTING

ADD

4'-0"

4'-0"

2'-0"

5'-0"

2'-0"

5'-0"

2'-0"

2'-0"

5'-0"

2'-0"

5'-0"

2'-0"

3'-0"

3'-0"

146'-6"

36'-3"

A

4'-0"

4'-0"

4'-0"

4'-0"

E

H

2'-0"

C O

N

TR

O L

BU

IL

D

IN

G

OIL CONTAINMENT

J

C B A

A

C

PHASING

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

SCALE IN FEET

AutoCAD SHX Text

DRAW:

AutoCAD SHX Text

DATE

AutoCAD SHX Text

REV

AutoCAD SHX Text

APP'D

AutoCAD SHX Text

CHK'D

AutoCAD SHX Text

REVISION DESCRIPTION

AutoCAD SHX Text

DRAWING NUMBER:

AutoCAD SHX Text JMILNER - 3/10/2026 - 15:12 - T:\EG\EG-PD\BVUASUBS\BVUASUBS-00001\1142-03 KING RIDGE SUBSTATION\WORK PRODUCTS\CAD\1142-03-300.DWG : ELECTRICAL EQUIPMENT PLAN - 3/10/2026 - 15:12 - T:\EG\EG-PD\BVUASUBS\BVUASUBS-00001\1142-03 KING RIDGE SUBSTATION\WORK PRODUCTS\CAD\1142-03-300.DWG : ELECTRICAL EQUIPMENT PLAN3/10/2026 - 15:12 - T:\EG\EG-PD\BVUASUBS\BVUASUBS-00001\1142-03 KING RIDGE SUBSTATION\WORK PRODUCTS\CAD\1142-03-300.DWG : ELECTRICAL EQUIPMENT PLAN - 15:12 - T:\EG\EG-PD\BVUASUBS\BVUASUBS-00001\1142-03 KING RIDGE SUBSTATION\WORK PRODUCTS\CAD\1142-03-300.DWG : ELECTRICAL EQUIPMENT PLAN15:12 - T:\EG\EG-PD\BVUASUBS\BVUASUBS-00001\1142-03 KING RIDGE SUBSTATION\WORK PRODUCTS\CAD\1142-03-300.DWG : ELECTRICAL EQUIPMENT PLAN - T:\EG\EG-PD\BVUASUBS\BVUASUBS-00001\1142-03 KING RIDGE SUBSTATION\WORK PRODUCTS\CAD\1142-03-300.DWG : ELECTRICAL EQUIPMENT PLANT:\EG\EG-PD\BVUASUBS\BVUASUBS-00001\1142-03 KING RIDGE SUBSTATION\WORK PRODUCTS\CAD\1142-03-300.DWG : ELECTRICAL EQUIPMENT PLAN1142-03-300.DWG : ELECTRICAL EQUIPMENT PLAN : ELECTRICAL EQUIPMENT PLANELECTRICAL EQUIPMENT PLAN

AutoCAD SHX Text

COPYRIGHT 2020, POWER CENTRIC SOLUTIONS LLC., ALL RIGHTS RESERVED

AutoCAD SHX Text

CHK'D:

AutoCAD SHX Text

APP'D:

AutoCAD SHX Text

DATE:

AutoCAD SHX Text

SCALE:

AutoCAD SHX Text 1142-03-300

AutoCAD SHX Text

BVU AUTHORITY

AutoCAD SHX Text

BRISTOL, VA

AutoCAD SHX Text

KING RIDGE SUBSTATION

AutoCAD SHX Text

ELECTRICAL EQUIPMENT PLAN

AutoCAD SHX Text

ADDITION

AutoCAD SHX Text

JRM

AutoCAD SHX Text 1"=20'

AutoCAD SHX Text 3.10.22

AutoCAD SHX Text

AutoCAD SHX Text 10.15.25

AutoCAD SHX Text

JRM

AutoCAD SHX Text

KRA

AutoCAD SHX Text

ISSUED FOR SUBSTATION MATERIAL BIDDING

AutoCAD SHX Text

AutoCAD SHX Text 03.16.26

AutoCAD SHX Text

JRM

AutoCAD SHX Text

KRA

NOT FOR

CONSTRUCTION

POWER

CENTRIC

SOLUTIONS

LEGEND:

EXISTING

REMOVE

C 301R

B

A

C O

N

TR

O L

BU

IL

D

IN

G

C B A

A

C

PHASING

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

SCALE IN FEET

AutoCAD SHX Text

DRAW:

AutoCAD SHX Text

DATE

AutoCAD SHX Text

REV

AutoCAD SHX Text

APP'D

AutoCAD SHX Text

CHK'D

AutoCAD SHX Text

REVISION DESCRIPTION

AutoCAD SHX Text

DRAWING NUMBER:

AutoCAD SHX Text JMILNER - 3/13/2026 - 10:55 - T:\EG\EG-PD\BVUASUBS\BVUASUBS-00001\1142-03 KING RIDGE SUBSTATION\WORK PRODUCTS\CAD\1142-03-300R.DWG : ELECTRICAL EQUIPMENT PLAN - 3/13/2026 - 10:55 - T:\EG\EG-PD\BVUASUBS\BVUASUBS-00001\1142-03 KING RIDGE SUBSTATION\WORK PRODUCTS\CAD\1142-03-300R.DWG : ELECTRICAL EQUIPMENT PLAN3/13/2026 - 10:55 - T:\EG\EG-PD\BVUASUBS\BVUASUBS-00001\1142-03 KING RIDGE SUBSTATION\WORK PRODUCTS\CAD\1142-03-300R.DWG : ELECTRICAL EQUIPMENT PLAN - 10:55 - T:\EG\EG-PD\BVUASUBS\BVUASUBS-00001\1142-03 KING RIDGE SUBSTATION\WORK PRODUCTS\CAD\1142-03-300R.DWG : ELECTRICAL EQUIPMENT PLAN10:55 - T:\EG\EG-PD\BVUASUBS\BVUASUBS-00001\1142-03 KING RIDGE SUBSTATION\WORK PRODUCTS\CAD\1142-03-300R.DWG : ELECTRICAL EQUIPMENT PLAN - T:\EG\EG-PD\BVUASUBS\BVUASUBS-00001\1142-03 KING RIDGE SUBSTATION\WORK PRODUCTS\CAD\1142-03-300R.DWG : ELECTRICAL EQUIPMENT PLANT:\EG\EG-PD\BVUASUBS\BVUASUBS-00001\1142-03 KING RIDGE SUBSTATION\WORK PRODUCTS\CAD\1142-03-300R.DWG : ELECTRICAL EQUIPMENT PLAN1142-03-300R.DWG : ELECTRICAL EQUIPMENT PLAN : ELECTRICAL EQUIPMENT PLANELECTRICAL EQUIPMENT PLAN

AutoCAD SHX Text

COPYRIGHT 2020, POWER CENTRIC SOLUTIONS LLC., ALL RIGHTS RESERVED

AutoCAD SHX Text

CHK'D:

AutoCAD SHX Text

APP'D:

AutoCAD SHX Text

DATE:

AutoCAD SHX Text

SCALE:

AutoCAD SHX Text 1142-03-300R

AutoCAD SHX Text

BVU AUTHORITY

AutoCAD SHX Text

BRISTOL, VA

AutoCAD SHX Text

KING RIDGE SUBSTATION

AutoCAD SHX Text

ELECTRICAL EQUIPMENT PLAN

AutoCAD SHX Text

REMOVAL

AutoCAD SHX Text

JRM

AutoCAD SHX Text 1"=20'

AutoCAD SHX Text 3.10.22

AutoCAD SHX Text

AutoCAD SHX Text 10.15.25

AutoCAD SHX Text

JRM

AutoCAD SHX Text

KRA

AutoCAD SHX Text

ISSUED FOR SUBSTATION MATERIAL BIDDING

AutoCAD SHX Text

AutoCAD SHX Text 03.16.26

AutoCAD SHX Text

JRM

AutoCAD SHX Text

KRA

NOT FOR

CONSTRUCTION

POWER

CENTRIC

SOLUTIONS

SECTION A

300SCALE: 1" = 10'

13'-0"

22'-6"

32'-0"

3 14 x 3 14 x 14 UABC (TYP)

16'-10"

6'-0"

14'-0"16'-0" 14'-0" 6'-0" 5'-0" 5'-0" 13'-0"

13'-0"

8" x 4" AL BAR

LEGEND:

EXISTING

ADD

9'-6"

2'-0"

5'-0"

2'-6"

2'-0"

14'-6"

4'-0"

6'-6"

24'-11"

11'-0"

36'-0"

2-500 MCM CU

2-500 MCM CU

2-500 MCM CU

556.5 MCM ASCR

556.5 MCM ASCR

8" x 4" AL BAR

556.5 MCM ASCR

556.5 MCM

ASCR

556.5 MCM ASCR

19'-0"

556.5 MCM ASCR

3 14 x 3 14 x 14 UABC (TYP)

#4 HD CU

8" x 4" AL BAR

21'-1 9 16"

NOTES

1. REMOVE EXISTING PT'S AND STRUCTURES.

PROVIDE NEW PT'S AND STRUCTURES. STRUCTURE

BASE SHALL MATCH EXISTING SO THAT EXISTING

FOUNDATIONS CAN BE RE-USED.

2. PROVIDE SWITCH BEAM AND ACCOMPANYING

CONNECTION MATERIAL TO PROVIDE ATTACHMENT

TO EXISTING STRUCTURE.

NOTE 2

NOTE 1

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

SCALE IN FEET

AutoCAD SHX Text

DRAW:

AutoCAD SHX Text

DATE

AutoCAD SHX Text

REV

AutoCAD SHX Text

APP'D

AutoCAD SHX Text

CHK'D

AutoCAD SHX Text

REVISION DESCRIPTION

AutoCAD SHX Text

DRAWING NUMBER:

AutoCAD SHX Text JMILNER - 11/10/2025 - 08:09 - T:\EG\EG-PD\BVUASUBS\BVUASUBS-00001\1142-03 KING RIDGE SUBSTATION\WORK PRODUCTS\CAD\1142-03-301.DWG : EQUIPMENT SECTION A - 11/10/2025 - 08:09 - T:\EG\EG-PD\BVUASUBS\BVUASUBS-00001\1142-03 KING RIDGE SUBSTATION\WORK PRODUCTS\CAD\1142-03-301.DWG : EQUIPMENT SECTION A11/10/2025 - 08:09 - T:\EG\EG-PD\BVUASUBS\BVUASUBS-00001\1142-03 KING RIDGE SUBSTATION\WORK PRODUCTS\CAD\1142-03-301.DWG : EQUIPMENT SECTION A - 08:09 - T:\EG\EG-PD\BVUASUBS\BVUASUBS-00001\1142-03 KING RIDGE SUBSTATION\WORK PRODUCTS\CAD\1142-03-301.DWG : EQUIPMENT SECTION A08:09 - T:\EG\EG-PD\BVUASUBS\BVUASUBS-00001\1142-03 KING RIDGE SUBSTATION\WORK PRODUCTS\CAD\1142-03-301.DWG : EQUIPMENT SECTION A - T:\EG\EG-PD\BVUASUBS\BVUASUBS-00001\1142-03 KING RIDGE SUBSTATION\WORK PRODUCTS\CAD\1142-03-301.DWG : EQUIPMENT SECTION AT:\EG\EG-PD\BVUASUBS\BVUASUBS-00001\1142-03 KING RIDGE SUBSTATION\WORK PRODUCTS\CAD\1142-03-301.DWG : EQUIPMENT SECTION A1142-03-301.DWG : EQUIPMENT SECTION A : EQUIPMENT SECTION AEQUIPMENT SECTION A

AutoCAD SHX Text

COPYRIGHT 2020, POWER CENTRIC SOLUTIONS LLC., ALL RIGHTS RESERVED

AutoCAD SHX Text

CHK'D:

AutoCAD SHX Text

APP'D:

AutoCAD SHX Text

DATE:

AutoCAD SHX Text

SCALE:

AutoCAD SHX Text 1142-03-301

AutoCAD SHX Text

BVU AUTHORITY

AutoCAD SHX Text

BRISTOL, VA

AutoCAD SHX Text

KING RIDGE SUBSTATION

AutoCAD SHX Text

EQUIPMENT SECTION A

AutoCAD SHX Text

ADDITION

AutoCAD SHX Text

JRM

AutoCAD SHX Text 1"=20'

AutoCAD SHX Text 03.08.22

AutoCAD SHX Text

AutoCAD SHX Text 10.15.25

AutoCAD SHX Text

JRM

AutoCAD SHX Text

KRA

ISSUED FOR SUBSTATION MATERIAL BIDDING

NOT FOR

CONSTRUCTION

POWER

CENTRIC

SOLUTIONS

SECTION A

300SCALE: 1" = 10'

LEGEND:

EXISTING

ADD

SECTION B

300SCALE: 1" = 10'

SECTION C

300RSCALE: 1" = 10'

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

SCALE IN FEET

AutoCAD SHX Text

DRAW:

AutoCAD SHX Text

DATE

AutoCAD SHX Text

REV

AutoCAD SHX Text

APP'D

AutoCAD SHX Text

CHK'D

AutoCAD SHX Text

REVISION DESCRIPTION

AutoCAD SHX Text

DRAWING NUMBER:

AutoCAD SHX Text JMILNER - 3/11/2026 - 09:07 - T:\EG\EG-PD\BVUASUBS\BVUASUBS-00001\1142-03 KING RIDGE SUBSTATION\WORK PRODUCTS\CAD\1142-03-301R.DWG : EQUIPMENT SECTION A B C - 3/11/2026 - 09:07 - T:\EG\EG-PD\BVUASUBS\BVUASUBS-00001\1142-03 KING RIDGE SUBSTATION\WORK PRODUCTS\CAD\1142-03-301R.DWG : EQUIPMENT SECTION A B C3/11/2026 - 09:07 - T:\EG\EG-PD\BVUASUBS\BVUASUBS-00001\1142-03 KING RIDGE SUBSTATION\WORK PRODUCTS\CAD\1142-03-301R.DWG : EQUIPMENT SECTION A B C - 09:07 - T:\EG\EG-PD\BVUASUBS\BVUASUBS-00001\1142-03 KING RIDGE SUBSTATION\WORK PRODUCTS\CAD\1142-03-301R.DWG : EQUIPMENT SECTION A B C09:07 - T:\EG\EG-PD\BVUASUBS\BVUASUBS-00001\1142-03 KING RIDGE SUBSTATION\WORK PRODUCTS\CAD\1142-03-301R.DWG : EQUIPMENT SECTION A B C - T:\EG\EG-PD\BVUASUBS\BVUASUBS-00001\1142-03 KING RIDGE SUBSTATION\WORK PRODUCTS\CAD\1142-03-301R.DWG : EQUIPMENT SECTION A B CT:\EG\EG-PD\BVUASUBS\BVUASUBS-00001\1142-03 KING RIDGE SUBSTATION\WORK PRODUCTS\CAD\1142-03-301R.DWG : EQUIPMENT SECTION A B C1142-03-301R.DWG : EQUIPMENT SECTION A B C : EQUIPMENT SECTION A B CEQUIPMENT SECTION A B C

AutoCAD SHX Text

COPYRIGHT 2020, POWER CENTRIC SOLUTIONS LLC., ALL RIGHTS RESERVED

AutoCAD SHX Text

CHK'D:

AutoCAD SHX Text

APP'D:

AutoCAD SHX Text

DATE:

AutoCAD SHX Text

SCALE:

AutoCAD SHX Text 1142-03-301R

AutoCAD SHX Text

BVU AUTHORITY

AutoCAD SHX Text

BRISTOL, VA

AutoCAD SHX Text

WEST BRISTOL SUBSTATION

AutoCAD SHX Text

EQUIPMENT SECTION A, B, & C

AutoCAD SHX Text

REMOVAL

AutoCAD SHX Text

JRM

AutoCAD SHX Text 1"=20'

AutoCAD SHX Text 03.08.22

AutoCAD SHX Text

AutoCAD SHX Text 10.15.25

AutoCAD SHX Text

JRM

AutoCAD SHX Text

KRA

AutoCAD SHX Text

ISSUED FOR SUBSTATION MATERIAL BIDDING

AutoCAD SHX Text

AutoCAD SHX Text 03.16.26

AutoCAD SHX Text

JRM

AutoCAD SHX Text

KRA

NOT FOR

CONSTRUCTION

POWER

CENTRIC

SOLUTIONS

9'-0"

10'-6"

9'-4"

3 14 x 3 14 x 14 UABC (TYP)

SECTION B

300SCALE: 1" = 10'

SECTION C

300SCALE: 1" = 10'

SECTION D

300SCALE: 1" = 10'

SECTION E

300SCALE: 1" = 10'

3 14 X 3 14 X 14 UABC (TYP)

7'-0" 7'-0" 9'-0"

21'-0"

25'-0"

14'-6"

36'-0"

12'-6"12'-6"

22'-0"

LEGEND:

EXISTING

ADD

12'-6" 12'-6"

556.5 MCM

ACSR

4'-0"

2'-6"

5'-8"

5'-4"

11'-0"

556.5 MCM

ACSR

2'-6"

8'-0"

13'-0"

556.5 MCM

ACSR

9'-4"12'-8"

20'-0"

556.5 MCM

ACSR

556.5 MCM

ACSR

556.5 MCM

ACSR

NOTES

1. 69kV LINE INSULATORS AND HARDWARE PROVIDED

UNDER MATERIAL CONTRACT AS WELL AS DOUBLE

PADDLE NEMA 4 HOLE CONNECT FOR JUMPER. 69 kV

LINE CONDUCTOR AND SHIELDING PROVIDED BY

BVUA.

2. NEMA 4 HOLE TERMINAL FOR UG CABLE

CONNECTION PROVIDED IN MATERIAL CONTRACT.

UG CABLE, TERMINATION, AND END TERMINAL

PROVIDED BY BVUA.

16'-8"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

SCALE IN FEET

AutoCAD SHX Text

DRAW:

AutoCAD SHX Text

DATE

AutoCAD SHX Text

REV

AutoCAD SHX Text

APP'D

AutoCAD SHX Text

CHK'D

AutoCAD SHX Text

REVISION DESCRIPTION

AutoCAD SHX Text

DRAWING NUMBER:

AutoCAD SHX Text JMILNER - 3/11/2026 - 10:04 - T:\EG\EG-PD\BVUASUBS\BVUASUBS-00001\1142-03 KING RIDGE SUBSTATION\WORK PRODUCTS\CAD\1142-03-302.DWG : EQUIPMENT SECTION B C D E - 3/11/2026 - 10:04 - T:\EG\EG-PD\BVUASUBS\BVUASUBS-00001\1142-03 KING RIDGE SUBSTATION\WORK PRODUCTS\CAD\1142-03-302.DWG : EQUIPMENT SECTION B C D E3/11/2026 - 10:04 - T:\EG\EG-PD\BVUASUBS\BVUASUBS-00001\1142-03 KING RIDGE SUBSTATION\WORK PRODUCTS\CAD\1142-03-302.DWG : EQUIPMENT SECTION B C D E - 10:04 - T:\EG\EG-PD\BVUASUBS\BVUASUBS-00001\1142-03 KING RIDGE SUBSTATION\WORK PRODUCTS\CAD\1142-03-302.DWG : EQUIPMENT SECTION B C D E10:04 - T:\EG\EG-PD\BVUASUBS\BVUASUBS-00001\1142-03 KING RIDGE SUBSTATION\WORK PRODUCTS\CAD\1142-03-302.DWG : EQUIPMENT SECTION B C D E - T:\EG\EG-PD\BVUASUBS\BVUASUBS-00001\1142-03 KING RIDGE SUBSTATION\WORK PRODUCTS\CAD\1142-03-302.DWG : EQUIPMENT SECTION B C D ET:\EG\EG-PD\BVUASUBS\BVUASUBS-00001\1142-03 KING RIDGE SUBSTATION\WORK PRODUCTS\CAD\1142-03-302.DWG : EQUIPMENT SECTION B C D E1142-03-302.DWG : EQUIPMENT SECTION B C D E : EQUIPMENT SECTION B C D EEQUIPMENT SECTION B C D E

AutoCAD SHX Text

COPYRIGHT 2020, POWER CENTRIC SOLUTIONS LLC., ALL RIGHTS RESERVED

AutoCAD SHX Text

CHK'D:

AutoCAD SHX Text

APP'D:

AutoCAD SHX Text

DATE:

AutoCAD SHX Text

SCALE:

AutoCAD SHX Text 1142-03-302

AutoCAD SHX Text

BVU AUTHORITY

AutoCAD SHX Text

BRISTOL, VA

AutoCAD SHX Text

WEST BRISTOL SUBSTATION

AutoCAD SHX Text

EQUIPMENT SECTION B, C, D, & E

AutoCAD SHX Text

ADDITIONS

AutoCAD SHX Text

TDH

AutoCAD SHX Text 1"=10'

AutoCAD SHX Text 3.10.22

AutoCAD SHX Text

AutoCAD SHX Text 10.15.25

AutoCAD SHX Text

JRM

AutoCAD SHX Text

KRA

AutoCAD SHX Text

ISSUED FOR SUBSTATION MATERIAL BIDDING

AutoCAD SHX Text

AutoCAD SHX Text 03.16.26

AutoCAD SHX Text

JRM

AutoCAD SHX Text

KRA

NOT FOR

CONSTRUCTION

POWER

CENTRIC

SOLUTIONS

SECTION F

300SCALE: 1" = 10'

SECTION G

300SCALE: 1" = 10'

13'-0"13'-0"

24'-6"

2'-7"

4'-0"

#2 SOL CU

TINNED

2'-0"

15'-2"

7'-6"

4'-0"

5'-6"

LEGEND:

EXISTING

ADD

3'-0"

4'-0"

4'-0"

1'-0"

7'-0"

2'-0"

3'-0"

3'-0"

3'-6"

1'-0"

1'-0"

18'-0" 8'-0"

2'-0"

5'-0"

2'-6"

2'-0"

7'-6"

22'-6"

9'-6"

32'-0"

3'-0"

2'-0"

2'-0"

2-500

MCM CU

8" x 4" AL BAR

4'-0"4'-0"4'-0"

22'-0"

9'-5"

SECTION H

300SCALE: 1" = 10'

SECTION J

300SCALE: 1" = 10'

13'-0"

2'-0"

7'-6"

4'-0"

8'-0"8'-0"

19'-11"

2'-1"

8'-0"8'-0"8'-0" 8'-0" 8'-0" 8'-0"

4'-0"4'-0"4'-0" 4'-0"4'-0"4'-0"4'-0" 4'-0"4'-0"4'-0"4'-0" 4'-0"4'-0"4'-0"4'-0"

11'-10"

2-500 MCM CU

#4 HD CU

5'-0"

17'-0"

14'-0"

NOTES

1. 69kV LINE INSULATORS AND HARDWARE PROVIDED

UNDER MATERIAL CONTRACT AS WELL AS DOUBLE

PADDLE NEMA 4 HOLE CONNECT FOR JUMPER. 69 kV

LINE CONDUCTOR AND SHIELDING PROVIDED BY

BVUA.

2. NEMA 4 HOLE TERMINAL FOR UG CABLE

CONNECTION PROVIDED IN MATERIAL CONTRACT.

UG CABLE, TERMINATION, AND END TERMINAL

PROVIDED BY BVUA.

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

SCALE IN FEET

AutoCAD SHX Text

DRAW:

AutoCAD SHX Text

DATE

AutoCAD SHX Text

REV

AutoCAD SHX Text

APP'D

AutoCAD SHX Text

CHK'D

AutoCAD SHX Text

REVISION DESCRIPTION

AutoCAD SHX Text

DRAWING NUMBER:

AutoCAD SHX Text JMILNER - 3/11/2026 - 10:06 - T:\EG\EG-PD\BVUASUBS\BVUASUBS-00001\1142-03 KING RIDGE SUBSTATION\WORK PRODUCTS\CAD\1142-03-303.DWG : EQUIPMENT SECTION F G H - 3/11/2026 - 10:06 - T:\EG\EG-PD\BVUASUBS\BVUASUBS-00001\1142-03 KING RIDGE SUBSTATION\WORK PRODUCTS\CAD\1142-03-303.DWG : EQUIPMENT SECTION F G H3/11/2026 - 10:06 - T:\EG\EG-PD\BVUASUBS\BVUASUBS-00001\1142-03 KING RIDGE SUBSTATION\WORK PRODUCTS\CAD\1142-03-303.DWG : EQUIPMENT SECTION F G H - 10:06 - T:\EG\EG-PD\BVUASUBS\BVUASUBS-00001\1142-03 KING RIDGE SUBSTATION\WORK PRODUCTS\CAD\1142-03-303.DWG : EQUIPMENT SECTION F G H10:06 - T:\EG\EG-PD\BVUASUBS\BVUASUBS-00001\1142-03 KING RIDGE SUBSTATION\WORK PRODUCTS\CAD\1142-03-303.DWG : EQUIPMENT SECTION F G H - T:\EG\EG-PD\BVUASUBS\BVUASUBS-00001\1142-03 KING RIDGE SUBSTATION\WORK PRODUCTS\CAD\1142-03-303.DWG : EQUIPMENT SECTION F G HT:\EG\EG-PD\BVUASUBS\BVUASUBS-00001\1142-03 KING RIDGE SUBSTATION\WORK PRODUCTS\CAD\1142-03-303.DWG : EQUIPMENT SECTION F G H1142-03-303.DWG : EQUIPMENT SECTION F G H : EQUIPMENT SECTION F G HEQUIPMENT SECTION F G H

AutoCAD SHX Text

COPYRIGHT 2020, POWER CENTRIC SOLUTIONS LLC., ALL RIGHTS RESERVED

AutoCAD SHX Text

CHK'D:

AutoCAD SHX Text

APP'D:

AutoCAD SHX Text

DATE:

AutoCAD SHX Text

SCALE:

AutoCAD SHX Text 1142-03-303

AutoCAD SHX Text

BVU AUTHORITY

AutoCAD SHX Text

BRISTOL, VA

AutoCAD SHX Text

KING RIDGE SUBSTATION

AutoCAD SHX Text

EQUIPMENT SECTION F, G, H, & J

AutoCAD SHX Text

ADDITION

AutoCAD SHX Text

TDH

AutoCAD SHX Text 1"=10'

AutoCAD SHX Text 3.10.22

AutoCAD SHX Text

AutoCAD SHX Text 10.15.25

AutoCAD SHX Text

JRM

AutoCAD SHX Text

KRA

AutoCAD SHX Text

ISSUED FOR SUBSTATION MATERIAL BIDDING

AutoCAD SHX Text

AutoCAD SHX Text 03.16.26

AutoCAD SHX Text

JRM

AutoCAD SHX Text

KRA

BASELINE "A"

NOTES

1. REFER TO DRAWING 1142-03-405 FOR

TRANSFORMER 2 FOUNDATION DETAILS. TOC

ELEVATION SHALL MATCH EXISTING TRANSFORMER

FOUNDATION.

2. REFER TO DRAWING 1142-03-407 FOR CONCRETE

MATERIAL AND CONSTRUCTION SPECIFICATIONS.

BA

SE

LI

N

E "B

ISSUED FOR

BIDDING ONLY

NOT FOR

CONSTRUCTION

POWER

CENTRIC

SOLUTIONS

14'-0"

4'-0" 4'-0"

16'-0"

6'-0" 5'-0" 5'-0"

12'-6"

7'-0"

2'-0"

12'-6"

8'-0"

5'-0"

2'-0"

5'-0"

2'-0"

2'-0"

16'-0"

4'-8"

4'-8"

7'-0"

9'-4"

C L

/1 3K

V

XF

M R

C L k V

D

EA

D

EN

D

16'-0"

16'-0"

CL

BREAKER

LEGEND:

EXISTING

ADD

13'-0"

12'-6"

12'-6"

8'-0"

8'-0"

8'-0"

8'-0"

16'-0"

8'-0"

16'-0"

8'-0"

8'-0"

64'-0"

9'-0"

9'-0"

8'-0"

4'-8"

4'-8" 9'-4"

CL

BREAKER

CL

BREAKER

CL

BREAKER

73'-0"

CL

CL

C L k V

SW

IT

C H

S

TA

N D

CL

TRANSFORMER &

C L k V

SW

IT

C H

S

TA

N D

C L kV P

T

BU

S

SU

P

C L A-

FR

AM

E

C L kV P

T

BU

S

SU

P

C L kV P

T

BU

S

SU

P

TOC=XXX.XX

TOC=XXX.XX

TOC=XXX.XX

15'-0"

TOC=XXX.XX

TOC=XXX.XX

A

A

B

B

B

B

11'-0"

11'-0"

8'-0"

(TYP)

C O

N

TR

O L

BU

IL

D

IN

G

10'-0"

OIL CONTAINMENT

B B

B

5'-0"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

SCALE IN FEET

AutoCAD SHX Text

DRAW:

AutoCAD SHX Text

DATE

AutoCAD SHX Text

REV

AutoCAD SHX Text

APP'D

AutoCAD SHX Text

CHK'D

AutoCAD SHX Text

REVISION DESCRIPTION

AutoCAD SHX Text

DRAWING NUMBER:

AutoCAD SHX Text JMILNER - 3/11/2026 - 10:17 - T:\EG\EG-PD\BVUASUBS\BVUASUBS-00001\1142-03 KING RIDGE SUBSTATION\WORK PRODUCTS\CAD\1142-03-400.DWG : FOUNDATION PLAN - 3/11/2026 - 10:17 - T:\EG\EG-PD\BVUASUBS\BVUASUBS-00001\1142-03 KING RIDGE SUBSTATION\WORK PRODUCTS\CAD\1142-03-400.DWG : FOUNDATION PLAN3/11/2026 - 10:17 - T:\EG\EG-PD\BVUASUBS\BVUASUBS-00001\1142-03 KING RIDGE SUBSTATION\WORK PRODUCTS\CAD\1142-03-400.DWG : FOUNDATION PLAN - 10:17 - T:\EG\EG-PD\BVUASUBS\BVUASUBS-00001\1142-03 KING RIDGE SUBSTATION\WORK PRODUCTS\CAD\1142-03-400.DWG : FOUNDATION PLAN10:17 - T:\EG\EG-PD\BVUASUBS\BVUASUBS-00001\1142-03 KING RIDGE SUBSTATION\WORK PRODUCTS\CAD\1142-03-400.DWG : FOUNDATION PLAN - T:\EG\EG-PD\BVUASUBS\BVUASUBS-00001\1142-03 KING RIDGE SUBSTATION\WORK PRODUCTS\CAD\1142-03-400.DWG : FOUNDATION PLANT:\EG\EG-PD\BVUASUBS\BVUASUBS-00001\1142-03 KING RIDGE SUBSTATION\WORK PRODUCTS\CAD\1142-03-400.DWG : FOUNDATION PLAN1142-03-400.DWG : FOUNDATION PLAN : FOUNDATION PLANFOUNDATION PLAN

AutoCAD SHX Text

COPYRIGHT 2021, POWER CENTRIC SOLUTIONS LLC., ALL RIGHTS RESERVED

AutoCAD SHX Text

CHK'D:

AutoCAD SHX Text

APP'D:

AutoCAD SHX Text

DATE:

AutoCAD SHX Text

SCALE:

AutoCAD SHX Text 1142-03-400

AutoCAD SHX Text

BVU AUTHORITY

AutoCAD SHX Text

BRISTOL, VA

AutoCAD SHX Text

KING RIDGE SUBSTATION

AutoCAD SHX Text

FOUNDATION PLAN

AutoCAD SHX Text

ADDITION

AutoCAD SHX Text

TDH

AutoCAD SHX Text 1"=20'

AutoCAD SHX Text 4.2.22

AutoCAD SHX Text

AutoCAD SHX Text 10.15.25

AutoCAD SHX Text

JRM

AutoCAD SHX Text

KRA

AutoCAD SHX Text

ISSUED FOR SUBSTATION MATERIAL BIDDING

AutoCAD SHX Text

AutoCAD SHX Text 03.16.26

AutoCAD SHX Text

JRM

AutoCAD SHX Text

KRA

AutoCAD SHX Text

ISSUED FOR CONSTRUCTION BIDDING

kaldridge Stamp

NOT FOR

CONSTRUCTION

POWER

CENTRIC

SOLUTIONS

LEGEND:

EXISTING

REMOVAL

C O N

TR

O L

BU

IL

D

IN

G

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

SCALE IN FEET

AutoCAD SHX Text

DRAW:

AutoCAD SHX Text

DATE

AutoCAD SHX Text

REV

AutoCAD SHX Text

APP'D

AutoCAD SHX Text

CHK'D

AutoCAD SHX Text

REVISION DESCRIPTION

AutoCAD SHX Text

DRAWING NUMBER:

AutoCAD SHX Text JMILNER - 3/11/2026 - 10:24 - T:\EG\EG-PD\BVUASUBS\BVUASUBS-00001\1142-03 KING RIDGE SUBSTATION\WORK PRODUCTS\CAD\1142-03-400R.DWG : FOUNDATION PLAN - 3/11/2026 - 10:24 - T:\EG\EG-PD\BVUASUBS\BVUASUBS-00001\1142-03 KING RIDGE SUBSTATION\WORK PRODUCTS\CAD\1142-03-400R.DWG : FOUNDATION PLAN3/11/2026 - 10:24 - T:\EG\EG-PD\BVUASUBS\BVUASUBS-00001\1142-03 KING RIDGE SUBSTATION\WORK PRODUCTS\CAD\1142-03-400R.DWG : FOUNDATION PLAN - 10:24 - T:\EG\EG-PD\BVUASUBS\BVUASUBS-00001\1142-03 KING RIDGE SUBSTATION\WORK PRODUCTS\CAD\1142-03-400R.DWG : FOUNDATION PLAN10:24 - T:\EG\EG-PD\BVUASUBS\BVUASUBS-00001\1142-03 KING RIDGE SUBSTATION\WORK PRODUCTS\CAD\1142-03-400R.DWG : FOUNDATION PLAN - T:\EG\EG-PD\BVUASUBS\BVUASUBS-00001\1142-03 KING RIDGE SUBSTATION\WORK PRODUCTS\CAD\1142-03-400R.DWG : FOUNDATION PLANT:\EG\EG-PD\BVUASUBS\BVUASUBS-00001\1142-03 KING RIDGE SUBSTATION\WORK PRODUCTS\CAD\1142-03-400R.DWG : FOUNDATION PLAN1142-03-400R.DWG : FOUNDATION PLAN : FOUNDATION PLANFOUNDATION PLAN

AutoCAD SHX Text

COPYRIGHT 2021, POWER CENTRIC SOLUTIONS LLC., ALL RIGHTS RESERVED

AutoCAD SHX Text

CHK'D:

AutoCAD SHX Text

APP'D:

AutoCAD SHX Text

DATE:

AutoCAD SHX Text

SCALE:

AutoCAD SHX Text 1142-03-400R

AutoCAD SHX Text

BVU AUTHORITY

AutoCAD SHX Text

BRISTOL, VA

AutoCAD SHX Text

KING RIDGE SUBSTATION

AutoCAD SHX Text

FOUNDATION PLAN

AutoCAD SHX Text

REMOVAL

AutoCAD SHX Text

TDH

AutoCAD SHX Text 1"=20'

AutoCAD SHX Text 4.2.22

AutoCAD SHX Text

AutoCAD SHX Text 10.15.25

AutoCAD SHX Text

JRM

AutoCAD SHX Text

KRA

AutoCAD SHX Text

ISSUED FOR SUBSTATION MATERIAL BIDDING

AutoCAD SHX Text

AutoCAD SHX Text 03.16.26

AutoCAD SHX Text

JRM

AutoCAD SHX Text

KRA

NOT FOR

CONSTRUCTION

POWER

CENTRIC

SOLUTIONS

10'-0"

1"Ø AB

TYP 6 PLACES

(NOTE 9)

3' -0

#5 BAR

#5 @ 6"

BENT

TOP & BOTTOM

1"Ø ABCHAMFER EXPOSED EDGES 1"

PLACE 4" LEAN

CONCRETE MUD

MAT

IMMEDIATELY

AFTER

EXCAVATION.

(NOTE 10)

POWER TRANSFORMER

NOTES:

1. CONCRETE SHALL HAVE COMPRESSIVE

STRENGTH F'c = 5000 PSI PER ASTM C-39.

2. CONCRETE SHALL HAVE MAX SIZE AGGREGATE =

2" INCHES.

3. CONCRETE REINFORCING STEEL: ASTM A-615,

GRADE 60.

4. CHAMFER ALL EXPOSED EDGES 1".

5. ALL EXPOSED CONCRETE SHALL BE SMOOTH

FORM FINISH.

6. ALL REINFORCING BARS NOT SHOWN FOR

CLARITY.

7. ALL REINFORCING BARS 3" CLEAR SPACING

BOTTOM AND UNFORMED SIDES, 2" CLEAR

SPACING TOP AND ANY FORMED SIDES, TYPICAL.

8. THREADS OF ANCHOR BOLTS AND NUTS SHALL BE

THOROUGHLY CLEANED AND PROTECTED AFTER

PLACEMENT.

9. ANCHOR BOLTS SHALL BE POST-INSTALLED, HILTI

TYPE, AFTER TRANSFORMER INSTALLATION.

10. GEOTECHNICAL PROFESSIONAL SHALL VERIFY A

MINIMUM SOIL BEARING PRESSURE OF 1500 PSF

PRIOR TO PLACEMENT OF MUD MAT.

11. TRANSFORMER 2 FOUNDATION HAS BEEN

INSTALLED BY BVUA.

(NOTE 9)

K

V

BU

SH

IN

G S

K

V

BU

SH

IN

G S

C L

CL

PLAN VIEW

A

'-0

3" MIN / 6" MAX REVEAL

SECTION A

AutoCAD SHX Text

DRAW:

AutoCAD SHX Text

DATE

AutoCAD SHX Text

REV

AutoCAD SHX Text

APP'D

AutoCAD SHX Text

CHK'D

AutoCAD SHX Text

REVISION DESCRIPTION

AutoCAD SHX Text

DRAWING NUMBER:

AutoCAD SHX Text JMILNER - 3/11/2026 - 11:00 - T:\EG\EG-PD\BVUASUBS\BVUASUBS-00001\1142-03 KING RIDGE SUBSTATION\WORK PRODUCTS\CAD\1142-03-401.DWG : FOUNDATION DETAILS POWER TRANSFORMER - 3/11/2026 - 11:00 - T:\EG\EG-PD\BVUASUBS\BVUASUBS-00001\1142-03 KING RIDGE SUBSTATION\WORK PRODUCTS\CAD\1142-03-401.DWG : FOUNDATION DETAILS POWER TRANSFORMER3/11/2026 - 11:00 - T:\EG\EG-PD\BVUASUBS\BVUASUBS-00001\1142-03 KING RIDGE SUBSTATION\WORK PRODUCTS\CAD\1142-03-401.DWG : FOUNDATION DETAILS POWER TRANSFORMER - 11:00 - T:\EG\EG-PD\BVUASUBS\BVUASUBS-00001\1142-03 KING RIDGE SUBSTATION\WORK PRODUCTS\CAD\1142-03-401.DWG : FOUNDATION DETAILS POWER TRANSFORMER11:00 - T:\EG\EG-PD\BVUASUBS\BVUASUBS-00001\1142-03 KING RIDGE SUBSTATION\WORK PRODUCTS\CAD\1142-03-401.DWG : FOUNDATION DETAILS POWER TRANSFORMER - T:\EG\EG-PD\BVUASUBS\BVUASUBS-00001\1142-03 KING RIDGE SUBSTATION\WORK PRODUCTS\CAD\1142-03-401.DWG : FOUNDATION DETAILS POWER TRANSFORMERT:\EG\EG-PD\BVUASUBS\BVUASUBS-00001\1142-03 KING RIDGE SUBSTATION\WORK PRODUCTS\CAD\1142-03-401.DWG : FOUNDATION DETAILS POWER TRANSFORMER1142-03-401.DWG : FOUNDATION DETAILS POWER TRANSFORMER : FOUNDATION DETAILS POWER TRANSFORMERFOUNDATION DETAILS POWER TRANSFORMER

AutoCAD SHX Text

COPYRIGHT 2021, POWER CENTRIC SOLUTIONS LLC., ALL RIGHTS RESERVED

AutoCAD SHX Text

CHK'D:

AutoCAD SHX Text

APP'D:

AutoCAD SHX Text

DATE:

AutoCAD SHX Text

SCALE:

AutoCAD SHX Text 1142-03-401

AutoCAD SHX Text

BVU AUTHORITY

AutoCAD SHX Text

BRISTOL, VA

AutoCAD SHX Text

KING RIDGE SUBSTATION

AutoCAD SHX Text

FOUNDATION DETAIL A

AutoCAD SHX Text

POWER TRANSFORMER

AutoCAD SHX Text

TDH

AutoCAD SHX Text

NTS

AutoCAD SHX Text 4.2.22

AutoCAD SHX Text

AutoCAD SHX Text 10.15.25

AutoCAD SHX Text

JRM

AutoCAD SHX Text

KRA

AutoCAD SHX Text

ISSUED FOR SUBSTATION MATERIAL BIDDING

AutoCAD SHX Text

AutoCAD SHX Text 03.16.26

AutoCAD SHX Text

JRM

AutoCAD SHX Text

KRA

NOT FOR

CONSTRUCTION

POWER

CENTRIC

SOLUTIONS

GENERAL NOTES:

1.01 ALL CONSTRUCTION SHALL CONFORM TO THE 2021 INTERNATIONAL BUILDING CODE. REFERENCE TO OTHER STANDARD SPECIFICATIONS OR CODES SHALL MEAN THE LATEST STANDARD OR CODE ADOPTED AND PUBLISHED UNLESS SPECIFIED

OTHERWISE.

1.02 VERIFY ALL EXISTING CONDITIONS, DIMENSIONS, AND ELEVATIONS PRIOR TO COMMENCING ANY WORK. NOTIFY ENGINEER

IMMEDIATELY OF ANY DISCREPANCY.

1.03 NOTIFY ENGINEER IMMEDIATELY OF ANY CONDITIONS ENCOUNTERED IN THE FIELD CONTRADICTORY TO THOSE SHOWN ON THE

CONSTRUCTION CONTRACT DRAWINGS AND DOCUMENTS.

1.04 REVIEW OF SUBMITTALS AND/OR SHOP DRAWINGS BY THE ENGINEER DOES NOT RELIEVE THE CONTRACTOR OF THE RESPONSIBILITY TO REVIEW AND CHECK SHOP DRAWINGS PRIOR TO SUBMITTAL TO THE ENGINEER. CONTRACTOR SHALL BE RESPONSIBLE FOR MEANS, METHODS, TECHNIQUES, SEQUENCES, AND CONSTRUCTION PROCEDURE.

1.05 REFERENCE GEOTECHNICAL REPORT: NONE

FOUNDATION NOTES:

2.01 CONTRACTOR SHALL VERIFY CONDITION AND/OR ADEQUACY OF ALL SUBGRADE, FILLS, AND BACKFILLS BEFORE PLACEMENT OF FOUNDATIONS, FOOTING, SLABS, WALLS, FILLS, BACKFILLS, ETC. ALL FOOTINGS SHALL REST UPON EITHER UNDISTURBED SOILS OR NEWLY PLACED STRUCTURAL FILL. REFER TO GEOTECHNICAL INVESTIGATION REPORT IF AVAILABLE FOR SITE PREPARATION REQUIREMENTS INCLUDING SUBGRADE IMPROVEMENT AND STRUCTURAL FILL PLACEMENT REQUIREMENTS. A MANUALLY OPERATED VIBRATOR SLED OR TAMPER SHALL BE USED TO THOROUGHLY COMPACT ANY SOILS IN THE BOTTOM OF FOOTING

TRENCHES LOOSENED DURING THE EXCAVATION PROCESS.

2.02 SIDES OF FOUNDATIONS SHALL BE FORMED UNLESS CONDITIONS PERMIT EARTH FORMING. FOUNDATIONS POURED AGAINST EARTH REQUIRE THE FOLLOWING PRECAUTIONS: SLOPE SIDES OF EXCAVATIONS AS APPROVED BY GEOTECHNICAL ENGINEER

AND CLEAN UP SLOUGHING BEFORE AND DURING CONCRETE PLACEMENT.

2.03 CONTRACTOR SHALL BE RESPONSIBLE FOR ADEQUATELY PROTECTING ALL EXCAVATION SLOPES.

2.04 WHERE FOOTING STEPS ARE NECESSARY, THEY SHALL BE NO STEEPER THAN ONE VERTICAL TO TWO HORIZONTALS.

2.05 THE BOTTOM OF FOOTINGS SHALL BER BELOW THE FROST DEPTH AS SPECIFIED IN THE GEOTECHNICAL REPORT OR BY THE LOCAL

MUNICIPALITY

2.06 FOOTINGS SHALL BE BACKFILLED BEFORE THE STRUCTURE IS CONSIDERED STABLE. CONCRETE SLAB SHALL REACH 28 DAY

COMPRESSIVE STRENGTH BEFORE STRUCTURE IS CONSIDERED STABLE.

2.07 CONTRACTOR SHALL VERIFY MINIMUM ALLOWABLE SOIL BEARING CAPACITY OF 3000 PSI, OR AS OUTLINED IN THE GEOTECHNICAL

REPORT, PRIOR TO CONSTRUCTION.

REINFORCED CONCRETE NOTES:

3.01 ALL CONCRETE WORK SHALL CONFORM TO ACI 301, SPECIFICATIONS FOR STRUCTURAL CONCRETE FOR BUILDINGS. DESIGN IS

BASED UPON ACI 318, BUILDING CODE REQUIREMENT FOR REINFORCED CONCRETE.

3.02 ALL CONCRETE SHALL BE PLANT MIX AND DELIVERED IN ACCORDANCE WITH STANDARD SPECIFICATIONS FOR READY MIXED CONCRETE, ASTM C94. MIXING TIME IN ASTM SPECIFICATION SHALL BE OBSERVED. CONCRETE SHALL BE COMPOSED OF PORTLAND CEMENT, AIR ENTRAINING AGENT (IF USED), FINE AGGREGATE, COARSE AGGREGATE AND WATER. MATERIALS FROM

THE SAME SOURCE FROM START TO FINISH OF THE JOB SHALL BE USED.

3.03 PORTLAND CEMENT SHALL CONFORM TO ASTM C150, TYPE I OR II. ONLY ONE BRAND OF CEMENT SHALL BE USED.

3.04 AGGREGATES: FINE AGGREGATES SHALL CONFORM TO THE REQUIREMENTS OF ASTM C33, EXCEPT THAT THE FIRST SENTENCE OF PARAGRAPH 4.1 SHALL BE CHANGED TO READ, “FINE AGGREGATE SHALL BE GRADED WITHIN THE FOLLOWING LIMITS,” AND PARAGRAPH 4.2 SHALL BE DELETED IN ITS ENTIRETY. COARSE AGGREGATE SHALL CONFORM TO THE REQUIREMENTS OF ASTM

C33, TABLE 2. COARSE AGGREGATE SHALL BE AS SPECIFIED ON CONTRACT DRAWINGS.

3.05 WATER: MIXING WATER FOR CONCRETE SHALL BE FRESH, CLEAN AND POTABLE.

3.06 ADMIXTURES: AIR ENTRAINING AGENT AND MID-RANGE WATER REDUCER ARE THE ONLY ADMIXTURES PERMITTED. IF USED, THEY SHALL BE STORED IN SUCH A MANNER AS TO AVOID CONTAMINATION AND DAMAGE. IT SHALL BE PROTECTED FROM FREEZING AND OTHER TEMPERATURE CHANGES WHICH WOULD ADVERSELY AFFECT ITS CHARACTERISTICS. ONLY ONE BRAND OF AIR

ENTRAINING AGENT SHALL BE USED.

3.07 CALCIUM CHLORIDE AND OTHER CHLORIDES SHALL NOT BE USED UNDER ANY CIRCUMSTANCES.

3.08 AIR ENTRAINING AGENT SHALL CONFORM TO THE REQUIREMENTS OF ASTM C260 AND SHALL NOT CONTAIN CHLORIDES. THE AIR ENTRAINING AGENT SHALL BE MASTER BUILDERS' MBVR, OR APPROVED EQUAL. AIR ENTRAINING AGENT SHALL BE IN SOLUTION AND INTRODUCED INTO THE CONCRETE MIX BY DISPENSER. THE AMOUNT OF AIR ENTRAINING AGENT USED SHALL BE BASED UPON CONSULTATION WITH A FIELD REPRESENTATIVE TRAINED BY THE MANUFACTURER OF THE PRODUCT. TESTS FOR AIR

CONTENT SHALL BE MADE IN ACCORDANCE WITH ASTM C231.

3.09 MID-RANGE WATER REDUCING AGENT SHALL CONFORM TO THE REQUIREMENTS OF ASTM C494 TYPE A AND SHALL NOT CONTAIN CHLORIDES. THE WATER REDUCING AGENT SHALL BE INTRODUCED AT THE BATCH PLANT. THE AMOUNT OF WATER REDUCING

AGENT USED SHALL BE BASED ON THE APPROVED MIX DESIGN.

3.10 CURING COMPOUND MAY BE USED IF APPROVED, SUBJECT TO THE REQUIREMENTS OF THIS SECTION. THE COMPOUND SHALL BE

SONOSIL, BY SONNEBORN BUILDING PRODUCTS COMPANY, OR APPROVED EQUAL.

3.11 FORM RELEASE AGENT SHALL BE NOX CRETE, OR APPROVED EQUAL.

3.12 THE CONCRETE MIX SHALL CONFORM TO “RECOMMENDED PRACTICE FOR SELECTING PROPORTIONS FOR NORMAL AND HEAVY WEIGHT CONCRETE” (ACI 211.1), LESS APPENDICES 1, 2, AND 4 AND ASTM C 94, READY MIX CONCRETE. AGGREGATES SHALL BE NORMAL WEIGHT. THE WATER CEMENT RATIO SHALL NOT EXCEED 0.45 FOR ANY CONDITION OR USE.

3.13 MINIMUM ULTIMATE COMPRESSIVE STRENGTH SHALL BE 4,000 PSI AT 28 DAY AGE. COM¬PRES-SIVE STRENGTH SHALL BE DETERMINED BY TESTING ON STANDARD 6 INCH BY 12 INCH CYLINDERS TESTED IN ACCORDANCE WITH ASTM C39.

3.14 SLUMP SHALL BE MAXIMUM 3-INCHES FOR SPREAD FOUNDATIONS AND MAXIMUM 7-INCHES FOR DRILLED PIERS.

3.15 ENTRAINED AIR CONTENT SHALL BE 5½-PERCENT WITHIN THE LIMITS OF +/- 1-PERCENT.

3.16 WHERE INDICATED IN THE CONTRACT DOCUMENTS, FOUNDATION BASE MATERIAL SHALL INCLUDED 6 MIL POLYETHYLENE VAPOR

BARRIER AND CRUSHER RUN LIMESTONE.

3.17 PROPOSED MATERIALS AND MIX SPECIFICATION DETAILS SHALL BE FULLY DOCUMENTED AND REVIEWED BY A TESTING LABORATORY. RESPONSIBILITY FOR OBTAINING THE REQUIRED DESIGN STRENGTH IS THE CONTRACTORS. CONCRETE PROPORTIONS SHALL BE ESTABLISHED ON THE BASIS OF FIELD EXPERIENCE AND/OR TRIAL MIXTURES WITH MATERIALS

EMPLOYED IN ACCORDANCE WITH ACI 318 AND 301.

3.18 THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE TESTING OF CONCRETE BY AN INDEPENDENT TESTING FIRM, APPROVED BY THE OWNER. TESTS WILL INCLUDE SLUMP AND AIR TESTING IN THE

FIELD AND PREPARATION AND STORAGE OF CYLINDERS FOR COMPRESSIVE STRENGTH TESTING.

CONCRETE CYLINDERS SHALL BE PREPARED FROM SAMPLES OBTAINED AT THE POINT OF TRUCK

DISCHARGE PER ASTM 172. THREE CYLINDERS SHALL BE PREPARED FOR EACH 30 CUBIC YARDS OF CONCRETE OR PORTION THEREOF, PLACED IN ONE DAY. CYLINDERS SHALL BE PREPARED, CURED AND TESTED BY THE

TESTING FIRM IN ACCORDANCE WITH ASTM C31 AND ASTM C39. ONE

CYLINDER SHALL BE TESTED AT SEVEN DAYS, ONE AT 28 DAYS, AND ONE KEPT IN RESERVE TO BE

TESTED AS DIRECTED BY THE OWNER. THESE TESTS SHALL BE AT CONTRACTOR'S EXPENSE.

3.19 WHERE THE 28 DAY COMPRESSIVE STRENGTH OF CONCRETE IN ANY TEST CYLINDER DOES NOT SATISFY THE REQUIREMENTS OF THE CONTRACT DOCUMENTS, THE CONTRACTOR SHALL BE HELD RESPONSIBLE FOR ADDITIONAL TESTS AND REMOVAL AND

REPLACEMENT OF UNACCEPTABLE CONCRETE WORK AT NO ADDITIONAL COST TO THE OWNER.

3.20 CONCRETE NOT CONFORMING TO REQUIRED ELEVATIONS, TOLERANCES, OR NOT PROPERLY PLACED OR NOT OF THE SPECIFIED

TYPE AND QUALITY SHALL BE CORRECTED OR REPLACED AT CONTRACTOR'S EXPENSE.

3.21 CONCRETE NOT CONFORMING TO REQUIRED ELEVATIONS, TOLERANCES, OR NOT PROPERLY PLACED OR NOT OF THE SPECIFIED

TYPE AND QUALITY SHALL BE CORRECTED OR REPLACED AT CONTRACTOR'S EXPENSE.

3.22 CONCRETE MIX PROPORTIONS AND STRENGTH TEST RESULTS SHALL EITHER BE PREPARED BY A TESTING AGENCY, PAID BY THE CONTRACTOR AND APPROVED BY THE OWNER, OR BE BASED UPON THE TEST RESULTS OF A SIMILAR MIX MADE IN THE LAST 120 DAYS AND CERTIFIED BY THE CONTRACTOR. MIXES SHALL BE MADE USING AGGREGATES PROPOSED TO BE USED FOR THE STRUCTURE. COMPRESSION TEST CYLINDERS MADE FROM CONCRETE MIXES USING THE COARSE AGGREGATES SPECIFIED SHALL BE TESTED FOR EACH SIZE OF COARSE AGGREGATE SPECIFIED AND USED. TEST CYLINDER AGES SHALL BE 7, 14 AND 28 DAYS FOR EACH SIZE OF COARSE AGGREGATE SPECIFIED. THE CONTRACTOR SHALL CERTIFY COMPLIANCE WITH SIEVE ANALYSES FOR THE AGGREGATES USED. TESTS SHALL BE PERFORMED IN ACCORDANCE WITH ASTM TESTS C31, C39, C143, C172 AND C173 AS

APPLICABLE. TESTS, IF REQUIRED, WILL BE AT CONTRACTOR'S EXPENSE.

3.23 TEST RESULTS OF AGGREGATES TO BE USED FOR CONCRETE SHALL EITHER BE PREPARED BE A TESTING AGENCY, PAID BY THE CONTRACTOR AND APPROVED BY THE OWNER, OR BASED UPON THE TEST RESULTS OF THE SAME MATERIAL SOURCE MADE IN THE MAST 120 DAYS AND CERTIFIED BY THE CONTRACTOR. TESTS SHALL, AT MINIMUM, INCLUDE ASTM C295. IF PETROGRAPHIC EXAMINATION DOES NOT DETERMINE CONCLUSIVELY THAT THE AGGREGATE IS NOT REACTIVE, THEN SAMPLES SHOULD BE TESTED PER ASTM C586 AND CONCRETE TESTS IN 1.04 F, ABOVE, SHALL ALSO INCLUDE ASTM C1105. THE CONTRACTOR SHALL CERTIFY THAT THE AGGREGATES TO BE USED ARE NOT REACTIVE. TESTS, IF REQUIRED, WILL BE AT CONTRACTOR'S EXPENSE.

3.24 THE CONDITION OF ALL FOUNDATION EXCAVATIONS AND OF THE PIER EXCAVATION, ABOVE GROUND FORMWORK, IN PLACE REINFORCING STEEL AND EMBEDDED ITEMS (E.G., ANCHOR BOLTS OR ANCHOR BOLT CAGE) ARE SUBJECT TO FIELD REVIEW BY THE OWNER PRIOR TO PLACING OF CONCRETE. THE REQUIREMENTS OF THE CONTRACT DRAWINGS GOVERN OVER ANY SHOP DRAWINGS USED IN PLACEMENT THEREOF. CONCRETE SHALL NOT BE PLACED UNTIL REINFORCING STEEL AND EMBEDDED ITEMS

HAVE BEEN REVIEWED BY OWNER.

3.25 FOUNDATION EXCAVATIONS AND DRILLED PIER SHAFTS SHALL NOT BE LEFT OPEN OVERNIGHT. CONCRETE SHALL BE POURED IMMEDIATELY AFTER EXCAVATION IS READY AND REINFORCEMENT AND ANCHOR BOLTS ARE SET.

3.26 PRECAUTIONARY PLANS SHALL BE SUBMITTED FOR HOT AND COLD WEATHER CONCRETING FOR REVIEW AT THE SAME TIME THE

REINFORCING PLACEMENT SHOP DRAWINGS ARE SUBMITTED.

3.27 PRECAUTIONARY PLANS SHALL BE SUBMITTED FOR MEETING UNEXPECTED WATER PROBLEMS AND/OR UNEXPECTED SOIL CAVING

PROBLEMS AT THE SAME TIME THE REINFORCING PLACEMENT SHOP DRAWINGS ARE SUBMITTED.

3.28 VERIFY THAT POSITIONING OF REINFORCEMENT AND ORIENTATION OF ANCHOR BOLTS (ANCHOR BOLT CAGE) ARE ACCURATELY PLACED AND SECURELY HELD IN POSITION, AS SHOWN ON THE CONTRACT DRAWINGS, AND THAT THEY WILL NOT BE DISPLACED

DURING CONCRETE POURING.

3.29 VERIFY LINES AND LEVELS BEFORE PROCEEDING WITH FORMWORK.

3.30 HAND TRIM SIDES AND BOTTOMS OF EARTH FORMS; REMOVE DEBRIS, LOOSE AND WET SOIL.

3.31 FORMWORK SHALL BE PROPERLY OILED OR COATED WITH A FORM RELEASE AGENT PRIOR TO THE POURING OF THE REVEALED

ABOVE GROUND LEVEL PORTION OF THE PIER.

3.32 CHAMFER ALL EXPOSED CORNERS A MINIMUM OF ¾”.

3.33 DETAIL CONCRETE REINFORCEMENT AND ACCESSORIES IN ACCORDANCE WITH ACE 315 DETAILING MANUAL. SUBMIT SHOP DRAWINGS FOR APPROVAL, INDICATING ALL FABRICATING DIMENSIONS AND LOCATIONS FOR PLACING REINFORCING STEEL AND ACCESSORIES. FABRICATION SHALL NO COMMENCE UNTIL SHOP DRAWINGS ARE COMPLETED, REVIEWED, AND APPROVED.

WRITTEN DESCRIPTION OF REINFORCEMENT WITHOUT ADEQUATE SECTIONS, ELEVATIONS, AND DETAILS SHALL NOT BE

ACCEPTED.

3.34 REINFORCING STEEL SHALL CONFORM TO ASTM A615, GRADE 60 DEFORMED BARS UNLESS NOTED OTHERWISE.

3.35 TIE ALL REINFORCING STEEL AND EMBEDMENT'S SECURELY IN PLACE PRIOR TO PLACING CONCRETE. PROVIDE SUFFICIENT SUPPORTS TO MAINTAIN THE POSITION OF REINFORCEMENT WITHIN SPECIFIED TOLERANCE DURING ALL CONSTRUCTION

ACTIVITIES. INSTALLING DOWELS INTO WET CONCRETE IS NOT PERMITTED.

3.36 ITEMS TO BE EMBEDDED (E.G., ANCHOR BOLTS) IN CONCRETE SHALL BE PLACED ACCURATELY AND HELD IN THE CORRECT POSITION WHILE THE CONCRETE IS PLACED. THE SURFACES OF METALWORK IN CONTACT WITH OR EMBEDDED IN CONCRETE SHALL BE CLEANED OF ALL RUST, DIRT, GREASE, LOOSE SCALE, GROUT, MORTAR AND OTHER FOREIGN MATTER. AFTER ANCHOR BOLTS (OR ANCHOR BOLT CAGE) HAVE BEEN EMBEDDED AND CAISSON SURFACE FINISHED, THE THREADS ON ANCHOR BOLTS WILL BE THOROUGHLY CLEANED OF ALL CONCRETE, AND SHALL BE PROTECTED BY GREASE, AND BY HAVING THE NUTS SCREWED ON OR BY OTHER ACCEPTABLE MEANS UNTIL THE TIME OF INSTALLATION OF THE POLE OR METALWORK.

3.37 PROVIDE CONTINUOUS REINFORCEMENT WHEREVER POSSIBLE. SPLICE ONLY AS SHOWN OR APPROVED. STAGGER SPLICE WHERE POSSIBLE. USE FULL TENSION SPLICE (CLASS “B”) UNLESS NOTED OTHERWISE. DOWELS SHALL MATCH THE SIZE AND SPACING OF THE SPECIFIED REINFORCEMENT AND SHALL BE LAPPED WITH FULL TENSION SPLICES (CLASS “B”) UNLESS NOTED

OTHERWISE. TERMINATE BARS WITH STANDARD HOOKS.

3.38 REINFORCING STEEL SHALL MAINTAIN THE FOLLOWING CONCRETE COVER, UNLESS NOTED OTHERWISE.

A. CONCRETE AGAINST EARTH (NOT FORMED) 3”

B. FORMED CONCRETE EXPOSED TO EARTH OR WEATHER

#6 THROUGH #18 BARS 2”

#5 BARS AND SMALLER 1 ½”

C. COVER FOR TOP BARS SHALL BE AS REQUIREMENTS FOR CONCRETE EXPOSED TO EARTH AND WEATHER

D. CONCRETE NOT EXPOSED TO EARTH OR WEATHER

SLABS AND WALLS 1”

3.39 DO NOT WELD OR TACK WELD REINFORCING STEEL UNLESS APPROVED OR DIRECTED BY ENGINEER.

3.40 DESIGN AND CONSTRUCTION OF FORMS SHALL CONFORM TO THE FOLLOWING REQUIREMENTS:

A. FORMS SHALL CONFORM TO SHAPE, FORM, AND LINES ON DRAWINGS.

B. ADEQUATE BRACING SHALL BE USED.

C. FORMS SUPPORTED ON GROUND SHALL HAVE ADEQUATE MUD SILLS.

D. QUALIFIED WORKMAN SHALL CONSTANTLY OBSERVE AND ADJUST, AS REQUIRED, ALL SHORES DURING PLACEMENT OF

CONCRETE.

E. CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR THE ADEQUATE DESIGN AND CONSTRUCTION OF ALL FORMS AS SPECIFIED IN

THE CONSTRUCTION DOCUMENTS.

3.41 SHORING SHALL REMAIN IN PLACE UNTIL CONCRETE HAS ATTAINED 75% OF ITS 28 DAY COMPRESSIVE DESIGN STRENGTH.

3.42 ALL REINFORCING STEEL PLACEMENT SHALL BE REVIEWED BY THE CONTRACTOR FOR COMPLIANCE WITH APPROVED SHOP

DRAWINGS AND THE REQUIREMENTS IN THE CONSTRUCTION DOCUMENTS.

3.43 THE FOLLOWING REINFORCING SHALL BE PROVIDED UNLESS NOTED OR DETAILED OTHERWISE:

A. PROVIDE 2'-6” X 2'-6” CORNER BARS OF ALL FOOTINGS, WALLS, BOND BEAMS, ETC.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .