This Invitation for Bids (IFB D26-147) is issued by the Hawaii State Department of Education Procurement and Contracts Branch to solicit sealed bids for comprehensive maintenance and repair services for air conditioning, heat-ventilating equipment, water treatment, and energy monitoring and control systems at various Hawaii Department of Education schools and other state public buildings on the island of Kauai. The solicitation encompasses recurring maintenance tasks (monthly, quarterly, semi-annual, and annual services), emergency and regular repair work, eddy current testing of chiller tubes, water treatment services, and energy monitoring and control system maintenance. Bids must be submitted electronically through the State of Hawaii eProcurement System (HIePRO) no later than 4:30 p.m. Hawaii Standard Time on December 1, 2026. The contract is a guaranteed maintenance service contract with specific performance requirements including maintaining room temperatures between 72 and 75 degrees Fahrenheit and ensuring all air conditioning systems operate satisfactorily. Work is to be performed by trained HVAC certified Journeyman Technicians with a minimum of five years of field experience, adhering to American Society of Mechanical Engineers standards and best commercial practices. All maintenance services shall be performed during normal business hours (7:30 a.m. to 4:00 p.m. Hawaii Standard Time, Monday through Friday, excluding state holidays), unless otherwise requested by the Contract Administrator.

Pricing is structured into two groups: Group A covering Hawaii State Department of Education schools and Group B covering state public buildings, with offerors required to submit annual bid prices for recurring maintenance items and an hourly labor rate for as-needed repairs authorized by the Contract Administrator. The hourly labor rate must be inclusive of all taxes, profits, and associated costs and applies to emergency services, authorized extra work, troubleshooting, Heat Abatement AC repairs, and repairs for vandalism, theft, weather, and calamity-related damages. For authorized repairs due to unforeseen or unusual events, the contractor must submit cost proposals to the Contract Administrator within 48 hours, with compensation including labor and replaced mechanical parts at supplier invoice price plus a markup not exceeding 30 percent. The State compensates for replaced parts and components, while the contractor is responsible for all labor and other costs. As a guaranteed maintenance service contract, this procurement is subject to Hawaii Revised Statutes Chapter 103-55 regarding wage requirements for public contracts exceeding $25,000, requiring services to be performed by employees paid at wages not less than those paid to public officers and employees for similar work. No specific set-asides are identified in the solicitation documentation.

View the file

Other files

File Type Posted
IFB D26 147 Additional offer page.pdf PDF
IFB D26 147 Legal Notice.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

HAWAII STATE DEPARTMENT OF EDUCATION

PROCUREMENT AND CONTRACTS BRANCH

NOVEMBER 16, 2026

INVITATION FOR BIDS

Number IFB D26-147

SEALED BIDS

TO

PROVIDE MAINTENANCE AND REPAIR SERVICES

FOR AIR CONDITIONING AND HEAT-VENTILATING EQUIPMENT,

INCLUDING WATER TREATMENT AND ENERGY MONITORING AND CONTROL SYSTEM

AT VARIOUS HAWAII STATE DEPARTMENT OF EDUCATION SCHOOLS

AND OTHER STATE PUBLIC BUILDINGS

ON THE ISLAND OF KAUAI

will be received through the State of Hawaii eProcurement System (HIePRO) at https://hiepro.ehawaii.gov/welcome.html until 4:30 p.m., Hawaii Standard Time (HST) on

DECEMBER 1, 2026

Offerors interested in responding to this electronic solicitation must be registered on the HIePRO (https://hiepro.ehawaii.gov/welcome.html) in order to participate in this procurement. Registration is free.

Once registered, Offerors can login to view and respond to the HIePRO solicitation.

Questions relating to this solicitation may be directed to Sharon Makabe, Procurement and Contracts Support Specialist, at telephone (808) 675-0130, via facsimile (808) 675-0133, or via email at sharon.makabe@k12.hi.us.

https://hiepro.ehawaii.gov/welcome.html https://hiepro.ehawaii.gov/welcome.html mailto:sharon.makabe@k12.hi.us

PROVIDE MAINTENANCE AND REPAIR SERVICES FOR AIR CONDITIONING AND HEAT-

VENTILATING EQUIPMENT, INCLUDING WATER TREATMENT AND ENERGY MONITORING AND

CONTROL SYSTEM AT VARIOUS HAWAII STATE DEPARTMENT OF EDUCATION SCHOOLS

AND OTHER STATE PUBLIC BUILDINGS ON THE ISLAND OF KAUAI

IFB D26-147

IFB D26-147 OF-1

OFFER PAGE OF-1

Exact Legal Name of Offeror, including “dba” or “division” of a corporation (furnish the exact legal name of the entity under which an awarded contract, if any, will be executed):

Address:

Principal Place of Business

(may not be a P.O. Box):

Mailing Address (only if different):

Payment Address (only if different)

Offeror’s Primary Contact Person:

Name

Title

Telephone Number Fax Number

Email Address

Federal Tax Identification Number:

State of Hawaii General Excise Tax License Number:

Type of Business Entity (check one):

Sole Proprietor Partnership Corporation Joint Venture Limited Liability Company Other

Names of all Offeror’s parent, affiliate and subsidiary organizations:

Offeror is either:

A Hawaii business incorporated or organized under the laws of the State of Hawaii; OR

A Compliant Non-Hawaii business incorporated or organized under the laws of the State of on (date) _____________, and, if applicable, registered with the State of Hawaii Department of Commerce and Consumer Affairs Business Registration Division to do business in the State of Hawaii.

The undersigned has carefully read and understands the terms and conditions specified herein and hereby submits the following offer to provide the goods and/or perform the work specified herein, all in accordance with the true intent and meaning thereof, and further that the Offeror shall comply with all terms, conditions and requirements of the solicitation. The undersigned further understands and agrees that by submitting this offer, 1) the undersigned is declaring the undersigned’s offer is not in violation of Chapter 84, Hawaii Revised Statutes, concerning prohibited State contracts, and 2) the undersigned is certifying that the price(s) submitted was (were) independently arrived at without collusion.

Authorized (Original in ink) Signature Name (printed)

Title Date

The following offer is hereby submitted:

Group A: Hawaii State Department of Education Schools

Item Total Bid Price (Annual)

Item Description Annual Estimated Hours (A)

*Unit Bid Price Hourly Labor Rate

(B)

Total Bid Price (A multiplied by B)

5 As-Needed Repairs Authorized by the Contract Administrator (CA) 200

SUBTOTAL BID PRICE FOR GROUP A (ITEMS 1 THROUGH 5)

Group B: State Public Buildings

Item Total Bid Price (Annual)

Item Description Annual Estimated Hours (A)

*Unit Bid Price Hourly Labor Rate

(B)

Total Bid Price (A multiplied by B)

5 As-Needed Repairs Authorized by the Contract Administrator (CA) 20

SUBTOTAL BID PRICE FOR GROUP B (ITEMS 1 THROUGH 5)

TOTAL SUM BID PRICE (FOR GROUP A AND GROUP B)

Offeror:

*This hourly rate shall be used as the Hourly Labor Rate for all cost proposals for as-needed repairs on ductless split units or other systems authorized by the CA, including Emergency Service, Authorized Extra Work, Troubleshooting and repair for Heat Abatement AC, or authorized repairs attributed to vandalism, theft, weather and other calamity-related damages as determined by the CA, and shall be inclusive of all taxes, profits and other associated costs. All as-needed repairs and other repairs authorized by the CA, along with authorized subcontracted work, shall be paid by purchase order.

Description

Recurring Maintenance and Repairs for Air Conditioning and Heat-Ventilating Equipment (Total of Monthly, Quarterly, Semi-Annual, and Annual Services)

Eddy Current Testing (Total of Eddy Current Testing)

Description

Recurring Maintenance and Repairs for Air Conditioning and Heat-Ventilating Equipment (Total of Monthly, Quarterly, Semi-Annual, and Annual Services)

Eddy Current Testing (Total of Eddy Current Testing)

Water Treatment Service of Air Conditioning System

Maintenance and Repair Services of the Energy Monitoring and Control System

Water Treatment Service of Air Conditioning System

Maintenance and Repair Services of the Energy Monitoring and Control System

OFFER PAGE

IFB D26-147 OF-2

Wage Certificate (Rev. 01.05.2022)

WAGE CERTIFICATE

Subject:

Project Number IFB D26-147

Project Description

Provide Maintenance and Repair Services for Air Conditioning and Heat-Ventilating Equipment, including Water Treatment and Energy Monitoring and Control System at Various Hawaii State Department of Education Schools and Other State Public Buildings on the Island of Kauai

Pursuant to §103-55, HRS, I hereby certify that, if awarded a contract in excess of $25,000.00, the services to be performed will be performed in accordance with the following conditions:

1. The services to be rendered shall be performed by employees paid at wages or salaries not less than wages paid to the public officers and employees for similar work, if similar positions are listed in the classification plan of the public sector.

Services Performed by Laborers and Mechanics:

The Contractor or the Contractor’s subcontractor shall give a copy of the rates of wages to each laborer and mechanic employed under the contract by the Contractor at the time each laborer and mechanic is employed; provided that the Contractor does not have to provide the Contractor’s employees the wage rate schedules where there is a collective bargaining agreement.

2. All applicable laws of the Federal and State governments relating to workers’ compensation, unemployment compensation, payment of wages, and safety will be fully complied with.

Contractor shall be obliged to notify its employees performing work under this contract of the provisions of §103-55, HRS, and the current wage rate for public employees performing similar work. The Contractor may meet this obligation by posting a notice to this effect in the Contractor’s place of business accessible to all employees, or the contractor may include such notice with each paycheck or pay envelope furnished to the employee

I understand that, in addition to the base wages required by §103-55, HRS, all payments required by Federal and State laws that employers must make for the benefit of their employees shall be paid.

Offeror

Signature

Title

Date

SPECIFICATIONS S-1

SPECIFICATIONS

I. SCOPE OF SERVICES

The CONTRACTOR shall furnish all labor, materials, parts, tools, lubricants, refrigerant, equipment, transportation, and supervision necessary for the complete inspection, maintenance, and repair services to the air conditioning (AC) and heat-ventilating, and Heat Abatement equipment, including Water Treatment and Energy Monitoring and Control System located at the various Hawaii State Department of Education schools and other State public buildings on the island of Kauai as listed herein on the attached Exhibit B – Equipment Schedule and Price Breakdown. The CONTRACTOR shall completely guarantee the satisfactory operation of all air conditioning and ventilating systems within the scope of this Contract such that the room temperature can be maintained between seventy-two (72) degrees Fahrenheit and seventy-five (75) degrees Fahrenheit unless otherwise directed by the Contract Administrator (CA).

II. DESCRIPTION OF WORK

This is a Guaranteed Maintenance Service Contract. The Contract shall include the following:

A. Maintenance Work

The CONTRACTOR shall be totally responsible for all costs necessary for the maintenance services of all systems and/or equipment listed herein for complete and satisfactory operation, including but not limited to, responding to all schools and State public building trouble calls or work orders regardless of the reason(s) for the call.

The CONTRACTOR shall complete all maintenance services in a timely and reasonable fashion.

The CONTRACTOR shall strictly adhere to the approved maintenance schedule and shall complete all maintenance services without delays.

B. Repair Work

The STATE shall compensate the CONTRACTOR for replaced mechanical part or component and the connected accessories and the CONTRACTOR shall be responsible for all labor and other costs.

For more details, please refer to Section VIII Parts and Materials.

The guaranteed full-service maintenance Contract shall not relieve the CONTRACTOR from performing the specified schedule of maintenance service and repair service.

The CONTRACTOR shall perform full guaranteed maintenance and repair services, including, but not limited to, inspections, recurring maintenance, responding to trouble calls, troubleshooting, performing repair work, coordinating troubleshooting and repairs for Heat Abatement AC, emergency service, and re-setting air conditioning equipment schedule as requested by the STATE for all equipment included in this Contract. Complete maintenance and repair services shall cover all equipment and appurtenances that are not listed but are part of the system, including but not limited to Variable Air Volume (VAV) boxes, Variable Frequency Drives (VFDs), actuators, sensors, valves, duct smoke detectors, all air conditioning and heat ventilation equipment controlling devices, and motorized dampers. These services shall be performed by trained Heating, Ventilation and Air- Conditioning (HVAC) certified Journeyman Technicians with a minimum of five (5) years of field experience in accordance with the requirements of the latest edition of the American Society of Mechanical Engineers standards and all other applicable laws, including, but not limited to regulations, rules ordinances, codes, and the best commercial practices governing the maintenance of the types of air conditioning systems and services as specified herein or the manufacturer’s original specifications, whichever is more stringent.

SPECIFICATIONS S-2

The CONTRACTOR shall repair or replace all worn, failed or doubtful components and parts, regardless of cause, to ensure satisfactory operation of the air conditioning and ventilation equipment.

Replacement parts shall be new, standard parts manufactured by the maker of each unit or of equal design and quality to maintain systems integrity and serviceability. Replacement equipment and coils shall be coated with corrosion protection coatings. The coils shall be coated with Blygold ‘Polual’ or Thermoguard or MicroGuard with a three (3) year warranty. Cabinets and exterior surfaces shall be coated with Polysiloxane-PSX 700 or Thermoguard with a three (3) year warranty. Coating shall be applied to all interior and exterior surfaces until a total of six to eight (6-8) mils dry film thickness (DFT) is achieved. Coating shall be applied in strict accordance with coating manufacturer’s recommendations. After the coating has totally cured, the equipment shall be assembled using care not to damage the coating during assembly and installation. If damage occurs, repair or touch up shall be performed onsite with approved coating material and shall be performed in accordance with the manufacturer's recommendations. The coating shall be performed by an experienced applicator qualified by the State. A certified test report for the required coating of six to eight (6-8) mils DFT shall be submitted for review and approval by the CA or authorized representative.

The CONTRACTOR shall be responsible for the electrical and built-in controls (except Direct Digital Controls (DDC) web control system) of each unit from the disconnect switch to the unit, including all electrical problems. Any questions as to the satisfactory performance of maintenance service and repairs and the satisfactory operation of all equipment and systems shall be determined by the CA.

The CONTRACTOR shall maintain a supply of parts and materials that are required for typical or normal repairs of the air conditioning units.

Should the CONTRACTOR elect to purchase parts from the mainland at reduced prices, even though the part is available locally, the STATE reserves the right to require the CONTRACTOR to air express (next day delivery) the parts at the CONTRACTOR’s expense.

The CONTRACTOR shall include all costs necessary to maintain a supply of refrigerant (virgin or equal quality) for the life of the Contract and shall maintain a record of refrigerant usage for each location and comply with all government regulations, and shall indemnify and defend the STATE from all legal and financial liabilities with regard to these regulations. Recovery or storage of refrigerant shall be included in the Offeror’s bid price and at no additional cost to the STATE.

Topping off, refilling and/or recharging refrigerant for maintenance and repair work shall be included in the Offeror’s bid price.

The CONTRACTOR shall not be responsible for repairs due to flagrant vandalism, fire, storm, flood, lightning and/or other damages caused by unforeseen or unusual events as determined solely by the CA. However, the CONTRACTOR shall be responsible for such repairs if the damages are caused by the CONTRACTOR’s failure to properly maintain and repair the equipment, for example, failure to reinstall protective covers causes motor to burn during rainstorm. In addition, the CONTRACTOR shall not be responsible for regular or scheduled maintenance service for the newly installed Heat Abatement Ductless Split AC Units powered either by Electric or Photovoltaic (PV) system.

However, troubleshooting and repair work on the Heat Abatement AC Units shall be performed by the CONTRACTOR only if ordered by the CA. For repair work which can be attributed to a cause beyond the CONTRACTOR’s control, including troubleshooting and repair work ordered by the CA for the newly installed Heat Abatement Ductless Split AC Units, the CONTRACTOR shall submit a cost proposal to the CA per Section IX – As-Needed Repairs Authorized by the Contract Administrator (CA).

C. Repairs Due to Unforeseen or Unusual Events

When a repair due to unforeseen or unusual event is authorized by the CA, the CONTRACTOR shall promptly, within forty-eight (48) hours, provide a written cost proposal for the repair to the CA for approval. The cost proposal shall contain at least the following information: All equipment information (for example, identification (ID), location), the STATE’s work order (WO) number, SPECIFICATIONS S-3 description of the issue or work to be done, materials or parts and equipment cost, material’s or part’s estimated time of arrival (ETA), estimated completion date, and any additional supporting information to justify costs.

If the cost proposal for the repair is approved by the CA, a purchase order (PO) and/or supplemental contract will be issued to the CONTRACTOR which will serve as authorization and notice to proceed with the repair. The STATE shall not be held responsible for payment of any unauthorized work. The STATE shall compensate the CONTRACTOR for labor, and replaced mechanical parts, units or components and the connected accessories at supplier’s invoice price plus a mark-up not exceeding thirty percent (30%), which shall include the cost of material, overhead, profit, taxes and any other incidental expenses. The CONTRACTOR will be reimbursed for shipping cost, if applicable.

A service report shall be prepared by the CONTRACTOR which shall contain at the least the following information: date of service, all equipment information (for example, ID, location), STATE’s Maximo WO number and PO number, if applicable, the name of the technician(s), the detailed summary of work performed, the name and the signature of the authorized person certifying the completed work. A service report shall be prepared for each day of work for work requiring multiple days to complete. In addition to the service report, the CONTRACTOR shall also submit before and after photos that will clearly show the before conditions of the existing or replaced components and/or parts and the completed repair with the new components and parts.

If the CA and the CONTRACTOR cannot agree on the price, the STATE reserves the right to make other arrangements to complete the repair work including but not limited to a formal STATE solicitation which the CONTRACTOR can participate on.

The STATE reserves the right to request expedited shipping of parts either by air freight or air express (next day delivery), if not available locally, at the expense of the STATE.

III. GENERAL REQUIREMENTS

A. RECURRING MAINTENANCE REQUIREMENTS

The CONTRACTOR shall be totally responsible for all tasks and costs necessary for accomplishing the recurring maintenance tasks as specified in the following sections including for all electrical components of the air conditioning system including the testing and/or replacement of the breakers.

The required recurring tasks shall consist of thorough maintenance work in accordance with the best commercial practices governing the maintenance of air conditioning and heat ventilating systems.

Where parts are worn out and cannot be restored, the CONTRACTOR shall replace these parts with new parts. Only new, standard parts manufactured by the maker of each unit or parts of equal quality shall be used. All parts and materials, including the refrigerant, at a minimum, need to be refilled, oiled, and lubricated at no additional cost to the STATE. Coil cleaning, including but not limited to, coil chemical cleanings, if necessary, shall be implemented at no additional cost to the

STATE.

Recurring Maintenance Tasks:

1. Air Handling Units and Fan Coil Units

Monthly Service CONTRACTOR shall perform the following services on a montly basis:

a. Clear and clean all drip pans and flush all related condensate drain lines with compressed air, water, nitrogen or other applicable means. (CONTRACTOR may be liable for water damages due to clogged drains). Install pan tablets if necessary to

SPECIFICATIONS S-4

control algae. Tablets shall not block drain hole at any time they are used in drip pans.

CONTRACTOR shall be responsible for drain lines up to where it enters the wastewater system.

b. Change all disposable air filters including automatic filters as required, but at least once every two (2) months or sooner if needed; use two (2) inch pleated, thirty percent (30%) efficiency type-FARR 30/30 or equal. The CONTRACTOR shall use the correct filter size for each equipment and shall not stack filters in the flow direction. The washable filters shall be washed at least once a month or sooner if needed. Filters shall be hand marked with the date of installation using a permanent ink marker by the technician servicing the equipment. Markings shall be easily readable with a one (1) inch minimum height font size. With the exception of Ductless Split Units, all new filters shall be positioned so that the markings are visible without having to remove the filters.

c. Wash permanent type filters in accordance with manufacturers specifications with detergent approved by the CA, and spray coat the washed filter with a HVAC industry approved filter treatment solution. Replace permanent type filters that are worn.

d. With the exception of Ductless Split Units, lubricate and oil all fan and motor bearings, and connections of dampers and vanes. Check controls to ensure proper operation.

e. Check all drives for wear; adjust belt tension. Replace belt as required.

f. Check ultraviolet C (UVC) lights and replace them if they are not working. As a minimum, UVC light shall be replaced every twelve (12) months. See Annual Service for details.

g. Check carbon dioxide (CO2) monitor systems; repair and/or replace items as needed to keep the systems operating properly.

Recalibrate the CO2 monitor system per manufacturer’s recommendations. Calibration of the interior CO2 sensor shall consist of comparison with readings from an outside CO2 sensor that has been calibrated and is used as the control sensor; only a relative comparison is required. Calibrate the interior sensor if the reading differs by more than seventy-five (75) parts per million (ppm). Replace CO2 sensor if it is inoperative.

h. Check back-draft and motor-controlled dampers and operators for proper operation;

lubricate linkage for free movement.

i. Operate equipment to check for proper operation, unusual noise and vibration. Adjust, repair, and correct all discrepancies before certifying service report.

Semi-Annual Service CONTRACTOR shall perform the following services on a semi-annual basis:

a. Except for Ductless Split Units, adjust alignment of bearings and sheaves, lubricate fan and motor bearings. Replace worn or noisy bearings or sheaves.

b. Wash cooling coils and clean all dirt accumulation, using CA approved cleaning method, including water washer, steam or surfactant chemical coil cleaner (alkali or acidic cleaners are not allowed) as necessary. UVC lights shall be fully protected during washing operations. Damaged lights shall be replaced. The CONTRACTOR shall submit to the CA a list of proposed chemical coil cleaning solution for approval. If the CONTRACTOR is found to be using a cleaning solution that is non-compliant with manufacturer’s specifications or not approved in writing by the CA the CONTRACTOR shall be required to purchase and use a cleaner selected by the CA. If the STATE

SPECIFICATIONS S-5

specifies a chemical coil cleaner, the CONTRACTOR shall furnish the chemical coil cleaner and, with all due diligence, shall use it according to the product manufacturer's recommendations and Material Safety Data Sheets (MSDS). The CONTRACTOR will also be responsible to correct any damage to the HVAC system linked to the use of improper or unapproved cleaning products.

The CONTRACTOR shall document the completed coil cleaning by taking before and after photos of the coils. The before and after photos shall be taken at the same angle and shall show the whole coil. The photos shall be clear and not blurry. The photos shall be submitted as part of the backup documents for the Semi-Annual Maintenance invoice.

c. Except for Ductless Split Units, all supply and return air and supply air grilles, register and diffusers and exterior surfaces of all related air conditioning equipment shall be vacuumed and wiped clean. Use High-Efficiency Particulate Air (HEPA) vacuum and filter; use vacuum hose extension kit to reach within a foot deep of the adjoining interior section of air conditioning duct to remove accumulated dust or debris, being extra-careful not to cause any damage to the duct's interior insulation or lining. Clean fresh air intake grille and damper, and repair and/or replace deteriorated bird and/or insect screens.

d. Check and adjust belt tension with deflection gauge and replace worn belts.

e. Operate equipment to check for proper operation, unusual noise. Adjust, repair, and correct all discrepancies before certifying service report.

Annual Service CONTRACTOR shall perform the following services on an annual basis:

a. Except for Ductless Split Units, check pressure drop and temperature differential across coils, and log readings. Clean strainers and check vents and drains on chill water coils.

b. Secure all loose housing, seal leaks, and touch-up paint after treating and cleaning all rust.

c. Except for Ductless Split Units, replace all UVC light tubes that have not been replaced since the last annual service. The UVC light replacement date (MM/DD/YY) shall be written or marked on the light bulb using a permanent marker. Ensure that UVC light is operating and replace if it is not working. UVC light bulbs shall be replaced every twelve (12) months at a minimum. Following execution of the Contract, a UVC light replacement schedule shall be submitted to the CA for approval. The CONTRACTOR shall submit backup documentations such as order or bill of lading or delivery sheets and invoices to prove that replacement UVC lights were ordered, delivered and installed. The backup documents shall be attached to the CONTRACTOR's Annual Maintenance invoice. The invoice will not be processed unless the aforementioned backup documents are submitted and the UVC lights are replaced.

d. Replace all fresh intake filter bags, with new bags where applicable.

e. Check condition of insulation; repair and/or reinsulate properly and immediately, including any adjustments made to the insulation when required to make repairs, or upon discovery or notification.

f. Calibrate pneumatic and/or electric temperature controls.

g. Clean all fan wheels and interior housings.

SPECIFICATIONS S-6

h. Except for Ductless Split Units, check for VAV boxes. Locate and exercise every VAV box primary air damper to verify it responds to “open-close” commands. Adjust, repair or replace the components or the whole VAV terminal as required to provide full operational function.

i. Operate equipment to check for proper operation, unusual noise and vibration. Adjust, repair, and correct all discrepancies before certifying service report.

2. Temperature Controls

CONTRACTOR shall perform the following services on a monthly basis:

a. Check all DDC, electric or pneumatic control thermostats, controllers, smoke detectors, control dampers, control valves and actuators for proper operation; lubricate, adjust, recalibrate or replace as required. Adjust classroom thermostats between seventy-five

(75) degrees Fahrenheit unless otherwise directed by the CA.

b. Check control dampers, at a minimum, for tight closing, bent blades, defective linkage.

Rusted linkages and blades shall be replaced with new parts.

c. Verify cooling equipment stages on and off optimally.

d. Verify compressors are loading and unloading.

e. Verify all adjustable speed drives are functioning and functioning in accordance with control strategy.

f. Verify soft starters are working properly.

g. Verify air conditioning equipment has staggered start times to reduce peak electricity demand.

h. Verify unoccupied spaces have cooling equipment turned off or set points are at setback temperatures.

i. Verify schedules that are overridden are returned to their normal operating mode.

j. Operate equipment to check for proper operation.

a. Replace worn parts or complete controls with new or reconditioned equivalents, as conditions warrant.

b. Replace all worn contactors.

c. Operate equipment to check for proper operation.

3. Packaged Water Chiller, Reciprocating Compressor, Air-Cooled Condenser and/or

Condensing Unit

SPECIFICATIONS S-7

a. Check and record entering and leaving water temperatures and pressures of chilled water and water-cooled condenser in the "maintenance log book."

b. Check and record refrigerant compressor suction and discharge and oil pressures in the

"maintenance log book.".

c. Visual check for water, refrigerant and oil leakage; correct or repair as required. Check vibration isolator mounts.

d. Check compressor, fan, and motor bearings for abnormal temperature and unusual noise; lubricate and/or replace as required.

e. Check refrigerant sight glass; change filter and/or drier if moisture indicated (Direct Expansion (DX) system). Check compressor oil level and add oil as required.

f. Check air-cooled condenser fans, sheaves, and belts. Adjust tension or replace as required.

g. Adjust alignment of bearings and sheaves for fans, motors, and compressors, and replace worn or noisy bearings or sheaves.

h. Note and run system operation through complete operating cycle and adjust for proper operation.

i. Operate equipment to check for proper operation, unusual noise and vibration.

j. Adjust chilled water temperature setting for seasonal change. (Winter: October 15th through April 30th; Summer: May 1st through October 14th). Annotate date changed and temperature settings in the “maintenance log book”.

k. Certify performance of monthly maintenance service and correct and report all discrepancies.

Quarterly Service CONTRACTOR shall perform the following services on a quarterly basis:

a. Check chiller response at various cooling load conditions for proper operation and calibration of capacity control system and record settings in recurring maintenance.

b. Check operation of freeze stat and oil failure switch; record settings in the “maintenance log book”.

c. Clean condenser coils of all dirt and/or salt accumulation with water, steam or surfactant chemical coil cleaning solution (alkali or acidic cleaners are not allowed) (air-cooled).

The STATE reserves the right to specify a chemical coil cleaning solution to be used if the STATE sees necessary or if CONTRACTOR’s cleaning solution is found non-compliant, without any additional cost implication to the STATE. If STATE specifies a chemical coil cleaner, the CONTRACTOR shall furnish the chemical coil cleaner and, with all due diligence, shall use it according to the product manufacturer’s recommendations and MSDS. The CONTRACTOR will also be responsible to correct any damage to the HVAC system linked to the use of improper or unapproved cleaning products.

The CONTRACTOR shall document the completed coil cleaning by taking “before and after” photos of the coils. The before and after photos shall be taken at the same angle

SPECIFICATIONS S-8

and shall show the whole coil. The photos shall be clear and not blurry. The photos shall be submitted as part of the backup documents for the Quarterly Maintenance invoice.

d. Test and adjust "make-up" water and expansion tank.

e. Operate equipment to check for proper operation, unusual noise and vibration.

f. Certify performance of quarterly maintenance service and correct and report all

a. Remove heads of condenser and internally brush tubes at the same time cooling tower is cleaned (water-cooled); coordinate with Water Treatment Contractor (WTC) and point of contact (POC).

b. Lubricate all fan, motor, and pump bearings as required.

c. Certify performance of semi-annual maintenance service and correct and report all

a. Have compressor crankcase oil analyzed and submit written report; replace if contaminated; clean or replace strainer and oil filter.

b. Check and clean or replace all strainers, filters, and refrigerant and/or driers.

c. Megger compressor motor and submit report; check starter relay and control contacts and electrical connections for tightness and clean as required.

d. Add chilled water chemicals as necessary.

e. Test operate control switches, compressor unloading and safeties; calibrate and record settings. Adjust as required.

f. Check and clean all unit housings (inside, outside, and components), seal leaks, and remove rust from exterior component and touch-up paint with matching color, immediately upon discovery or notification.

g. Check condition of insulation; re-insulate properly and immediately, including any adjustments made to the insulation when required to make repairs, or upon discovery or notification.

h. Operate equipment to check for proper operation, unusual noise and vibration.

i. Certify performance of annual service, report and correct all discrepancies. Submit maintenance report in writing to CA within thirty (30) days of service.

4. Ventilating Fans (Part of Air Conditioning System)

SPECIFICATIONS S-9

a. Check back-draft and motor-controlled dampers and operators for proper operation;

lubricate linkage for free movement.

b. Lubricate fan and motor bearings.

c. Check belt wear and tension; adjust or replace as needed.

d. Check sheaves for wear, replace as needed.

e. Check fan collar, bearings and shaft for wear, repair or replace as needed.

f. Replace air filters where installed.

g. Operate equipment to check for proper operation, unusual noise and vibration.

a. Check and clean fan wheels and housings of dust, dirt, and grease.

b. Remove and wash all intake and/or exhaust or supply grilles, registers, louvers and dampers; repair or replace deteriorated bird and/or insect screens.

c. Change air filters as required.

d. Operate equipment to check for proper operation, unusual noise and vibration.

5. Pumps

a. Check packing glands and seals on all water pumps for excessive leakage. Adjust, tighten, repair, or replace as required.

b. Lubricate; and check pump and motor bearings including pump couplings for abnormal temperature and unusual noise or vibration and repair and/or replace as needed. Check pump and motor shafts for proper alignment and re-align as necessary and provide new couplings.

c. Operate equipment to check for proper operation, unusual noise and vibration.

a. Remove and clean strainer for all condenser pumps after tower cleaning.

b. Check and blow down strainer to chilled water pumps. Remove and clean strainer if excessive debris is noted.

c. Check condition of insulation; repair and/or re-insulate properly and immediately, including any time disturbing of insulation is required to make repairs, or upon discovery or notification.

d. Log suction and discharge pressures and motor amperes for all pumps in the maintenance checklist.

SPECIFICATIONS S-10

e. Clean and remove all dust and foreign matter. Clean all rust spots and scratches and touch up paint with matching color, immediately upon discovery or notification.

f. Check motor coupling for alignment; mounting bolts are secure. Cracked and deteriorated rubber coupling inserts shall be removed and new coupling inserts shall be provided once shaft alignment is checked and corrected.

g. Operate equipment to check for proper operation, unusual noise and vibration.

6. Packaged or Split DX Air Conditioning Units

a. Perform the monthly tasks of Item 1 - Air Handling Units and Fan Coil Units and Item

3 - Packaged Water Chiller, Reciprocating Compressor, Air Cooled Condenser and Condensing Unit.

b. Certify performance of all services, report and correct all discrepancies. Submit maintenance report in writing to the CA.

a. Perform the quarterly tasks of Item 3 - Packaged Water Chiller, Reciprocating Compressor, Air-Cooled Condenser and Condensing Unit

a. Perform the semi-annual tasks of Item 1 - Air Handling Units and Fan Coil Units and Item 3 - Packaged Water Chiller, Reciprocating Compressor, Air-Cooled Condenser and Condensing Unit

a. Perform the annual tasks of Item 1 - Air Handling Units and Fan Coil Units and Item

3 - Packaged Water Chiller, Reciprocating Compressor, Air-Cooled Condenser and Condensing Unit

7. Standby and Lead-Lag Equipment (including, but not limited to, Pumps and Chillers), Control Panel Switches and Time Clocks

SPECIFICATIONS S-11

a. The CONTRACTOR shall be responsible for the operational changeover of all standby and lead-lag equipment (monthly, unless otherwise indicated).

b. Check lead-in wires to see that all connections are tightly secured. Clean contacts, replace if necessary.

c. Check and adjust time settings as directed or required. Charge battery for back-up if applicable, as necessary.

d. Should time clock fail - replace with electronic type with capacitance back up (Batteries are NOT ALLOWED).

e. Should bypass timer switch fail - replace with adjustable four (4)-hour programmable electronic selector switch or push button; add and/or revise wiring as necessary.

f. Should insects and/or vermin enter device housings, clean and correct housing by providing door gaskets, screens over air vents, and seal conduit openings entering the housing.

g. Operate equipment to check for proper operation.

a. Thoroughly clean out all dust and dirt from inside of housing by wiping down exterior with shop towels.

b. Check and tighten loose fasteners and adjust spring tensions as required.

c. Check and operate all release mechanisms to see that they are in proper working order.

d. Clean out all dust and dirt from inside of all control and/or electrical panels by using dry compressed nitrogen to blow out dust and foreign matters.

e. Operate equipment to check for proper operation.

8. Centrifugal and Screw Chiller

a. Check and record all chiller water and/or condenser water temperatures and pressures, including but not limited to head pressure, oil pressure and system pressure; and check oil heater.

b. Check oil pump operation; service purge compressor and purge system.

c. Check for refrigerant and oil leakage; recharge system.

d. Adjust chilled water temperature setting for seasonal changes.

e. Check, adjust, and calibrate the oxygen and refrigerant monitor and alarm system.

f. Certify monthly performance of chiller operation and maintenance service. Correct and report all discrepancies.

SPECIFICATIONS S-12

g. Check purging controls. If purge pump activates frequently, check for leaks and report.

h. Check moisture indicating a sight glass and drain water accumulation. If excessive moisture is present and pump does not cycle, check for source of water leak.

i. Check oil level in cup on the control modulating motor and refill as required (Carrier).

j. Turn oil filter handle on sump cover, two (2) or three (3) revolutions (Trane).

k. Review daily operating log for abnormal conditions and report any discrepancies. Wipe down chiller and check operation of all gauges and indicating lamps.

l. Certify that equipment has received monthly service and submit written service report to

CA.

a. Check chiller response at various load conditions for proper operation and calibration of capacity control system.

b. Check safety and purge controls; record settings.

c. Certify performance of quarterly service and correct and report all discrepancies.

a. Remove heads of condenser and internally brush tubes at the same time cooling tower is cleaned; coordinate with WTC and POC.

b. Perform pressure test to detect refrigerant leaks.

c. Check condition of insulation; repair and/or reinsulate properly and immediately, including any time disturbing of insulation is required to make repairs, or upon discovery or notification.

d. Certify performance of semi-annual service and correct and report all discrepancies.

e. Check, test, and adjust all safety controls, switches, loading and unloading of the chiller;

record settings for each machine on tags and affix to machine.

f. Check and report any oil pump wear and oil leaks.

g. Check functioning of all control valves, gauges, thermometers. List defective items and submit written report to CA.

h. Clean purge drum, lubricate purge motor bearings, and adjust belt tension (Trane).

i. Clean and remove all dust and foreign matter in the chiller control panels with air or other safe means.

j. Test and adjust "make-up water" for chilled water system.

SPECIFICATIONS S-13

k. Lubricate vane linkage arms (Trane). DO NOT LUBRICATE VANE LINKAGE

BELLOWS ASSEMBLY OR THE SHAFT OF THE PNEUMATIC VAN OPERATOR.

l. Check purge unit inlet drier cartridge and replace.

m. Check and record motor amperage for each chiller for twenty-four (24)-hour period.

Adjust lead-lag controls for each chiller as directed by the POC. Adjust chiller control to obtain proper loading and cycling for optimum running.

n. Clean all rust spots and scratches and touch-up paint with matching color.

o. Certify that chiller has received semi-annual service and submit semi-annual maintenance report including recommendations for each chiller to the CA.

Note: It is the CONTRACTOR’s responsibility to keep chillers running at a high efficiency with minimum downtime for repairs. The CONTRACTOR shall repair the equipment as required based on oil and vibration analyses, purge counts, and other maintenance checks to ensure machinery is not operated to failure and proper, timely repairs are accomplished to prevent breakdown.

An annual service preventive maintenance schedule for all chillers shall be provided to the CA within thirty (30) days after full execution of this Contract. Annual services and inspection shall include, but is not limited to:

a. Oil Analysis: CONTRACTOR shall have chiller and purge compressor oil analyzed. This shall include a full spectrum analysis to be collected under Environmental Protection Agency (EPA) guidelines. The spectrochemical analysis shall test for wear and corrosion elements in the oil sample. This shall include, but not be limited to: iron, chromium, aluminum, lead, silicon, tin, and zinc. Reported results shall be in ppm. The Karl Fisher method shall determine the water content of the oil. The CONTRACTOR shall submit an annual written report to the CA within fourteen (14) days of the oil analysis receipt. The report shall include the CONTRACTOR’s “expert” evaluation and recommendations for repairs if any are required; i.e., including but not limited to, seal replacements, overhauls, along with a cost proposal for repairs.

b. Vibration Analysis shall be conducted annually prior to the oil analysis and a baseline trend established, charted, and compared with the manufacturer’s specifications. This trend chart shall be provided to the CA as part of the annual written report.

CONTRACTOR shall make recommendations for repairs, if required, based on the results of analyses.

c. Annually brush one hundred percent (100%) of the condenser tubes. Remove heads of condenser and internally brush tubes at the same time cooling tower is cleaned;

coordinate with WTC.

d. Inspect starters for proper operation.

e. Check, adjust, and calibrate all safety switches and alarms for proper operation. This shall include, but not be limited to:

1) High-pressure cutoff;

2) Low-pressure cutoff;

3) Low oil pressure switch;

4) Oil pump timers;

SPECIFICATIONS S-14

5) Flow switches;

6) Pump interlocks;

7) System monitor timers;

8) System freeze stats;

9) Vane closing switches; and

10) Oxygen and /or refrigerant monitor and alarm system.

f. Check operation of all operating controls, which includes but is not limited to:

1) Temperature control stats;

2) Motor load limit controls;

3) Vane operation controls; and

4) Variable frequency drive units (if applicable).

g. Check operation of chiller unit, which includes but is not limited to:

1) Leak check compressor fittings and terminals;

2) Leak check purge compressor (if applicable);

3) Leak check oil pump and fittings;

4) Leak check relief valves and rupture disk; and

5) Service surge compressor and purge system.

h. Check operation of main starter, which includes but is not limited to:

1) Examine contacts on all electrical connections;

2) Verify overload and trip settings; and

3) Test all electrical connections.

i. Make recommendation to clean and/or wash any air cooled coils including chemical solution as required.

j. The CONTRACTOR shall brush one hundred percent (100%) all the condenser tubes once every year and Eddy Current Test one hundred percent (100%) of the condenser tubes no less than one (1) time every five (5) years. The technician performing such tests must hold a current Level 2 certification from American Standard for Nondestructive Testing (ASNT) standard SNT-TC-1A. Proof of this certification shall be included with Offeror’s proposal.

The CONTRACTOR shall brush one hundred percent (100%) all the evaporator tubes at least once every five (5) years or as needed. For this Contract, CONTRACTOR shall brush all evaporator tubes within the first year of this Contract and shall brush them again if needed.

k. The standard requirement is to Eddy Current Test one hundred percent (100%) of the evaporator tubes no less than one time every five (5) years. For this Contract, the CONTRACTOR shall perform all eddy current testing within the first year of this Contract. Priority shall be based on the observed condition of the system (taken during the initial survey); for example, worst conditions shall be accomplished first.

The technician performing such tests must hold a current Level 2 certification from American Standard for Nondestructive Testing (ASNT) standard SNT-TC-1A.

l. CONTRACTOR must brush tubes (condenser and evaporator) before each Eddy

Current Test is performed. Priority shall be based on the observed condition of the system (taken during the initial survey); for example, worst conditions shall be accomplished first.

m. Megger Insulation Test on compressor motor. Megger chiller and oil pump motors, check relay contacts and electrical connections. Establish baselines for future comparisons. CONTRACTOR shall make recommendations as required.

SPECIFICATIONS S-15

n. Electronic leak test entire system and repair leaks.

o. Inspect starter panel and main contacts for pitting and burring. Clean contacts and/or repair as necessary. Torque all connections and clean starter.

p. Copy of annual inspection report (CONTRACTOR’s form) shall be forwarded to CA for formal review.

q. Clean or back flush heat exchanger. CONTRACTOR shall also replace oil filter and oil return filter and/or driers (external and internal), CONTRACTOR shall make recommendation if oil change required; replace oil reclaim filter and/or strainer (when applicable); and replace refrigerant filter.

r. Replace coolant (After cleaning heat exchanger (Hxer)).

s. Replace or clean starter air filters if applicable.

t. Run through a regular purge cycle to ensure that all parts are operating within correct parameters. Operate purge unit to remove non-condensable gases, obtain vacuum, ensure unit operates properly, and check purge unit canister for depletion, replace as required.

9. Screw-Type Chillers:

a. Check evaporator and condenser pressures at the gauges on the unit(s) and record the readings of each equipment. CONTRACTOR shall report and troubleshoot any discrepancy with recommendations of corrective action to the CA.

b. Inspect refrigerant filter.

c. Inspect oil filter pressure drop indicator. Replace oil filter as required.

d. Check oil level and refrigerant charge.

e. Clean all water strainers in both chilled and condensing water piping systems.

f. Check refrigerant temperature drop at full load.

a. Have a qualified laboratory perform a compressor oil analysis to determine moisture content acid level. CONTRACTOR shall report result and troubleshoot any discrepancy with recommendations of corrective action to the CA.

b. Tighten all electrical connections in the control panel and starter panel.

a. Test vent piping of all relief valves for presence of refrigerant to detect improperly sealed valves. Replace as necessary.

SPECIFICATIONS S-16

b. Test the differential pressure switch setting.

c. Measure the compressor motor winding resistance to ground. A qualified service technician should conduct this check to ensure that the findings are properly interpreted.

The CONTRACTOR shall submit report and troubleshoot any discrepancy with recommendations of corrective action to the CA. Overhaul or replacement of a compressor is not included in the scope of work and will be an additional cost item.

d. Check oil level and refrigerant charge.

e. Leak-test the chiller and check operating and safety controls and electrical components.

10. Cooling Towers and Evaporative Condensers

a. Check and adjust water make-up float valve and bleed rate.

b. Check general condition of tower interior and water distribution pattern.

c. Check and lubricate motor and fan bearings.

d. Check all drives for wear; adjust belt tension. Replace belts or sheaves as required.

e. Remove foreign material from inside the tower, vacuum basin residue as required.

f. Check for leaks, patch, correct or repair immediately upon discovery or notification.

a. Drain, clean, and flush tower; coordinate with WTC and POC.

b. Clean condenser suction screen, drift eliminators, spray nozzles, vacuum basin residue.

c. Certify semi-annual cleaning of towers and correct and report any discrepancies to the

CA.

11. Window and Ductless Split DX Air Conditioners (three and one half (3-1/2) Tons or Less)

a. Clean and wash evaporator and condenser coils of all dirt and/or salt accumulation with water, steam, or surfactant chemical coil cleaner (alkali or acidic cleaners not allowed);

wash unit to remove dirt, oil, and debris from fan assembly and chassis.

b. Clean, wash, or furnish and install new filter as required.

c. Check and clean condensate pan and flush drain lines.

d. Lubricate compressor and fan motor bearings.

SPECIFICATIONS S-17

e. Check system refrigerant charge.

f. Run and check units’ operation and controls through complete cycle, record temperature and setting when compressor cuts in.

g. Certify performance of quarterly services, report and correct all discrepancies. Submit

12. Valves and Condenser Water Lines, Equipment and Supports

a. The CONTRACTOR shall check and inspect all equipment shut-off valves by turning the valves on and off every three (3) months (quarterly) for proper operation and tightness.

b. Wire brush and remove rust from pipe, equipment and support surfaces, then prime and paint to prevent further rusting. Perform work immediately upon discovery of rust and/or corrosion or notification by the CA.

13. Cleaning of Mechanical Equipment Rooms or Enclosures

a. Vacuum or wipe clean all equipment surfaces and all related appurtenance.

b. Vacuum clean or sweep complete floor and platform areas. DO NOT wet floor and platform area where there is no waterproofing.

c. Wet wash complete floor area with tap water where allowed. CAUTION: DO NOT splash water onto the electrical and mechanical equipment.

d. Remove all used, deteriorated, replaced, discarded parts and related debris.

e. Remove tall grass, brush, or other vegetation within outdoor enclosures, which affects operation or maintenance of…