IFB-Contract Documents-Parking Lot Pavement Improvements-451 Elm St-July 2026.pdf

PDF 1 MB Posted

Attached to
IFB: Proposed Parking Lot Pavement Improvements, 451 Elm Street, North Attleborough, MA 02760
Solicitation number
BD-26-1306-NABOS-NABOS-131536
Issued by
Bristol County, Massachusetts

About this file

This is an Invitation for Bid (IFB) and associated contract documents issued by the Town of North Attleborough, Massachusetts, for proposed parking lot pavement improvements at 451 Elm Street. The project, identified as Project Number 27-123-049, involves pavement improvements, parking lot striping, limited drainage work, and all incidental work necessary for completion. Bid documents and plans are available through the Town's eProcurement Portal at https://procurement.opengov.com/portal/nattleboro, with the bid package available beginning Wednesday, July 29, 2026. The question submission deadline is Friday, August 21, 2026, at 11:00 AM, and bids must be submitted electronically through the eProcurement Portal by 11:00 AM on Friday, August 28, 2026. No pre-bid conference will be held. The successful bidder must commence work within ten days of receiving the Notice to Proceed and complete the project by Friday, November 15, 2026. The contract will be awarded to the lowest responsible and eligible bidder based on qualifications, past performance on similar projects, and bid price. The work is divided into three bid options: a Base Bid covering standard pavement improvements, Alternative Bid Item 1 involving milling and selective overlaying, and Alternative Bid Item 2 involving milling and full-depth pavement repairs, with the Town selecting only one option for award.

Bids must be accompanied by bid security in the form of a certified check, bid bond, cash, or treasurer's check equal to five percent of the bid amount. The successful contractor must furnish a performance bond and a labor and materials payment bond, each in an amount equal to 100 percent of the total contract price, with surety companies qualified to do business in Massachusetts. Prevailing wage rates as determined by the Massachusetts Department of Labor and Workforce Development apply to all workers on the project, with detailed wage schedules provided in the contract documents. Liquidated damages are set at $200 per day for each calendar day of delay beyond the November 15, 2026, completion date. The contractor must obtain and maintain comprehensive general liability insurance with minimum limits of $3,000,000 per occurrence and $3,000,000 aggregate, automobile liability insurance with $3,000,000 limits, workers' compensation insurance at statutory rates with employer liability limits of $1,000,000, and property insurance for the full contract sum, with the Town and Crossman Engineering, Inc. named as additional insureds. All employees must complete at least 10 hours of OSHA-approved construction safety and health training before beginning work. Contract award is contingent upon the availability of funding appropriation.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Contract Documents

Parking Lot Pavement Improvements 451 Elm Street, North Attleborough, MA

Project Number: 27-123-049

Office of the Town Manager Town of North Attleborough 43

South Washington Street North Attleborough, MA 02760

July 2026

TOWN OF NORTH ATTLEBOROUGH, MASSACHUSETTS

CONTRACT DOCUMENTS

FOR

Parking Lot Pavement Improvements 451 Elm Street, North Attleborough MA

Project Number: 27-123-049

July 2026

Town of North Attleborough

Town Hall

43 South Washington Street

North Attleborough, MA 02760

TOC-1

TABLE OF CONTENTS

Section Number

Division 0 - Bidding and Contract Requirements Invitation to Bid 00020 Instructions to Bidders 00100 Form of General Bid 00300 Agreement 00500 Construction Performance Bond 00610 Construction Payment Bond 00620 Supplemental Conditions 00800 Incorporation of Applicable Provisions of Massachusetts General Laws

00850

Attachment A – Wage Rates Attachment B – List of Plan Sheets

Division 1 – General Requirements

Summary of Work Work Restrictions 01110 Measurement and Payment 01140 Coordination 01270 Color Audio/Video DVD Documentation Survey 01310 Scheduling of Construction 01321 Submittal Procedures 01325 Health and Safety Plan 01330 Quality Control 01350 Temporary Utilities 01450 Temporary Controls 01510 Control of Materials and Equipment 01570 Product Substitution During Construction 01600 Product Storage and Handling Requirements 01630 Field Engineering 01660 Preservation and Restoration of Project Features 01720 Protecting Installed Construction 01725 Closeout Procedures 01760

01770

TOC-2

Section Number

Division 2 – Site Construction Supplemental Standards and Specifications Subsurface Investigations

02000 02210

Excavation, Backfill, Compaction and Dewatering 02315 Underground Warning Tape 02317 Borrow Material Cold Recycled Base Course

02320 02406

Manholes and Catchbasins 02530 Lawn and Grasses 02920

DIVISION 0

BIDDING AND CONTRACT

REQUIREMENTS

00020-2

SECTION 00020

INVITATION TO BID

Sealed bids for Proposed Parking Lot Pavement Improvements, 451 Elm Street, North Attleborough will be received through the Town of North Attleborough's eProcurement Portal located at https://procurement.opengov.com/portal/nattleboro until 11:00 am on Friday, August 28, 2026, at which time they will be publicly opened and read.

Timeline:

• Bid Package to be available on the Town of North Attleborough's eProcurement Portal:

Wednesday, July 29, 2026

• Question Submission Deadline: Friday, August 21, 2026, 11 AM

• Bid Submission Deadline: Friday, August 28, 2026, 11 AM

Each Bid must be accompanied by a bid security consisting of a BID BOND, CASH, or, CERTIFIED CHECK issued by a responsible bank or trust company in the amount of 5% of the bid price.

A Pre-Bid Conference will not be held.

A performance bond in an amount equal to 100 percent of the total amount of the contract price with a surety company qualified to do business in the Commonwealth of Massachusetts will be required for the faithful performance of the contract, as well as a labor and materials bond in an amount equal to 100 percent of the total contract price.

All bids for this project are subject to applicable public bidding laws of Massachusetts, including, but not limited to G.L. c. 30, §39M, as amended.

Attention is directed to the minimum wage rates to be paid as determined by the Commissioner of Labor and Workforce Development and the weekly payroll record submittal requirements under the provisions of Massachusetts General Laws, Chapter 149, Section 26 through 27D inclusive.

Selection of the contractor will be based upon bidder qualifications, including evidence of past performance in similar projects, and bid price. The contract will be awarded to the bidder deemed by the awarding authority to be the lowest responsible and eligible bidder.

The bidder agrees that its bid shall be good and may not be withdrawn for a period of 30 days, Saturdays, Sundays and legal holidays excluded, after the opening of the bids.

The Town reserves the right to waive any informalities, to accept or reject, in whole or in part any or all bids, or take whatever other action may be deemed to be in the best interest of the Town.

The Town of North Attleborough

By: Michael Borg, Town Manager https://procurement.opengov.com/portal/nattleboro

00100-5

SECTION 00100

INSTRUCTIONS TO BIDDERS

1. Receipt and Opening of Bids Sealed bids for Proposed Parking Lot Pavement Improvements, 451 Elm Street, North Attleborough will be received through the Town of North Attleborough's eProcurement Portal located at https://procurement.opengov.com/portal/nattleboro until 11:00 am on Friday, August 28, 2026, at which time they will be publicly opened and read.

The Town of North Attleborough is accepting electronic bid submissions. Bidders shall create a FREE account with OpenGov Procurement by signing up at https://procurement.opengov.com/signup. Once you have completed account registration, browse back to this webpage, click on "Draft Response", and follow the instructions to submit the electronic bid.

Any bid may be withdrawn prior to the above scheduled time for the opening of bids. Any bid received after the time and date specified will not be considered. The bidder agrees that its bid shall be good and may not be withdrawn for a period of 30 days, Saturdays, Sundays, and legal holidays excluded, after the opening of bids.

2. Scope of Work The Work generally consists of pavement improvements, parking lot striping, limited drainage work and all work incidental thereto, in accordance with the Specifications and Plans attached hereto.

Additional drawings or specifications of details of Work to be performed may be furnished by addendum from time to time during the bidding period by the Owner or its Architect/Engineer, and shall then become a part of the Contract Documents. Bid Documents, Plans and Addenda will only be available on the eProcurement Portal.

The Contractor shall furnish all labor, services, materials, equipment, plant, machinery, apparatus, appliances, tools, supplies, and all other things necessary to do all work required for the completion of each item of the Work and as herein specified.

The Work to be done and paid for as a lump sum bid and shall not be limited to the exact extent mentioned or described but shall include all incidental work necessary or customarily done for the completion of that item.

3. Preparation of Bid & Bid Opening Procedure Bids are to be submitted through the Town of North Attleborough's eProcurement Portal located at https://procurement.opengov.com/portal/nattleboro. Bidders are to follow instructions provided within the eProcurement Portal.

4. Ability and Experience of Bidder

No award will be made to any bidder who cannot satisfy the Owner that he has sufficient https://procurement.opengov.com/portal/nattleboro https://procurement.opengov.com/signup https://procurement.opengov.com/portal/nattleboro

00100-6 ability and experience in this class of work and sufficient capital and plant to enable him to prosecute and complete the work successfully within the time named. The Owner's decision or judgment on these matters will be final, conclusive, and binding.

The Owner may make such investigations as it deems necessary, and the bidder shall furnish to the Owner, under oath if so required, all such information and data for this purpose as the Owner may request.

5. Conditions of Work

Each bidder must familiarize himself fully with the conditions relating to the construction of the project and the employment of labor thereon. Failure to do so will not relieve a successful bidder of his obligation to furnish all material and labor necessary to carry out the provisions of his contract. Insofar as possible the Contractor, in carrying out his work, must employ such methods or means as will not cause any interruption of or interference with the work of any other Contractor.

6. Addenda and Interpretations

No interpretation of the meaning of the plans, specifications or other documents will be made to any bidder orally. All information given to bidders other than by means of the plans, specifications, or by addenda, as described below, is given informally and shall not be used as the basis of a claim against the Owner.

Every request for information must be submitted through the Town’s On-line Portal and received at least seven (7) days prior to the date fixed for the opening of bids.

Any and all such responses, interpretations and any supplemental instructions will be in the form of written addenda to the specifications which, when issued, will be available on the eProcurement Portal. All addenda so issued shall become part of the Contract Documents.

7. Security for Faithful Performance

Simultaneously with his delivery of the executed Contract, the Contractor shall furnish a surety bond or bonds as security for faithful performance of this contract and for the payment of all persons performing labor and materials under this contract. The surety on such bond or bonds shall be a surety company qualified to do business under the laws of the Commonwealth and satisfactory to the Owner. The bonds shall remain in force for one year after final acceptance of the work by the Owner, unless the Owner, in writing, releases the Contractor from the obligation sooner.

8. Power of Attorney

Attorneys-in-fact who sign Contract bonds must file with each bond a certified and effectively dated copy of their power of attorney.

00100-7

9. Laws and Regulations

The bidder's attention is directed to the fact that all applicable State laws, municipal ordinances or bylaws, and the rules and regulations of all authorities having jurisdiction over construction of the project shall apply to the Contract throughout, and they will be deemed to be included in the Contract the same as though written out in full.

10. Liquidated Damages for Failure to Enter into Contract

The successful bidder, upon his failure or refusal to execute and deliver the Contract and bonds required within 10 days after presentation thereof by the Owner, shall forfeit to the Owner, as liquidated damages for such failure or refusal, the security deposited with his/her bid, but the amount forfeited shall not exceed the difference between his/her bid price and the bid price of the next lowest responsible and eligible bidder. In case of death, disability, bona fide clerical or mechanical error of a substantial nature, or other similar unforeseen circumstances affecting the bidder, his/her bid deposit will be returned.

11. Obligation of Bidder

At the time of the opening of bids, each bidder will be presumed to have inspected the site and to have read and to be thoroughly familiar with the Contract Documents (including all addenda). The failure or omission of any bidder to examine any form, instrument, or document shall in no way relieve any bidder from any obligation in respect of his bid.

12. Information Not Guaranteed

All information given in the Contract Documents relating to subsurface and other conditions, natural phenomena, existing pipes, and other structures is from the best sources at present available to the Owner. All such information is furnished only for the information and convenience of bidders and is not guaranteed.

It is agreed and understood that the Owner does not warrant or guarantee that the subsurface or other conditions, natural phenomena, existing pipes, or other structures encountered during construction will be the same as those indicated in the Contract Documents. It is further agreed and understood that no bidder or Contractor shall use or be entitled to use any of the information made available to him or obtained in any examination made by him in any manner as a basis of or ground for any claim or demand against the Owner or the Architect/Engineer, arising from or by reason of any variance which may exist between the information made available and the actual subsurface or other structures actually encountered during the construction work, except as may otherwise be expressly provided for in the Contract Documents.

13. Bid Security

Each bid and sub-bid must be accompanied by bid security in the form of a certified check, a bid bond, cash, or a treasurer's or cashier's check, payable to the Owner, in the

00100-8 amount of five (5) percent of the value of the bid. Such security of general bidders will be returned to all except the three lowest responsible and eligible bidders within five days, Saturdays, Sundays, and legal holidays excluded, after the opening of bids, and the remaining securities will be returned promptly after the Owner and the accepted bidder have executed the Contract, or if no notice of intent to award has been presented to the selected contractor within 30 days, Saturdays, Sundays and holidays excluded, after the date of the opening of bids, upon demand of the bidder at any time thereafter.

14. Right to Reject Bid

The Owner reserves the right to waive any informalities in bids and to reject any and all bids, should the Owner deem it to be in the public interest to do so.

The Owner may also reject bids which in its sole judgment are either incomplete, conditional, obscure or not responsive or which contain additions not called for, erasures not properly initialed, alterations, or similar irregularities.

15. Time for Completion

The successful general bidder must agree to commence work within ten (10) days of the date of the Notice to Proceed and to fully complete the project within the time limit stated in Section 00300, FORM OF GENERAL BID.

16. Comparison of Bids

Bids will be compared on the basis of prices set forth in the bid forms. In the event that there is a discrepancy between the lump sum or unit prices written in words and figures, the prices written in words will govern. The Town has the option to select either the Base Bid, Alternative Bid 1 or Alternative Bid 2 and to make a selection based upon the prices of the Base Bid or the Alternative Bid selected.

17. Award of Contract

The Contract will be awarded to "the lowest responsible and eligible bidder" pursuant to General Laws Chapter 30, §39M, as amended. Such a bidder shall possess the skill, ability and integrity necessary for the faithful performance of the work, shall be able to furnish labor that can work in harmony with all other elements of labor employed, or to be employed, in the work, and shall otherwise comply with all applicable provisions of law.

Contract award shall be subject to availability of an appropriation for funding.

18. Statutes Regulating Competitive Bidding

Any bid which does not comply with the provisions of Massachusetts General Laws Chapter 30, §39M, as amended, need not be accepted and the Owner may reject every such bid.

19. Wage Rates

Prevailing Wage Rates as determined by the Commissioner of Department of Labor and

00100-9

Workforce Development under the provision of the Massachusetts General Laws, Chapter 149, Section 26 to 27G, as amended, apply to this project. It is the responsibility of the bidder, before bid opening, to request any additional information on Prevailing Wage Rates for those tradespeople who may be employed for the proposed work under this contract.

20. Contractor Records

The Contractor shall comply with the provisions of Massachusetts General Laws, Chapter 30, Section 39R concerning Contractor records.

21. INSURANCE

The Contractor shall carry and continuously maintain until completion of the Contract, insurance as specified in Agreement and in such form as shall protect him performing work covered by this Contract, and the Town of North Attleborough and its employees, agents and officials, from all claims and liability for damages for bodily injury, including accidental death, and for property damage, which may arise from operations under this Contract. The Town shall be named as an additional insured. The Contractor covenants and agrees to hold the Town and its employees, agents and officials harmless from loss or damage due to claims for bodily injury or death and/or property damage arising from, or in connection with, operations under this Contract.

25. PROJECT MANAGER

The Owner may utilize the services of a project manager, whose duties shall be as set forth in an Agreement for Project Manager Services.

00300-1

SECTION 00300

FORM OF GENERAL BID

Bid of (hereinafter called "Bidder")*

( ) a corporation, organized and existing under the laws of the state of

( ) a partnership

( ) a joint venture

( ) an individual doing business as

To the Town of North Attleborough, Massachusetts (hereinafter called "Owner").

Gentlemen:

A) The undersigned Bidder, in compliance with your invitation for bids for the project known as Proposed Parking Lot Pavement Improvements, 451 Elm Street having examined the plans and specifications and related documents and the site of the proposed work, and being familiar with all of the conditions surrounding the construction of the proposed project including the availability of materials and labor, hereby proposes to furnish all labor, materials, and supplies, and to construct the project in accordance with the contract documents and the plans and specifications within the time set forth below, and at the prices stated below. These prices are to cover all expenses incurred in performing the work required under the contract documents, of which this bid is a part.

The Bidder hereby agrees to commence work on or before the date to be specified in written "Notice to Proceed" of the Owner, and to fully complete the project by Friday, November 15, 2026. The Bidder further agrees to pay as liquidated damages the sum of two hundred ($200) Dollars for each consecutive calendar day thereafter that the work is not complete as provided in the contract.

*Specify corporation, partnership or individual as applicable.

00300-2

B) Bidder acknowledges receipt of and this bid includes the following addenda:

C) The Bidder agrees to perform the bid work described in the specifications and shown on the plans for the following lump sum bids on the Bid Form Below:

BASE BID – Quantities are for bidding purposes only.

Bid Item Description Unit Quantity Price Per Unit Total

1 Compost Filter Sock LF 974 $________ $_______

2 Remove and Dispose Manhole EA 2 $________ $_______

3 Catch Basin, Including Frame & Grate EA 5 $________ $_______

4 Drop Inlet, including Frame & Grate EA 3 $________ $_______

5 12” RCP (all types) LF 254 $________ $_______

6 Clean and Flush Pipe LF 160 $________ $_______

7 Installation of Regulatory Signs (36”x 36”) EA 4 $________ $_______

8 Installation of Misc Signs EA 8 $________ $_______

9 4” White Pavement Markings LF 2875 $________ $_______

10 12” White Pavement Markings LF 53 $________ $_______

Painted Arrows, Stop, Drop off Area & No Parking Symbols

EA 13 $________ $_______

12 ADA Pavement Markings EA 4 $________ $_______

13 Precast Concrete Car Stops EA 4 $________ $_______

14 Concrete ADA Sidewalk Ramps SY 13 $________ $_______

No. Dated:

No. Dated:

No. Dated:

No. Dated:

00300-3

15 Remove and Dispose Pavement SY 99 $________ $_______

16 Bituminous Sidewalks SY 15 $________ $_______

17 Bituminous Berm LF 100 $________ $_______

18 Granite Curb LF 37 $________ $_______

19 Sawcut and Match LF 600 $________ $_______

20 Reclaim Cold Recycled Pavement SY 5024 $________ $________

21 Tack Coat SY 5150 $________ $________

22 1.5 Bituminous Surface Course TON 520 $________ $________

23 2.5 Bituminous Binder Course TON 820 $________ $________

24 Police Details-(Reimbursable Allowance-Enter $5,000.00) Allowance 1 $________ $________

TOTAL LUMP SUM BID PRICE - BASE BID

(In Words) Dollars and Cents

(In Figures) $

ALTERNATIVE BID ITEM 1 – Quantities are for bidding purposes only.

Item Description Unit Quantity Price Per Unit Total

1 Compost Filter Sock LF 974 $________ $_______

2 Remove and Dispose Manhole EA 2 $________ $_______

3 Catch Basin, Including Frame & Grate EA 5 $________ $_______

4 Drop Inlet, including Frame & Grate EA 3 $________ $_______

5 12” RCP (all types) LF 254 $________ $_______

00300-4

6 Clean and Flush Pipe LF 160 $________ $_______

7 Installation of Regulatory Signs (36”x 36”) EA 4 $________ $_______

Installation of Misc. Signs EA 8 $________ $_______

9 4” White Pavement Markings LF 2875 $________ $_______

10 12” White Pavement Markings LF 53 $________ $_______

Painted Arrows, Stop, Drop off Area, No Parking Symbols

EA 13 $________ $_______

12 ADA Pavement Markings EA 4 $________ $_______

13 Precast Concrete Car Stops EA 4 $________ $_______

14 Concrete Sidewalk ADA Ramps SY 13 $________ $_______

15 Remove and Dispose Pavement SY 99 $________ $_______

16 Bituminous Sidewalks SY 15 $________ $_______

17 Bituminous Berm LF 100 $________ $_______

18 Granite Curb LF 37 $________ $_______

19 Sawcut and Match LF 600 $________ $_______

20 Mill 2” Bituminous Pavement SY 3793 $________ $________

21 Clean and Sweep Pavement HSY 50 $________ $________

22 Asphalt Tack Coat SY 5025 $________ $________

23 2” Bituminous Top Coat TON 491 $________ $________

24 Reclaim, Cold Recycled Pavement SY 1232 $________ $________

25 Full Depth Pavement Repair, including Bit. & Gravel SY 500 $________ $________

26 1.5” Bituminous Surface Course Ton 138 $________ $________

27 2.5” Bituminous Binder Course Ton 217 $________ $________

28 Police Details-(Reimbursable

00300-5

ALTERNATIVE BID ITEM 1, LUMP SUM BID PRICE

ALTERNATIVE BID ITEM 2 – Quantities are for bidding purposes only.

Item Description Unit Quantity Price Per Unit Total

1 Compost Filter Sock LF 974 $________ $_______

2 Remove and Dispose Manhole EA 2 $________ $_______

3 Catch Basin, including Frame & Grate EA 5 $________ $_______

4 Drop Inlet, including Frame & Grate EA 3 $________ $_______

5 12” RCP (all types) LF 254 $________ $_______

6 Clean and Flush Pipe LF 160 $________ $_______

7 Installation of Regulatory Signs (36”x 36”) EA 4 $________ $_______

8 Installation of Misc. Signs EA 8 $________ $_______

9 4” White Pavement Markings LF 2875 $________ $_______

10 12” White Pavement Markings LF 53 $________ $_______

Painted Arrows, Stop, Drop off Area, No Parking Symbols

EA 13 $________ $_______

12 ADA Pavement Markings EA 4 $________ $_______

13 Precast Concrete Car Stops EA 4 $________ $_______

14 Concrete Sidewalk ADA Ramps SY 13 $________ $_______

15 Remove and Dispose Pavement SY 99 $________ $_______

16 Bituminous Sidewalks SY 15 $________ $_______

00300-6

17 Bituminous Berm LF 100 $________ $_______

18 Granite Curb LF 37 $________ $_______

19 Sawcut and Match LF 600 $________ $_______

20 Mill 2” Bituminous Pavement SY 5024 $________ $_______

21 Clean and Sweep Pavement HSY 51 $________ $_______

22 Asphalt Tack Coat SY 5150 $________ $________

23 2” Bituminous Top Coat TON 650 $________ $________

24 Full Depth Pavement Repair, Including Bit and Gravel SY 500 $________ $________

25 Police Details-(Reimbursable

ALTERNATIVE BID ITEM 2, LUMP SUM BID PRICE

Each Bid Item (Base Bid, Alternative Bid Item 1 & Alternative Bid Item 2) above is independent and the Town will select only one of the Bid Options. Work to be performed for each Bid Item is depicted in the Project’s Site Plans by Crossman Engineering. Work shown on the Plans and Work necessary for project completion which has no specific details, specification or payment item does not relieve the contractor from furnishing, installing and completing the project to the satisfaction of the Town. Quantities provided are for bidding purposes only. The Contractor is responsible to ensure that their bid includes all work and quantities necessary for successful project completion. Items not specifically listed are considered incidental to other bid items and included in the proposed Lump Sum Bid Price.

00300-7

As noted, the above Lump Sum Bid Prices for the Base Bid and Alternative Bid Prices shall include all labor, materials, bailing, shoring, removal, overhead, profit, insurance, etc., to cover the finished work of the several kinds called for on the plans and specifications, and all work necessary to complete the project to the acceptance of the Owner. Any item not identified in the Base Bid Item is considered incidental and included in the Bid Item listed.

The Bidder understands that all bids for this project are subject to the applicable bidding laws of the Commonwealth of Massachusetts, including General Laws Chapter 149 and Chapter 30, Section 39M, as amended.

The Bidder understands that the Owner reserves the right to reject any or all bids and to waive any informalities in the bidding.

The Bidder agrees that this bid shall be good and may not be withdrawn for a period of 30 days, Saturdays, Sundays and legal holidays excluded, after the opening of bids.

Within 10 days of receipt of the written notice of acceptance of this bid, the Bidder will execute the formal Agreement set forth in Section 00500 CONTRACT.

Bid security is attached in the sum of five percent (5%) of the total bid in accordance with the conditions of Section 00100 INSTRUCTIONS TO BIDDERS. The bid security may become the property of the Owner in the event the contract and bond are not executed within the time set forth above.

The selected Contractor shall furnish a performance bond and a payment bond in an amount at least equal to one hundred percent (100%) of the contract price in accordance with Section 00610 PERFORMANCE BOND, Section 00620 PAYMENT BOND, and as stipulated in the contract.

The undersigned offers the following information as evidence of his qualifications to perform the work as bid upon according to all the requirements of the plans and specifications.

1. Have been in business under present name for years.

2. The names and addresses of all persons interested in the bid (if made by a partnership or corporation) as principals, are as follows:

(Attach supplementary list if necessary)

00300-4

3. The bidder is requested to state below what work of a similar character to that included in the proposed contract he has done, and give references that will enable the Owner to judge his experience, skill and business standing (add supplementary page if necessary).

Completion Date

Project Name Contract Amount

Design Engineer Reference Name Telephone No.

1.

2.

3.

4.

5.

6.

7.

8.

9.

10.

00300-5

Bank reference (Name)

(Bank)

(Address)

(Telephone No.)

Pursuant to M.G.L. c. 62C, §49A, I certify hereby in writing, under penalties of perjury, that the within named Bidder/Contractor has complied with all laws of the Commonwealth relating to taxes, reporting of employees and contractors, and withholding and remitting of child support.

The undersigned Bidder hereby certifies under penalties of perjury, as follows: (1) that he/she is able to furnish labor that can work in harmony with all other elements of labor employed or to be employed in the work; (2) that all employees to be employed at the worksite will have successfully completed a course in construction safety and health approved by the United States Occupational Safety and Health Administration that is at least 10 hours in duration at the time the employee begins work and who shall furnish documentation of successful completion of said course with the first certified payroll report for each employee; and (3) that all employees to be employed in the work subject to this bid have successfully completed a course in construction safety and health approved by the United States Occupational Safety and Health Administration that is at least 10 hours in duration.

The undersigned certifies under penalties of perjury that this bid is in all respects bona fide, fair and made without collusion or fraud with any other person. As used in this paragraph the word “person” shall mean any natural person, joint venture, partnership, corporation or other business or legal entity.

The undersigned bidder hereby certifies, under pains and penalties of perjury, that the foregoing bid is based upon the payment to laborers to be employed on the project of wages in an amount no less that the applicable prevailing wage rates established for the project by the Massachusetts Department of Labor and Workforce Development. The undersigned bidder agrees to indemnify the awarding authority for, from and against any loss, expense, damages, actions or claims, including any expense incurred in connection with any delay or stoppage of the project work arising out of or as a result of (1) the failure of the said bid to be based upon the payment of the said applicable prevailing wage rates or (2) the failure of the bidder, if selected as the contractor, to pay laborers employed on the project the said applicable prevailing wage rates.

00300-6

Respectfully submitted:

Date: By:

(Signature)

(Type Name of Bidder)

(Title)

(Business Address)

(City and State)

(Telephone Number)

00500-1

SECTION 00500

AGREEMENT

THIS AGREEMENT made this day of in the year Two Thousand and Twenty-Six, between , with a usual place of business at , hereinafter called the CONTRACTOR, and the Town of North Attleborough, acting by its Town Manager, with a usual place of business at 43 South Washington Street, North Attleborough, MA 02760, hereinafter called the OWNER.

The CONTRACTOR and the OWNER, for the consideration hereinafter named, agree as follows:

1. Scope of Work

The Contractor shall furnish all labor, materials, equipment and insurance to perform all work required for the project known as the Proposed Parking Lot Pavement Improvements, 451 Elm Street, in strict accordance with the Contract Documents and all related Drawings and Specifications. The said Documents, Specifications, Drawings and any supplementary general conditions are incorporated herein by reference and are made a part of this Agreement.

2. Contract Price

The Owner shall pay the Contractor for the performance of this Agreement, subject to additions and deductions provided herein, in current funds, the sum of

Dollars

3. Commencement and Completion of Work and Liquidated Damages

It is agreed that time is of the essence of this Agreement. The Contractor shall commence and prosecute the work under this Agreement upon execution hereof and shall complete the work on or before November 15, 2026.

A. Definition of Term: The Term "Substantial completion" shall mean the date certified by the Owner when construction is sufficiently complete, in accordance with the Contract Documents, so the Owner may occupy the project, or designated portion(s) thereof, for the use for which it is intended.

00500-2

B. Time as Essential Condition: It is understood and agreed that the commencement of and substantial completion of the work are essential conditions of this Agreement. It is further agreed that time is of the essence for each and every portion of the Contract Documents wherein a definite and certain length of time is fixed for the performance of any act whatsoever; and where under the Contract Documents any additional time is allowed for the completion of any work, the new time fixed by such extension shall be of the essence of this Agreement. It is understood and agreed that the times for the completion of the work are reasonable, taking into consideration the average climatic range and usual industrial conditions prevailing in this locality.

C. Progress and Completion: Contractor shall commence work promptly upon execution of this Agreement and shall prosecute and complete the work regularly, diligently and uninterruptedly at such a rate of progress as will insure Substantial Completion within the stipulated number of calendar days.

D. Liquidated Damages: It is expressly agreed between the Contractor and the Owner that the

Contractor will be responsible for all damages which may arise due to the Contractor's failure to substantially complete the work within the above specified time. If the Contractor shall neglect, fail or refuse to complete the work within the specified number of days, or any extension thereof authorized by the Owner, Contractor agrees, as a part of the consideration for the execution of this Contract by the Owner, to pay the Owner the amount specified herein, not as a penalty, but as liquidated damages for such breach of contract as hereinafter set forth, for each and every calendar day, excluding Saturdays, Sundays and legal Holidays, that the Contractor shall be in default of Substantial completion after the date specified in the Agreement. Due to the impracticability and extreme difficulty of fixing and ascertaining the actual damages the Owner would in such event sustain, said amount is agreed to be the amount of damages which the Owner would sustain, and said amount shall be retained from time to time by the Owner from current periodic estimates.

The amount of liquidated damages shall be $200 per day.

4. Performance of the Work

A. Direction of the Work: The Contractor shall supervise and direct the Work, using his best skills and attention which shall not be less than such state of skill and attention generally rendered by the contracting profession for projects similar to the Project in scope, difficulty and location. The Contractor shall maintain adequate supervisory personnel at the project site during the performance of the Work. He shall be solely responsible for all construction means, methods, techniques, sequences and procedures and for coordinating all portions of the Work under the Agreement.

B. Responsibility for the Work:

(1) The Contractor shall be responsible to the Owner for the acts and omissions of his employees, Subcontractors and their agents and employees, and other persons performing any of the Work under a contract with the Contractor. This obligation shall also extend to the presence on the Site of suppliers of materials or equipment, their employees, contractors, and agents engaged in the work.

00500-3

(2) The Contractor shall not be relieved from his obligations to perform the Work in accordance with the Contract Documents either by the activities or duties of the Owner in its administration of the Agreement, or by inspections, tests or approvals required or performed by persons other than the Contractor.

C. Permits and Fees: Unless otherwise expressly provided, the Contractor shall secure and pay for all permits and fees, licenses and inspections necessary for the proper execution and completion of the Work which are customarily secured after execution of the Agreement and which are legally required at the time the bids are received, and the same shall at all times be the property of the Owner and shall be delivered to the Owner upon completion of the Project.

D. Notices, Compliance with Laws:

(1) The Contractor shall give all notices and comply with all federal, state and local laws, ordinances, rules, regulations and lawful orders of any public authority bearing on the performance of the Work. The Contractor shall provide the Owner with reproductions of all permits, licenses and receipts for any fees paid. The Owner represents that it has disclosed to the Contractor all orders and requirements known to the Owner of any public authority particular to this Agreement.

(2) If the Contractor observes that any of the Contract Documents are at variance with applicable laws, statutes, codes and regulations in any respect, he shall promptly notify the Owner in writing, and any necessary changes shall be accomplished by appropriate modification.

(3) If the Contractor performs any Work which he knows or should know is contrary to such laws, ordinances, rules and regulations, and without such notice to the Owner, he shall assume full responsibility therefor and shall bear all costs attributable thereto.

(4) In the performance of the Work, the Contractor shall comply with all applicable federal, state and local laws and regulations including those relating to workplace and employee safety. The Contractor shall notify the Owner immediately of any conditions at the place of the work which violate said laws and regulations and shall take prompt action to correct and eliminate any such violations.

E. Project Superintendent: The Contractor shall employ a competent superintendent and necessary assistants who shall be in attendance at the Project site at all times during the progress of the Work. The superintendent shall represent the Contractor and all communications given to the superintendent shall be as binding as if given to the Contractor. Important communications shall be confirmed in writing. Other communications shall be so confirmed on written request in each case.

F. Progress Schedule: The Contractor, immediately after being awarded the Contract, shall prepare and submit for the Owner's information an estimated progress schedule for the Work. The progress schedule shall be related to the entire Project to the extent required by the Contract Documents, and shall provide for expeditious and practicable execution of the Work.

00500-4

G. Drawings, Specifications and Submittals:

(1) The Contractor shall maintain at the site for the Owner one record copy of all Drawings, Specifications, Addenda, Change Orders and other Modifications, and "As- Built" Drawings and Specifications in good order and marked currently to record all changes made during construction, and approved Shop Drawings, Product Data and Samples. These shall be delivered to the Owner upon completion of the Work.

(2) By approving and submitting Shop Drawings, Product Data and Samples, the Contractor represents that he has determined and verified all materials, field measurements, and field construction criteria related thereto, or will do so, and that he has checked and coordinated the information contained within such submittals with the requirements of the Work and of the Contract Documents.

(3) The Contractor shall not be relieved of responsibility for any deviation from the requirements of the Contract Documents by the Owner's approval of Shop Drawings, Product Data or Samples unless the Contractor has specifically informed the Owner in writing of such deviation at the time of submission and the Owner has given written approval to the specific deviation. The Contractor shall not be relieved from responsibility for errors or omissions in the Shop Drawings, Product Data or Samples by the Owner's approval thereof.

(4) The Contractor shall direct specific attention, in writing or on resubmitted Shop Drawings, Product Data or Samples, to revisions other than those requested by the Owner on previous submittals.

(5) No portion of the Work requiring submission of a Shop Drawing, Product Data or Sample shall be commenced until the submittal has been approved by the Owner. All such portions of the Work shall be in accordance with approved submittals.

H. Protection of the Work and Owner's Property: The Contractor shall at all times safely guard the Owner's property from injury or loss in connection with this Agreement. He shall at all times safely guard and protect his own work, and that of adjacent property from damage.

The Contractor shall replace or make good any such damage, loss or injury. The Contractor shall clean the work area and restore it to its original condition upon completion of the work.

I. Quality of the Work: The Contractor shall perform the work in a good, workmanlike manner. The Contractor hereby guarantees that the entire work constructed by him under the Agreement will meet fully all requirements thereof as to quality of workmanship and materials. The Contractor hereby agrees to make at his own expense any repairs or replacements made necessary by defects in materials or workmanship supplied to him that become evident within one (1) year after the date of the final payment, and to restore to full compliance with the requirements set forth herein any part of the work constructed hereunder, which during said one (1) year period is found to be deficient with respect to any provisions of the Contract Documents. The Contractor also agrees to hold the Owner harmless from claims of any kind arising from damage due to said defects. The Contractor shall make all repairs and replacements promptly upon receipt of written orders for same from the Owner. If the Contractor fails to make the repairs and

00500-5 replacements promptly, the Owner may do the work and the Contractor shall be liable to the Owner for the cost thereof.

J. Warranty: The Contractor guarantees to Owner that all materials incorporated into the work will be new unless otherwise specified or agreed. Prior to final payment, the Contractor shall deliver to the Owner all manufacturers' warranties, together with such endorsements or assignments as are necessary to ensure to the Owner the full rights and benefits of such warranties.

5. Affirmative Action/Equal Employment Opportunity

The Contractor is directed to comply with all applicable State Laws, Ordinances, Bylaws, and rules and regulations regarding affirmative action/equal employment opportunity requirements. Failure of the Contractor to comply with any such law, rule or regulation shall constitute grounds for the Owner to terminate the Agreement.

6. Site Information Not Guaranteed; Contractor's Investigation

All information given in the Contract Documents relating to subsurface and other conditions, natural phenomena, existing pipes, and other structures is from the best sources at present available to the Owner. All such information is furnished only for the information and convenience of the Contractor and is not guaranteed.

It is agreed and understood that the Owner does not warrant or guarantee that the subsurface or other conditions, natural phenomena, existing pipes, or other structures encountered during construction will be the same as those indicated in the Contract Documents.

Contractor has familiarized himself with the nature and extent of the Contract Documents, work, locality, and with all local conditions and federal, state, and local laws, rules, ordinances, and regulations that in any manner may affect costs, progress, or performance of the work.

Contractor has made, or has caused to be made, examinations, investigations, and tests and studies of such reports and related data in addition to those referred to in the paragraph above as he deems necessary for the performance of the work at the Contract Price, within the Contract Time, and in accordance with the other Terms and Conditions of the Contract Documents; and no additional examinations, tests, investigations, reports, and similar data are or will be required by the Contractor for such purposes.

Contractor has correlated the results of all such observations, examinations, investigations, tests, reports, and data with the Contract Documents. Contractor has given the Owner written notice of all conflicts, errors, or discrepancies that he has discovered in the Contract Documents, and the resolution thereof by the Owner is acceptable to the Contractor.

It is further agreed and understood that the Contractor shall not use or be entitled to use any of the information made available to him or obtained in any examination made by him in any manner as a basis of or ground for any claim or demand against the Owner, arising from or by reason of any variance which may exist between the information made available and the actual subsurface conditions or other conditions or structures actually encountered during the

00500-6 construction work, except as may otherwise be expressly provided for in the Contract Documents.

7. Project Architect or Engineer

The Architect/Engineer for the Owner is Crossman Engineering, Inc. Except as otherwise indicated in the Contract Documents, the Architect/Engineer or a Project Manager assigned by the Town shall be a representative of the Owner and the Contractor shall direct all communications, questions and comments on the work and the performance thereof to the Architect/Engineer or Town assigned Project Manager. Except as otherwise provided, the Architect/Engineer or Town assigned Project Manager shall have all the authority of the Owner set forth in the Contract Documents. In general, the Architect/Engineer or Town assigned Project Manager shall have the authority to review the performance of the work, reject work which is defective or otherwise does not comply with the Contract Documents and to order the Contractor to remedy defective work and take such actions which are necessary to make the work conform to the Contract Documents.

8. Wage Rates

Prevailing Wage Rates as determined by the Commissioner of the Department of Labor and Workforce Development under the provisions of Massachusetts General Laws, Chapter 149, Section 26 to 27G, as amended, apply to this project. It is the responsibility of the Contractor to provide the Town with certified payrolls and to comply with all requirements of the above-cited statutes.

The schedules of prevailing wage rates are included in the Contract Documents.

9. Payments to the Contractor

Within fifteen (15) days after receipt from the Contractor of a proper and satisfactory periodic estimate requesting payment of the amount due for the preceding month, the Owner shall have fifteen (15) days to make payment for:

A. The work performed during the preceding month.

B. The materials not incorporated in the Work but delivered and suitably stored at the site (or at some location agreed upon in writing) to which the Contractor has title, or to which a Subcontractor has title and has authorized the Contractor to transfer title to the Owner.

C. Less the following retention items:

1. A retention based on an estimate of the fair value of the Owner's claims against the

Contractor.

2. A retention for direct payments to Subcontractors, if any, based on demands for same in accordance with the provisions of Section 39F of Chapter 30 of the General Laws.

00500-7

3. A retention not exceeding five percent (5%) of the approved amount of the periodic payment.

D. After the receipt of a periodic estimate requesting final payment and within sixty-five

(65) days after the Contractor fully completes the Work, or substantially completes the Work so that the value of the Work remaining to be done is, on the estimate of the Owner, less than 1% of the original Contract Price, or substantially completes the Work and the Owner takes possession or occupancy, whichever occurs first, the Owner shall pay the Contractor the entire balance due on the Contract less:

1. A retention based on an estimate of the fair value of the Owner's claims against the Contractor and of the cost of completing the incomplete and unsatisfactory items of work.

2. A retention for direct payments to Subcontractors, if any, based on demands of same in accordance with the provisions of Section 39F of Chapter 30 of the General Laws, or based on the record of payments by the Contractor to the Subcontractors under this Contract if such record of payment indicates that the Contractor has not paid Subcontractors as provided in Section 39F of Chapter 30 of the General Laws.

If the Owner fails to make payment as herein provided, there shall be added to each such payment, daily interest at the rate of 3 percentage points above the rediscount rate than charged by the Federal Reserve Bank of Boston, commencing on the first day after said payment is due, and continuing until the payment is delivered or mailed to the Contractor;

provided that no interest shall be due, in any event, on the amount of a periodic estimate for final payment until fifteen (15) days after receipt of such a periodic estimate by the Owner as provided in the first paragraph of this Article. The Contractor agrees to pay to each subcontractor a portion of any such interest paid in accordance with the amount due each subcontractor.

The Owner may make changes in any periodic estimate submitted by the Contractor and the payment due on said periodic estimate shall be computed in accordance with the changes so made, and such changes and any requirements for a corrected periodic estimate shall not affect the due date for the periodic payment or the date for the commencement of interest charges on the amount of the periodic payment computed in accordance with the changes made, as provided herein; provided further, that the Owner may, within seven (7) days after receipt, return to the Contractor for correction, any periodic estimate which is not in acceptable form or which contains computations not arithmetically correct, and in that event, the date of receipt of such periodic estimate shall be the date of receipt of the corrected periodic estimate in proper form and with arithmetically correct computations.

The date of receipt of a periodic estimate received on a Saturday shall be the first working day thereafter.

E. Changes in the Work: No changes in the work covered by the approved Contract Documents shall be made without prior written approval of the Owner. Charges or credits for the work covered by the approved change shall be determined by one or more, or a combination of the following methods:

00500-8

(a) Unit bid prices previously approved.

(b) An agreed lump sum.

(c) The actual cost of:

(1) Labor.

(2) Materials entering permanently into the work.

(3) The ownership or rental cost of construction equipment during the time of use on the extra work.

(4) Power and consumable supplies for the operation of power equipment.

(5) Wages to be paid.

To the cost under (c) there shall be added a fixed fee to be agreed upon but not to exceed fifteen percent (15%) of the actual cost of work. The fee shall be compensation to cover the cost of supervision, overhead, bond, profit and any other general expenses.

F. Claims for Additional Costs: If the Contractor wishes to make a claim for an increase in the Contract Sum, he shall give the Owner written notice thereof within twenty days after the occurrence of the event giving rise to such claim. This notice shall be given by the Contractor before proceeding to execute the Work, except in an emergency endangering life or property. No such claim shall be valid unless so made. Any change in the Contract Sum resulting from such claim shall be authorized by Change Order.

The Contractor hereby agrees that the Contractor shall have no claim for damages of any kind against the Town on account of any delay in the commencement or performance of the work and/or any hindrance, delay or suspension of any portion of the work including,…

This is the start of the file's text. The full file is on GovTribe.