IFB_Addendum_1.pdf
PDF 194 KB Posted
- Solicitation number
- 1CA06874
- Issued by
- California
About this file
This document is an Addendum to an Invitation for Bid (IFB) issued by the California Department of Forestry and Fire Protection (CAL FIRE) for the Advanced Cleaning, Inspection, and Repair of Structural Firefighting Protective Ensemble (SFPE). The IFB outlines the requirement for a contractor to provide all materials, labor, equipment, tools, permits, taxes, transportation, and fees for these services. The key details include a 25-day turnaround time, which is critical, but the specific timing within the month is flexible. The contact person for this Addendum and the IFB is Christopher Cabanes, Contracts Analyst at CAL FIRE.
The IFB does not provide any additional details on pricing terms, set asides, incumbents, funding requirements or sources, or contract term and renewal options. The document only includes the Addendum with Bidder Questions and Answers and contact information for the procurement.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| IFB_1CA06874.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATE OF CALIFORNIA THE NATURE RESOURCES AGENCY Gavin Newsom, Governor
DEPARTMENT OF FORESTRY AND FIRE PROTECTION
P.O. Box 944246
SACRAMENTO, CA 94244-2460
Website: www.fire.ca.gov
(916) 653-7772
ADDENDUM ONE (1) TO:
INVITATION FOR BID, IFB #1CA06874
Advanced Cleaning, Inspection, and Repair of
Structural Firefighting Protective Ensemble (SFPE) Notice to Prospective Bidders
05/13/2024
Please review the following Addendum to Invitation for Bid (IFB), entitled IFB 1CA06874 Advanced Cleaning, Inspection, and Repair of Structural Firefighting Protective Ensemble (SFPE).
1. Bidder Questions and Answers are included on the attached page.
The contact person for this Addendum and the IFB is:
Christopher Cabanes Department of Forestry and Fire Protection
710 Riverpoint Court West Sacramento, CA 95605
Christopher.Cabanes@fire.ca.gov
Please note that no verbal information given will be binding upon the State unless such information is issued in writing as an official addendum.
Christopher Cabanes Contracts Analyst mailto:Christopher.Cabanes@fire.ca.gov
Questions and Answers
Question #1
Is CAL FIRE open to scheduling the same 25-day turnaround at a different time of the month or is the first of the month critical?
Answer #1
The time of month is not critical, what is critical would be the 25-day turn around.
Questions and Answers
File details come from the government source that posted it. Updated .