IFB 9924.1 Gnrl Conditions 11-23.pdf

PDF 599 KB Posted

Attached to
HVAC MAINTENANCE, REPAIR, AND REPLACEMENT SERVICES
Solicitation number
BPM059877
Issued by
Montgomery County, Maryland

About this file

This is an Invitation for Bid (IFB) document issued by Montgomery County Public Schools' Department of Procurement for comprehensive HVAC maintenance, repair, and replacement services across district facilities. The solicitation seeks qualified contractors to provide ongoing preventive maintenance, emergency repair services, and equipment replacement for air handling units, variable air volume systems, rooftop units, boilers, chillers, heat pumps, dedicated outdoor air systems, energy recovery units, variable refrigerant volume systems, and associated pneumatic or direct digital controls. The contractor must visit various MCPS facilities to develop proposals for specific projects. The contract term is one year from the date of Board of Education approval, with MCPS reserving the right to extend for up to five additional one-year terms upon 90 days' written notice. Pre-qualified contractors will respond to individual project solicitations within five business days of mandatory site inspections coordinated by the MCPS Project Coordinator, with normal work periods Monday through Friday, 6:30 a.m. to 7:00 p.m., though weekend and evening work may be required to avoid disrupting school operations.

Pricing is submitted on an hourly rate basis with all costs included in proposals, covering labor, materials, equipment, and miscellaneous items. The allowable combined overhead and profit markups for prime contractors range from 20 percent for work valued $0–$1,000 to negotiated rates for work exceeding $25,000, with subcontractors limited to 8 percent markup on their all-inclusive costs. All workmanship and materials carry a two-year warranty beginning upon project completion approval. The document requires contractors to possess current Maryland Construction Business or Home Improvement Commission licenses, submit notarized pre-qualification questionnaires, and undergo criminal background checks for employees with direct unsupervised access to children. No specific set-asides are established, though minority business enterprises are encouraged to participate. Late charges of $500 per day for the first five days and $1,000 per day thereafter apply for failure to meet completion deadlines without MCPS-approved extensions. All deliveries must be prepaid FOB destination, and contractors must comply with Maryland's Buy American Steel Act for purchases exceeding 10,000 pounds and provide asbestos-free material verification through EPA-accredited laboratories.

View the file

Other files

File Type Posted
9924.1 Item Specifications.pdf PDF
BID 9924.1 Bid Cover.pdf PDF
BID 9924.1 Bid Cover Gen Stip and Instr.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Division of Financial Management

Department of Procurement

MONTGOMERY COUNTY PUBLIC SCHOOLS

45 West Gude Drive, Suite 3100

Rockville, Maryland

INVITATION OR BID # 9924.1

HVAC MAINTENANCE, REPAIR, AND REPLACEMENT SERVICES

GENERAL CONDITIONS AND SPECIFICATIONS

GENERAL CONDITIONS

A. SCOPE OF WORK

The contractor shall provide all labor, supervision, materials, equipment, and tools necessary to service, maintain, repair, and replace HVAC equipment. Systems include but are not limited to air handling units (AHU) variable air volume (VAV), roof top units (RTU), boilers, chillers, rooftop units, heat pumps, dedicated outdoors air systems (DOAS), energy recovery units ERU, variable refrigerant volume (VRV) systems, and associated pneumatic or direct digital controls (DDC) controls.

All work shall be performed in compliance with MCPS specifications herein and the manufacturer’s instructions. The successful Contractor(s) will be required to visit various facilities throughout MCPS to develop proposals.

B. INTENT

1. The intent of this IFB is to pre-qualify one or more Bonafide contractors to ensure reliable

HVAC operations across MCPS facilities. The contractor should provide ongoing maintenance, rapid repair services, and equipment replacement solutions.

2. Only Contractors who are full-service HVAC contractors regularly engaged in this trade will be considered.

3. After MCPS evaluation, one or more Bonafide contractors will be selected based on their submissions and pre-qualified to participate in providing proposals for future HVAC services adhering to all terms, conditions and detailed specifications herein.

4. Proposals offered for future projects by the authorized Contractors shall be all inclusive, including but not limited to labor, equipment and miscellaneous materials to satisfy all specification requirements. All costs shall be included in the proposals when submitted.

All work shall be performed in accordance with the latest applicable laws, codes, and regulations of the various regulatory bodies of the State of Maryland, Federal/Local

Governments, and all other boards or departments having jurisdiction. These regulations and

GENERAL CONDITIONS 2 IFB #9924.1

standards will be further considered a part of these specifications and conditions. The

Contractor will furnish and install any additional items required by the same, whether particularly shown or specified. Any items or requirements noted herein more than code requirements and permitted under the code shall take preference. All deliveries must be prepaid

FOB destination. In no case will collect shipment be accepted.

C. AWARD

1. This solicitation does not commit MCPS to award any contract or to pay any costs incurred in the preparation of a response. It is the intention to award future projects under this contract to only Pre-qualified Contractors, based on their submissions and future submittals of the most favorable offers. Consideration will be given to any previous project performance for the Board of Education as to quality of service, acceptable merchandise, and regarding the Contractor’s ability to perform should the individual projects be awarded. However, the Board of Education reserves the right to make awards according to the best interest of MCPS. In addition, the Board reserves the right to remove or add items to the specifications as our requirements change, as well as add Contractors throughout the contract term, should a need arise, that cannot be facilitated by an awarded Contractor. Awards are contingent upon the availability of funds.

2. Wherever the term “provide” is used, it shall mean “furnish and install in place, complete in all detail”.

D. SCHEDULE

1. Following Board of Education approval of the pre-qualified Contractors, the MCPS Department of Facilities Maintenance Project Coordinator (the 'Project Coordinator') will coordinate mandatory site inspections for proposal development. When a site inspection is required, the

Project Coordinator will notify each pre-qualified Contractor in writing at least two (2) business days in advance. During the inspection, the Project Coordinator will provide the scope of work, project schedule, and all other pertinent information necessary to submit a proposal.

2. All pre-qualified Contractors interested in supplying a written proposal shall do so within five business days after the MCPS scheduled project site inspection meeting. The IFB hourly rates will be used for work not specified in any giving project. Contractors shall list each hourly rate and quantity used to develop the proposal individually on each proposal. The proposal prices offered shall be all-inclusive. All proposals shall list labor rates, the total cost for labor, material cost, and shall include completion date for each project.

3. Start and completion dates MUST be identified on each proposal. No work shall commence without MCPS’ approval. A purchase order issued and signed by the Director of the

Department of Procurement will be the Contractor’s authorization to proceed with an approved proposal. All work is to be completed on or before the stated completion date, identified and accepted on each proposal. This includes, but is not limited to, final inspections by the MCPS

Project Coordinator, all cleaning tasks, punch-out work, etc. Late charges will be deducted for failure to meet any target dates without an MCPS approved extension. (See “Late Charges for Failure to Complete on Time” under Section I. Contract Administration.)

GENERAL CONDITIONS 3 IFB #9924.1

4. Contractor shall take into consideration that some school activities will be taking place

(administration and special activities) while work is being performed. No work performed by the Contractor shall disrupt normal school functions. Any traffic blockages, utility outages, etc., which may be required in the execution of the Contractor's work shall be scheduled with the

MCPS Project Coordinator and will require the Contractor to perform such work at premium labor times. The Contractor shall anticipate these occurrences in their proposals, and no changes in amounts or completion date will be made for such occurrences. The intent is to have each project performed without closing the building during regular weekday hours.

Contractors shall plan for the possibility that work may be performed over a weekend or at night, so as not to affect the building usage and to satisfy the completion dates.

5. Normal Work Periods

Work may be performed Monday through Friday, 6:30 A.M. through 7:00 P.M. (MCPS building service staff are normally on-site during these hours.) Changes may be made only by obtaining approval in advance from the MCPS Project Coordinator. Contractor(s) must make prior arrangements for building access beyond the normal working hours of school building service staff. An authorized MCPS staff person shall be in attendance in the building whenever any Contractor is in the building.

6. The Contractor shall maintain an adequate labor force on the worksite from the start of the project until the completion to satisfy the schedule. MCPS expects the work to proceed uninterrupted regarding labor and material availability. The Contractor shall inventory materials as they are received from the manufacturer and not wait until work is under way to determine if inventory is sufficient.

E. CONTRACT TERM

The term of the contract shall be for one year as stipulated by the IFB. However, the contract may not begin until after approval by the Board of Education and will conclude as stated under the contract term. MCPS reserves the right to extend this contract for up to five additional one-year terms. A written notice indicating MCPS' intention to pursue the extension of the contract will be issued to the successful Contractors 90 days prior to the expiration of each contract term. The contractor will have 10 days from the date of notification to return the notice acknowledging its intent to accept or reject the extension. Once the response is evaluated, MCPS staff may make a recommendation to the Board of Education to extend this contract or decide to rebid. If the contract is extended by the Board of Education, a contract amendment will be issued.

F. QUANTITIES

MCPS shall not be obligated to purchase any specific quantity. Assigned projects are dependent upon the current requirements of MCPS and on budgetary limitations. Orders will be placed from time to time throughout the contract term.

GENERAL CONDITIONS 4 IFB #9924.1

G. MCPS EMERGENCY/CRISIS PROCEDURES, SHELTER/LOCKDOWN

Emergency/ Crisis Procedure Information

1. In the event of an emergency/crisis incident while working in an MCPS facility, the Contractor and/or their representative(s) shall be required to adhere to the established MCPS procedures and school administrative guidelines during such an occurrence.

2. Supplied herein under APPENDIX A for the Contractor’s information are the MCPS

Emergency/Crisis Procedures, Shelter/Lockdown. It is the Contractor’s responsibility to familiarize themselves and their representative(s) regarding the Shelter/Lockdown Procedures.

These procedures are subject to change due to new MCPS requirements.

3. The Contractor shall have at the worksite, a reasonable number of materials that will allow them to quickly secure the work area and/or secure buildings as required for the type of work being performed.

H. WARRANTY

1. The specifications require that all workmanship and materials should be guaranteed for two years. Final payment will be made once the project is complete and accepted by the MCPS

Project Coordinator for each project. The warranty shall begin once the MCPS Project

Coordinator has approved the Contractor’s final invoice for payment.

2. Warranty shall provide for the replacement of defective materials plus installation and labor.

Any warranty claim made by MCPS prior to the expiration of said warranty shall be satisfied even if the warranty has subsequently expired. Failure of a Contractor to provide satisfactory warranty service to MCPS will be grounds for exclusion from future solicitations.

3. Any manufacturer of material(s) used on the project, offering as standard, a longer warranty/guarantee than as specified herein, shall take precedence.

4. Upon completion of the projects, the point of contact may change between MCPS and the

Contractor when identifying and resolving any warranty claims during the warranty period.

I. BRAND NAMES

1. Commodity descriptions that state “Only a specified brand will be considered” are brands that have been evaluated and tested for inclusion on this IFB and are the only brands acceptable at this time. No substitutions will be accepted. Other brands will be evaluated and tested for future projects by MCPS if materials are submitted at no cost to MCPS. Forward samples/information to Montgomery County Public Schools, Department of Facilities

Maintenance, Testing normally requires a minimum of 60 workdays to complete;

therefore, your samples/materials for testing may be approved for future projects if the evaluation is satisfactory.

GENERAL CONDITIONS 5 IFB #9924.1

2. The brand name, code, or model number on each item being offered, even if bidding the specified brand shall be provided. If a brand and code or model number is not shown, your IFB may not be considered.

3. If an item specification shows code or model numbers that have been discontinued, the bidder shall so state and indicate the current code or model number.

J. GENERAL ASBESTOS INFORMATION

1. Asbestos Free Materials

NO MATERIALS PROVIDED SHALL CONTAIN ASBESTOS!!!! All Contractors providing and/or installing any of the building materials listed below shall secure laboratory analysis confirming that materials contain NO ASBESTOS. The cost for testing shall be included in the ifb prices offered. After the initial testing has been performed additional annual testing will be required thereafter or immediately upon any change in materials or manufacturers.

• Acoustical ceiling tile

• Adhesives

• Caulking

• Fire Rated Doors

• Fire Board

• Floor tile and sheet flooring

• Folding Doors

• Gypsum Panels (Drywall)

• Insulation (All types; roof, HVAC, piping, wall, etc.)

• Mastics

• Plaster

• Roofing System Components e.g. BUR

• Asphalt, Felts, Cap Sheets, Shingles, etc.

• Spackle

• Toilet Partitions

• Window Glazing

The laboratory performing the analysis must have received U.S. Environmental Protection Agency

(EPA) accreditation and be a member of the National Voluntary Laboratory Accreditation Program

(NVLAP). The Contractor or the manufacturer can have the laboratory testing performed. No other form of confirmation such as Material Safety Data Sheets, manufacturer documentation, historical testing, etc. will be accepted. A list of EPA accredited laboratories can be found at http://ts.nist.gov/standards/scopes/programs.htm

The Contractor shall provide the required laboratory analysis report(s) and a completed “Asbestos

Free Material Verification Form” herein (see APPENDIX E) within 10 working days after receipt of the “Pre-Award Notification” letter for each listed product required in the execution of the scope of work.

2. Existing Asbestos Materials

MCPS shall be responsible for all asbestos abatement tasks as may be required regarding existing materials on site. Any questions concerning asbestos materials shall be directed to the IAQ Team

Leader at 301-926-4378.

http://ts.nist.gov/standards/scopes/programs.htm

GENERAL CONDITIONS 6 IFB #9924.1

K. DEVIATIONS

All offers meeting the intent of the request will be considered for award. Contractors who are deviating from the terms, conditions, and/or specifications shall list such and explain fully on a separate sheet to be submitted with their IFB. If these deviations are of a technical nature, the Contractor shall supply the manufacturer’s description of the deviation. The absence of such a sheet shall indicate that the Contractor has taken no exception and shall be held responsible for performing in accordance with the terms, conditions, and specifications as stated herein.

L. eMARYLAND MARKETPLACE ADVANTAGE

M. DELIVERY, STORAGE, AND HANDLING

1. The Contractor shall store all materials and equipment exclusively in areas designated by the MCPS

Project Coordinator. The Project Coordinator will coordinate with school staff and the Contractor to identify appropriate staging areas prior to the start of work.

2. MCPS will not be held responsible for any material stored at job sites; it is the contractor’s responsibility to arrange for securing their materials and equipment.

N. MANDATORY SUBMISSION

1. IFB Documents

One original and one copy of the IFB submissions are requested. The cover page of each copy must be clearly marked original or copy. Contractors may wish to reproduce and retain an additional copy for their files. Proposals must contain all required information to be considered responsive.

2. Quotation Form

a. Quotations are to be entered on the Item Specifications Sheet, APPENDIX F. Faxed responses are not acceptable. SEALED IFB ONLY.

b. Contractors shall submit a separate price for each item listed on the Item Specification Form.

Submission of one price for all the items without indicating a price per item shall be considered non-responsive and will invalidate the IFB. Prices offered shall be valid for acceptance during a period of no less than 90 days from the date of IFB opening.

Maryland law requires local and state agencies to post solicitations on eMaryland

Marketplace Advantage. Registration with eMaryland Marketplace is free. It is recommended that any interested supplier register at https://emma.maryland.gov/, regardless of the award outcome for this procurement as it is a valuable resource for upcoming bid notifications for municipalities throughout Maryland.

GENERAL CONDITIONS 7 IFB #9924.1

5. Addenda/Errata

Changes and addenda to a solicitation may occur prior to the IFB opening date and time. It is the bidder’s responsibility to check the MCPS website under the event calendar http:www.montgomeryschoolsmd.org/departments/procurement/ or contact the Department of

Procurement email to Laly_A_Bowers@mcpsmd.org and procurement@mcpsmd.org to confirm that they have all addenda/errata. Failure to acknowledge addenda/errata on the form may result in a IFB being deemed non-responsive and consequently rejected.

6. Licenses/Certifications to be Submitted with IFB Response

Copies of valid licenses must be submitted with the IFB response. Failure to provide licenses may disqualify your response.

a. Maryland Tax Liability Licenses

The contractor shall possess a current “State of Maryland” Construction Business License or a Maryland Home Improvement Commission License. These are considered “TAX

LIABILITY” Licenses and do not authorize a contractor to perform any trade-specific work in the State of Maryland without the appropriate trade licenses as required. NOTE: All out-of-state bidders must provide an out-of-state Maryland Construction Business or Home

Improvement License.

• Construction Business License: This type of business license is issued through the County or Baltimore City, or the Clerk of the Circuit Court in which your business is located within the State of Maryland. Contact the State License Bureau http://ww.marylandtaxes.com/ or at 410-260-6240 for additional information as required.

• Maryland Home Improvement Commission License: This type of license is issued through the State of Maryland, Department of Labor, Licensing and Regulations, Maryland Home

Improvement Commission. For further information, and to locate the closest office go to www.DLLR.state.md.us or call 410-230-6309.

7. Minority Business Enterprise in Public Schools are encouraged to participate in this solicitation

O. INQUIRIES

Inquiries regarding this solicitation must be submitted in writing, to Laly Bowers, Senior Buyer, Montgomery County Public Schools, 45 West Gude Drive, Suite 3100, Rockville Maryland 20850, email to Laly_A_Bowers@mcpsmd.org and procurement@mcpsmd.org Questions must be received no later than four business days prior to IFB opening for the bidder to receive a reply prior to submitting its IFB.

The Board of Education will not be responsible for any oral or telephone explanations or interpretations.

Bidder contact with any other MCPS employee regarding this solicitation until the contract is mailto:Laly_A_Bowers@mcpsmd.org mailto:procurement@mcpsmd.org http://ww.marylandtaxes.com/ http://www.dllr.state.md.us/ mailto:Laly_A_Bowers@mcpsmd.org mailto:procurement@mcpsmd.org

GENERAL CONDITIONS 8 IFB #9924.1

awarded by the Board of Education will be considered by MCPS as an attempt to obtain an unfair advantage and result in non-consideration of its IFB. The MCPS Department of Procurement website address is https://www.montgomeryschoolsmd.org/departments/procurement/staff.aspx

Subsequent to the award if the bidder finds any discrepancy or omission and has questions of MCPS’s intent, prior to performing work, they shall notify the MCPS project manager and the Procurement Buyer by email to resolve and receive clarification.

P. SPECIAL CONDITIONS

1. Audit Provisions – MCPS shall have the right to examine the successful bidder(s) records pertaining to work performed under the contract to determine and verify their compliance with all contractual conditions. MCPS shall be granted access to such records at all reasonable times during the contract period and for three years thereafter.

2. Contingent Fee – The successful bidder(s) hereby represents that they have not retained anyone to solicit or secure this contract from MCPS upon an agreement or understanding for a commission, percentage, brokerage, or contingent fee, except for bona fide employees or bona fide established commercial selling agencies maintained by the person so representing for the purpose of securing business, or any attorney rendering professional legal services consistent with applicable canons of ethics.

3. Assignments – Neither this contract nor any interest therein nor claim thereunder shall be assigned or transferred by the successful vendor except as expressly authorized in writing by MCPS and no contract shall be made by the successful vendor with any other party for furnishing any of the work or services herein contracted for without the written approval of MCPS.

4. Disputes – Any dispute concerning a question of fact arising under this contract shall be disposed of by written agreement between the Contractor and MCPS. Pending final decision of a dispute hereunder, the Contractor shall proceed diligently with the contract performance.

Q. CONTRACTOR’S OBLIGATION REGARDING CRIMINAL RECORDS OF INDIVIDUALS

ASSIGNED TO WORK IN MCPS FACILITIES

a. Prohibition against assigning registered sex offenders and individuals convicted of sexual offenses, child sexual abuse, and other crimes of violence to MCPS contracts:

Maryland Law requires that any person who enters into a contract with a county board of education “may not knowingly employ an individual to work at a school” if the individual is a registered sex offender. Under § 11-722 of the Criminal Procedure Article of the Maryland Code, an employer who violates this requirement is guilty of a misdemeanor and, if convicted, may be subject to up to five years imprisonment and/or a $5000 fine.

Effective July 1, 2015, amendments to §6-113 of the Education Article of the Maryland Code further require that a contractor or subcontractor for a local school system may not knowingly assign an employee to work on school premises with direct, unsupervised, and uncontrolled https://www.montgomeryschoolsmd.org/departments/procurement/staff.aspx

GENERAL CONDITIONS 9 IFB #9924.1

access to children, if the employee has been convicted of or pled guilty or nolo contendere to a crime involving:

1. A sexual offense in the third or fourth degree under § 3–307 or § 3–308 of the Criminal Law

Article of the Maryland Code or an offense under the laws of another state that would constitute an offense under § 3–307 or § 3–308 of the Criminal Law Article if committed in

Maryland;

2. Child sexual abuse under § 3-602 of the Criminal Law Article, or an offense under the laws of another state that would constitute child sexual abuse under § 3-602 of the Criminal Law

Article if committed in Maryland; or

3. A crime of violence as defined in § 14–101 of the Criminal Law Article, or an offense under the laws of another state that would be a violation of § 14–101 of the Criminal Law Article if committed in Maryland, including: (1) abduction; (2) arson in the first degree; (3) kidnapping;

(4) manslaughter, except involuntary manslaughter; (5) mayhem; (6) maiming; (7) murder;

(8) rape; (9) robbery; (10) carjacking; (11) armed carjacking; (12) sexual offense in the first degree; (13) sexual offense in the second degree; (14) use of a handgun in the commission of a felony or other crime of violence; (15) child abuse in the first degree; (16) sexual abuse of a minor; (17) an attempt to commit any of the crimes described in items (1) through (16) of this list; (18) continuing course of conduct with a child under § 3-315 of the Criminal Law

Article; (19) assault in the first degree; (20) assault with intent to murder; (21) assault with intent to rape; (22) assault with intent to rob; (23) assault with intent to commit a sexual offense in the first degree; and (24) assault with intent to commit a sexual offense in the second degree.

Each contractor is required to submit, following the award of a contract, documentation confirming that its direct employees and those of any subcontractors and/or independent contractors assigned to perform work in a MCPS school facility under the contract meet this obligation. Additionally, the contractor must confirm that it continues to meet this obligation on an annual basis and/or when there are changes in the workforce that the contractor and/or its subcontractors use to perform the work required by the contract.

Violation of this provision is a material breach of contract for which MCPS may take appropriate action up to and including termination of the contract.

b. Required criminal background check process for certain individuals in the contractor’s workforce:

Under recent amendments to § 5-551 of the Family Law Article of the Maryland Code, each contractor and subcontractor shall require that any individuals in its workforce must undergo a criminal background check, including fingerprinting, if the individuals will work in a MCPS school facility in circumstances where they have direct, unsupervised, and uncontrolled access to children. The term “workforce” in this and the preceding section refers to all of the contractor’s direct employees, subcontractors and their employees, and/or independent contractors and their employees that the contractor uses to perform the work required by the contract.

GENERAL CONDITIONS 10 IFB #9924.1

Fingerprinting for the criminal background check may be performed by the MCPS Office of

Human Resources and Development, 45 W. Gude Drive, Rockville, MD 20850, or through another service approved by MCPS. Individuals fingerprinted by MCPS will be required to provide written consent, and MCPS will maintain copies of all records for criminal background checks performed by MCPS. If the contractor uses another service approved by MCPS, the results of the criminal background check must be provided to MCPS for record- keeping. A list of MCPS approved fingerprinting agencies can be found on the Procurement Unit website at http://www.montgomeryschoolsmd.org/departments/procurement.

The contractor must take appropriate steps to promptly follow up on information identified in the criminal background check related to the sexual offenses, child sexual abuse offenses, and crimes of violence enumerated above, as well as any information regarding offenses involving the distribution of drugs or other controlled substances, or any other criminal information identified by MCPS as warranting further explanation insofar as it may significantly affect the safety and security of MCPS students. If, after following up, the contractor believes that the individual is qualified and should be assigned to work (or continue to work) in a MCPS school facility, then the contractor will provide a written summary to MCPS justifying its recommendation. MCPS will rely on the contractor’s summary to determine whether to accept the contractor’s recommendation, and the contractor will be responsible for any consequences of a material misrepresentation in its written summary.

Once the contract is awarded, the contractor is responsible for implementing the background check process. An individual in the contractor’s workforce may not begin work in a MCPS school facility on an assignment where the individual will have direct, unsupervised, and uncontrolled access to children, until: (a) the background check results for that individual have been received by MCPS; (b) the contractor certifies to MCPS that the individual has received training and/or reviewed informational materials, as appropriate, regarding recognizing, reporting, and preventing child abuse and neglect, consistent with the content provided in training for MCPS employees; and (c) the individual obtains a MCPS identification badge. The badge will be issued by MCPS.

http://www.montgomeryschoolsmd.org/departments/procurement

II. CONTRACT ADMINISTRATION 12 IFB #9924.1

II. CONTRACT ADMINISTRATION

A. PRE-CONSTRUCTION MEETING

1. Prior to final award notification MCPS reserves the right to convene a meeting with the apparent successful contractor prior to awarding a project The purpose of this meeting is to afford all parties an opportunity to discuss any aspects of the project and contract execution, which may be of concern for the successful and timely completion of the project.

2. Documents required elsewhere in this solicitation, such as service and warranty agreements, shall be provided at this meeting.

3. Issues raised during this meeting that cannot be resolved to the satisfaction of MCPS will be reason to reject the proposal response and to consider the next responsive contractor.

B. POST AWARD SUBMISSIONS

1. The Contractor may be required to supply within 48 hours after MCPS requests, applicable business and Contractors licenses, master licenses for trades appropriate for work to be performed, etc., as required to allow MCPS time for contractor evaluation. Failure to supply a copy as specified may disqualify your proposal.

2. Sub-Contractors

a. MCPS must approve all sub-contracting work in advance; it is MCPS’ intent that the successful bidder has the in-house resources to perform the primary task and only sub-contract secondary task(s) in which they do not specialize, e.g., electrical, mechanical and/or plumbing, etc. The contractor shall supply a complete list of all sub-contractors and the cost of their work for evaluation by MCPS. This list must be submitted within two workdays after MCPS makes the request. Failure to do so will be grounds for termination. The Contractor shall be responsible for ensuring that all proposed sub-contractors are in good standing with MCPS and have a minimum of five years of experience performing the type of work they will be performing under this IFB/contract and possess appropriate licensing.

b. MCPS shall notify the Contractor in writing if, after due investigation, there is a reasonable objection to any of the proposed sub-contractors. Failure of MCPS to make an objection to any proposed sub-contractor shall constitute notice of no objection. Each sub-contractor may be required to furnish to MCPS, in duplicate, proof of their financial stability and experience to perform the particular work for which they will be engaged. All contractual agreements between the Contractor and their sub-contractors shall be written, unamended, on the Standard Form of

Agreement between Contractor and Sub-Contractor, AIA Document A401 (most recent edition).

Upon request, the Contractor shall supply copies of this contract to MCPS within five workdays.

c. MCPS acceptance of Sub-Contractors in no way relieves the Contractor from being responsible for the total and complete performance of the work for the project: i.e., failures of the Sub-

II. CONTRACT ADMINISTRATION 12 IFB #9924.1

Contractors to satisfactory perform the work in timely fashion is the Contractor's responsibility and not that of MCPS.

d. All work must be performed by a bona-fide licensed trade person.

3. Minority Business Enterprise (MBE) in Public Schools

Certified Minority Business Enterprises are highly encouraged to respond to this solicitation.

4. Submit Evidence of Insurance

a. Insurance

See Article XXI of the General Stipulations and Instructions to Bidders. The successful

Contractor(s) shall submit an actual certificate of insurance made in favor of MCPS within five workdays after an award of IFB/contract.

b. Additional Insurance

The Montgomery County Board of Education shall be named as an additional insured on all liability policies.

c. Policy Cancellation/Certificate Holder

1) Sixty days written notice of cancellation or material change in any of the policies is required.

2) The Department of Procurement, Montgomery County of Board of Education shall be the insurance certificate holder.

5. Invoicing

a. Bidder shall submit invoices preferred electronically, via email or regular mail to the Project

Coordinator assigned to each project unless otherwise requested for payment approval. All invoices shall identify with pertinent information such as purchase order number and building name where work was performed. The MCPS Project Coordinator shall submit invoices and receiving reports in a timely manner to the Division of Controller to process payments and shall specify final or partial payments.

b. MCPS is not obligated to make any partial payments. However, partial payments may be considered based upon the Contractor’s justification of expenditures and satisfactory work performed up to 75% of the total contract cost. The remaining balance will be paid upon MCPS acceptance of the project as being 100% complete and in compliance with specifications. MCPS will refrain from making any partial payments if, in MCPS' opinion, the project falls behind schedule. MCPS may resume making partial payments once all delays have been overcome and the project is back on schedule. Final payment shall be made after the project is completed in all detail as specified and accepted by the MCPS Project Coordinator.

II. CONTRACT ADMINISTRATION 13 IFB #9924.1

6. Permits & Inspection

The Contractor shall obtain all required permits, pay all fees, and certify that other required permits have been obtained prior to commencing work. Upon completion of all work, obtain all certificates of inspections required and deliver them to the MCPS Project Coordinator. All required permit certificates and related documentation shall be submitted to the MCPS Project Coordinator for approval prior to final payment.

The Contractor is responsible for determining the permitting jurisdiction that has authority and what permits are required such as Montgomery County Government, City of Rockville, City of

Gaithersburg, and Town of Poolesville, etc.

C. MARYLAND BUY AMERICAN STEEL ACT

Steel purchased under this IFB must be in compliance with the “Maryland Buy American Steel Act “, Sections 17-301 to 17-306 of the State Finance and Procurement Article of the Annotated Code of

Maryland. This applies to steel purchases that are combined or a single purchase that is composed of at least 10,000 pounds of steel products. More detailed information can be found at:

http://www.dsd.state.md.us/comar/AnnotCodeIdx/StateFinProcIndex.htm it is the bidder’s responsibility to be in compliance as required if purchasing steel in excess of 10,000 pounds.

D. SALES TAX

Section 326 (a) of Chapter 452 of the Laws of Maryland, 1968, provides, among other things, for the taxation of “any sale . . . of tangible personal property to the Contractors or Builders to be used for the construction, repair, or alteration of real property Sales tax, as applicable, shall be included in any IFB made to the Board of Education of Montgomery County, Maryland.

E. PERFORMANCE

a. MCPS anticipates that work will usually occur during normal business hours. However, some projects may require the Contractor to perform work other than during normal business hours. this will be handled on a case-by-case basis

b. The Contractor(s) may be asked to provide services for multiple school sites concurrently. The

Contractor must provide an estimate of the number of site installations they can support at one time.

c. The Contractor shall have on the job site at least one person fluent in English at all times.

All employees shall have and wear an MCPS badge at all times.

d. The Contractor(s) must provide to the MCPS Project Coordinator cellular telephone numbers and email addresses of project managers to allow for day-to-day direct communications.

2. Work is to be completed in a timely workmanlike manner; fumes, odors, materials, and work procedures will be controlled to protect occupants and property from harm and damage.

http://www.dsd.state.md.us/comar/AnnotCodeIdx/StateFinProcIndex.htm

II. CONTRACT ADMINISTRATION 14 IFB #9924.1

3. The Contractor shall furnish an experienced, on-site supervisor who shall remain in charge of the work and always provide continuous direction to the crew. Prior to the start of each project, the Contractor shall submit a roster of all assigned personnel to the MCPS Project Coordinator. The assigned supervisor and crew must remain consistent throughout the duration of the project; any proposed personnel changes after work has commenced require prior written approval from the MCPS Project Coordinator before the replacement employee reports to the job site.

4. The Contractors and employees:

a. Contractors shall have all employees complete the fingerprint and background check, so they can receive a MCPS badge. All workers will be required to check in daily at the facility’s main office to receive identification badges that shall be worn while on premises.

b. Use of any form of tobacco products, liquor, and/or illegal drugs is not permitted in MCPS buildings and on grounds.

c. May not routinely use facility equipment and buildings, i.e., telephone, lounges, toilet rooms, parking lots, etc. The MCPS Project Coordinator will designate such facilities as authorized for

Contractor use.

5. All work shall be scheduled to the mutual satisfaction of the School Administration and the MCPS

Project Coordinator to avoid conflicts with school activities.

6. Work area shall be left clean and ready for use after the installation. The Contractor must remove all debris generated by the work from the premises daily adhering to Montgomery County Solid Waste and

Recycling Regulation NO. 15-04 AM, COMCOR 48.00.03. The Contractor shall track all recyclable materials such as metal, concrete, asphalt, cardboard, etc., and provide MCPS recyclable amounts by weight.

7. Installation shall be performed in strict compliance with the latest local, state, and federal regulations having authority. The Maryland Occupational Safety and Health Administration Hazard Communication

Standards and the Occupational Safety and Health Administration Hazard Communication Standards must be followed.

8. Upon completion of all work, any and all damage to the school building and grounds because of the work shall be restored to a condition as good as existed prior to damage.

9. Failure to perform in accordance with MCPS specifications and industry standards may result in the Contractor being removed from the approved bidder list to participate in future solicitations for a period no less than two years.

II. CONTRACT ADMINISTRATION 15 IFB #9924.1

F. CHANGES IN THE WORK

1. Should it be desired to make alterations or changes at any time during the progress of the work or to add to or delete work, MCPS shall have the undisputed right to make such changes, additions, omissions, or alterations by written order. An MCPS CHANGE ORDER FORM under

APPENDIX B must be completed and signed by both MCPS and Contractor's authorized representative as identified on the form. All Change Order Forms, Proposals and other supporting documentation relating to additional work must be supplied to the MCPS Project Coordinator within one week from the time the Change Order need is identified. No cost increases to the contract will be paid without a complete Change Order Form signed by both parties. Approved

Change orders do not automatically revise completion dates. It is the Contractor’s responsibility to provide a written request for an extension, with an explanation of justification as they deem necessary. Using approved orders as the rationale for not completing on time will not be accepted without an MCPS approved extension. If work is performed without MCPS authorization and/or written Change Order, the contractor will be subject to reversing said work, or work and/or materials should remain at no cost to MCPS. This shall be solely at MCPS’ discretion.

2. The allowable, “all inclusive” mark-up for combined overhead, bonds, fringe benefits, union fees, equipment, tools and profit for work performed by the prime Contractor shall be based on the monetary value of the work not to exceed the following rates:

Value of Work Combined Overhead & Profit

$0 - $1,000 20%

$1,001 - $4,999 18%

$5,000 - $9,999 14%

$10,000 - $24,999 12%

Over $25,000 Negotiated and approved by MCPS prior to commencement of work

This schedule applies to work done by the prime Contractor or by a Sub-Contractor(s). The prime

Contractor shall be allowed not more than 8% of the Sub-Contractor’s all-inclusive cost for combined overhead, bonds, fringe benefits, union fees small equipment, tools, and profit for labor, materials.

3. The Contractor shall furnish supporting documentation with all Change Order requests for all credits and/or extras. At a minimum, change order requests shall include a description of the work, detailed material lists, cost of materials (actual Contractor costs, not list prices), man-hours and rates. The contractor shall not use any sub-contractor that is not willing to provide an itemized proposal as required by MCPS. The same material costs, man-hours and rates, supervision, overhead, and profit shall be applied equally to all credits.

G. LATE CHARGES FOR FAILURE TO COMPLETE ON TIME

1. MCPS will retain $500.00 per calendar day of delay beyond the completion date stipulated on each accepted proposal, for the first five days. MCPS shall retain $1,000.00 for each calendar day

II. CONTRACT ADMINISTRATION 16 IFB #9924.1

thereafter. The late charges shall be assessed by MCPS because of the late completion. This shall apply if the Contractor fails to meet any specified target date as identified herein unless a written approval for an extension has been granted by MCPS.

2. Failure to complete the work within the time specified will entitle MCPS to late charges. These charges will be deducted and retained out of any monies due to the Contractor under this

IFB/contract for the sum stated in the above paragraph for each calendar day required to complete the work beyond the agreed upon and documented completion date. This includes Saturdays, Sundays, and legal Holidays.

3. If necessary, to reach a proper stopping place in any portion of work or to complete work within proposal/contract time limit, both the Contractor’s and the Sub-Contractor’s workforces shall work overtime without additional cost to the proposal/contract price. The Contractor shall be responsible for all incidental cost in connection with such overtime work including, but not limited to, MCPS building service overtime required.

4. If work falls behind schedule, as determined by the MCPS Project Coordinator, the Contractor shall provide, at their own expense, additional labor and/or equipment, overtime pay, etc., as required to overcome delays including, but not limited to, MCPS building service overtime as required.

5. The MCPS Contract Officer will review requests for extension of completion time due to strikes, lack of materials, and/or any other condition, over which the Contractor has no control. A written application for extension shall be made immediately upon occurrence of conditions that, in the opinion of the Contractor requires such an extension, with reason clearly stated and a detailed proof for each such delay. The delay with MCPS issuing a purchase order does not automatically alter any completion dates. If in the Contractor’s view, the delay of a purchase order has a negative effect on completion of the contract within the dates specified, they must notify MCPS in writing immediately. Using the rationale that a purchase order was issued late, at the conclusion of the work will not be an acceptable reason for requesting a contract extension. No time extension will be allowed except by the final written approval of the MCPS Contract Officer. No requests for an extension due to weather conditions will be considered unless accompanied by documentary evidence supplied by NOAA’s National Weather Service showing, by comparison, that such weather suffered is abnormal to any of the past five years as recorded. No request for an extension will be considered by MCPS if received from the Contractor after the previously agreed completion date has passed. Late charges will be automatically deducted from the money owed.

H. CONTRACTOR’S OVERTIME PROCEDURE

If the Contractor chooses to work overtime for any reason and secures approval from the Project

Coordinator to do so, the Contractor shall be responsible for any associated costs including MCPS building service staff, etc. The building service staff overtime rate is $45.00 per hour. All overtime work must be requested, in writing, to the MCPS Project Coordinator, at least 48 hours in advance.

This will allow MCPS staff sufficient time to coordinate the required building service staff participation.

The Overtime Reimbursement Agreement under APPENDIX C must be completed and signed by

MCPS and the Contractor before the work is to be performed. The request must identify the dates and

II. CONTRACT ADMINISTRATION 17 IFB #9924.1

times the Contractor proposes to work. Without written request and the Overtime Reimbursement

Agreement, MCPS will not approve any overtime.

I. MCPS PROJECT COORDINATOR

1. The Division of Facility Maintenance Director (DFM) will represent MCPS in the execution of this contract. No changes in contract conditions or specifications will be made without the DFM director’s approval and authorization by the director of the Department of Procurement or the authorized designee.

2. After the award the MCPS Maintenance Director will assign a Project Coordinator who will handle day-to-day operation and installation coordination of each project. Scheduling work onsite must be done through the MCPS Project Coordinator copy to the Department of Procurement.

3. The MCPS Project Coordinator is authorized to:

a. Serve as liaison between MCPS and the Contractor;

b. Give direction to the Contractor to ensure satisfactory and complete performance;

c. Monitor and inspect the Contractor's performance to ensure acceptable timeliness and quality;

d. Serve as records custodian for this contract;

e. Accept or reject the Contractor's performance;

f. Furnish timely written notice of the Contractor's performance failure to the director of

Maintenance and the director of Procurement;

g. Prepare required reports;

h. Approve or reject invoices for payment and submitted construction schedules;

i. Recommend contract modifications or terminations to the director of the Department of

Facilities Maintenance with copies to the director of the Department of Procurement;

4. The MCPS Department of Facilities Maintenance staff are not authorized to make any determination - as opposed to recommendations - that alter, modify, terminate, or cancel the contract, affect procurement, interpret ambiguities in the contract language, or waive MCPS contractual rights.

J. QUALITY ASSURANCE

1. The Contractor shall perform all work in accordance with the manufacturer's instructions/procedures and MCPS specifications herein. All Contractor(s) responding to this IFB shall have been in business and be regularly engaged in the type of work, which is specified herein, for a minimum of five years. Work performed under this contract shall be performed with

II. CONTRACT ADMINISTRATION 18 IFB #9924.1

bona-fide, full-time employees of the successful Contractor. If part-time Sub-Contractors are used, they must be pre-approved by the MCPS Project Coordinator. Appropriately licensed trade persons shall perform all trade work. A copy of these licenses must be submitted to MCPS prior to performing any work.

K. PROJECT CLOSE-OUT

1. Initial Installation Punch-out

a. The Contractor shall notify the MCPS Project Coordinator, in writing, that the work is ready for punch-out inspection. Punch-out shall occur sufficiently in advance of the proposed completion date to afford the Contractor time to rectify punch list corrections.

Before calling for a punch-out, work shall be completed and all areas shall be clear of construction materials and debris.

b. During punch-out, the following individuals shall be present:

1) Authorized representatives of MCPS

2) Contractor

c. Upon completion of a punch-out, a written punch list will be prepared by the Contractor and submitted to MCPS within five workdays

2. The Contractor shall notify the MCPS Project Coordinator, in writing, for a final inspection once all related punch list items have been completed. All punch-out and final inspections shall be performed well in advance of the completion date to allow for corrections. Late fees shall accrue until all punch list items are 100% complete.

3. The Contractor is entitled to one punch-out inspection and one final inspection for each proposal under the terms of the contract with MCPS. Any additional inspection by MCPS staff due to the

Contractor’s failure to complete the punch-out items will result in deductions in costs incurred by MCPS for such inspections from the Contractor’s final invoice.

4. The Contractor shall provide written warranty statements indicating the start and end of warranty dates to be signed by both the Contractor and the MCPS Project Coordinator. The starting date shall be the date the final invoice for payment to the Contractor is signed and approved by the

MCPS Project Coordinator.

III. SCOPE OF WORK 19 BID 9924.1

A. HVAC SERVICE, REPAIR, AND REPLACEMENT PROGRAM

Montgomery County Public Schools (MCPS) is soliciting proposals from qualified firms to provide comprehensive heating ventilation air conditioning (HVAC) service, repair, and replacement services district-wide. Services shall include preventive maintenance, emergency response, system diagnostics, equipment repair, and full replacement HVAC systems as required.

1. Intent

The intent of this RFP is to establish a multi-year contract with one or more qualified contractors to ensure reliable HVAC operations across MCPS facilities. The contractor shall provide ongoing maintenance, rapid repair services, and equipment replacement solutions.

2. Scope of Services

The contractor shall provide all labor, supervision, materials, equipment, and tools necessary to service, maintain, repair, and replace HVAC equipment. Systems include but are not limited to air handling units (AHU) variable air volume (VAV), roof top units (RTU), boilers, chillers, rooftop units, heat pumps, dedicated outdoors air systems (DOAS), energy recovery units

ERU, variable refrigerant volume (VRV) systems, and associated pneumatic or direct digital controls (DDC) controls.

3. Service Requirements

Preventative maintenance inspections and services

1.- Troubleshooting and diagnostics

2.- Repairs and parts replacement

3.- Full system replacement

4.- Emergency response within 2 hours

5.- 24/7 on-call availability

4. Staffing Requirements

The contractor shall employ licensed HVAC technicians, including journeyman and master-level…

This is the start of the file's text. The full file is on GovTribe.