IFB _9195 -Installation of Radio Communications Systems (09.15.26).pdf
PDF 3 MB Posted
- Solicitation number
- # 9195
- Issued by
- Middlesex County, Massachusetts
About this file
This Invitation for Bids (IFB #9195) is issued by the City of Framingham, Massachusetts, for the installation of radio antennas at radio sites in Framingham, Natick, and Wayland to support the 911 Regional Dispatch communications system. The project scope involves comprehensive installation of a radio communications system at multiple locations across these three municipalities. Sealed bids are due by 10:00 a.m. on Wednesday, October 14, 2026, and must be submitted to Brian E. Turbitt, Chief Procurement Officer, at the City of Framingham, 150 Concord Street, Room 205, Framingham, MA 01702. The contract time from execution to substantial completion is specified as 120 calendar days. The project is designed by Context Architecture. Bidders must provide at least three references and demonstrate they are regularly engaged in construction work, with documentation of construction projects completed within the last three years.
The bid requires submission of multiple certifications and documents, including a 5% bid deposit, bid bond, performance bond, and labor and materials payment bond each equal to 100% of the contract price. Bidders must possess DCAMM Certification of Eligibility in telecommunications systems, which is a mandatory requirement for this project. The solicitation is subject to prevailing wage requirements under Massachusetts General Laws Chapter 149, Section 27, with wage rates established by the Massachusetts Department of Labor and Workforce Development effective through various dates in 2028. Contractors must comply with the City of Framingham's Wage Theft Ordinance for projects exceeding $250,000, including workers' compensation insurance requirements, proper employee classification, and weekly certified payroll submissions. Additionally, contractors are encouraged to provide opportunities for Service-Disabled Veteran-Owned Business Enterprises (SDVOBE) to participate on the project, and must achieve workforce participation goals of 15.3% for minorities and 6.9% for women.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CITY OF FRAMINGHAM
Invitation for Bids
Installation of Radio Antennas at Radio Sites in Framingham, Natick and Wayland
IFB # 9195
Bids Due:
Wednesday, October 14, 2026 by 10:00 a.m.
*Late bids will be rejected
Brian E. Turbitt Chief Procurement Officer
City of Framingham 150 Concord Street, Room 205
Framingham, MA 01702
IFB #9195 – Installation of Radio Antennas at Radio Sites in Framingham, Natick & Wayland Page | 2
IFB #9195
COVER SHEET
PLEASE PRINT OR TYPE:
Name of Bidder:
Contact Individual:
Address:
# Street City/Town Zip Code
Phone:
Alternate Phone:
Email Address: Social Security/Federal Tax Identification Number:
Authorized Signature:_______________________________________
IFB #9195 – Installation of Radio Antennas at Radio Sites in Framingham, Natick & Wayland Page | 3
CHECKLIST
Submissions:
Completed Cover Sheet
Checklist (this sheet)
Signed Price Sheet
Signed Bid Bond Form
5% Bid Deposit
Signed Certificate of Non-Collusion
Signed Tax Compliance Certification
Signed Certificate as to Corporate Bidder
Signed Certificate of Foreign Corporation (if applicable)
Signed Contractor’s Equal Employment Requirement
DCAMM Certification of Eligibility and Update Statement (Bidders Affidavit)
Affidavit of Wage Theft Ordinance
Signed Prevailing Wage Certification
Signed Debarment Certification
Signed Labor Harmony and OSHA Certification
Bidder Reference Form
Minimum Requirements:
Yes No
A. Bidder must furnish at least three references with this Invitation for Bids.
B. Bidder must be regularly engaged in the business of construction
C. Bidder shall provide a list of construction completed within the last 3 years.
IFB #9195 – Installation of Radio Antennas at Radio Sites in Framingham, Natick & Wayland Page | 4
PRICE SHEET
To the Awarding Authority:
A. The Undersigned proposes to furnish all labor and materials required for: # IFB #9195 – Installation of Radio Antennas at Radio Sites in Framingham, Natick and Wayland in Framingham, Massachusetts for the City of Framingham in accordance with the accompanying plans and specifications prepared by Context Architecture for the contract price specified below, and deductions according to the terms of the specifications.
B. This bid acknowledges the following addenda:
No.:_____________ Dated: _____________
No.: _____________ Dated: _____________
No: _____________ Dated: _____________
C. The proposed Base Bid Contract amount is ____________________________dollars and
____________________________ cents ($_______________________).
The contract time from the date of execution of this construction agreement to the date of substantial completion shall be 120 calendar days.
C.1. ALTERNATES: the undersigned Bidder submits to following alternate price(s), as described in the Bid Documents, which are to be added to or deducted from the above stated Bid Proposal, as may be selected by the Awarding Authority for inclusion into this Contract. (In the event that the alternate does not affect the Contract Price, the Bidder shall remark “No Change”).
For Alternate(s)
N/A
A. The undersigned agrees that, if they are selected as the contractor, they will within five days, Saturdays, Sundays and legal holidays excluded, after presentation thereof by the awarding authority, execute a contract in accordance with the terms of this general bid and furnish a performance bond and also a labor and materials or payment bond each of a surety company
IFB #9195 – Installation of Radio Antennas at Radio Sites in Framingham, Natick & Wayland Page | 5 qualified to do business under the laws of the Commonwealth and satisfactory to the Awarding Authority and each sum of one hundred per cent of contract price, the premiums for which are to be paid by the General Contractor and are included in the contract price.
The undersigned hereby certifies that they are able to furnish labor that can work in harmony with all other elements of labor employed or to be employed on the work; that all employees to be employed at the worksite will have successfully completed a course in construction safety and health approved by the United States Occupational Safety and Health Administration that is at least 10 hours in duration at the time the employee begins work and who shall furnish documentation of successful completion of said course with the first certified payroll report for each employee; and that he will comply fully with all laws and regulations applicable to awards made subject to Massachusetts General Laws Chapter 149, Section 44A.
The undersigned further certifies under the penalties of perjury that this bid is in all respects bona fide, fair and made without collusion or fraud with any other person. As used in this subsection the word “person” shall mean any natural person, joint venture, partnership, corporation or other business or legal entity. The undersigned further certifies under penalty of perjury that the said undersigned is not presently debarred from doing public construction work in the commonwealth under the provisions of section twenty-nine F of chapter twenty-nine, or any other applicable debarment provisions of any other chapter of the General Laws or any rule or regulation promulgated thereunder.
The undersigned hereby certifies the bidder shall comply with the minority manpower ratio and specific action steps contained in the Supplementary Conditions pertaining to
Equal Employment Opportunity (EEO), including compliance with the minority contractor compliance specified in the Supplementary Conditions. The contractor receiving the award of the contract shall be required to obtain from each
Subcontractor and submit to the contracting or administering agency prior to the performance of any work under the contract, a certification by each Subcontractor, regardless of tier, that the Subcontractor will comply with the minority manpower ratio and specific affirmative action steps contained in the EEO Supplementary
Conditions.
The undersigned certifies that the bidder has examined the Contract Documents and is familiar with the conditions surrounding the proposed construction including, but not limited to, the availability of materials and labor, and that bid amount shall cover the expenses incurred in the performance of the contract.
IFB #9195 – Installation of Radio Antennas at Radio Sites in Framingham, Natick & Wayland Page | 6
If Bidder is a corporation, indicate state of incorporation, and affix corporate seal. If
Bidder is a partnership, give full names and residential addresses of partners. If Bidder is an individual proprietorship, give residential address if different from business or indicate same as business address.
Date:
(Name of General Bidder)
By:
(Name of Person Signing Bid)
(Corporation: State of Incorporation and Seal) or (Partnership or Proprietorship: Residential Address
(Business Address)
(City and State)
(Zip Code)
IFB #9195 – Installation of Radio Antennas at Radio Sites in Framingham, Natick & Wayland Page | 7
BID BOND FORM
KNOW ALL MEN BY THESE PRESENTS, that we:
(insert full Name and Address of Bidder) as Principal, hereinafter called the Principal, and:
(insert full Name and Address of Surety) as Surety, a corporation duly organized under the laws of the State of ______________________ and duly registered to conduct a surety business in Massachusetts, hereinafter called the Surety, are held and firmly bound unto CITY OF FRAMINGHAM, Framingham, Massachusetts, as
Obligee, hereinafter called the Obligee, in the sum of Five Percent (5%) of the total amount bid for the payment of which sum well and truly be made, the said Principal and the said Surety, bind themselves, their heirs, executors, administrators, successors and assigns, jointly and severally, firmly by these presents.
WHEREAS, the Principal has submitted a Bid for:
(insert full Name of Project)
NOW THEREFORE, if the Obligee shall accept the Bid of the Principal and the Principal shall enter into a Contract with the Obligee in accordance with the terms of such Bid, and give such bonds as may be specific in the Bid Documents with good and sufficient surety for the faithful performance of such Contract and for the prompt payment of labor and materials furnished in the persecution therefore, and such other documents as may be required by the Bid Documents, then this obligation shall be null and void; but in the event of the failure of the Principal following
Obligee's acceptance of Principal's Bid to enter such Contract and give such bonds within ten
(10) calendar days of receipt of such Contract, or such other documents as may be required, this obligation shall remain in full force and effect, and the Surety shall pay to the Obligee the difference not to exceed the penalty hereof between the amount specified in said Bid and such larger amount for which the Obligee may in good faith contract with another party to perform the
Work covered by said Bid.
Signed and sealed this ________ day of _____________, 2026
(Principal)
Witness as to Principal
IFB #9195 – Installation of Radio Antennas at Radio Sites in Framingham, Natick & Wayland Page | 8
(Seal)
(Title)
(Surety)
Witness as to Surety
(Seal)
(Title)
IFB #9195 – Installation of Radio Antennas at Radio Sites in Framingham, Natick & Wayland Page | 9
CERTIFICATIONS
FORM A
NON-COLLUSION
The undersigned certifies under penalties of perjury that this bid or proposal has been made and submitted in good faith and without collusion or fraud with any other person. As used in this certification, the word "person" shall mean any natural person, business, partnership, corporation, union, committee, club, or other organization, entity, or group of individuals.
(Signature of authorized individual submitting proposal)
(Printed Name)
(Name of Proposer)
(Date)
IFB #9195 – Installation of Radio Antennas at Radio Sites in Framingham, Natick & Wayland Page | 10
FORM B
ATTESTATION OF TAX COMPLIANCE
Pursuant to M.G.L. c. 62C, §49A, I certify under the penalties of perjury that, to the best of my knowledge and belief, I am in compliance with all laws of the Commonwealth relating to taxes, reporting of employees and contractors, and withholding and remitting child support.
(Printed Name)
(Name of Proposer)
(Federal Tax Identification or Social Security Number)
IFB #9195 – Installation of Radio Antennas at Radio Sites in Framingham, Natick & Wayland Page | 11
FORM C
CERTIFICATE OF CORPORATE AUTHORITY (if applicable):
I, _______________________________ certify that I am the _____________________ of the corporation named as Bidder in the Bid included herein, that _________________, who signed said Bid on behalf of the Bidder was then ________________________ of said corporation, that I know his signature, that his signature thereon is genuine and that said Bid was duly signed, sealed and executed for and in behalf of said corporation by authority of its governing body.
(Corporate Seal)
(Secretary-Clerk)
(Printed Name)
(Name of Proposer)
IFB #9195 – Installation of Radio Antennas at Radio Sites in Framingham, Natick & Wayland Page | 12
FORM D
CERTIFICATE OF FOREIGN CORPORATION (if applicable)
In accordance with Massachusetts General Laws Chapter 30, Section 39 and Chapter 149, any foreign contractor or subcontractor is required to provide a certificate from the secretary of state stating that such corporation has complied with Massachusetts General Laws Chapter 181, Section 3 and 5, including the date of compliance. Further, bidder's attention is called to Massachusetts General Laws Chapter 268A.
In connection with which the bidder is requested to submit the following information:
Full Legal Name
Telephone
State of Incorporation
Principal Place of Business
Qualified in Massachusetts
Place of Business in Massachusetts
Signature
Notarization:
Subscribed and sworn on the ________day of_______________, 2026
Title
Commission expires:
If state of incorporation is Massachusetts, insert MASSACHUSETTS on State of Incorporation line and disregard other parts of the form.
IFB #9195 – Installation of Radio Antennas at Radio Sites in Framingham, Natick & Wayland Page | 13
FORM E
CONTRACTOR’S EQUAL EMPLOYMENT CERTIFICATION
______________________________________________________________ certifies that:
1. The undersigned intends to use the following listed construction trades in the work under the contract:
2. The undersigned shall comply with the minority manpower ratio and specific affirmative action steps contained herein and;
3. The undersigned shall obtain from each of its Subcontractors and submit to the Awarding Authority prior to the award of any subcontract under the Contract the Subcontractor certification.
Signature of the authorized representative of Contractor
IFB#8760 – HVAC Preventative Maintenance/Repairs
Submit with Bid
CERTIFICATE OF ELIGIBILITY
#«Certificatenumb»
CONTRACTOR: «Contractor»
«Address»
«City», «State» «Zip»
In accordance with M.G.L. Chapter 149, Section 44D and 810 CMR 4.00, you are hereby certified to file bids under Chapter 149, Section 44 A in the following categories:
«category1» «category2» «category3»
«category4» «category5» «category6»
«category7» «category8» «category9»
Your Single Project Limit is $«singlemax».
Your Aggregate Work Limit is $«aggregatemax».
This certificate is valid from to
George M. Matthews, Deputy General Counsel Date for David B. Perini, Commissioner
Official Asset Management Amendments Date Authorization
Extension to:
_Name:
_SPL:
_AWL:
Category:
_Address:
Form CQ7
Division of Capital Asset Management and Maintenance Page 1 of 11 Prime Contractor Update Statement Effective March 30, 2023
PRIME CONTRACTOR UPDATE STATEMENT
TO ALL BIDDERS AND AWARDING AUTHORITIES
A COMPLETED AND SIGNED PRIME CONTRACTOR UPDATE STATEMENT MUST BE SUBMITTED WITH EVERY PRIME BID FOR A CONTRACT PURSUANT TO M.G.L. c.149, §44A AND M.G.L. c. 149A. ANY PRIME BID SUBMITTED WITHOUT AN APPROPRIATE UPDATE STATEMENT IS INVALID AND MUST BE REJECTED.
Caution: This form is to be used for submitting Prime Contract bids. It is not to be used for submitting Filed Sub-Bids or Trade Sub-Bids.
AWARDING AUTHORITIES
If the Awarding Authority determines that the bidder does not demonstrably possess the skill, ability and integrity necessary to perform the work on the project, it must reject the bid.
BIDDER’S AFFIDAVIT
I swear under the pains and penalties of perjury that I am duly authorized by the bidder named below to sign and submit this Prime Contractor Update Statement on behalf of the bidder named below, that I have read this Prime Contractor Update Statement, and that all of the information provided by the bidder in this Prime Contractor Update Statement is true, accurate, and complete as of the bid date.
Bid Date Print Name of Prime Contractor
Project Number (or name if no number)
Business Address
Awarding Authority Telephone Number
INSTRUCTIONS
SIGNATURE
Bidder’s Authorized Representative
PRIME UPDATE STATEMENTS ARE NOT PUBLIC RECORDS AND
ARE NOT OPEN TO PUBLIC INSPECTION (M.G.L. C.149, §44D)
Division of Capital Asset Management and Maintenance Page 2 of 11
INSTRUCTIONS TO BIDDERS
• This form must be completed and submitted by all Prime contractors bidding on projects pursuant to M.G.L. c. 149, §44A and M.G.L. c. 149A.
• You must give complete and accurate answers to all questions and provide all of the information requested. MAKING A MATERIALLY FALSE
STATEMENT IN THIS UPDATE STATEMENT IS
GROUNDS FOR REJECTING YOUR BID AND FOR
DEBARRING YOU FROM ALL PUBLIC
CONTRACTING.
• This Update Statement must include all requested information that was not previously reported on the Application used for your firm’s most recently issued (not extended or amended) Prime Contractor Certificate of Eligibility. The Update Statement must cover the entire period since the date of your Application, NOT since the date of your Certification.
• You must use this official form of Update Statement. Copies of this form may be obtained from the awarding authority and from the Division of Capital Asset Management and Maintenance Web Site: www.mass.gov/DCAMM.
• If additional space is needed, please copy the appropriate page of this Update Statement and attach it as an additional sheet.
• See the section entitled “Bidding Limits” in the Instructions to Awarding Authorities for important information concerning your bidding limits.
INSTRUCTIONS TO AWARDING AUTHORITIES
Determination of Bidder Qualifications
• It is the awarding authority’s responsibility to determine who is the lowest eligible and responsible bidder. You must consider all of the information in the low bidder’s Update Statement in making this determination. Remember: this information was not available to the Division of Capital Asset Management and Maintenance at the time of certification.
• The bidder’s performance on the projects listed in Parts 1 and 2 must be part of your review.
Contact the project references.
• AWARDING AUTHORITIES ARE STRONGLY
ENCOURAGED TO REVIEW THE LOW BIDDER’S
ENTIRE CERTIFICATION FILE AT THE DIVISION OF
CAPITAL ASSET MANAGEMENT AND
MAINTENANCE. Telephone (617) 727-9320 for an appointment.
Bidding Limits
Single Project Limit: The total amount of the bid, including all alternates, may not exceed the bidder’s Single Project Limit.
Aggregate Work Limit: The annual value of the work to be performed on the contract for which the bid is submitted, when added to the annual cost to complete the bidder’s other currently held contracts, may not exceed the bidder’s Aggregate Work Limit.
Use the following procedure to determine whether the low bidder is within its Aggregate Work Limit:
Step 1 Review Update Statement Question #2 to make sure that all requested information is provided and that the bidder has accurately calculated and totaled the annualized value of all incomplete work on its currently held contracts (column 9).
Step 2 Determine the annual dollar value of the work to be performed on your project.
This is done as follows:
(i) If the project is to be completed in less than 12 months, the annual dollar value of the work is equal to the full amount of the bid.
(ii) If the project will take more than 12 months to complete, calculate the number of years given to complete the project by dividing the total number of months in the project schedule by 12 (calculate to 3 decimal places), then divide the amount of the bid by the calculated number of years to find the annual dollar value of the work.
Step 3 Add the annualized value of all of the bidder’s incomplete contract work (the total of column 9 on page 5) to the annual dollar value of the work to be http://www.mass.gov/dcam
Division of Capital Asset Management and Maintenance Page 3 of 11 performed on your project. The total may not exceed the bidder’s Aggregate Work Limit.
Correction of Errors and Omissions in Update Statements
Matters of Form: An awarding authority shall not reject a contractor’s bid because there are mistakes or omissions of form in the Update Statement submitted with the bid, provided the contractor promptly corrects those mistakes or omissions upon request of the awarding authority. [810 CMR 8.05(1)].
Correction of Other Defects: An awarding authority may, in its discretion, give a contractor notice of defects, other than mistakes or omissions of form, in the contractor’s Update Statement, and an opportunity to correct such defects, provided the correction of such defects is not prejudicial to fair competition. An awarding authority may reject a corrected Update Statement if it contains unfavorable information about the contractor that was omitted from the Update Statement filed with the contractor’s bid. [810 CMR 8.05(2)].
Division of Capital Asset Management and Maintenance Page 4 of 11
PART 1 - COMPLETED PROJECTS
LIST ALL PUBLIC AND PRIVATE BUILDING PROJECTS YOUR FIRM HAS COMPLETED SINCE THE DATE OF APPLICATION FOR YOUR MOST RECENTLY ISSUED (NOT EXTENDED OR AMENDED) DCAMM CERTIFICATE OF ELIGIBILITY. YOU MUST REPORT ALL REQUESTED INFORMATION NOT
PREVIOUSLY REPORTED ON THAT DCAMM APPLICATION*.
PROJECT TITLE & LOCATION WORK
CATEGORY
CONTRACT PRICE START DATE DATE
COMPLETED
Attach additional sheets if necessary
* If your firm has been terminated from a project prior to completion of the work or has failed or refused to complete its work under any contract, full details and an explanation must be provided. See Part 3 of this Update Statement.
Division of Capital Asset Management and Maintenance Page 5 of 11
PROVIDE THE FOLLOWING REFERENCE INFORMATION FOR EACH COMPLETED PROJECT LISTED ON THE PREVIOUS PAGE.
PROJECT TITLE COMPANY NAME CONTACT PERSON TELEPHONE
OWNER:
DESIGNER:
GC:
OWNER:
DESIGNER:
GC:
OWNER:
DESIGNER:
GC:
OWNER:
DESIGNER:
GC:
OWNER:
DESIGNER:
GC:
Is your company or any individual who owns, manages or controls your company affiliated with any owner, designer or general contractor named above, either through a business or family relationship? YES NO
Are any of the contact persons named above affiliated with your company or any individual who owns, manages or control your company, either through a business or family relationship? YES NO
If you have answered YES to either question, explain. _ _
Division of Capital Asset Management and Maintenance Page 6 of 11
PART 2 - CURRENTLY HELD CONTRACTS
LIST ALL PUBLIC AND PRIVATE BUILDING AND NON-BUILDING CONSTRUCTION PROJECTS YOUR COMPANY HAS UNDER CONTRACT ON THIS DATE
REGARDLESS OF WHEN OR WHETHER THE WORK COMMENCED.
1 2 3 4 5 6 7 8 9
PROJECT TITLE &
LOCATION
WORK
CATEGORY
START AND
END DATES
ON
SCHEDULE
(yes / no)
CONTRACT
PRICE
% NOT
COMPLETE
$ VALUE OF
WORK NOT
COMPLETE
(col. 5 X col.
6)
NO. OF YEARS
REMAINING
(see note below)
ANNUALIZED
VALUE OF
INCOMPLETE
WORK
(col. 7 ÷ col. 8) (divided by)
ANNUALIZED VALUE OF ALL INCOMPLETE CONTRACT WORK (Total of Column 9) $_ _
Column 8 • If less than one year is left in the project schedule, write 1.
• If more than 12 months are left in the project schedule, divide the number of months left in the project schedule by 12 (calculate to three decimal places).
Division of Capital Asset Management and Maintenance Page 7 of 11
PROVIDE THE FOLLOWING REFERENCE INFORMATION FOR EACH CURRENTLY HELD PROJECT LISTED ON THE PREVIOUS PAGE.
PROJECT TITLE COMPANY NAME CONTACT PERSON TELEPHONE
OWNER:
DESIGNER:
GC:
OWNER:
DESIGNER:
GC:
OWNER:
DESIGNER:
GC:
OWNER:
DESIGNER:
GC:
OWNER:
DESIGNER:
GC:
Is your company or any individual who owns, manages or controls your company affiliated with any owner, designer or general contractor named above either through a business or family relationship? YES NO
Are any of the contact persons named above affiliated with your company or any individual who owns, manages or control your company, either through a business or family relationship? YES NO
If you have answered YES to either question, explain. _ _
Division of Capital Asset Management and Maintenance Page 8 of 11
For Parts 3 and 4, if you answer YES to any question, please provide on a separate page a complete explanation. You must report all requested information not previously reported on your most recent DCAMM Application for Prime Certificate of Eligibility. Information must supplement all judicial and administrative proceedings involving bidder’s firm, which were instituted or concluded (adversely or otherwise) since your firm’s Application for your most recently issued (not extended or amended) Certificate of Eligibility. Include all details [project name(s) and location(s), names of all parties involved, relevant dates, etc.].
PART 3 – GENERAL PERFORMANCE
Part 3 of the Update Statement corresponds to Section 5 of the Prime Application. The numbering below refers back to the numbered questions in the application for your reference.
Prime Application Section 5 - General Performance
YES NO
5.A. Has your Company been terminated prior to completion of a Contract?
5.B. Has your Company failed or refused to perform or complete any of its Scope of Work under any Contract prior to substantial completion?
5.C. Has your Company and/or any principal, officer, or individual with a Financial Interest in your Company filed for bankruptcy?
5.D. Has a surety for your Company taken over or been asked to complete your Scope of Work under any Contract?
5.E. Has a payment or performance bond been invoked against your Company on any Contract?
5.F. Has any surety for your Company made payment under a payment bond to a vendor or supplier or other party on any Contract?
5.G. Has any subcontractor filed a demand for direct payment on any of your Contracts?
5.H. Has a lawsuit been filed by any of your subcontractors or suppliers to enforce a mechanic’s lien in connection with any of your Contracts?
5.I. Has there been a death of any Company employee or other person in connection with (or as the result of) performing your Company’s Scope of Work on any of your Contracts?
5.J. Has any Company employee or other person suffered an injury while performing any tasks within the Scope of Work on any of your Contracts resulting in his/her inability to return to work for a period in excess of one year?
Division of Capital Asset Management and Maintenance Page 9 of 11
PART 4 – LEGAL OR ADMINISTRATIVE PROCEEDINGS; COMPLIANCE WITH LAWS
Part 4 of the Update Statement corresponds to section 6 of the Prime Application. The numbering below refers back to the numbered questions in the application for your reference.
Prime Application Section 6 -Legal or Administrative Proceedings; Compliance with Laws
The term “administrative proceeding” as used in this Prime Contractor Update Statement includes (i) any action taken or proceeding brought by a governmental agency, department or officer to enforce any law, regulation, code, legal, or contractual requirement, except for those brought in state or federal courts, or (ii) any action taken by a governmental agency, department or officer imposing penalties, fines or other sanctions for failure to comply with any such legal or contractual requirement.
The term “anyone with a financial interest in your firm” as used in this Section “I”, shall mean any person and/or entity with a 5% or greater ownership interest in the applicant’s firm.
6.A. Have any Judicial Actions or Administrative Proceedings involving your Company and/or a principal or officer or individual with a Financial Interest in your Company been brought, concluded, or settled relating to the procurement or performance of any of your Contracts?
6.B. Have any Judicial Actions or Administrative Proceedings involving your Company and/or a principal or officer or individual with a Financial Interest in your Company been brought, concluded, or settled relating to a violation of any state or federal construction procurement laws?
6.C. Have any criminal charges involving your Company and/or a principal or officer or individual with a Financial Interest in your Company been brought, concluded, or settled relating to the procurement or performance of any of your Contracts (e.g., fraud, graft, embezzlement, forgery, bribery, falsification or destruction of records or receipt of stolen property)?
6.D. Have any Judicial Actions or Administrative Proceedings involving your Company and/or a principal or officer or individual with a Financial Interest in your Company been brought, concluded, or settled relating to a violation of state ethics laws (in Massachusetts: M.G.L. Chapter 268A)?
Division of Capital Asset Management and Maintenance Page 10 of 11
Section 6 - Legal or Administrative Proceedings; Compliance with Laws (continued)
6.E. Have any Judicial Actions or Administrative Proceedings involving your Company and/or a principal or officer or individual with a Financial Interest in your Company been brought, concluded, or settled relating to a violation of any state or federal law regulating hours of labor, unemployment compensation, minimum wages, prevailing wages, overtime pay, equal pay, child labor or worker’s compensation?
6.F. Have any Judicial Actions or Administrative Proceedings involving your Company and/or a concluded, or settled relating to a violation of any state or federal law prohibiting discrimination in hiring and/or employment?
6.G. Have any Judicial Actions or Administrative Proceedings involving your Company and/or a principal or officer or individual with a Financial Interest in your Company been brought, concluded, or settled for violation of any state or federal law regulating labor relations, including collective bargaining agreements, employee welfare benefit plans, employee pension benefit plans, other ERISA and non-ERISA plans?
6.H. Have any proceedings by a local, state, or federal agency been brought, concluded, or settled relating to decertification, debarment or suspension of your Company and/or any principal or officer or individual with a Financial Interest in your Company from construction contracting?
6.I. Have any Judicial Actions or Administrative Proceedings involving your Company and/or a concluded, or settled relating to a violation of state or federal environmental laws?
6.J. Has your Company been fined or sanctioned by OSHA and/or any other state or federal agency for violations of any laws or regulations related to occupational health or safety?
6.K. Has your Company ever (i) failed to meet applicable workforce and/or diversity program goals, benchmarks or other requirements, and/or (ii) been sanctioned, fined and/or penalized for non-compliance with workforce policies and/or diversity programs (e.g., for MBEs, WBEs, SDVOBEs and DBEs) and/or failure to maintain and/or submit required reports, such as certified payrolls.
6.L. Other than previously reported in the above questions, have any Judicial Actions or Administrative Proceedings or investigations involving your Company and/or a principal or officer or individual with a Financial Interest in your Company been brought, concluded, or settled by any local, state or federal agency relating to the procurement or performance of any construction contract?
Division of Capital Asset Management and Maintenance Page 11 of 11
PART 5 - SUPERVISORY PERSONNEL
List all supervisory personnel, such as project managers and superintendents, who will be assigned to the project if your firm is awarded the contract. Attach the resume of each person listed below.
NAME TITLE OR FUNCTION
PART 6 - CHANGES IN BUSINESS ORGANIZATION OR FINANCIAL CONDITION
Have there been any changes in your company’s business organization (including changes in ownership, mergers, or asset/stock sales), financial condition or bonding capacity since the date your current Certificate of Eligibility was issued? Yes No If YES, attach a separate page providing complete details.
PART 7 – LIST OF COMPLETED CONSTRUCTION PROJECTS SUBMITTED TO THE DIVISION OF CAPITAL ASSET
MANAGEMENT AND MAINTENANCE.
Attach here a copy of the list of completed construction projects which was submitted with your firm’s DCAMM Application for your most recently issued (not extended or amended) DCAMM Certificate of Eligibility. The Attachment must include a complete copy of the entire Projects Table – “Completed Projects” and the final page – “Certification” (Signature Page) containing the signature and date that the Completed Projects list was submitted to the Division of Capital Asset Management and Maintenance.
AFFIDAVIT OF CONTRACTOR REQUIRED FOR CHAPTER 149, CHAPTER 49A and CHAPTER 30, s. 39M CONTRACTS WITH AN ESTIMATED CONSTRUCTION COST
OF MORE THAN $250,000
Pursuant to Section 4 of the City of Framingham Wage Theft Ordinance enacted by the Framingham City Council on June 10, 2021 (“Ordinance”), a copy of which is attached to and incorporated into the Bid Documents as Appendix ___, the undersigned acknowledges receipt of the Ordinance and further verifies under oath, as a condition of bidding, contracting or subcontracting for City construction projects with an estimated construction cost in excess of $250,000, that it complies with the following conditions for bidding, contracting, and subcontracting and, for the duration of the project, will comply with the following requirements and obligations:
1. The contractor shall not have been debarred or suspended from performing construction work by any federal, state or local government agency or authority in the past five years;
2. The contractor shall not have been found within the past five years by a court or governmental agency in violation of any law relating to providing workers compensation insurance coverage, misclassification of employees as independent contractors, payment of employer payroll taxes, employee Income tax withholding, earned sick time, wage and hour laws, prompt payment laves, or prevailing wage laws;
3. The contractor shall maintain appropriate industrial accident insurance sufficient to provide coverage for all the employees on the project in accordance with M.G.L. chapter 152 and provide documentary proof of such coverage included with the contractor’s submitted bid to the Chief Procurement Officer to be maintained as a public record;
4. The contractor shall properly classify workers as employees rather than independent contractors and treat them accordingly for purposes of prevailing wages and overtime, workers' compensation insurance coverage, unemployment taxes, social security taxes and state and federal income tax withholding. (M.G.L. chapter 149, § 148B on employee classification).
5. The contractor shall comply with M.C.L. chapter 151, §1A and M.G.L. chapter 149, § 148 with respect to the payment of wages;
6. The contractor shall not discriminate against residents of states other than Massachusetts in hiring individuals for the project but, as between prospective employees who are residents of Massachusetts, however, shall give preference to residents of Framingham. The City shall provide the contractor with local instructions on the preferred means to publicize employment opportunities to City residents;
7. The contractor must make arrangements to ensure that each employee of every contractor and subcontractor of any tier entering or leaving the project individually completes the appropriate entries in a daily sign-in/out log. The sign in/out log shall include: the location of the project;
current date; printed employee name; signed employee name; name of employee's employer and
FORM G
the time of each entry or exiting. The log shall contain a prominent notice that employees are entitled under state law to receive the prevailing wage rate for their work on the project. Such sign-in/out logs shall be provided to the City on a weekly basis with the certified payrolls and shall be a public record;
8. The contractor, prior to bidding or, if not subject to bidding requirements, prior to performing any work on the project, shall sign under oath and provide to the City a certification that they are not debarred or otherwise prevented from bidding for or performing work on a public project in the Commonwealth of Massachusetts or in the City;
9. The contractor must be in compliance with the health and hospitalization requirements of the Massachusetts Health Care Reform law established by Chapter 5 8 of the Acts of 2006, as amended, and regulations promulgated under that statute by the Commonwealth Health Insurance Connector Authority;
10. The contractor must submit weekly to Chief Procurement Officer certified payrolls for all employees. A certified payroll format will be provided by the City that includes the employees full name, address, identifying number, gender and race, and which tabulates hours worked for females, people of color and residents of the City. Each contractor shall provide a copy of the OSHA 10 card for every employee attached to the first certified payroll they submit on which the employee appears;
11. The applicant and contractor agree to attend all regularly scheduled and/or special meetings convened by the City for the purpose of reviewing workforce hiring commitments in paragraph 6, above.
12. The contractor shall require all subcontractors and/or trade contractors for the project to execute this affidavit and shall provide copies of the same to the Chief Procurement Officer with the first requisition or request for payment related to such subcontractor or trade contractor’s services on the project.
13. Pursuant to Section 4.C. of the Ordinance, an officer of each contractor or subcontract shall certify under oath and in writing in connection with each requisition or request for payment that is compliance with all of the above obligations.
SIGNED UNDER THE PAINS AND PENALTIES OF PERJURY, THIS ____ DAY OF
__________________, 20___.
CONTRACTOR NAME: ___________________________
BY: __________________________________________
ITS: __________________________________________
IFB #9195 – Installation of Radio Antennas at Radio Sites in Framingham, Natick & Wayland Page | 16
FORM H
SAMPLE PERFORMANCE BOND
DO NOT COMPLETE OR SUBMIT
Bond No. _________________________
KNOW ALL MEN BY THESE PRESENT, that we with a place of business at___________________ as
Principal (the “Principal”), and______________________ a corporation qualified to do business in the
Commonwealth of Massachusetts, with a place of business at_______________ as Surety (the “Surety”), are held and firmly bound unto City of Framingham as Obligee (the “Obligee”), in the sum of ______________lawful money of the United States of America, to be paid to the Obligee, for which payment, well and truly to be made, we bind ourselves, our respective heirs, executors, administrators, successors and assigns, jointly and severally, firmly by these present.
WHEREAS, the Principal has assumed and made a contract with the Obligee, bearing the date of __________, and entitled IFB #9195 –Installation of Radio Antennas at Radio Sites in Framingham, Natick and Wayland.
NOW, THE CONDITIONS of this obligation are such that if the Principal and all Subcontractors under said contract shall pay for all labor performed or furnished and for all materials used or employed in said contract and in any and all duly authorized modifications, alterations, extensions of time, changes or additions to said contract that may hereafter be made, notice to the Surety of such modifications, alterations, extensions of time, changes or additions being hereby waived, the foregoing to include any other purposes or items set out in, and to be subject to, the provisions of Massachusetts General Laws, Chapter 30, Section 39A, and Chapter 149, Section 29, as amended, then this obligation shall become null and void; otherwise, it shall remain in full force and virtue.
IN WITNESS WHEREFORE, the Principal and Surety have hereto set their hands and seals this day of , 2026.
PRINCIPAL S SURETY
[Name and Seal] [Attorney-In-Fact][Seal]
[Title] [Address]
[Phone]
Attest:__________________________ Attest: ______________________________
The rate for this Bond is _____________% of the first $_______________ and ________% for the next
The total premium for this Bond is $__________________.
END OF PERFORMANCE BOND
IFB #9195 – Installation of Radio Antennas at Radio Sites in Framingham, Natick & Wayland Page | 17
FORM I
SAMPLE PAYMENT BOND – DO NOT COMPLETE OR SUBMIT
Bond No.
KNOW ALL MEN BY THESE PRESENT, that we with a place of business at as principal (the “Principal”), and______________________ a corporation qualified to do business in the Commonwealth of Massachusetts, with a place of business at as Surety (the “Surety”), are held and firmly bound unto City of
Framingham as Obligee (the “Obligee”), in the sum of ______________lawful money of the United States of
America, to be paid to the Obligee, for which payment, well and truly to be made, we bind ourselves, our respective heirs, executors, administrators, successors and assigns, jointly and severally, firmly by these present.
WHEREAS, the Principal has assumed and made a contract with the Obligee, bearing the date of __________, and entitled IFB #9195 –Installation of Radio Antennas at Radio Sites in Framingham, Natick and Wayland
NOW, THE CONDITIONS of this obligation are such that if the Principal and all Subcontractors under said contract shall pay for all labor performed or furnished and for all materials used or employed in said contract and in any and all duly authorized modifications, alterations, extensions of time, changes or additions to said contract that may hereafter be made, notice to the Surety of such modifications, alterations, extensions of time, changes or additions being hereby waived, the foregoing to include any other purposes or items set out in, and to be subject to, the provisions of Massachusetts General Laws, Chapter 30, Section
39A, and Chapter 149, Section 29, as amended, then this obligation shall become null and void; otherwise, it shall remain in full force and virtue.
IN WITNESS WHEREFORE, the Principal and Surety have hereto set their hands and seals this day of
, 2026.
PRINCIPAL SURETY
[Name and Seal] [Attorney-In-Fact][Seal]
[Title] [Address]
[Phone]
Attest:__________________________ Attest: ______________________________
The rate for this Bond is % of the first $_ and % for the next
The total premium for this Bond is $ .
IFB #9195 – Installation of Radio Antennas at Radio Sites in Framingham, Natick & Wayland Page | 18
FORM J
PREVAILING WAGES:
The undersigned bidder or quoter hereby certifies, under the pains and penalties of perjury, that the foregoing bid or quote is based upon the payment to laborers employed on the project of wages in an amount no less than the applicable prevailing wage rates established for the project by the Massachusetts Department of Labor and Workforce Development. The undersigned bidder or quoter agrees to indemnify the awarding authority for, from and against any loss, expenses, damages, action or claims, including any expense incurred in connection with any delay or stoppage of the project work, arising out of or as a result of (1) the failure of the said bid or quote to be based upon the payment of the said applicable prevailing wage rates, or (2) the failure of the bidder or quoter, if selected as the Contractor, to pay laborers employed on the project the said applicable prevailing wages.
(Printed Name)
(Name of Proposer)
07/23
WEEKLY STATEMENT OF COMPLIANCE
In accordance with Massachusetts General Law c. 149, §27B, a true and accurate record must be kept of all persons employed on the public works project for which the enclosed rates have been provided.
A Payroll Form is available from the Department of Labor Standards (DLS) at mass.gov/dols/pw and includes all the information required to be kept by law. Every contractor or subcontractor is required to keep these records and preserve them for a period of three years from the date of completion of the contract.
On a weekly basis, every contractor and subcontractor is required to submit a certified copy of their weekly payroll records to the awarding authority; this includes the payroll forms and the Statement of Compliance form. The certified payroll records must be submitted either by regular mail or by e-mail to the awarding authority. Once collected, the awarding authority is required to preserve those records for three years from the date of completion of the project.
Each such contractor and subcontractor shall furnish weekly and within 15 days after completion of its portion of the work, to the awarding authority directly by first-class mail or email, a statement, executed by the contractor, subcontractor or by any authorized officer thereof who supervised the payment of wages, this form, accompanied by their payroll:
WEEKLY STATEMENT OF COMPLIANCE
_______________, 20_______
I,___________________________________,___________________________________ (Name of signatory party) (Title) do hereby state:
That I pay or supervise the payment of the persons employed by
___________________________________ on the ______________________________ (Contractor, subcontractor or public body) (Building or project) and that all mechanics and apprentices, teamsters, chauffeurs and laborers employed on said project have been paid in accordance with wages determined under the provisions of sections twenty-six and twenty-seven of chapter one hundred and forty nine of the General Laws.
Signature _________________________
Title _____________________________ http://www.mass.gov/dols/pw
Massachusetts Weekly Certified Payroll Report and Workforce Participation Form Certified Payroll Report: Pursuant to MGL c. 149, s. 27B, every contractor and subcontractor is required to submit a true and accurate copy of their certified weekly payroll records to the awarding authority by first-class mail or email. In addition, each weekly payroll must be accompanied by a statement of compliance signed by the employer. Failure to comply may result in the commencement of a criminal action or the issuance of a civil citation.
Workforce Participation Goals: The Commonwealth of Massachusetts has set the following goals for workforce participation for minorities and women. The participation goals for this project shall be 15.3% for minorities and 6.9% for women. The Contractor shall strive to achieve on this project the labor workforce participation goals contained herein. The Contractor shall enter the number of hours worked in each trade by each employee, identified as woman, minority, or non-minority below.
Company name: Address: Phone number: Payroll number:
Employer’s signature: Job title: Contract Number:
Taxpayer ID Number:
Work week ending:
Awarding Authority name: Public Works project name: Public Works Project Location: Minimum Wage Rate Sheet number:
General/Prime Contractor’s name: Subcontractor’s name: Employer hourly fringe benefit contributions
(B+C+D+E) (A x F) Employee name and Complete address
Work classification
Project hours Non-Minority
Project hours
Minority
Project hours
Women
Employee is
OSHA 10
certified (?)
Apprentice Rate
Percentage
Hours worked Project hours
(A)
Hourly base wage (B)
Health and Welfare
Insurance (C/)
ERISA
Pension Plan (D)
Supplemental unemployment
(E/)
Total Hourly
Previous Wage (F)
Project gross wages
Check number
(H)
Sun. Mon. Tues. Wed. Thur. Fri. Sat. All other hours
Total gross wages
Apprenticeship Documentation: Please answer the questions below.
1. Are any apprentice employees identified above? Yes No
2. If yes, are all apprentice employees identified above currently registered with the Massachusetts Department of Labor Standards’ (DLS) Division of Apprentice Standards (DAS)? Yes No
3. If yes, is a copy of the apprentice Identification (ID) card issued by the MA Department of Labor Standards’ (DLS), Division of Apprentice Standards (DAS) included for all apprentice employees identified above? Yes No
Page ______ of ________
THE COMMONWEALTH OF MASSACHUSETTS
EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT
DEPARTMENT OF LABOR STANDARDS
Prevailing Wage Rates
MAURA HEALEY
Governor
KIM DRISCOLL
Lt. Governor
As determined by the Director under the provisions of the Massachusetts General Laws, Chapter 149, Sections 26 to 27H
LAUREN JONES
Secretary
MICHAEL FLANAGAN
Director
Awarding Authority: Framingham City/Town: FRAMINGHAM
Contract Number: 9195
Description of Work: Installation of Radio Communication System
Job Location: 180 Concord St Framingham Ma 01702
Information about Prevailing Wage Schedules for Awarding Authorities and Contractors
The wage rates will remain in effect for the duration of the project, except in the case of multi-year public construction projects. For construction projects lasting longer than one year, awarding authorities must request an updated wage schedule no later than two weeks before the anniversary of the date the contract was executed by the awarding authority and the general contractor. For multi-year CM AT RISK projects, the awarding authority must request an annual update no later than two weeks before the anniversary date, determined as the earlier of: (a) the execution date of the GMP Amendment, or (b) the execution date of the first amendment to permit procurement of construction services. The updated wage schedule must be provided to all contractors, including general and sub-contractors, working on the construction project.
This annual update requirement is generally not applicable to 27F “rental of equipment” contracts. For such contracts, the prevailing wage rates issued by DLS shall remain in effect for the duration of the contract term. However, if the prevailing wage rate sheet issued does not contain wage rates for each year covered by the contract term, the Awarding Authority must request updated rate sheets from DLS and provide them to the contractor to ensure the correct rates are being paid throughout the duration of the contract. Additionally, if an Awarding Authority exercises an option to renew or extend the contract term, they must request updated rate sheets form DLS and provide them to the contractor.
This wage schedule applies only to the specific project referenced at the top of this page and uniquely identified by the “Wage Request Number” on all pages of this schedule.
An Awarding Authority must request an updated wage schedule if it has not opened bids or selected a contractor within 90 days of the date of issuance of the wage schedule. For CM AT RISK projects (bid pursuant to G.L. c.149A), the earlier of: (a) the execution date of the GMP Amendment, or (b) the bid for the first construction scope of work must be within 90-days of the wage schedule issuance date.
The wage schedule shall be incorporated in any advertisement or call for bids for the project as required by M.G.L. c. 149, § 27. The wage schedule shall be made a part of the contract awarded for the project. The wage schedule must be posted in a conspicuous place at the work site for the life of the project in accordance with M.G.L. c. 149 § 27. The wages listed on the wage schedule must be paid to employees performing construction work on the project whether they are employed by the prime contractor, a filed sub-bidder, or a sub-contractor.
Apprentices working on the project are required to be registered with the Massachusetts Division of Apprentice Standards (DAS). Apprentices must keep their apprentice identification card on their persons during all work hours on the project. An apprentice registered with DAS may be paid the lower apprentice wage rate at the applicable step as provided on the prevailing wage schedule.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .