IFB_7500_MAS1016_ATT_3_v1.docx
DOCX document 32 KB Posted
- Attached to
- Electrolyzed Water Disinfection Systems
- Solicitation number
- IFB 7500 MAS1016
- Issued by
- Texas
About this file
This is a Key Personnel Designation submittal document for the City of Austin related to an Invitation for Bid (IFB 7500 MAS1016) concerning the procurement of Electrolyzed Water Disinfection Systems. The document establishes the designated key personnel responsible for managing the contract between the City of Austin and the Contractor. The identified key personnel include Eric Herman, the City's Contract Manager and City Project Manager, and Maggie Stenz, the City's Contract Administrator and Procurement Specialist. The City of Austin seeks a Contractor to provide standalone Electrolysis Water Disinfection Systems, also known as Hypochlorous Acid (HOCL) Generator Systems or Electrolyzed Water Generators, to support daily cleaning operations across City facilities including offices, restrooms, breakrooms, kitchens, animal shelters, and warehouses.
The document specifies that the Contractor and City are committed to retaining the same key personnel throughout the contract term. Should replacement of key personnel become necessary, the Contractor must provide a replacement individual with equivalent experience and competence, and must obtain City approval before such replacement takes effect, with approval not to be unreasonably withheld. The Contractor shall promptly notify the City of any proposed personnel changes. Contact information is provided for both the City's Contract Manager, Eric Herman (512-974-3975, Eric.Herman@austintexas.gov), and the City's Contract Administrator, Maggie Stenz (512-974-3020, Margaret.Stenz@austintexas.gov). In addition to equipment provision, the Contractor is responsible for providing ongoing preventive maintenance and as-needed system repairs for the electrolyzed water systems, which utilize water and sodium chloride to produce a non-toxic disinfecting solution suitable for multiple surface types.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| IFB_7500_MAS1016_ATT_4_v1.docx | DOCX document | |
| IFB_7500_MAS1016_ATT_7_v1.docx | DOCX document | |
| IFB_7500_MAS1016_ATT_8_v1.docx | DOCX document | |
| IFB_7500_MAS1016_ATT_5_v1.docx | DOCX document | |
| IFB_7500_MAS1016_ATT_1_v1.docx | DOCX document | |
| IFB_7500_MAS1016_PAC1_v2.docx | DOCX document | |
| IFB_7500_MAS1016_ATT_9_v1.docx | DOCX document | |
| IFB_7500_MAS1016_BID_DOC_v1.xlsx | XLSX spreadsheet | |
| IFB_7500_MAS1016_ATT_2_v1.docx | DOCX document | |
| IFB_7500_MAS1016_ATT_6_v1.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SUBMITTAL – Key Personnel
Designation of Key Personnel. The City and the Contractor resolve to keep the same key personnel assigned to this engagement throughout its term. In the event that it becomes necessary for the Contractor to replace any key personnel, the replacement will be an individual having equivalent experience and competence in executing projects such as the one described herein. Additionally, the Contractor shall promptly notify the City and obtain approval for the replacement. Such approval shall not be unreasonably withheld. The Contractor’s and City’s key personnel are identified as follows:
| Role |
| Name |
| Phone |
Contractor Contract Manager
City Contract Manager
| City Project Manager |
| Eric Herman |
| 512-974-3975 |
| Eric.Herman@austintexas.gov |
| City Contract Administrator, Procurement Specialist |
| Maggie Stenz |
| 512-974-3020 |
| Margaret.Stenz@austintexas.gov |
| SUBMITTAL – Key Personnel IFB 7500 MAS1016 |
| Pg. 1 |
image1.png
File details come from the government source that posted it. Updated .