IFB_5000_RGW1027REBID_0600_v1.xlsx
XLSX spreadsheet 102 KB Posted
- Solicitation number
- IFB 5000 RGW1027REBID
- Issued by
- Texas
About this file
This is a price sheet for Invitation for Bid (IFB) 5000 RGW1027REBID issued by the City of Austin for collection, hauling, processing, and disposal of landfill trash, recycling, and compostable materials at City facilities. The solicitation is structured into four pricing groups: Group A covers landfill trash containers and services; Group B addresses single-stream recycling containers and services; Group C encompasses composting containers and services; and Group D includes waste composition and contamination audits. Offerors must complete pricing for the groups in which they wish to be considered for award. The price sheet includes estimated quantities for various container sizes (ranging from 32 gallons to 10 cubic yards for routine collections, plus roll-off containers up to 40 cubic yards), pickup frequencies, and ancillary services such as lockbars, wheels, compactor rentals, cleaning fees, and emergency services. The City does not guarantee the listed quantities, which are provided as estimates based on historical or anticipated usage, and actual purchases will be on an as-needed basis. Group E is provided for informational purposes only and is not included in the award determination; it contains optional pricing for special weight studies and extra or unscheduled collections.
Offerors must submit all pricing in the designated Unit Price cells on the price sheet, with extended prices calculated automatically. A bid of zero will be interpreted as a no-charge item, while a blank response or "no bid" may result in disqualification. All prices must be all-inclusive and may not separately charge for administrative overhead, per diem, shipping, transportation costs, or other ancillary expenses. Offerors must furnish all necessary tools, labor, travel, and equipment to perform required services. The City reserves the right to award a single contract based on overall low cost or multiple awards based on individual line items, categories, or any combination of criteria deemed advantageous. Offerors are required to submit copies of all licenses and certifications demonstrating regulatory compliance within the past five years and must identify specific facility locations for landfill trash, material recycling, compostable materials processing, and construction and demolition debris operations. Contractor contact information available 24/7 must be provided along with company details.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| IFB_5000_RGW1027REBID_PAC1_v1.pdf | ||
| IFB_5000_RGW1027REBID_ATT_v1.pdf | ||
| IFB_5000_RGW1027REBID_BID_DOC_v1.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Summary
CITY OF AUSTIN PRICE SHEET
COLLECTION, HAULING, PROCESSING, & DISPOSAL OF
LANDFILL TRASH, RECYCLING, AND COMPOSTABLE MATERIALS AT CITY FACILITIES
SOLICITATION # IFB 5000 RGW1027REBID
Special Instructions: Offerors must use this Price Sheet to submit pricing. Be advised that altering the Price Sheet, modifying the formulas, or taking exceptions to any portion of the solicitation may jeopardize acceptance of your Offer. The Price Sheet is structed by Groups, with each Group representing a tab at the bottom of the spreadsheet. Fill in Pricing in the tab for the Group(s) in which your firm wishes to be considered for award.
The quantities noted below are estimates and not a guarantee of actual volume. The City does not guarantee the purchase of the quantities listed, actual purchases may be more or less. Quantities are provided as a guide based on historical or anticipated usage. Order quantities will be as-needed and specified by the City for each order.
A bid of "0" (zero) will be interpreted by the City as a no-charge (free) item and the City will not expect to pay for that item. A bid of "no bid" or no response (space left blank) will be interpreted by the City that the Offeror does not wish to bid on that item. Be advised, a "no bid" or no response may be considered as non-responsive and may result in disqualification of the bid.
Prices offered on the Price Sheet shall be all inclusive of fees not expressly allowed in the scope of work. The Offeror shall not charge separately for administrative, overhead, per diem, and shipping or transportation costs (travel time, fuel surcharges, mileage, stop-fee, etc.) to deliver services or items to the Austin, Texas area. The Offeror shall provide all tools, labor, travel, and equipment necessary to perform the services required under this contract.
The City reserves the right to award a single contract based on overall low cost or multiple awards based on individual or categories/groups of specific line items, cost, or any criteria or combination deemed most advantageous to the City.
| Group | Extended Total (THIS SECTION WILL BE FILLED IN AUTOMATICALLY BASED ON THE PRICING SUBMITTED IN EACH GROUP) |
| Group A - Landfill Trash | - |
| Group B - Recycling | - |
| Group C - Composting | - |
| Group D - Other Items | - |
| GRAND TOTAL (Groups A + B + C+ D) | - |
| Group E is for informational purposes only and is NOT included in the award total, or in determining contract award. |
| The following should be submitted with your Bid. Please check the box below as confirmation. | ||
| ☐ | Copies of all licenses and certifications indicating compliance to all regulatory requirements within the last five years. | |
| The following sites shall be identified for any type of Waste you are bidding on. Requirements for sites are included in the Scope of Work. | ||
| Location of Landfill Trash Facility: _______________________________________________________________________________________________ | ||
| Location of Material Recycling Facility: ___________________________________________________________________________________________ | ||
| Location of Compostable Materials Processing Facility: ______________________________________________________________________________ | ||
| Location of C&D Debris Facility: _______________________________________________________________________________________________ | ||
| Contractor Contact Information: Available 24/7 | Contact Name: _____________________________________________________________________________________ | |
| Contact Email: ______________________________________________________________________________________ | ||
| Contact Phone: _____________________________________________________________________________________ | ||
| Company Name: __________________________________________________________________ | ||
| Company Email: ___________________________________________________________________ |
Group A - Trash
| CITY OF AUSTIN - PRICE SHEET - IFB 5000 RGW1027REBID | |||||
| Group A: Landfill Trash | |||||
| Enter pricing only in Column F, Unit Price cells. Extended Price calculates automatically. Bid of 0 = no charge; blank = no bid. | |||||
| GROUP A - Landfill Trash | |||||
| Section 1: LANDFILL TRASH CONTAINERS (CARTS & DUMPSTERS) - Contractor shall furnish all labor and equipment to provide landfill trash collection, hauling, and disposal services for City departments. | |||||
| Line | |||||
| No. | Dumpster Size | Pick-Ups per Week (For informational purposes only, not part of formula) | Estimated Containers | Months | Unit Price |
| (enter bid) | Extended |
Price
| 1.1 | 32 gallon | 1 | 1 | 12 | - |
| 1.2 | 32 gallon | 2 | 1 | 12 | - |
| 1.3 | 32 gallon | 3 | 1 | 12 | - |
| 1.4 | 32 gallon | 4 | 1 | 12 | - |
| 1.5 | 32 gallon | 5 | 1 | 12 | - |
| 1.6 | 32 gallon | 6 | 1 | 12 | - |
| 1.7 | 64 Gallon | 1 | 1 | 12 | - |
| 1.8 | 64 Gallon | 2 | 1 | 12 | - |
| 1.9 | 64 Gallon | 3 | 1 | 12 | - |
| 1.10 | 64 Gallon | 4 | 1 | 12 | - |
| 1.11 | 64 Gallon | 5 | 1 | 12 | - |
| 1.12 | 64 Gallon | 6 | 1 | 12 | - |
| 1.13 | 96 Gallon | 1 | 1 | 12 | - |
| 1.14 | 96 Gallon | 2 | 1 | 12 | - |
| 1.15 | 96 Gallon | 3 | 1 | 12 | - |
| 1.16 | 96 Gallon | 4 | 1 | 12 | - |
| 1.17 | 96 Gallon | 5 | 1 | 12 | - |
| 1.18 | 96 Gallon | 6 | 1 | 12 | - |
| 1.19 | 3 CU YD | 1 | 8 | 12 | - |
| 1.20 | 3 CU YD | 2 | 1 | 12 | - |
| 1.21 | 3 CU YD | 3 | 1 | 12 | - |
| 1.22 | 3 CU YD | 4 | 1 | 12 | - |
| 1.23 | 3 CU YD | 5 | 1 | 12 | - |
| 1.24 | 3 CU YD | 6 | 1 | 12 | - |
| 1.25 | 4 CU YD | 1 | 30 | 12 | - |
| 1.26 | 4 CU YD | 2 | 10 | 12 | - |
| 1.27 | 4 CU YD | 3 | 1 | 12 | - |
| 1.28 | 4 CU YD | 4 | 2 | 12 | - |
| 1.29 | 4 CU YD | 5 | 1 | 12 | - |
| 1.30 | 4 CU YD | 6 | 1 | 12 | - |
| 1.31 | 6 CU YD | 1 | 14 | 12 | - |
| 1.32 | 6 CU YD | 2 | 15 | 12 | - |
| 1.33 | 6 CU YD | 3 | 3 | 12 | - |
| 1.34 | 6 CU YD | 4 | 3 | 12 | - |
| 1.35 | 6 CU YD | 5 | 1 | 12 | - |
| 1.36 | 6 CU YD | 6 | 4 | 12 | - |
| 1.37 | 8 CU YD | 1 | 35 | 12 | - |
| 1.38 | 8 CU YD | 2 | 45 | 12 | - |
| 1.39 | 8 CU YD | 3 | 25 | 12 | - |
| 1.40 | 8 CU YD | 4 | 1 | 12 | - |
| 1.41 | 8 CU YD | 5 | 4 | 12 | - |
| 1.42 | 8 CU YD | 6 | 10 | 12 | - |
| 1.43 | 10 CU YD | 1 | 1 | 12 | - |
| 1.44 | 10 CU YD | 2 | 2 | 12 | - |
| 1.45 | 10 CU YD | 3 | 1 | 12 | - |
| 1.46 | 10 CU YD | 4 | 1 | 12 | - |
| 1.47 | 10 CU YD | 5 | 1 | 12 | - |
| 1.48 | 10 CU YD | 6 | 1 | 12 | - |
| Section 2: WHEELS AND LOCKBARS ON CONTAINERS | |||
| Line | |||
| No. | Description | Est. | |
| Qty | Months | Unit Price | |
| (enter bid) | Extended |
Price
| 2.1 | Lockbar Added to a 3 CU YD Container | 10 | 12 | - |
| 2.2 | Lockbar Added to a 4 CU YD Container | 10 | 12 | - |
| 2.3 | Lockbar Added to a 6 CU YD Container | 10 | 12 | - |
| 2.4 | Lockbar Added to a 8 CU YD Container | 1 | 12 | - |
| 2.5 | Lockbar Added to a 10 CU YD Container | 1 | 12 | - |
| 2.6 | Wheels Added to a 3 CU YD Container | 5 | 12 | - |
| 2.7 | Wheels Added to a 4 CU YD Container | 10 | 12 | - |
| Section 3: ROLL OFF RENTAL AND SERVICING - NOTE: Costs shall include the container rental fee (including delivery and pick-up of roll off). | ||||
| Line | ||||
| No. | Size | Estimated # of Roll Offs | Estimated # of Hauls per Year | Unit Price |
| (enter bid) | Extended |
Price
| 3.1 | 20 CU YD | 20 | 125 | - |
| 3.2 | 30 CU YD | 15 | 300 | - |
| 3.3 | 40 CU YD | 17 | 300 | - |
| 3.4 | 40 CU YD (City Furnished Equipment - COAFE) | 7 | 75 | - |
| 3.5 | BULKY ITEM PICK UP | 20 | 15 | - |
| Section 4: COMPACTOR RENTAL AND SERVICING - NOTE: Costs shall include the container rental fee (including delivery and pick-up). | ||||
| Line | ||||
| No. | Description | Estimated # of Compactors | Estimated # of Hauls per Year | Unit Price |
| (enter bid) | Extended |
Price
| 4.1 | 20 CU YD COMP | 3 | 150 | - | ||
| 4.2 | 34 CU YD COMP | 3 | 130 | - | ||
| 4.3 | 40-42 CU YD COMP | 7 | 100 | - | ||
| Section 4: Compactor Cleaning Fee | ||||||
| Line | ||||||
| No. | Description | Estimated # of Cleanings per Year | Unit Price | |||
| (enter bid) | Extended |
Price
4.4 Cleaning Fee 65 -
| Section 5: EMERGENCY SERVICES - Includes delivery, hauling, swaps, and final pickup. | |||
| Line | |||
| No. | Description | Estimated # of Hauls per Year | Unit Price |
| (enter bid) | Extended |
Price
| 5.1 | 8 CU YD | 4 | - |
| 5.2 | 10 CU YD | 4 | - |
| 5.3 | 20 CU YD | 6 | - |
| 5.4 | 30 CU YD | 6 | - |
| 5.5 | 40 CU YD | 12 | - |
| GROUP A SUBTOTAL | $0.00 | ||
| Pricing for the next Group is in the Group B tab at the bottom of the spreadsheet. |
Group B - Recycling
| CITY OF AUSTIN - PRICE SHEET - IFB 5000 RGW1027REBID | |||||
| Group B: Recycling | |||||
| Enter pricing only in Column F, Unit Price cells. Extended Price calculates automatically. Bid of 0 = no charge; blank = no bid. | |||||
| GROUP B - Recycling | |||||
| Section 1: SINGLE-STREAM RECYCLING CONTAINERS (CARTS & DUMPSTERS) - Contractor shall urnish all labor and equipment to provide collection, hauling, and disposal services for City Departments. | |||||
| Line | |||||
| No. | Dumpster Size | Pick-Ups per Week (For informational purposes only, not part of formula) | Estimated Containers | Months | Unit Price |
| (enter bid) | Extended |
Price
| 1.1 | 32 gallon | 6 | 1 | 12 | - |
| 1.2 | 64 Gallon | 6 | 1 | 12 | - |
| 1.3 | 96 Gallon | 6 | 1 | 12 | - |
| 1.4 | 3 CU YD | 1 | 7 | 12 | - |
| 1.5 | 3 CU YD | 2 | 3 | 12 | - |
| 1.6 | 3 CU YD | 3 | 2 | 12 | - |
| 1.7 | 3 CU YD | 4 | 1 | 12 | - |
| 1.8 | 3 CU YD | 5 | 1 | 12 | - |
| 1.9 | 3 CU YD | 6 | 1 | 12 | - |
| 1.10 | 4 CU YD | 2 | 22 | 12 | - |
| 1.11 | 4 CU YD | 3 | 4 | 12 | - |
| 1.12 | 4 CU YD | 4 | 1 | 12 | - |
| 1.13 | 4 CU YD | 5 | 2 | 12 | - |
| 1.14 | 4 CU YD | 6 | 2 | 12 | - |
| 1.15 | 6 CU YD | 2 | 10 | 12 | - |
| 1.16 | 6 CU YD | 3 | 1 | 12 | - |
| 1.17 | 6 CU YD | 4 | 3 | 12 | - |
| 1.18 | 6 CU YD | 5 | 1 | 12 | - |
| 1.19 | 6 CU YD | 6 | 1 | 12 | - |
| 1.20 | 8 CU YD | 2 | 13 | 12 | - |
| 1.21 | 8 CU YD | 1 | 45 | 12 | - |
| 1.22 | 8 CU YD | 3 | 9 | 12 | - |
| 1.23 | 8 CU YD | 4 | 2 | 12 | - |
| 1.24 | 8 CU YD | 5 | 1 | 12 | - |
| 1.25 | 8 CU YD | 6 | 1 | 12 | - |
| 1.26 | 10 CU YD | 1 | 1 | 12 | - |
| 1.27 | 10 CU YD | 2 | 2 | 12 | - |
| 1.28 | 10 CU YD | 3 | 2 | 12 | - |
| 1.29 | 10 CU YD | 4 | 1 | 12 | - |
| 1.30 | 10 CU YD | 5 | 1 | 12 | - |
| 1.31 | 10 CU YD | 6 | 1 | 12 | - |
| Section 2: WHEELS AND LOCKBARS ON CONTAINERS | |||
| Line | |||
| No. | Description | Est. | |
| Qty | Months | Unit Price | |
| (enter bid) | Extended |
Price
| 2.1 | Lockbar Added to a 3 CU YD Container | 5 | 12 | - |
| 2.2 | Lockbar Added to a 4 CU YD Container | 7 | 12 | - |
| 2.3 | Lockbar Added to a 6 CU YD Container | 7 | 12 | - |
| 2.4 | Lockbar Added to a 8 CU YD Container | 1 | 12 | - |
| 2.5 | Lockbar Added to a 10 CU YD Container | 1 | 12 | - |
| 2.6 | Wheels Added to a 3 CU YD Container | 7 | 12 | - |
| 2.7 | Wheels Added to a 4 CU YD Container | 10 | 12 | - |
| 2.8 | Wheels Added to a 6 CU YD Container | 7 | 12 | - |
| 2.9 | Wheels Added to a 8 CU YD Container | 2 | 12 | - |
| 2.10 | Wheels Added to a 10 CU YD Container | 1 | 12 | - |
| Section 3: ROLL OFF RENTAL AND SERVICING - NOTE: Costs shall include the container rental fee (including delivery and pick-up of roll off). | ||||
| Line | ||||
| No. | Size | Estimated # of Roll Off | Estimated # of Hauls per Year | Unit Price |
| (enter bid) | Extended |
Price
| 3.1 | 20 CU YD | 1 | 30 | - |
| 3.2 | 30 CU YD | 3 | 30 | - |
| 3.3 | 40 CU YD | 5 | 20 | - |
| Section 4: COMPACTOR RENTAL AND SERVICING - NOTE: Costs shall include the container rental fee (including delivery and pick-up). | ||||
| Line | ||||
| No. | Size | Estimated # of Compactors | Estimated # of Hauls per Year | Unit Price |
| (enter bid) | Extended |
Price
| 4.1 | 34 CU YD COMP | 1 | 150 | - | ||
| 4.2 | 40-42 CU YD COMP | 1 | 35 | - | ||
| 4.3 | 3 YD FL Packer | 2 | 12 | - | ||
| Section 4: Compactor Cleaning Fee | ||||||
| Line | ||||||
| No. | Description | Estimated # of Cleanings | Unit Price | |||
| (enter bid) | Extended |
Price
4.4 Cleaning Fee 30 -
| Section 5: BALERS - Leasing of vertical downstroke balers for recycling cardboard. | |||
| Line | |||
| No. | Description | Est. | |
| Qty | Unit Price | ||
| (enter bid) | Extended |
Price
| 5.1 | Monthly Baler Rental | 12 | - |
| 5.2 | Vendor Collection of 400-600 lb Bales (Priced Per Bale) | 165 | - |
| 5.3 | Price Per Collection Trip | 25 | - |
| Section 6: EMERGENCY SERVICES - Includes delivery, hauling, swaps, and final pickup. | |||
| Line | |||
| No. | Description | Est. | |
| Qty | Unit Price | ||
| (enter bid) | Extended |
Price
| 6.1 | 8 CU YD | 2 | - |
| 6.2 | 10 CU YD | 2 | - |
| 6.3 | 20 CU YD | 4 | - |
| 6.4 | 30 CU YD | 4 | - |
| 6.5 | 40 CU YD | 8 | - |
| GROUP B SUBTOTAL | - | ||
| Pricing for the next Group is in the Group C tab at the bottom of the spreadsheet. |
Group C - Composting
| CITY OF AUSTIN - PRICE SHEET - IFB 5000 RGW1027REBID | ||||
| Group C: Composting | ||||
| Enter pricing only in Column F, Unit Price cells. Extended Price calculates automatically. Bid of 0 = no charge; blank = no bid. | ||||
| Group C - Composting | ||||
| Section 1: COMPOSTING CONTAINERS - Furnish all labor and equipment to provide composting collection, hauling, and disposal services for City Departments. | ||||
| Line | ||||
| No. | Size | Pick-Ups per Week (For informational purposes only, not part of formula) | Estimated # of Hauls per Year | Unit Price |
| (enter bid) | Extended |
Price
| 1.1 | 32 gallon | 1 | 52 | - |
| 1.2 | 64 gallon | 1 | 52 | - |
| 1.3 | 96 gallon | 1 | 52 | - |
| 1.4 | 32 gallon | 2 | 52 | - |
| 1.5 | 64 gallon | 2 | 52 | - |
| 1.6 | 96 gallon | 2 | 52 | - |
| 1.7 | 32 gallon | 3 | 52 | - |
| 1.8 | 64 gallon | 3 | 52 | - |
| 1.9 | 96 gallon | 3 | 52 | - |
| 1.10 | 32 gallon | 6 | 52 | - |
| 1.11 | 64 gallon | 6 | 52 | - |
| 1.12 | 96 gallon | 6 | 52 | - |
| 1.13 | 35 gallon | 1 | 52 | - |
| 1.14 | 2 YD | 2 | 52 | - |
| 1.15 | 4 YD | 1 | 52 | - |
| 1.16 | 30-34 YD | 1 | 33 | - |
| Section 2: WHEELS AND LOCKBARS ON CONTAINERS | |||
| Line | |||
| No. | Description | Est. | |
| Qty | Months | Unit Price | |
| (enter bid) | Extended |
Price
| 2.1 | Lockbar Added to a 2 CU YD Container | 5 | 12 | - |
| 2.2 | Lockbar Added to a 4 CU YD Container | 10 | 12 | - |
| 2.3 | Lockbar Added to a 30-34 CU YD Container | 5 | 12 | - |
| 2.4 | Wheels Added to a 4 CU YD Container | 10 | 12 | - |
| 2.5 | Wheels Added to a 30-34 CU YD Container | 5 | 12 | - |
| GROUP C SUBTOTAL | - | |||
| Pricing for the next Group is in the Group D tab at the bottom of the spreadsheet. |
Group D - Other Items
| CITY OF AUSTIN - PRICE SHEET - IFB 5000 RGW1027REBID | ||||||
| Group D: Other Items | ||||||
| Enter pricing only in Column F, Unit Price cells. Bid of 0 = no charge; blank = no bid. | ||||||
| GROUP D - Other Items | ||||||
| Section 1: Waste Composition and Contamination Audits (per City request) | ||||||
| Line | ||||||
| No. | Description | Estimated Quantities | Unit Price | |||
| 1.1 | Per Scope of Work Item 7.2 Waste Composition and Contamination Audits | 1 | ||||
| GROUP D SUBTOTAL | - | |||||
| Pricing for the next Group is in the Group E tab at the bottom of the spreadsheet. |
Group E - INFORMATIONAL ONLY
| CITY OF AUSTIN - PRICE SHEET - IFB 5000 RGW1027REBID | ||
| Group E: Other Items (For Informational Purposes Only. This Section Not Used in Award Determination) | ||
| Enter pricing only in Column C, Unit Price cells. Bid of 0 = no charge; blank = no bid. | ||
| GROUP E - Other Items | ||
| Section 1: Special Weight Study (optional per City request) | ||
| Line | ||
| No. | Description | Unit Price |
(enter bid)
1.1 Per Scope of Work Item 9.6 Special Weight Study
| Section 2: EXTRA OR UNSCHEDULED COLLECTIONS - Cost of extra pick-ups for containers already at a specified location and specified collection schedule. | ||
| Line | ||
| No. | Size | Unit Price |
(enter bid)
| 2.1 | 3 CU YD - Landfill Trash |
| 2.2 | 4 CU YD - Landfill Trash |
| 2.3 | 6 CU YD - Landfill Trash |
| 2.4 | 8 CU YD - Landfill Trash |
| 2.5 | 10 CU YD - Landfill Trash |
| 2.6 | 32 gallon - Landfill Trash |
| 2.7 | 64 gallon - Landfill Trash |
| 2.8 | 96 gallon - Landfill Trash |
| 2.9 | 3 CU YD - Recycling |
| 2.10 | 4 CU YD - Recycling |
| 2.11 | 6 CU YD - Recycling |
| 2.12 | 8 CU YD - Recycling |
| 2.13 | 10 CU YD - Recycling |
| 2.14 | 32 gallon - Recycling |
| 2.15 | 64 gallon - Recycling |
| 2.16 | 96 gallon - Recycling |
| 2.17 | 32 gallon - Composting |
| 2.18 | 64 gallon - Composting |
| 2.19 | 96 gallon - Composting |
| Section 3: SPECIAL EVENT COLLECTIONS/TEMPORARY CONTAINERS - Cost of extra pick-ups for containers that will need to be delivered and then removed. Containers to be serviced as requested. | ||
| Line | ||
| No. | Size | Unit Price |
(enter bid)
| 3.1 | 20 CU YD Landfill Trash Container | |
| 3.2 | 30 CU YD Landfill Trash Container | |
| 3.3 | 40 CU YD Landfill Trash Container | |
| Section 3 (cont.): DAILY RENTAL RATES FOR SPECIAL EVENTS/TEMPORARY | ||
| Line | ||
| No. | Container Size | Unit Price |
(enter bid)
| 3.4 | 4 CU YD |
| 3.5 | 8 CU YD |
| 3.6 | 20 CU YD |
| 3.7 | 30 CU YD |
| 3.8 | 40 CU YD |
| 3.9 | 32 gallon |
| 3.10 | 64 gallon |
| 3.11 | 96 gallon |
| Section 4: COMPACTORS (MONTHLY RATE) | ||
| Line | ||
| No. | Size | Unit Price |
(enter bid)
| 4.1 | 4 CU YD Front or Side Loading |
| 4.2 | 8 CU YD Front or Side Loading |
| 4.3 | 20 CU YD Front or Side Loading |
| 4.4 | 30 CU YD Front or Side Loading |
| 4.5 | 40 CU YD Front or Side Loading |
image1.png image2.png image3.png image4.png image5.png
File details come from the government source that posted it. Updated .