IFB-36C24523B0007 LEAD AND CADMIUM REMEDIATION - 4-6-23.pdf
PDF 617 KB Posted
- Solicitation number
- 36C24523B0007
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C24523B0007 0001-AMENDMENT.pdf | ||
| 36C24523B0007_1.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1. SOLICITATION NUMBER 2. TYPE OF SOLICITATION 3. DATE ISSUED PAGE OF PAGES
4. CONTRACT NUMBER 5. REQUISITION/PURCHASE REQUEST NUMBER 6. PROJECT NUMBER
7. ISSUED BY CODE 8. ADDRESS OFFER TO
a. NAME b. TELEPHONE NUMBER (Include area code) (NO COLLECT CALLS)
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying number, date)
12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES," indicate within how many calendar days after award in Item 12B.)
12b. CALENDAR DAYS
13. ADDITIONAL SOLICITATION REQUIREMENTS:
STANDARD FORM 1442 (REV. 8/2014) STANDARD FORM 1442
Prescribed by GSA-FAR (48 CFR) 52.236-1(d)
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
SOLICITATION SOLICITATION
IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
9. FOR INFORMATION
CALL:
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
SEALED BID (IFB)
NEGOTIATED (RFP)
11. The Contractor shall begin performance within ____________ calendar days and complete it within ____________ calendar days after receiving award, notice to proceed. This performance period is mandatory negotiable. (See _____________________________).
YES NO
a. Sealed offers in original and ___________________copies to perform the work required are due at the place specified in Item 8 by _____________ (hour) local time _____________________ (date). If this is a sealed bid solicitation, offers must be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, the date and time offers are due.
b. An offer guarantee is, is not required.
c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
d. Offers providing less than _______________________ calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.
1 62
36C24523B0007 X
04/06/2023
23-479-TBD
Department of Veterans Affairs
VAMC (688)
NCO 5 Contracting
50 IRVING STREET, N.W.
WASHINGTON DC 20422
Department of Veterans Affairs
VAMC (688)
NCO 5 Contracting
50 IRVING STREET, N.W.
WASHINGTON DC 20422
John Aston 410-642-2411 ext 26057
The contractor shall provide lead and cadmium remediation services that includes all labor, tools, materials, equipment, supplies and supervision to perform work as required in accordance with the Statement of Work.
Instructions for submission of Bids and Opening of Bids can be found on PAGE 18 of this Document. Site visit information is li d d Listed under SITE VISIT (Construction) page 23.
This is a 100% Service -Disabled Veteran Owned Business (SDVOSB) set aside.
Award is subject to availability of Funds.
10 30
X X 52.211-10
X
1 12pm EDT
05-05-2023
X
14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NUMBER
16. REMITTANCE ADDRESS
CODE FACILITY CODE
17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of the solicitation, if this offer is accepted by the Government in writing within __________ calendar days after the date offers are due.
AMOUNTS
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
AMENDMENT
NUMBER
DATE.
20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER 20b. SIGNATURE 20c. OFFER DATE
21. ITEMS ACCEPTED:
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO 10 U.S.C. 2304(c)( ) 41 U.S.C. 3304(a) ( )
26. ADMINISTERED BY 27. PAYMENT WILL BE MADE BY
PHONE: FAX:
28. NEGOTIATED AGREEMENT 29. AWARD Your Contractor agrees offer on this solicitation is hereby accepted as to the items listed. This to furnish and deliver all items or perform all work requirements identified award consummates the contract, which consists of (a) the Government on this form and any continuation sheets for the consideration stated in solicitation and your offer, and (b) this contract award. No further cont-this contract. The rights and obligations of the parties to this contract ractual document is necessary.
shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.
30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31a. NAME OF CONTRACTING OFFICER
TO SIGN
30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA 31c. AWARD DATE
BY
OFFER
AWARD
STANDARD FORM 1442 (REV. 8/2014) BACK
(Include ZIP Code) (Include area code)
(Include only if different than Item 14.)
(Insert any number equal to or greater than the minimum requirement stated in Item 13d. Failure to insert any number means the offeror accepts the minimum in Item 13d.)
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
(Type or print)
(4 copies unless otherwise specified)
(Type or print) (Type or print)
(Contractor is required to sign this document and return _______ copies to issuing office.)
(Contractor is not required to sign this document.)
(Must be fully completed by offeror)
(To be completed by Government)
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
Department of Veterans Affairs
VAMC (688)
NCO 5 Contracting
50 IRVING STREET, N.W.
WASHINGTON DC 20422
PAYMENT WILL BE MADE BY
FSC e-Invoice Payment Invoice must be submitted electronically http://www.fsc.va.gov/einvoice.asp Invoice Setup Information 1-877-489-6135
Table of Contents
PART I - THE SCHEDULE
SECTION A - SOLICITATION/CONTRACT FORM
A.1 SF 1442 SOLICITATION, OFFER, AND AWARD (Construction, Alteration, or Repair)
A.2 SF 1442 SOLICITATION, OFFER, AND AWARD (CONSTRUCTION,
ALTERATION, OR REPAIR)– BACK
B.1-STATEMENT OF WORK
B.2- SPECIFICATIONS- SECTION 02 83 33. 13 LEAD BASED PAINT REMOVAL AND
DISPOSAL
PART 1 - GENERAL
1.1 SUMMARY
1.2 DEFINITIONS
1.3 APPLICABLE PUBLICATIONS
1.4 PRE-REMOVAL MEETINGS
1.5 SUBMITTALS
1.6 QUALITY ASSURANCE
1.7 WARRANTY
PART 2 - PRODUCTS
2.1 PAINT REMOVAL PRODUCTS
2.2 ACCESSORIES
PART 3 - EXECUTION
3.1 EXAMINATION
3.2 PREPARATION
3.3 WORK PROCEDURES
3.4 LEAD-BASED PAINT REMOVAL
3.5 SUBSTRATE SURFACE PREPARATION
3.6 FIELD QUALITY CONTROL
3.7 CLEANING AND DISPOSAL
C.1 INFORMATION REGARDING BIDDING MATERIAL, BID GUARANTEE AND BONDS ... 18
C.2 INSTRUCTIONS, CONDITIONS AND OTHER STATEMENTS TO BIDDERS/OFFERORS
INSTRUCTIONS FOR SUBMISSION OF BIDS and OPENING OF SEALED BIDS
2.1 52.214-31 FACSIMILE BIDS (DEC 1989)
2.2 52.222-5 CONSTRUCTION WAGE RATE REQUIREMENTS—SECONDARY SITE
OF THE WORK (MAY 2014)
2.3 52.222-23 NOTICE OF REQUIREMENT FOR AFFIRMATIVE ACTION TO ENSURE
EQUAL EMPLOYMENT OPPORTUNITY FOR CONSTRUCTION (FEB 1999)
2.4 52.225-10 NOTICE OF BUY AMERICAN REQUIREMENT—CONSTRUCTION
MATERIALS (MAY 2014)
2.5 52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995) ALTERNATE I (FEB 1995)
2.6 52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB
1998)
C.3 REPRESENTATIONS AND CERTIFICATIONS
3.1 52.204-8 ANNUAL REPRESENTATIONS AND CERTIFICATIONS (MAR 2023) .. 23
3.2 52.204-24 REPRESENTATION REGARDING CERTAIN TELECOMMUNICATIONS
AND VIDEO SURVEILLANCE SERVICES OR EQUIPMENT (NOV 2021)
C.4 GENERAL CONDITIONS
4.1 52.204-19 INCORPORATION BY REFERENCE OF REPRESENTATIONS AND
CERTIFICATIONS (DEC 2014)
4.2 52.204-23 PROHIBITION ON CONTRACTING FOR HARDWARE, SOFTWARE,
AND SERVICES DEVELOPED OR PROVIDED BY KASPERSKY LAB AND OTHER
COVERED ENTITIES (NOV 2021)
4.3 52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK
(APR 1984) ALTERNATE I (APR 1984)
4.4 52.219-28 POST-AWARD SMALL BUSINESS PROGRAM REREPRESENTATION
(MAR 2023)
4.5 52.225-9 BUY AMERICAN—CONSTRUCTION MATERIALS (OCT 2022)
4.6 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)
4.7 VAAR 852.201-70 CONTRACTING OFFICER'S REPRESENTATIVE (DEC 2022)
4.8 VAAR 852.219-73 VA NOTICE OF TOTAL SET-ASIDE FOR VERIFIED SERVICE-
DISABLED VETERAN-OWNED SMALL BUSINESSES (NOV 2022)
4.9 VAAR 852.232-72 ELECTRONIC SUBMISSION OF PAYMENT REQUESTS (NOV
2018)
4.10 VAAR 852.236-71 SPECIFICATIONS AND DRAWINGS FOR CONSTRUCTION
(APR 2019)
4.11 VAAR 852.236-79 CONTRACTOR PRODUCTION REPORT (APR 2019)
4.12 VAAR 852.236-80 SUBCONTRACTS AND WORK COORDINATION (APR 2019)
4.13 VAAR 852.242-70 GOVERNMENT CONSTRUCTION CONTRACT
ADMINISTRATION (OCT 2020)
4.14 VAAR 852.242-71 ADMINISTRATIVE CONTRACTING OFFICER (OCT 2020) .. 49
4.15 VAAR 852.243-70 CONSTRUCTION CONTRACT CHANGES—SUPPLEMENT
(SEP 2019)
D.1 -ATTACHMENTS WAGE RATE DETERMINATION
B.1-STATEMENT OF WORK
Statement of Work
Lead and Cadmium Removal Service Oncology Clinic
Washington, DC VA Medical Center
A. GENERAL INFORMATION
1. Introduction: The Washington DC VA Medical Center (DC VAMC) operates a medical hospital, rehabilitation, and long-term care units on its campus. The Contractor shall provide lead and cadmium remediation services that includes all labor, tools, materials, equipment, supplies and supervision to perform work as required. Service will involve, but will not be limited to, infection control precautions, mold abatement, lead abatement, and accompanying demolition.
2. Period of Performance: The initial contract will be for 30 days after award.
3. Scope of Work: The contractor shall remove, remediate, mold cadmium and lead containing materials from the DC VAMC Oncology room. There is a needed to eliminate possible exposure to staff and visitors. Contractor should be able to remediate within 10 days of award and submit written compliance program per 29 CFR 1910.1025 for review to Safety Service/COR. All work inside contaminated areas shall be performed by an asbestos abatement firm licensed to perform asbestos, mold and lead abatement in the district of Columbia. The area and final air testing inside the work areas shall be performed by a third party, independent, licensed air monitoring firm procured separately by the VA. Informal shop drawings, incidental to the job reflecting the plan of action and completed project, may be required. Provide proof of lead/cadmium Training and a removal plan for review to the COR. Contractor will comply with all local building and safety codes. Contractor will provide clearance, report, lab analysis, documentation and recommendations on service provided to DCVAMC Safety Contracting Officer Representative (COR) within a reasonable amount of time not exceeding 15 days. Upon completion of the project contractor shall provide Air sample reports, inclusive of the two personal samples and outside of work area samples and shall provide Surface sample reports for (1) Lead Wipe samples and (2) Cadmium Wipe samples.
a) Line Items:
1) Lead & Cadmium Removal and IH final air clearance - 0001
4. Location: Washington DC, VAMC at 50 Irving ST NW, Washington, DC 20422.
5. Background: Public awareness about the toxicity of lead, asbestos and mold has greatly increased in the last 20 years and has focused much attention on the potential health problems associated with these contaminants. It is important for building managers to maintain consistently high standards of indoor air quality to ensure the long-term health of their employees and occupants. This work is being solicited to satisfy the requirements of VHA Directive 2010-036 Asbestos Management.
6. Hours of Operation: Normal facility business hours are Monday through Friday between the hours of 07:00 AM through 4:00 PM excluding Federal Holidays. Contractors shall schedule work around business hours, so it does not interfere with operations. Do not schedule work on Federal holidays or days observed in lieu thereof. The Federal holidays listed below are observed.
New Year’s Day Labor Day Christmas Day Martin Luther King Columbus Day President’s Day Veteran’s Day Memorial Day Thanksgiving Day Independence Day Juneteenth Independence Day
7. ENTRY/ACCESS TO SITE:
a) A listing of all Contractor personnel who will be working under the contract, must be submitted to the Contracting Officer prior to the start of work under each task order awarded under this contract. The preferred method of providing this list is via email, to the contracting officer’s representative (COR), unless otherwise notified. The listing shall include, but not limited to contract number, project number, employee name, and the estimated starting and ending date of each employee. Subsequent listings of all additions or deletions will be submitted as employees are hired or released.
b) During construction, the Contractor shall permit the Department of Veterans Affairs personnel access to the facilities within the work area. The Contractor shall provide protection to persons and property throughout the progress of the work.
8. SAFETY PRECAUTIONS: a. The Contractor shall comply with all applicable Federal, State and Local legal requirements regarding workers health and safety. The requirements include, but are not limited to, those found in Federal and State Occupational Safety and Health Act (OSHA) statutes and regulation, such as applicable provision of Title 29, Code of Federal Regulations (CFR) Parts 1910 and 1926. Contractor is solely responsible for determining the legal requirements that apply to activities and shall ensure safe and healthful working conditions for its employees.
b. Contractor shall assume the responsibility to guard against causing fires and/or explosion and to protect Government Property, reference NFPA 241 and 29 CFR 1926.
c. The Contractor shall perform the work in a manner consistent with the area security and fire safety regulations especially about exits and exit way access. Utility shutdowns shall not compromise security, communication or fire safety for occupants.
d. No flammable liquids shall be stored or used in the Medical Center.
e. The necessary number and appropriate types of portable fire extinguishers are required per National Fire Protection Association (NFPA) 10 and NFPA 41.
f. The Contractor shall receive from the COTR a permit for all cutting, welding and soldering.
g. All necessary precautions shall be taken by the contractor to prevent activation of any existing smoke detectors or sprinkler heads.
9. HAZARDOUS MATERIAL REPORTING: a. The Contractor shall maintain hazardous inventories and material safety data sheets (MSDS) for all hazardous materials (as defined in CFR 1910.120, 40 CFR’s 355, 370, & 372) to be stored and used at this Medical Center.
Hazardous materials must be inventoried when received and when the project is completed.
b. Hazardous Materials Inventories, Safety Data Sheets and Material Quantities used shall be submitted to the Contracting Officer for approval.
c. In the event of a spill, Contractor shall immediately notify the Contracting Officer’s Technical Representative as well as the Contracting Officer. The Contractor shall be solely responsible for the expense of any cleanup of such spill, and the cleanup shall be in accordance with the applicable provision of 40 CFR Part 761.
10. ENVIRONMENTAL PROTECTION:
a. To provide for abatement and control of all environmentally hazardous materials arising from demolition and/or construction activities, the Contractor shall comply with all applicable environmentally hazardous material control and abatement and all applicable provisions of the Corps of Engineers’ Manual EM 385-1-1, “General Safety Requirements” as well as the specific requirements stated elsewhere in the Contract Documents.
b. All hazardous and universal waste resulting from contractor demolition and construction shall be removed and properly disposed in accordance with 40 CFR 261 through 265, 40 CFR 273 and 40 CFR 279 by the contractor at no additional cost to the VA. This will include the disposal of ballasts, fluorescent bulbs, used oil, mercury switches and any hazardous material. Copies of disposal manifests must be provided to the COTR.
c. Contractor must comply with Federal Executive Order 13514 and VA specifications by developing a waste management plan to divert 30-50% of demolition debris from the solid waste stream. At a minimum, the following shall be diverted from the landfill: inert material, wood, metal, cardboard, roofing material, plastics, carpets, carpet pads, gypsum board, insulation, unused paint.
11.INTERIM LIFE SAFETY MEASURES: A series of operational actions taken to temporarily reduce the hazard posed by life safety deficiencies created during and until completion of construction.
12.APPLICABLE SPECIFICATIONS: Specifications applicable to projects will be attached via email. The Contractor shall be responsible for compliance with all regulations and orders of Safety Service and VA Police, respecting identification of employees, movements on installation, parking, truck entry, and all other applicable regulations, which may affect the work.
Special requirements will be identified in the statement of work for an individual task order.
The Medical Center may have specific requirements, which will be identified by the individual task orders issued under this contract.
13.ADDITIONAL INFORMATION: Parking for contractors will not be permitted on the VAMC/DC facility. Violators will be ticketed or towed at Contractor’s expense. Contractor will maintain their own dumpster at an approved location for removal of waste materials. The COR will be Cynthia Warren, alternate COR Lynn Holloway and Cheryl Williamson who can be reached at 202-745-8000 ext.56985
B.2- SPECIFICATIONS- SECTION 02 83 33. 13 LEAD BASED PAINT
REMOVAL AND DISPOSAL
PART 1 - GENERAL
1.1 SUMMARY
A. Section Includes:
1. Removing and disposal of lead-based paint (LBP) at interior locations indicated in existing conditions report or SOW.
1.2 DEFINITIONS
A. Action Level: Employee exposure, without regard to use of respirator, to an airborne lead concentration of 30 micrograms(µ) per cubic meter
(m3) of air determined as an 8-hour Time-Weighted Average (TWA). As used in this section, ”30 micrograms per cubic meter of air" refers to OSHA
29 CFR 1926.62 Lead in Construction Action Level (AL).
B. Area Monitoring: Sampling of lead concentrations within lead control area and inside physical boundaries which are representative of airborne lead concentrations which may reach breathing zone of personnel potentially exposed to lead.
C. Breathing Zone: Area within hemisphere, forward of shoulders, with 150 mm to 225 mm (6 to 9 inches) radius and center at nose or mouth of employee.
D. Certified Industrial Hygienist (CIH): As used in this section, refers to an Industrial Hygienist Certified in the Comprehensive Practice of
Industrial Hygiene by the American Board of Industrial Hygiene and
Board for Global EHS Credentialing, employed by Contractor.
E. Change Rooms and Shower Facilities: Rooms within designated physical boundary around lead control area equipped with separate storage facilities for clean protective work clothing and equipment and for street clothes which prevents cross contamination.
F. Competent Person: Person capable of identifying lead hazards in work area and authorized by contractor to take corrective action. Meets the
OSHA definition of Competent Person.
G. Decontamination Room: Room for removal of contaminated personal protective equipment (PPE).
H. Eight-Hour Time Weighted Average (TWA): Airborne concentration of lead averaged over 8-hour workday to which an employee is exposed.
I. High Efficiency Particulate Air (HEPA) Filter Equipment:
HEPA filtered vacuuming equipment with UL 586 filter system capable of collecting and retaining lead-contaminated paint dust. HEPA filter means 99.97 percent efficient against 0.3-micron (0.012 mil) size particles.
J. Lead: Metallic lead, inorganic lead compounds, and organic lead soaps.
Excluded from this definition are other organic lead compounds.
K. Lead Control Area: Enclosed area or structure with full containment to prevent spreading lead dust, paint chips, and debris from lead-based paint removal operations. Lead control area is isolated by physical boundaries to prevent unauthorized entry of personnel.
L. Lead Permissible Exposure Limit (PEL): Fifty micrograms per cubic meter of air (50 µg/m3) determined as an 8-hour TWA as determined by
29 CFR Part 1926.62. When employee is exposed for more than 8-hours per work day, determine PEL by the following formula. PEL micrograms/cubic meter (parts per million) of air = 400/No. of hrs. worked per day.
M. Personnel Monitoring: Sampling of lead concentrations within employee breathing zone to determine 8-hour time weighted average concentration according to 29 CFR Part 1926.62. Take samples that are representative of the various employee's work tasks.
N. Physical Boundary: Area physically roped or partitioned off around enclosed lead control area to limit unauthorized entry of personnel. As used in this section, "inside boundary" shall mean same as "outside lead control area."
1.3 APPLICABLE PUBLICATIONS
A. Comply with references to extent specified in this section.
B. American National Standards Institute (ANSI):
Z9.2-2018...............Fundamentals Governing the Design & Operation of Local Exhaust Ventilation Systems.
C. Code of Federal Regulations (CFR):
29 CFR Part 1910........Occupational Safety and Health Standards.
29 CFR Part 1926........Safety and Health Regulations for Construction.
40 CFR Part 260.........Hazardous Waste Management System: General.
40 CFR Part 261.........Identification and Listing of Hazardous Waste.
40 CFR Part 262.........Standards Applicable to Generators of Hazardous
Waste.
40 CFR Part 263.........Standards Applicable to Transporters of
Hazardous Waste.
40 CFR Part 264.........Standards for Owners and Operations of
Hazardous Waste Treatment, Storage, and
Disposal Facilities.
40 CFR Part 265.........Interim Status Standards for Owners and
Operators of Hazardous Waste Treatment, Storage, and Disposal Facilities.
40 CFR Part 268.........Land Disposal Restrictions.
49 CFR Part 172.........Hazardous Material Table, Special Provisions, Hazardous Material Communications, Emergency
Response Information, and Training
Requirements, and Security Plans.
49 CFR Part 178.........Specifications for Packaging.
D. Underwriters Laboratories (UL):
586-09..................High-Efficiency, Particulate, Air Filter Units.
1.4 PRE-REMOVAL MEETINGS
A. Conduct pre-removal meeting minimum 30 days before beginning Work of this section.
1. Required Participants:
a. Contracting Officer's Representative.
b. Certified Industrial Hygienist.
c. Architect/Engineer.
d. Contractor.
e. Paint removal contractor.
f. Other installers responsible for finishing resulting surfaces.
2. Meeting Agenda: Distribute agenda to participants minimum 3 days before meeting.
a. Respiratory protection program.
b. Hazard communication program.
c. Hazardous waste management plan.
d. Safety and health regulation compliance.
e. Employee training.
f. Removal schedule.
g. Removal sequence.
h. Preparatory work.
i. Protection before, during, and after removal.
j. Removal.
k. Inspecting and testing.
l. Other items affecting successful completion.
3. Document and distribute meeting minutes to participants to record decisions affecting installation.
1.5 SUBMITTALS
A. Submittal Procedures: SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES.
B. Manufacturer's Literature and Data:
1. Description of each product.
a. Paint removal products.
b. Vacuum filters.
c. Respirators.
2. Safety Data Sheet for each paint removal product.
3. Installation instructions.
a. Paint removal products.
C. Test Reports: Submit testing laboratory reports.
1. Submit air monitoring results within three working days, signed by testing laboratory employee performing air monitoring, employee analyzing sample, and CIH.
D. Certificates: Certify completed lead training.
1. Submit certificate for each employee signed and dated by CIH and employee stating employee was trained.
E. Qualifications: Substantiate qualifications comply with specifications.
1. Paint removal contractor.
2. Testing laboratory.
a. Name, address, and telephone number.
b. Current evidence of participation in American Industrial Hygiene
Association (AIHA) Laboratory Accreditation Program (LAP), LLC, Environmental Lead Laboratory Accreditation Program (ELLAP).
c. Copy of current AIHA accreditation certificate.
3. Industrial hygienist.
a. Name, address, and telephone number.
b. Resume showing previous experience.
c. Copy of current ABIH CIH certification.
4. Paint disposal facility.
a. Name, address, and telephone number.
b. Current license or authorization to receive and dispose lead contaminated waste.
F. Record Documents:
1. Completed and signed hazardous waste manifest from waste transporter.
2. Toxicity Characteristic Leaching Procedure (TCLP) test results to determine if waste is hazardous.
3. Paint disposal facility receipts and disposition reports.
4. Certification of medical examinations.
5. Medical Opinion that employee is qualified to wear a respirator, that employees has been trained and fit tested for the respirator.
6. Employee training certification.
1.6 QUALITY ASSURANCE
A. Safety and Health Regulation Compliance:
1. Comply with laws, ordinances, rules, and regulations of Federal, State, and Local authorities having jurisdiction regarding removing, handling, storing, transporting, and disposing lead waste materials.
a. Comply with applicable requirements of 29 CFR Part 1926.62.
b. Notify Contracting Officer's Representative and request resolution of conflicts between regulations and specified requirements before starting work.
2. Comply with the local laws, ordinances, criteria, rules and regulations regarding removing, handling, storing, transporting, and disposing lead-contaminated materials:
B. Paint Removal Contractor: Experienced contractor, registered or licensed by applicable state agency regulating lead-based paint removal.
C. Testing Laboratory: State certified independent testing laboratory experienced in airborne lead monitoring, testing, and reporting.
1. Successful participant in American Industrial Hygiene Association (AIHA) Laboratory Accreditation Program (LAP), LLC, Environmental
Lead Laboratory Accreditation Program (ELLAP).
D. Certified Industrial Hygienist: Certified as CIH by American Board of Industrial Hygiene in comprehensive practice and responsible for:
1. Certify Training.
2. Review and approve lead-based paint removal plan for conformance to applicable referenced standards.
3. Inspect lead-based paint removal work for conformance with approved plan.
4. Direct monitoring.
5. Ensure work is performed according to specifications.
6. Ensure personnel and environment hazardous exposures are adequately controlled.
E. Paint Disposal Facility: State certified disposal facility qualified to receive and dispose lead-based paint.
F. Lead-based Paint Removal Plan:
1. Submit detailed, site-specific plan describing lead-based paint removal procedures.
2. Include sketch showing location, size, and details of lead control areas, decontamination rooms, change rooms, shower facilities, and mechanical ventilation system.
3. Include eating, drinking, and restroom procedures, interface of trades, work sequencing, collected wastewater and paint debris disposal plan, air sampling plan, respirators, protective equipment, and detailed description of containment methods ensuring airborne lead concentrations do not exceed action level outside lead control area.
a. Eating, drinking, and smoking are not acceptable within lead control area.
4. Include air sampling, training and strategy, sampling methodology, frequency, duration, and qualifications of air monitoring personnel.
G. Respiratory Protection Program: Establish and implement program required by 29 CFR Part 1910.134 and 29 CFR Part 1926.62.
1. Provide each employee negative pressure or other appropriate respirator.
a. Respirator fit each employee's respirator at initial fitting and at least annually thereafter, as required by 29 CFR Part 1910.134
Respiratory Protection.
H. Hazard Communication Program: Establish and implement program required by 29 CFR Part 1910.1200 which is the same as 29 CFR 1926.59.
I. Hazardous Waste Management Plan: Establish and implement plan according to applicable requirements of Federal, State, and Local hazardous waste regulations including the following:
1. Identification of hazardous wastes associated with work.
2. Estimated quantities of generated and disposed waste.
3. Names and qualifications of each contractor transporting, storing, treating, and disposing wastes. Include facility location and 24-hour point of contact. Provide two copies of // EPA // State // and
// Local // hazardous waste // permit applications // permits // and
// EPA Identification numbers //.
4. Names and qualifications (experience and training) of personnel working on-site with hazardous wastes.
5. List of required waste handling equipment including cleaning, volume reduction, and transport equipment.
6. Spill prevention, containment, and cleanup contingency implementation measures.
7. Work plan and schedule for waste containment, removal, and disposal with daily waste cleaned up and containerization.
8. Hazardous waste disposal cost.
1.7 WARRANTY
A. Construction Warranty: FAR clause 52.246-21, "Warranty of Construction."
PART 2 - PRODUCTS
2.1 PAINT REMOVAL PRODUCTS
A. Chemical Stripper: Biodegradable, non-toxic, capable of removing existing paint layers in one application, and acceptable to CIH.
2.2 ACCESSORIES
A. Waste Collection Drums: 49 CFR Part 178; Type 1A2, steel, removable head, 200 L (55 gal.) capacity, capable of containing waste without loss.
B. Vacuum Cleaner: HEPA filtered type.
C. Scrapers:
1. Metal type for use on metal, concrete, and masonry surfaces.
2. Plastic type for use on wood, plaster, gypsum board, and other surfaces.
D. Rinse Water: Potable.
E. Cleaning Cloths: Cotton.
PART 3 - EXECUTION
3.1 EXAMINATION
A. Before exposure to lead-contaminated dust, provide workers with comprehensive medical examination required by 29 CFR Part 1926.62 (j)
Medical Surveillance.
B. Maintain complete and accurate employee medical records according to 29 CFR Part 1910.1020.
C. Train each employee performing paint removal, disposal, and air sampling operations according to 29 CFR Part 1926.62.
1. Certify training is completed before employee is permitted to work on project and enter lead control area.
3.2 PREPARATION
A. Protect existing work indicated to remain.
1. Perform paint removal work without damaging and contaminating adjacent work.
2. Restore damage and contamination to original condition.
B. Notify Contracting Officer 20 days before starting paint removal work.
C. Lead Control Area Requirements:
1. Establish lead control area by completely enclosing lead-based paint removal work area with containment screens.
2. Contain removal operations using negative pressure full containment system with minimum one change room and HEPA filtered exhaust.
D. Boundary Requirements: Provide physical boundaries around lead control area by roping off area or providing curtains, portable partitions or other enclosures to ensure that airborne lead concentrations do not meet or exceed action level outside of lead control area.
E. Heating, Ventilating and Air Conditioning (HVAC) Systems: Shut down, lock out, and isolate HVAC systems supplying exhausting, and passing through lead control areas. Seal HVAC inlets and outlet within lead control area with 6-mil plastic sheet and tape. Tape seal seams in HVAC components passing through lead control area.
F. Change Room and Shower Facilities: Provide clean change rooms and shower facilities within physical boundary around lead control area according to 29 CFR Part 1926.62.
G. Mechanical Ventilation System:
1. Provide ventilation system to control personnel exposure to lead using HEPA equipped negative air machines.
2. Design, construct, install, and maintain HEPA filtered fixed local exhaust ventilation system according to ANSI Z9.2 and approved by
CIH.
3. Exhaust ventilation air to exterior wherever possible.
4. When exhaust ventilation air must be recirculated into work area, provide HEPA filter with reliable back-up filter and controls to monitor lead concentration in return air and to bypass recirculation system automatically when system fails.
H. Personnel Protection: Provide and use required protective clothing and equipment within lead control area.
I. Warning Signs: Provide warning signs complying with 29 CFR Part 1926.62 at lead control area approaches. Locate signs so personnel read signs and take necessary precautions before entering lead control area.
3.3 WORK PROCEDURES
A. Remove lead-based paint according to approved lead-based paint removal plan.
1. Perform work only in presence of CIH or Industrial Hygienist (IH) Technician under direction of CIH ensuring continuous inspection of work in progress and direction of air monitoring activities.
2. Handle, store, transport, and dispose lead or and lead contaminated waste according to 40 CFR Part 260, 40 CFR Part 261, 40 CFR Part 262, 40 CFR Part 263, 40 CFR Part 264, and
40 CFR Part 265. Comply with land disposal restriction notification requirements as required by 40 CFR Part 268.
B. Use procedures and equipment required to limit occupational and environmental lead exposure when lead-based paint is removed according to 29 CFR Part 1926.62.
C. Dispose removed paint and waste according to Environmental Protection Agency (EPA), federal, state, and local requirements.
D. Personnel Exiting Procedures:
1. When personnel exit lead control area, comply with the following procedures:
a. Vacuum exposed clothing surfaces.
b. Remove protective clothing and equipment in decontamination room.
Place clothing in approved impermeable disposal bag.
c. Shower.
d. Dress in clean clothes before leaving lead control area.
E. Monitoring - General:
1. Monitor airborne lead concentrations according to
29 CFR Part 1910.1025by testing laboratory as directed by CIH.
2. Take personal air monitoring samples on employees anticipated to have greatest exposure risk as determined by CIH. Additionally, take air monitoring samples on minimum 25 percent of work crew or minimum of two employees, whichever is greater, during each work shift.
3. Submit results of air monitoring samples, signed by CIH, within 24 hours after taking air samples. Notify Contracting Officer's
Representative immediately of lead exposure at or exceeding action level outside of lead control area.
F. Monitoring During Paint Removal:
1. Perform personal and area monitoring during entire paint removal operation.
2. Conduct area monitoring at physical boundary daily for each work shift to ensure unprotected personnel are not exposed above action level anytime.
3. For outdoor operations, take at least one sample on each shift leeward of lead control area. When adjacent areas are contaminated, clean area of contamination and have CIH visually inspect and certify lead contamination is cleaned.
4. Stop work when outside boundary lead levels meet or exceed action level. Notify Contracting Officer's Representative, immediately.
5. Correct conditions causing increased lead concentration as directed by CIH.
6. Review sampling data collected during work stoppage to determine if conditions require additional work method modifications as determined by CIH.
7. Resume paint removal when approved by CIH.
3.4 LEAD-BASED PAINT REMOVAL
A. Remove paint within areas indicated on drawings completely exposing substrate. Minimize damage to substrate.
B. Comply with paint removal processes described lead paint removal plan.
C. Lead-Based Paint Removal: Select processes for each application to minimize work area lead contamination and waste.
3.5 SUBSTRATE SURFACE PREPARATION
Protect substrates from deterioration and contamination until refinished.
3.6 FIELD QUALITY CONTROL
A. Field Tests: Performed by testing laboratory B. Perform sampling and testing for:
1. Air monitoring.
2. Lead-Based Paint.
3.7 CLEANING AND DISPOSAL
A. Cleaning:
1. Maintain lead control area surfaces free of accumulating paint chips and dust. Confine dust, debris, and waste to work area.
2. HEPA vacuum clean and wet wipe with detergent solution work area daily, at end of each shift, and when paint removal operation is complete.
B. CIH Certification: Certify in writing that inside and outside lead control area air monitoring samples are less than action level, employee respiratory protection was adequate, the work was performed according to 29 CFR Part 1926.62, and no visible accumulations of lead-based paint and dust remain on worksite.
1. Do not remove lead control area or roped-off boundary and warning signs before Contracting Officer's Representative's receipt of CIH's certification.
2. Re-clean areas showing dust or residual paint chips.
C. Testing: Where indicated and when directed by Contracting Officer's
Representative, test lead-based paint residue and used abrasive according to 40 CFR Part 261 for hazardous waste.
D. Waste Collection:
1. Collect lead-contaminated materials including waste, scrap, debris, bags, containers, equipment, and clothing, which may produce airborne lead contamination.
2. Place lead contaminated materials in waste disposal drums. Label each drum identifying waste type according to 49 CFR Part 172 and date waste materials were first put into drum. Obtain and complete the Uniform Hazardous Waste Manifest forms. Comply with land disposal restriction notification requirements required by
40 CFR Part 268:
3. Coordinate temporary storage location on project site with Contracting Officer's Representative.
E. Waste Disposal:
1. Do not store hazardous waste drums in temporary storage location longer than 90 calendar days from drum label date.
2. Remove, transport, and deliver drums to paint disposal facility.
a. Obtain signed receipt including date, time, quantity, and description of materials received according to 40 CFR Part 262.
b. Obtain final report of materials disposition after disposal completion.
- - - E N D - - -
C.1 INFORMATION REGARDING BIDDING MATERIAL, BID
GUARANTEE AND BONDS
C.2 INSTRUCTIONS, CONDITIONS AND OTHER STATEMENTS TO
BIDDERS/OFFERORS
INSTRUCTIONS FOR SUBMISSION OF BIDS and OPENING OF SEALED
BIDS
1. Submission of Bid in PDF format via email. Please submit a quote in Adobe Acrobat Portable Document Format (“PDF”) documents:
2. Submission Email Address. Bids should be emailed with subject line IFB-36C24523B0007 LEAD AND CADMIUM REMEDIATION to the following email address no later than Friday May 5,2023, 12:00 PM.EDT: John Aston, Contracting Officer, john.aston@va.gov
3. The Sealed Bids will be Opened @ 12:30PM via an electronic Microsoft Teams Call meeting ID: 243 088 629 643 Passcode: DqAhe7 or call in 1+872-701-0185, Phone Conference ID: 170 655 957#.
4. Large file sizes limits. Due to file size limitations, it is recommended that vendors break up submissions so that total email transmissions are less than 20 megabytes. All files must be received by the submission deadline.
5. Technical Response and the Pricing Responses are Mandatory. Any offeror submission that does not include both a technical response and a pricing response will be considered nonresponsive and will not be given further consideration.
6. Prior Contract Information: There is presently no contract in place for this requirement (no incumbent).
7. Evaluation Criteria. The Government will evaluate bids using the evaluation criteria listed below: BASIS FOR CONTRACT AWARD: This is a project that will be awarded on the basis of price alone. The total price from all bid schedule prices, to include options will be the evaluated total price. The evaluation process shall proceed as follows: The Government intends to award a contract without discussions to the lowest priced bid. The Government, however, reserves the right to conduct discussions if deemed in its best interest.
RESPONSIBILITY REQUIREMENTS: A responsibility check will be accomplished for the apparent awardee prior to award. Checks of the VIP database (to insure apparently successful offeror is a verified Service -Disabled Veteran Owned Small Business), System for Award Management (SAM) database (Central Contractor Registration, Online Representations and Certifications, and Excluded Parties List System to insure registrations are current, valid, and no debarment records exist). Any information retrieved or received by the Government that would be cause for negative or unsatisfactory responsibility rating may result in the offeror being determined ineligible for award.
8. Question Cutoff Deadline. All questions/inquiries must be made in written form. No phone calls will be accepted. Questions/inquiries are to be submitted by email by no later than Tuesday, May 25, 2023, 12:00 p.m. EDT to john.aston@va.gov.
2.1 52.214-31 FACSIMILE BIDS (DEC 1989)
(a) Definition. "Facsimile bid," as used in this solicitation, means a bid, modification of a bid, or withdrawal of a bid that is transmitted to and received by the Government via electronic equipment that communicates and reproduces both printed and handwritten material.
(b) Bidders may submit facsimile bids as responses to this solicitation. These responses must arrive at the place and by the time, specified in the solicitation.
(c) Facsimile bids that fail to furnish required representations or information or that reject any of the terms, conditions, and provisions of the solicitation may be excluded from consideration.
(d) Facsimile bids must contain the required signatures.
(e) The Government reserves the right to make award solely on the facsimile bid. However, if requested to do so by the Contracting Officer, the apparently successful bidder agrees to promptly submit the complete original signed bid.
(f) Facsimile receiving data and compatibility characteristics are as follows:
(1) Telephone number of receiving facsimile equipment:
(2) Compatibility characteristics of receiving facsimile equipment (e.g., make and model number, receiving speed, communications protocol):
(g) If the bidder chooses to transmit a facsimile bid, the Government will not be responsible for any failure attributable to the transmission or receipt of the facsimile bid including, but not limited to, the following:
(1) Receipt of garbled or incomplete bid.
(2) Availability or condition of the receiving facsimile equipment.
(3) Incompatibility between the sending and receiving equipment.
(4) Delay in transmission or receipt of bid.
(5) Failure of the bidder to properly identify the bid.
(6) Illegibility of bid.
(7) Security of bid data.
(End of Provision)
2.2 52.222-5 CONSTRUCTION WAGE RATE REQUIREMENTS—
SECONDARY SITE OF THE WORK (MAY 2014)
(a)(1) The offeror shall notify the Government if the offeror intends to perform work at any secondary site of the work, as defined in paragraph (a)(1)(ii) of the FAR clause at 52.222-6, Construction Wage Rate Requirements, of this solicitation.
(2) If the offeror is unsure if a planned work site satisfies the criteria for a secondary site of the work, the offeror shall request a determination from the Contracting Officer.
(b)(1) If the wage determination provided by the Government for work at the primary site of the work is not applicable to the secondary site of the work, the offeror shall request a wage determination from the Contracting Officer.
(2) The due date for receipt of offers will not be extended as a result of an offeror's request for a wage determination for a secondary site of the work.
(End of Provision)
2.3 52.222-23 NOTICE OF REQUIREMENT FOR AFFIRMATIVE ACTION TO
ENSURE EQUAL EMPLOYMENT OPPORTUNITY FOR CONSTRUCTION
(FEB 1999)
(a) The offeror's attention is called to the Equal Opportunity clause and the Affirmative Action Compliance Requirements for Construction clause of this solicitation.
(b) The goals for minority and female participation, expressed in percentage terms for the Contractor's aggregate workforce in each trade on all construction work in the covered area, are as follows:
Goals for minority participation for each trade
Goals for female participation for each trade
% 6.9 % These goals are applicable to all the Contractor's construction work performed in the covered area. If the Contractor performs construction work in a geographical area located outside of the covered area, the Contractor shall apply the goals established for the geographical area where the work is actually performed. Goals are published periodically in the Federal Register in notice form, and these notices may be obtained from any Office of Federal Contract Compliance Programs office.
(c) The Contractor's compliance with Executive Order 11246, as amended, and the regulations in 41 CFR 60-4 shall be based on (1) its implementation of the Equal Opportunity clause, (2) specific affirmative action obligations required by the clause entitled "Affirmative Action Compliance Requirements for Construction," and (3) its efforts to meet the goals. The hours of minority and female employment and training must be substantially uniform throughout the length of the contract, and in each trade. The Contractor shall make a good faith effort to employ minorities and women evenly on each of its projects. The transfer of minority or female employees or trainees from Contractor to Contractor, or from project to project, for the sole purpose of meeting the Contractor's goals shall be a violation of the contract, Executive Order 11246, as amended, and the regulations in 41 CFR 60-4. Compliance with the goals will be measured against the total work hours performed.
(d) The Contractor shall provide written notification to the Deputy Assistant Secretary for Federal Contract Compliance, U.S. Department of Labor, within 10 working days following award of any construction subcontract in excess of $10,000 at any tier for construction work under the contract resulting from this solicitation. The notification shall list the—
(1) Name, address, and telephone number of the subcontractor;
(2) Employer's identification number of the subcontractor;
(3) Estimated dollar amount of the subcontract;
(4) Estimated starting and completion dates of the subcontract; and
(5) Geographical area in which the subcontract is to be performed.
(e) As used in this Notice, and in any contract resulting from this solicitation, the "covered area" is
(End of Provision)
2.4 52.225-10 NOTICE OF BUY AMERICAN REQUIREMENT—
CONSTRUCTION MATERIALS (MAY 2014)
(a) Definitions. "Commercially available off-the-shelf (COTS) item," "construction material," "domestic construction material," and "foreign construction material," as used in this provision, are defined in the clause of this solicitation entitled "Buy American—Construction Materials" (Federal Acquisition Regulation (FAR) clause 52.225-9).
(b) Requests for determinations of inapplicability. An offeror requesting a determination regarding the inapplicability of the Buy American statute should submit the request to the
Contracting Officer in time to allow a determination before submission of offers. The offeror shall include the information and applicable supporting data required by paragraphs (c) and (d) of the clause at FAR 52.225-9 in the request. If an offeror has not requested a determination regarding the inapplicability of the Buy American statute before submitting its offer, or has not received a response to a previous request, the offeror shall include the information and supporting data in the offer.
(c) Evaluation of offers.
(1) The Government will evaluate an offer requesting exception to the requirements of the Buy American statute, based on claimed unreasonable cost of domestic construction material, by adding to the offered price the appropriate percentage of the cost of such foreign construction material, as specified in paragraph (b)(3)(i) of the clause at FAR 52.225-9.
(2) If evaluation results in a tie between an offeror that requested the substitution of foreign construction material based on unreasonable cost and an offeror that did not request an exception, the Contracting Officer will award to the offeror that did not request an exception based on unreasonable cost.
(d) Alternate offers.
(1) When an offer includes foreign solicitation in paragraph (b)(2) of the clause at FAR 52.225-9, the offeror also may submit an alternate offer based on use of equivalent domestic construction material.
(2) If an alternate offer is submitted, the offeror shall submit a separate Standard Form 1442 for the alternate offer, and a separate price comparison table prepared in accordance with paragraphs (c) and (d) of the clause at FAR 52.225-9 for the offer that is based on the use of any foreign construction material for which the Government has not yet determined an exception applies.
(3) If the Government determines that a particular exception requested in accordance with paragraph (c) of the clause at FAR 52.225-9 does not apply, the Government will evaluate only those offers based on use of the equivalent domestic construction material, and the offeror shall be required to furnish such domestic construction material. An offer based on use of the foreign construction material for which an exception was requested—
(i) Will be rejected as nonresponsive if this acquisition is conducted by sealed bidding; or
(ii) May be accepted if revised during negotiations.
(End of Provision)
2.5 52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995) ALTERNATE I
(FEB 1995)
(a) The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigations and Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, offerors or quoters are urged and expected to inspect the site where the work will be performed.
(b) An organized site visit has been scheduled for—10 AM- 4/18/2023- Point of Contact will be
Ms. Cynthia Warren @ 202-710-6965© / 202-745-8000 EXT 56985
(c) Participants will meet at— VAMC 5O Irving Street, Washington DC 20422
(End of Provision)
2.6 52.252-1 SOLICITATION PROVISIONS INCORPORATED BY
REFERENCE (FEB 1998)
This solicitation incorporates one or more solicitation provisions by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available.