IFB_27-04_Questions and Answers.pdf
PDF 6 MB Posted
- Attached to
- IFB 26-07 Ranger Shipyard Repairs
- Solicitation number
- BD-27-1070-MMA01-PURCH-134561
- Issued by
- Barnstable County, Massachusetts
About this file
This is a Questions and Answers document for IFB #27-04 TV Ranger Shipyard Repairs issued by the Massachusetts Maritime Academy. The document addresses 18 questions submitted by prospective bidders regarding the dry docking, inspection, and repair requirements for the Training Vessel Ranger, a USCG-inspected 80-foot school ship. Key service items include hull growth removal, marine chemist certification for 12 spaces (seven ballast tanks, four potable water tanks, and one lazzerette space), surface preparation and coating application, and internal USCG inspections. The Academy will handle vessel delivery to and from the shipyard and will maintain daytime site presence during work execution. Bidders are invited to request site visits, with the vessel available Monday 12:00–15:00, Wednesday 07:00–12:00, Thursday 12:00–15:00, and Friday 07:00–15:00. The document clarifies that Service Item #11 has been removed, that no geographic restrictions apply (though the Academy seeks bids from qualified shipyards in Massachusetts and Rhode Island), and that continuity logs for tank inspections are maintained by shipyard personnel only. The vessel's maximum lightship draft is 8.5 feet, and it was recently hauled out in October 2026 with propellers cleaned but hull unwashed.
The Questions and Answers document does not contain pricing information, set-asides, incumbency details, or funding source requirements. Instead, it provides technical clarifications essential for accurate bidding, including confirmation that tubing specifications for optional repairs at frames 15-21 and frame 44 will be determined by the selected vendor, that spaces must be made safe for entry (not hot work), and that the surface preparation and applied coatings must produce a smooth finished surface in accordance with good marine practice. The document includes a general arrangement drawing and fire and safety plan diagram of the vessel to assist bidders in understanding the scope. All responses reference the primary IFB #27-04 opportunity, which established the original bid submission deadline of November 3, 2026, and work completion date of February 19, 2027.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| IFB 27-04 TV Ranger Shipyard Repairs.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
IFB #27-04 TV Ranger Shipyard Repairs Questions and Answers
Confirming, delivery and pick up of vessel is by the Academy / RANGER crew not the bidder correct?
The Academy will reposition the vessel to and from the shipyard.
Will crew be on board during the shipyard period? Staying on board or ahsore? 24/7 access to vessel required or working hours only?
Academy personnel will be on site during routine business hours to oversee shipyard progress and perform routine internal maintenance tasks.
Confirming, there is no Service Item #11, correct?
Item #11 has been removed
Required Service Item #6, can you confirm the contents of the 12 spaces so as to confirm the appropriate chemist qualifications. Is there and existing continuity log that can be viewed prior to the bid?
(7) Ballast Tanks
(4) Potable water tanks
(1) Lazzerette Space
All tanks will be opened and pumped out by Academy personnel. 4 of the ballast tanks are coated with fluid film and there will be remaining residue on the tank surfaces.
Continuity logs are maintained by shipyard personnel and a previous copy is not available.
Required Service Item # 4, as the scope of work can vary significantly making quotation a risk to the bidder, the options are (a) advise bidders of the extent of growth (b) let bidders assume a heavy amount of growth at the risk of exaggerating the scope or (c) let bidders assume a "typical" amount of growth or hours and submit a contract amendment if the actual exceeds the assumed. Which option is preferred?
The Ranger underwent a short haulout in October 2026 and a picture of the hull condition is below. Please note that the propellers were cleaned at that time. Accumulated hull growth is reported to be typical for a vessel that has been in service for 2.5 years with a quality antifouling paint system in place during that period.
Required Service Item # 7,8; "suitable substrate profile" in the case of bottom paint is not likely to be uncertain but in the case of the hull it can vary tremendously. Is it possible during inspection to be shown an area of agreed "standard" ?
The intent is for the surface preparation and applied coatings to produce a smooth finished surface in accordance with good marine practice.
Has a bidders inspection date been declared yet?
Bidders can request a site visit.
The vessel is available as follows:
Monday 1200-1500
Wednesday 0700-1200
Thursday 1200-1500
Friday 0700-1500
Optional Service Item #2, what are the specifications of the tubing (material , thickness, standard if any) at frames 15-21 and frame 44 ?
Tubing specification to be determined by vendor
10 What is the shipyard geographical restrictions; if any?
There are no specific geographical restrictions. The Academy is seeking bids from qualified shipyards in the Massachusetts and Rhode Island area
11 Will the vessel be delivered to the shipyard under its own power and crewed by academy staff?
The Academy will reposition the vessel to and from the shipyard. An Academy representative will be present onboard during daytime working hours to oversee the project.
12 Can the academy provide a drydocking/blocking plan?
Closes available drawing is attached
13 Can the academy provide a General Arrangement Drawing?
A copy of the vessels general layout is attached
14 What are the 12 spaces that require a Marine Chemist certificate?
(7) Ballast Tanks
(4) Potable water tanks
(1) Lazzerette Space
15 Are the spaces to be made safe for entry or safe for hot work?
The spaces must be made safe for entry for the purposes of the USCG internal inspection
16 What is the maximum draft of the vessel in a lightship condition?
8.5ft
17 When was the vessel last hauled out/bottom cleaned?
The vessel was recently hauled out in October 2026 for a quick repair. The propellers were cleaned at that time. The hull was not washed.
18 Can the vessel be made available for a site visit?
The vessel is available as follows:
Monday 1200-1500
Wednesday 0700-1200
Thursday 1200-1500
Friday 0700-1500
A
FT STEERIN
G
M A
N
LIFE RA
FT
LIFE RA
FT
M
A N
F.E. #
LB C
O
F.E. #
.5
LB D
RY
C H
EM
EN
G
IN
E RO
O M
W
TD
F.S. #
(75
F.E. #
LB C
O
F.E. #
LB C
O
F.E. #
LB C
O
F.E. #
LB D
RY
C
H
EM
F.O
. TA
N K 1P
G A
LLO
N
S
F.O
. TA
N K 2P
G A
LLO
N
S
F.O
. TA
N K 3P
G A
LLO
N
S F.O
. "D A
Y
" TA
N K 4P
G A
LLO
N
S
LU
BE O
IL TA
N K
G A
LLO
N
S
POTABLE WATER 2P
2000 GALLONS
BA
L. TA
N K 4P
G A
LLO
N
S
BA
L. TA
N K 4S
G A
LLO
N
S
POTABLE WATER 2S
2000 GALLONS
H Y
D O
IL TA
N
K
G
A
LLO
N S
F.O . "D
A Y
" TA
N
K 4S
G A
LLO
N
S F.O
. TA
N
K 3S
G A
LLO
N
S
F.O
. TA
N K 2S
G A
LLO
N
S
F.O
. TA
N K 1S
G A
LLO
N
S
PO
T. W
A
TER 1S
G A
LLO
N
S
BA
L. TA
N K
G
A
LLO
N S
PO
T. W
A
TER 1P
G A
LLO
N
S
ESC
A
PE H
A
TC
H
F.E. #
LB C
O
BU
N
K (1)
BU
N
K (2)
BUNK (2)
F.E. #
0LB D
RY C
H
EM
F.E. #
LB C
O
EM
ER FU
EL
SH
U
TO
FF
EM
ER FU
EL
SH
U
TO
FF
M.T.W.B.
W O
RK
SH
O P
FW
D
H O
LD
LAZZERETTE
BU
N
K RO
O
M G
A
LLEY
NAVIGATION LAB
WHEEL HOUSE
N O
.2
FIRE STA
TIO
N
N O
.1
FIRE STA
TIO
N
SW
ITC
H
BO
A
RD
PO
RT M
A
IN
EN
G
IN
E
STBD
M
A
IN
EN
G
IN
E
STBD
G
EN
PO
RT G
EN
BO
ILER
AIR RECEIVER AIR RECEIVER
FUEL TRANSFER
PUMP
FRA
M
ES
D
EC
K H O
U
SE TO
P
BRID
G
E D
EC
K
M A
IN
D
EC
K
H O
LD
A
RRA
N
G
EM
EN
T
BA
L. TA
N K 2P
G A
LLO
N
S
BA
L. TA
N
K 3P
G
A
LLO
N S
BA
L. TA
N K 3S
G A
LLO
N
S
BA
L. TA
N
K 2S
G
A
LLO
N S
FU
EL TRA
N
SFER SH
U
TD
O W
N V
EN
TILA
TIO
N
SH
U
TD
O
W N
M U
STER A
REA
(8) Type I PFD
(28 ) Type I PFD
(20 ) Type I PFD
F L
C O
P
C O
C O
C O
C
O
C O
W
W
P
P
M
M
***M
M
*** M
P L A N
F
IR
E
W
D
IRTY
O
IL TA
N K
G A
LLO
N
S
SEW
A G
E TA
N
K
G
A
LLO
N S
M.T.W.B.
M.T.W.B.
M.T.W.B.
M.T.W.B.
FRA
M
E SPA
C
IN
G
1.5 FT
BELL &
LIG
H T
T/V
RA
N G
ER
FIRE &
SA
FETY
PLA
N
Q
TY
SYM
BO
L D
ESC
RIPTIO
N
PO
RTA
BLE C
O
FIRE EXTIN
G U
ISH
ER
PO
RTA
BLE D
RY
C H
EM
IC
A
L FIRE EXTIN
G U
ISH
ER
FIRE A
XE
FIRE C
O
N
TRO
L PLA
N
LIFE JA
C
K
ETS (5
x TY
PE I)
LIFE RA
FTS
LIFE RIN
G
LIFE RIN
G
W
ITH
LIG
H
T
D
ISTRESS SIG
N A
L KIT
M U
STER A
REA
FIRST A
ID
K
IT
BILG
E, BA
LLA
ST, A
N D
FIRE PU
M
P
G
EN
ERA
L A
LA
RM
BELL
M
ED
IC
A
L G
RA
B BA
G
M
M
G
EN
ERA
L A
LA
RM
PU
LL STA
TIO
N
P L A N
F
IR
E
/2 " H
O
SE
FIRE STA
TIO
N
REQ
'D
REQ
'D
H O
SE SPA
N
N
ER
/2 " N
O Z
Z
LE
REQ
'D
W
C O
SEM
I PO
RTA
BLE FIRE EXTIN
G
U
ISH
ER
LO
C
K
ER W
/FIREM
A
N 'S O
U
TFIT
FLA
M
E SA
FETY
LA
M
P
REQ
'D
SC
BA
REQ
'D
FLA
SH
LIG
H
T
REQ
'D
REQ
'D G
LO
V
ES
BO
O
TS
REQ
'D
REQ
'D
FIREM
A
N
SU
IT
REQ
'D H
ELM
ET
REQ
'D
SPA
RE C
H
A
RG
ES FO
R TH
E SC
BA
F L
C O
REM
O
TE FU
EL V
A
LV
E / PU
M
P SH
U
TD
O
W N
STO
K
ES LITTER
P C O
- 1
5LBS
- 10
LBS
- 2
.5
LBS
112 4 4 1 2 1 1 1 1 2221 x1
PERSO
N
- 10
LBS
- 5
LBS
- 5
FT H
O
SE
x 28 x 20 x 8 x 8
PERSO
N
M A
C H
IN
ERY
SPA
C
ES
REM
O
TE V
EN
TILA
TIO
N
SH
U
TO
FF
C
LO
SIN
G
A
PPLIA
N C
E FO
R V
EN
TILA
TIO
N
IN
LET O
R O U
TLET - M
A
C H
IN
ERY SPA
C E
Prepared by: K . O
'Sullivan U pdated 03
.06 .202
EM
ERG
EN
C
Y
LIG
H T
EM
ERG
EN
C
Y
FLA
SH
LIG
H T
File details come from the government source that posted it. Updated .