IFB 27-001 Little Florida Road Sidewalk Addendum 1.pdf

PDF 86 KB Posted

Attached to
Little Florida Road Sidewalk IFB 27-001
Solicitation number
IFB-126773
Issued by
Williamsburg City, Portsmouth City, Virginia

About this file

This is Addendum No. 1 to the Invitation for Bid (IFB) documents for the Little Florida Road Sidewalk project issued by a Virginia local government jurisdiction. The addendum amends the original IFB No. 27-001 and addresses project timeline requirements and cost savings considerations. The project involves providing all labor, materials, equipment, and other necessary items to complete sidewalk improvements along Little Florida Road, as detailed in the accompanying drawings and specifications. The project must be completed by December 31, 2026, with a mandatory work restriction during the week of October 12-18, 2026 (Poquoson Seafood Festival). Bidders intending to begin work after the seafood festival should indicate this intention in their bids. All bidders must acknowledge receipt of this addendum as part of the bid submission process.

The addendum clarifies that certain existing elements, such as the concrete apron by CVS and the drop inlet by the concrete swale, may not require replacement, and potential cost savings in these areas should be bid as outlined in the project plans. Final determination of which elements will be replaced versus retained will be discussed during the construction phase. No specific pricing information, set-asides, or funding sources are detailed in this addendum document.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ADDENDUM NO. 1

To Bid Documents for the

Little Florida Road Sidewalk

IFB No: 27-001

Date: August 26, 2026

The original IFB documents for #27-001 for Little Florida Road Sidewalk are amended as noted in this

Addendum Number 1, and the Addendum shall become part of the IFB Documents. Bidders must acknowledge receipt of this Addendum during the bid process.

QUESTIONS:

Question #1: What is the timeline? Is there a need by date?

Response: The project needs to be completed by the end of calendar year 2026. Also, per the IFB, no construction is permitted during the week of the Poquoson Seafood Festival, October 12-18, 2026. If intending to start after the seafood festival, please indicate that in the bid.

Question #2: There are potential cost savings in areas that will not need to be replaced, such as the concrete apron by CVS or the drop inlet by the concrete swale. How should these be bid?

Response: Bid to plan and possible savings will be discussed during construction.

This Addendum shall be made a part of the solicitation documents.

Note: A signed acknowledgement of this addendum should be attached to your Bid.

Name of Bidder Date

Signature Title

END OF ADDENDUM NUMBER 1