IFB_26-10443_-_Cost_Worksheet.xlsx

XLSX spreadsheet 23 KB Posted

Attached to
Invitation for Bid (IFB) 26-10443 - Boiler Preventive Maintenance
Solicitation number
26-10443
Issued by
Contra Costa County, California

About this file

Cost Worksheet Summary

This is a cost worksheet for IFB #26-10443, a boiler maintenance and inspection services contract administered by the California Department of Public Health (CDPH). The contract encompasses preventive maintenance and inspection services for multiple boiler systems located in the Central Plant (Building J) and Building P, including AJAX steam boilers, Fulton steam boilers, AERCO heating hot water boilers, Patterson-Kelley boilers, and associated equipment. The worksheet itemizes 21 line items covering both semi-annual and annual service frequencies, with quantities ranging from 1 to 8 units per equipment type. The contract is structured as a unit-based agreement covering a three-year period (FY 26-28) with an estimated maximum agreement amount not to exceed $750,000.00. All pricing is currently shown as $0.00 pending bidder submissions.

The cost worksheet establishes that bidders must submit unit rates for semi-annual services, annual services, and hourly labor rates for regular hours, after-hours/weekend, and emergency services. The agreement requires bidders to include all operating expenses, labor, taxes, insurance, overhead, certifications, equipment costs, supplies, permits, licenses, and profit margin in their quoted rates. Up to 10 percent of the total agreement amount may be allocated for unanticipated tasks. Bidders must acknowledge that their submitted rates remain in effect throughout the contract duration and any contract extensions, with cost overruns billed at the rates applicable to the relevant budget period. No set-asides are indicated in this cost worksheet document.

View the file

Other files

File Type Posted
IFB_26-10443_-_Boiler_Preventive_Maintenance.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FY 26-28

Contractor TBD

IFB #26-10443

EXHIBIT B-1, COST WORKSHEET
Contractor will be reimbursed for services satisfactorily performed based on the following rate schedule:
No.BuildingService DescriptionUnit QuantityFrequency# of ServicesCost Per ServiceTotal
1Central Plant (Building J)AJAX Steam Boiler (NG): M/N SFG 1253Semi-annual3$0.00$ - 0
2Central Plant (Building J)Fulton Steam Boiler (NG): VMP 1301Semi-annual3$0.00$ - 0
3Central Plant (Building J)Fulton Steam Generator (NG): M/N ICS 9.52Semi-annual3$0.00$ - 0
4Central Plant (Building J)AJAX Heating Hot Water Boiler (D): M/N WFC 85001Semi-annual3$0.00$ - 0
5Central Plant (Building J)Webster Combustion Cyclonetic JB Series Forced Draft Burner M/N JB 30-75-RM7840L-F-MRUL, S/N U120383A-011Semi-annual3$0.00$ - 0
6Central Plant (Building J)AERCO Heating Hot Water Boiler (NG): M/N INN6008Semi-annual3$0.00$ - 0
7Building PPatterson-Kelley Heating Hot Water Boiler (NG): M/N N1500-2RW3Semi-annual3$0.00$ - 0
8Central Plant (Building J)AERCO Industrial Hot Water Boiler (NG): M/D INN 10603Semi-annual3$0.00$ - 0
9Central Plant (Building J)AERCO Domestic Hot Water Boiler (NG): M/N INN 8002Semi-annual3$0.00$ - 0
10Central Plant (Building J)Industrial Steam DA Tank: NB No. 36461Semi-annual3$0.00$ - 0
Total for Semi-annual Services$ - 0
No.BuildingService DescriptionUnit QuantityFrequency# of ServicesCost Per ServiceTotal
11Central Plant (Building J)AJAX Steam Boiler (NG): M/N SFG 1253Annual3$0.00$ - 0
12Central Plant (Building J)Fulton Steam Boiler (NG): VMP 1301Annual3$0.00$ - 0
13Central Plant (Building J)Fulton Steam Generator (NG): M/N ICS 9.52Annual3$0.00$ - 0
14Central Plant (Building J)AJAX Heating Hot Water Boiler (D): M/N WFC 85001Annual3$0.00$ - 0
15Central Plant (Building J)Webster Combustion Cyclonetic JB Series Forced Draft Burner M/N JB 30-75-RM7840L-F-MRUL, S/N U120383A-011Annual3$0.00$ - 0
16Central Plant (Building J)AERCO Heating Hot Water Boiler (NG): M/N INN6008Annual3$0.00$ - 0
17Building PPatterson-Kelley Heating Hot Water Boiler (NG): M/N N1500-2RW3Annual3$0.00$ - 0
18Central Plant (Building J)AERCO Industrial Hot Water Boiler (NG): M/D INN 10603Annual3$0.00$ - 0
19Central Plant (Building J)AERCO Domestic Hot Water Boiler (NG): M/N INN 8002Annual3$0.00$ - 0
20Building PLAARS Mighty Therm Domestic Heating Hot Water M/N (NG): MT2V0300NACC2BLG1Annual3$0.00$ - 0
21Central Plant (Building J)Industrial Steam DA Tank: NB No. 36461Annual3$0.00$ - 0
Total for Annual Services$ - 0
Subtotal$ - 0
Unanticipated Tasks (Not to exceed 10-percent of Total Agreement Amount)$ - 0
Total Agreement Amount$ - 0
Hourly Rates for Repairs, After Hours/Weekend, and Emergency Services (billed as Unanticipated Tasks)
Regular Hours Labor Rate$0.00
After-Hours/Weekend Labor Rate$0.00
Emergency Services Labor Rate$0.00

Bidder Acknowledgment / Certification

The Bidder hereby certifies that the price(s)/rate(s) offered on this Bid Form are true and accurate to the best of the Bidder's knowledge.

The undersigned Contractor, as bidder, declares that they have carefully reviewed the proposed work as described, examined the specifications and general conditions, read the instructions to Bidders, and is familiar with all proposal requirements. Contractor agrees, if the proposal is accepted, to complete the above project in accordance with the Contract Documents, in the time stated herein. This is a unit-based agreement in accordance with State Contracting Manual Volume 1, Section 7.30. The total amount of this agreement shall not exceed $750,000.00.

The Bidder agrees that the price(s)/rate(s) offered herein shall remain in effect until CDPH awards the agreement and throughout the duration of the agreement. Any cost over runs or increases in services, if allowed, shall be billed at the price(s)/rate(s) stated for the appropriate budget period. Contract extensions, if any, shall be billed at the price(s)/rate(s) stated for the last budget period/year if more than one budget period/year is shown.

The Bidder further understands that the above quoted rate(s) must include all of the Bidders costs including operating expenses, labor, taxes, insurance, overhead, certification, equipment costs, supplies, incidental parts, annual inflation costs/rate adjustments, profit margin, software, permits, licenses, shipping & handling and/or any other overhead expenses necessary to perform all the work required for qualified services in accordance with the terms and conditions contained herein.

By submitting this Bid Form, the Bidder hereby claims its willingness to certify to and comply with all requirements and terms and conditions cited in this bid and any attachments thereto. The Bidder understands that its bid response will become a public document and will be open to public inspection.

Bidder's signature:Date signed
Printed/typed nameTitle