IFB_26_013_DN_LEE_Commercial_Hangar_Bid_Drawings.pdf
PDF 5 MB Posted
- Attached to
- Commercial Hangar Building
- Solicitation number
- IFB 26-013-DN
- Issued by
- Miramar Beach CDP, Florida
About this file
This is a set of bid drawings and civil site plans for the City of Leesburg, Florida's Commercial Hangar Building project at Leesburg International Airport, prepared by AVCON, Inc. The project involves the design and construction of a 240-foot by 60-foot, four-unit pre-engineered metal hangar building with associated site infrastructure including concrete aprons and parking areas, grading and drainage improvements, and utility installations. The scope encompasses approximately 500 cubic yards of unclassified excavation, 1,700 cubic yards of borrow excavation, 650 square yards of fiber-reinforced concrete pavement (6 inches thick), 3,300 square yards of sodding, 400 linear feet of potable water service lines, 320 linear feet of sanitary sewer lines, and electrical conduit installation. The project is divided into two construction work areas with Work Area A limited to 150 consecutive calendar days and Work Area B limited to 5 consecutive calendar days concurrent with Work Area A, both operating Monday through Friday, 7:00 AM to 5:00 PM. The pre-proposal conference is scheduled for March 30, 2026 at 2:00 PM, with questions due by April 7, 2026 at 5:00 PM, addenda issued by April 10, 2026, and bids due April 23, 2026 at 10:00 AM. The bid tabulation will occur within two working days of opening, with an intent to award recommendation by May 11, 2026 and final award by June 8, 2026. The drawings include construction safety and phasing plans, existing conditions and demolition plans, civil site plans with details, grading and drainage plans with typical sections, and comprehensive utility plans detailing water main connections, sanitary sewer installations, and electrical infrastructure requirements.
The contract structure includes three allowance line items totaling $170,000: $20,000 for City of Leesburg water main/line installation, $100,000 for City of Leesburg electrical installation, and $50,000 for sanitary sewer line installation, indicating that the primary contract is a lump-sum bid with supplemental allowances for utility coordination work. All work must comply with FAA Advisory Circular AC 150/5370-2, the 2023 Florida Building Code, 2017 National Electrical Code, Lake County Land Development Code, and FDOT Standard Specifications. The contractor is responsible for all coordination with utility providers including the City of Leesburg Public Works Department, Leesburg Utilities Power Department, and other service providers, as well as obtaining all necessary permits and scheduling inspections with jurisdictional agencies. Liquidated damages are assessed at $1,500 per day for schedule overruns. The contractor must submit a five percent bid bond, certificates of insurance naming the City as an additional insured with minimum coverage of $1,000,000 per occurrence combined single limit, proof of E-Verify registration, conflict of interest statement, non-collusion/lobbying certification, and debarment certification. The contract is contingent upon availability of funds from the Florida Department of Transportation (FDOT) and includes a one-year construction warranty from substantial completion, extended 20-year weather-tightness and paint film warranties for metal roofing and wall panels, and four-year warranties for LED fixtures. Bids must remain firm for 65 calendar days after opening, and the City of Leesburg is exempt from state and local sales tax. All disputes are governed by Florida law with venue in Lake County, Florida.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
NO. DATE DESCRIPTION
REVISIONS
DATE
AVCON PROJ NO.
CITY IFB NO.
MARCH 2026
2025.236.02
26-011-HG
VICINITY MAP
N.T.S.
LOCATION MAP
N
KEY WEST
FT.PIERCE
DAYTONA BEACH
TITUSVILLE
PANAMA CITY
PENSACOLA TALLAHASSEE
JACKSONVILLE
ORLANDO
TAMPA
ST.PETERSBURG
MIAMI
LOCATION OF PROJECT
N
N.T.S.
LEESBURG, FLORIDA.
GAINESVILLE
AVCON, INC.
ENGINEERS & PLANNERS
5555 MICHIGAN STREET, ORLANDO, FL. 32822
OFFICE: (407) 599-1122
www.avconinc.com
MELBOURNE
PROJECT AREA
N
KEY WEST
FT.PIERCE
DAYTONA BEACH
TITUSVILLE
PANAMA CITY
PENSACOLA TALLAHASSEE
JACKSONVILLE
ORLANDO
TAMPA
ST.PETERSBURG
MIAMI
LOCATION OF PROJECT
LEESBURG, FLORIDA.
GAINESVILLE
MELBOURNE
LEESBURG INTERNATIONAL AIRPORT
COMMERCIAL HANGAR BUILDING
LEESBURG, FLORIDA
A1 GENERAL NOTES A4 SHEET INDEX
ATTENTION:
THIS DOCUMENT CONTAINS PRIVILEGED AND PROPRIETARY
INFORMATION, ALL OF WHICH IS EXPRESSLY PROVIDED BY AVCON, INC.,
FOR USE BY THE INTENDED RECIPIENT, AND FOR A SPECIFIC PURPOSE.
WITHOUT THE EXPRESS WRITTEN CONSENT OF AVCON, INC. ANY
DISTRIBUTION, REPRODUCTION, OR OTHER USE OF THIS DOCUMENT, IN
WHOLE OR IN PART, IS STRICTLY PROHIBITED
V:
\2
5\
.2
.0
- L
EE
C om m er ci al
H an ga r D es
B id
\2
5.
6.
C
AD
D
\x
2_ G
I S er ie s.
dw g
3/
/2
4:
P
M
LEESBURG INTERNATIONAL
AIRPORT
LEESBURG, FLORIDA
COMMERCIAL HANGAR
BUILDING
XR
EF
S:
x
2_
St an da rd
_t b
X2523602_GI SERIES
PROFESSIONAL SEAL
CLIENT LOGO
B
ID
D O
C U
M
EN
TS
CADD:
CITY IFB NO. 26-011-HG
DRAWING
DATE:
APPROVED BY:
CHECKED BY:
DRAWN BY:
DESIGNED BY:
MARCH 2026
DJN
SCALE (US SVY FT): GRAPHIC
NO. DATE BY DESCRIPTION
REVISIONS:
AVCON, INC.
ENGINEERS & PLANNERS
5555 E. MICHIGAN ST., SUITE 200 - ORLANDO, FL 32822-2779
OFFICE: (407) 599-1122 - FAX: (407) 599-1133
CORPORATE CERTIFICATE OF AUTHORIZATION NUMBER: 5057
www.avconinc.com
Printed copies of this document are not considered signed and sealed and the signature must be verified on any electronic copies.
This item has been digitally signed and sealed by:
A
B
C
1 2 3 4
A
B
C
1 2 3 4
TH
IS
S H
EE
T
SH
A
LL
B
E
PR
IN
TE
D
IN
C O
LO
R
, S H
EE
TS
N O
T
PR
IN
TE
D
IN
C O
LO
R
A R
E
IN
VA
LI
D
AVCON PROJECT NO. 2025.236.02
GENERAL NOTES,
LEGEND,
ABBREVIATIONS
AND SHEET INDEX
ALB
JCW
ALB
GENERAL NOTES:
1. LOCATIONS, ELEVATIONS, AND DIMENSIONS OF EXISTING UTILITIES, STRUCTURES
AND OTHER FEATURES ARE SHOWN ACCORDING TO THE BEST INFORMATION
AVAILABLE AT THE TIME OF PREPARATION OF THESE PLANS. THE CONTRACTOR
SHALL FIELD LOCATE, VERIFY, AND FURTHER IDENTIFY THE LOCATIONS,
ELEVATIONS, AND DIMENSIONS OF ALL EXISTING UTILITIES, STRUCTURES, AND
OTHER FEATURES (IDENTIFIED ON THE PLANS OR NOT) AFFECTING ANY
COMPONENT OF WORK HEREIN PRIOR TO THE START OF ANY CONSTRUCTION.
DISCREPANCIES, CONFLICTS, OR POTENTIAL DEVIATIONS SHALL BE BROUGHT TO
THE ATTENTION OF THE ENGINEER PRIOR TO THE START OF ANY CONSTRUCTION.
2. THE CONTRACTOR SHALL CHECK PLANS FOR CONFLICTS AND DISCREPANCIES
PRIOR TO THE START OF ANY CONSTRUCTION. SPECIAL ATTENTION SHALL BE TAKEN
WITH THOSE EXISTING UTILITIES, STRUCTURES OR FEATURES (IDENTIFIED ON THE
PLANS OR NOT) THAT MAY POTENTIALLY CONFLICT OR CROSS PROPOSED DESIGN
COMPONENTS (I.E., AIRFIELD ELECTRICAL, STORM SEWERS, SANITARY SEWERS,
WATER MAINS, COMMUNICATION LINES, HIGH POWER TRANSMISSION LINES,
BUILDING FOUNDATIONS, ETC) AND ANY DISCREPANCIES, CONFLICTS, OR
POTENTIAL DEVIATIONS SHALL BE BROUGHT TO THE ATTENTION OF THE ENGINEER
PRIOR TO THE START OF ANY CONSTRUCTION. ANY COST ASSOCIATED WITH THE
LOCATION OF EXISTING UTILITIES AS OUTLINED ABOVE IS THE RESPONSIBILITY OF
THE CONTRACTOR.
3. ERRORS OR OMISSIONS - DO NOT TAKE ADVANTAGE OF ANY APPARENT ERROR OR
OMISSION DISCOVERED IN THE CONTRACT DOCUMENTS, BUT IMMEDIATELY NOTIFY
THE ENGINEER OF SUCH DISCOVERY. THE ENGINEER WILL THEN MAKE SUCH
CORRECTIONS AND INTERPRETATIONS AS NECESSARY TO REFLECT THE ACTUAL
SPIRIT AND INTENT OF THE CONTRACT DOCUMENTS.
4. THE CONTRACTOR SHALL EXERCISE EXTREME CAUTION IN AREAS OF BURIED
UTILITIES AND SHALL PROVIDE AT LEAST 48-HOURS NOTICE TO THE UTILITY
COMPANIES PRIOR TO CONSTRUCTION TO OBTAIN FIELD LOCATIONS OF EXISTING
UNDERGROUND UTILITIES.
5. THE CONTRACTOR IS RESPONSIBLE FOR REPAIRING ANY DAMAGE TO EXISTING
FACILITIES, ABOVE OR BELOW GROUND, THAT MAY OCCUR AS A RESULT OF THE
WORK PERFORMED BY THE CONTRACTOR CALLED FOR IN THIS CONTRACT.
CONTRACTOR SHALL BE RESPONSIBLE FOR PROTECTING ALL EXISTING SURVEY
MONUMENTATION, AND ANY DISTURBED MONUMENTATION SHALL BE RESTORED AT
CONTRACTOR'S EXPENSE BY A SURVEYOR SELECTED BY THE OWNER.
6. ALL UNDERGROUND UTILITIES MUST BE IN PLACE AND PASS ALL TESTING OR
INSPECTION REQUIREMENTS PRIOR TO ROAD BASE AND/OR SURFACE
IMPROVEMENT CONSTRUCTION.
7. IT IS THE CONTRACTOR'S RESPONSIBILITY TO BECOME FAMILIAR WITH THE PERMITS
AND INSPECTION REQUIREMENTS SPECIFIED BY THE VARIOUS GOVERNMENTAL
AGENCIES AND THE ENGINEER. THE CONTRACTOR SHALL OBTAIN ALL NECESSARY
PERMITS PRIOR TO CONSTRUCTION, AND SCHEDULE INSPECTIONS AND TESTING
ACCORDING TO AGENCY REQUIREMENTS.
8. ALL WORK PERFORMED SHALL COMPLY WITH THE CODES, STANDARDS,
REGULATIONS AND REQUIREMENTS OF THE LAKE COUNTY LAND DEVELOPMENT
CODE AND ENGINEERING STANDARDS, PLUS THE CURRENT EDITION OF THE FDOT
STANDARD SPECIFICATIONS FOR ROAD, BRIDGE AND UTILITY CONSTRUCTION, PLUS
THE REGULATIONS AND ORDINANCES OF THE VARIOUS OTHER GOVERNMENTAL
AGENCIES HAVING JURISDICTION OVER THE WORK.
9. CONTRACTOR SHALL SUBMIT SHOP DRAWINGS ON ALL PRECAST AND
MANUFACTURED ITEMS TO THE ENGINEER FOR APPROVAL. FAILURE TO OBTAIN
APPROVAL BEFORE INSTALLATION COULD RESULT IN REMOVAL AND REPLACEMENT
AT CONTRACTOR'S EXPENSE. THE ENGINEER'S REVIEW OF THE SHOP DRAWINGS IS
FOR CONFORMITY WITH THE CONTRACT DOCUMENTS AND DOES NOT INCLUDE
IN-DEPTH CHECK FOR THE ABILITY OF THE CONTRACTOR TO PERFORM THE WORK IN
A SAFE OR EFFICIENT MANNER. THE ENGINEER'S REVIEW OF THE SHOP DRAWINGS
DOES NOT RELIEVE THE CONTRACTOR OF RESPONSIBILITY FOR DIMENSIONAL
ACCURACY TO ENSURE FIELD FIT AND CONFORMITY OF THE VARIOUS COMPONENTS
AND DETAILS.
10. CONTRACTOR SHALL KEEP ENGINEER ADVISED OF CONSTRUCTION SCHEDULE
CHANGES SO THAT ENGINEER CAN PROVIDE CONSTRUCTION CERTIFICATIONS TO
JURISDICTIONAL AGENCIES.
11. WORK PERFORMED UNDER THIS CONTRACT SHALL INTERFACE SMOOTHLY WITH
OTHER WORK BEING PERFORMED ON OR ADJACENT TO THE SITE BY OTHER
CONTRACTORS AND UTILITY COMPANIES. IT WILL BE NECESSARY FOR THE
CONTRACTOR TO COORDINATE AND SCHEDULE HIS ACTIVITIES, WHERE NECESSARY,
WITH OTHER CONTRACTORS AND UTILITY COMPANIES.
12. SAFETY - DURING THE CONSTRUCTION AND/OR MAINTENANCE OF THIS PROJECT,
ALL SAFETY REGULATIONS ARE TO BE ENFORCED. THE CONTRACTOR OR HIS
REPRESENTATIVE SHALL BE RESPONSIBLE FOR THE CONTROL AND SAFETY OF THE
TRAVELING PUBLIC AND THE SAFETY OF HIS PERSONNEL. LABOR SAFETY
REGULATIONS SHALL CONFORM TO THE PROVISIONS SET FORTH BY OSHA IN THE
FEDERAL REGISTER OF THE DEPARTMENT OF TRANSPORTATION.
13. "AS-BUILT" FOR THE PROPOSED CONSTRUCTION SHALL BE PROVIDED UPON
COMPLETION OF CONSTRUCTION, THE CONTRACTOR SHALL FURNISH THE OWNER'S
ENGINEER WITH COMPLETE "AS-BUILT" INFORMATION CERTIFIED BY A FLORIDA
REGISTERED PROFESSIONAL SURVEYOR.
14. THESE DRAWINGS HAVE BEEN PREPARED, IN PART, BASED UPON RECORD
DRAWINGS AND/OR CAD FILES FURNISHED BY OTHERS. WHILE THIS INFORMATION IS
BELIEVED TO BE RELIABLE, THOSE UTILIZING THE INFORMATION ON THESE
DRAWINGS ARE ADVISED TO OBTAIN INDEPENDENT VERIFICATION OF ITS ACCURACY
BEFORE USING IT FOR ANY PURPOSE.
15. ALL AREAS DISTURBED AS A RESULT OF THE CONTRACTOR'S STAGING AND
CONSTRUCTION OPERATIONS SHALL BE RESTORED EQUAL TO OR BETTER THAN
ORIGINAL CONDITION AT THE CONTRACTOR'S EXPENSE.
16. DURING THE WORK OF THIS CONTRACT, THE CONTRACTOR SHALL FURNISH, ERECT
AND MAINTAIN WHATEVER TEMPORARY LIGHTING MAY BE NECESSARY TO KEEP THE
TAXIWAYS AND TAXILANES IN OPERATING CONDITION WHEN OPEN FOR AIRCRAFT.
17. ALL DIRT, DUST, STONES AND LOOSE DEBRIS SHALL BE CONTINUOUSLY REMOVED
FROM ALL PAVED SURFACES DURING THIS CONTRACT.
18. ALL OF THE CONTRACTOR'S OPERATIONS SHALL REMAIN ON AIRPORT PROPERTY AT
ALL TIMES. UNDER NO CIRCUMSTANCES WILL THE CONTRACTOR BE ALLOWED ON
ADJACENT PROPERTY.
19. TO THE EXTENT THAT WETLAND AREAS ARE KNOWN, THEY HAVE BEEN DEPICTED ON
THE CONTRACT DRAWINGS.
20. IN WETLAND AREAS, NO EXCAVATION, VEHICLES OR OTHER SOIL DISTURBANCE WILL
BE ALLOWED. ANY CLEARING REQUIRED WILL BE PREFORMED WITH HAND HELD
TOOLS AND REMOVED BY HAND. NO GRUBBING WILL BE ALLOWED.
21. THE CONTRACT DOES NOT ALLOW FOR PRICE INCREASES DUE TO ESCALATION IN
COST OF UNIT BID ITEMS. THE CONTRACTOR SHALL TAKE THIS INTO CONSIDERATION
WHEN PREPARING UNIT PRICES FOR BID.
22. ALL ELEVATIONS REFER TO NAVD 88 VERTICAL DATUM. COORDINATES REFER TO
NAD 83 HORIZONTAL DATUM.
23. THE TOPOGRAPHIC FEATURES SHOWN HEREON WERE COMPILED FROM FIELD
SURVEY PERFORMED BY BOWMAN CONSULTING SERVICES, INC. DATED 9-22-2025.
24. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE PAYMENT OF ALL FAILED QA
TESTING.
25. THE CHARACTERISTICS OF PROPOSED UTILITY EQUIPMENT SHALL BE VERIFIED TO
BE COMPATIBLE WITH EXISTING EQUIPMENT MANUFACTURER PRIOR TO
INSTALLATION.
26. ABANDONED CABLES MAY EXIST IN THE VICINITY OF THE PROPOSED WORK. IF
ENCOUNTERED, CONTRACTOR SHALL VERIFY THAT THEY ARE ABANDONED PRIOR
TO REMOVAL. IF THEY ARE ABANDONED, CABLES SHALL BE REPAIRED AT THE
CONTRACTOR'S EXPENSE.
27. ALL EXCESS SOIL, MILLINGS, LIMEROCK, OR OTHER NATIVE MATERIALS SHALL BE
STOCKPILED ON AIRPORT PROPERTY AS DIRECTED BY THE ENGINEER. ALL EXISTING
SPOIL MATERIALS ARE THE PROPERTY OF THE AIRPORT/CITY AND THE
AIRPORT/CITY SHALL HAVE FIRST RIGHT OF REFUSAL FOR ALL EXCESS OR SPOIL
MATERIALS.
GRADING NOTES:
1. SELECTIVE GRADING SHALL BE REQUIRED AS DIRECTED BY THE ENGINEER.
2. THE QUANTITY OF UNCLASSIFIED EXCAVATION, ITEM P-152, DOES NOT INCLUDE
QUANTITY FOR UNDERCUT EXCAVATION. UNDERCUTTING SHALL BE AT THE
DISCRETION OF THE CONTRACTOR AND NO DIRECT MEASUREMENT OR PAYMENT
SHALL BE MADE.
3. EMBANKMENTS SHALL BE CONSTRUCTED WITH SUITABLE ON-SITE MATERIAL
UNLESS OTHERWISE DIRECTED BY THE ENGINEER.
4. THE LIMITS FOR SODDING ARE THE LIMITS OF GRADING SHOWN ON THE GRADING
PLANS. ALL AREAS OUTSIDE OF THE GRADING LIMITS WHICH ARE DISTURBED SHALL
BE RESTORED, WITH SOD, BY THE CONTRACTOR AT THEIR EXPENSE.
5. ALL SOIL EROSION AND SEDIMENT CONTROL DEVICES AND MATERIALS SHALL BE IN
PLACE PRIOR TO BEGINNING EARTHWORK OPERATIONS AND SHALL BE MAINTAINED
UNTIL THE NEW SLOPES ARE STABILIZED WITH SODDING AND/OR SLOPE
PROTECTION.
6. PRIOR TO AND DURING CONSTRUCTION, THE CONTRACTOR SHALL ENSURE AGAINST
POLLUTING, SILTING OR DISTURBING TO SUCH AN EXTENT AS TO CAUSE AN
INCREASE IN TURBIDITY OUTSIDE THE PROJECT LIMITS, OR ABOVE BACKGROUND
LEVELS IN THE EXISTING STORMWATER SYSTEM PONDS. SUCH MEASURES MAY
INCLUDE, BUT ARE NOT LIMITED TO, CONSTRUCTION OF TEMPORARY EROSION
CONTROL STRUCTURES SUCH AS SEDIMENT BASINS, SEDIMENT CHECKS, OR SILT
BARRIERS. THESE TURBIDITY CONTROL DEVICES SHALL BE INSPECTED AND
MAINTAINED ON A DAILY BASIS TO ENSURE THAT CONSTRUCTION GENERATED
TURBIDITY IS CONTAINED WITHIN THE WORK AREAS. AT NO TIME SHALL THE
CONSTRUCTION SITE RUNOFF RESULT IN EXCEEDING THE WATER QUALITY
STANDARDS AS REQUIRED BY FLORIDA STATUTES, BY THE FLORIDA DEPARTMENT
OF ENVIRONMENTAL PROTECTION (FDEP), AND BY THE SAINT JOHN'S RIVER WATER
MANAGEMENT DISTRICT.
7. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO ENSURE SEDIMENT
ACCUMULATION IN THE STORMWATER SYSTEM FROM THE CONSTRUCTION
ACTIVITIES MUST BE REMOVED PRIOR TO THE FINAL CERTIFICATION OF THE
PROPOSED PROJECT.
8. THE CONTRACTOR SHALL BE EQUIPPED WITH THE ABILITY TO UTILIZE GPS
MACHINE-CONTROL SYSTEMS TO EFFICIENTLY PERFORM EARTHWORK IN
ACCORDANCE WITH THE PLANS AND SPECIFICATIONS. THE CONTRACTOR SHALL
NOTIFY THE ENGINEER OF RECORD PRIOR TO CONSTRUCTION IF THERE IS ANY
UNDERGROUND UTILITY CONFLICT THAT INTERFERES WITH THE PROPOSED
GRADING PLANS.
STORMWATER SYSTEM NOTES:
1. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY INVERTS AND
LOCATIONS OF THE EXISTING STORM SEWER SYSTEM PRIOR TO SUBMITTAL OF
SHOP DRAWINGS AND CONSTRUCTION AND NOTIFY THE ENGINEER IF ANY
DISCREPANCY IN INVERTS AND LOCATIONS EXIST.
2. THE CONTRACTOR SHALL PROVIDE SHOP DRAWINGS, PRODUCT INFORMATION/CUT
SHEETS, AND/OR CERTIFICATIONS FOR ALL STORM WATER STRUCTURES, STORM
SEWER PIPES, AND CONCRETE DESIGN MIX.
3. THE CONTRACTOR SHALL MAKE ALL NECESSARY PROVISIONS TO MAINTAIN
EXISTING STORM SEWER SYSTEM IN SERVICE.
4. SURFACE DRAINAGE SHALL BE DIVERTED FROM EXCAVATIONS, AND STOCKPILE
AREAS SUCH THAT PROPER SITE CONDITIONS ARE MAINTAINED AND EROSION DUE
TO RAIN RUN-OFF OR SEEPAGE IS PREVENTED OR MINIMIZED.
UTILITY NOTES:
1. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO COORDINATE WITH THE
CITY OF LEESBURG PUBLIC WORKS DEPARTMENT FOR ALL POTABLE WATER LINE
CONNECTIONS/SERVICE TAPS, SANITARY SEWER CONNECTIONS, CONNECTIONS TO
SANITARY MANHOLES, LIFT STATION STARTUPS, AND/OR ANY EXTENSIONS OR
MODIFICATIONS OF CITY OWNED AND MAINTAINED WATER AND SEWER
INFRASTRUCTURE.
2. LEESBURG UTILITIES - POWER DEPARTMENT IS THE POWER/ENERGY PROVIDER ON
SITE. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO COORDINATE
DIRECTLY WITH LEESBURG UTILITIES - POWER DEPARTMENT FOR UTILITY
CONNECTIONS AND TRANSFORMER MODIFICATIONS TO ACCOMMODATE THE
FUTURE BUILDING INSTALLATIONS.
3. THERE ARE NO COMUNICATIONS OR FIBER INSTALLATIONS SHOWN OR INCLUDED IN
THIS DESIGN. IF THE OWNER WOULD LIKE TELECOMMUNICATIONS, FIBER, DATA, OR
OTHER NON CRITICAL INFRASTRUCTURE UTILITIES (POWER, WATER, SEWER), THEN
THE OWNER SHALL COORDINATE DIRECTLY WITH THE CONTRACTOR AND UTILITY
PROVIDERS TO FACILITATE THE INSTALLATIONS, ACCOUNT/BILLING, AND START UP
SERVICES.
ABBREVIATIONS:
ABAN - ABANDONED
APPROX - APPROXIMATE
ASPH - ASPHALT
BL - BASELINE
BLDG - BUILDING
BM - BENCHMARK
CL - CENTERLINE
CCR - CONSTANT CURRENT REGULATOR
CIP - CAST IN PLACE
CMP - CORRUGATED METAL PIPE
CONC - CONCRETE
CSP - CORRUGATED STEEL PIPE
D - DIAMETER
E - EASTING
ELL - ELBOW / ARM
ELEV - ELEVATION
FND - FOUNDATION
HP - HIGH POINT
INV - INVERT
JCP - JUNCTION CAN PLAZA
LT - LEFT
LP - LOW POINT
MAX - MAXIMUM
MES - MITERED END SECTION
MEG - MEET EXISTING GRADE
MIN - MINIMUM
N - NORTHING
NA - NOT ACCEPTABLE
NFPA - NATIONAL FIRE PROTECTION ASSOCIATION
OFA - OBJECT FREE AREA
OC - ON CENTER
PAV'T - PAVEMENT
PC - POINT OF CURVATURE
PCC - PORTLAND CEMENT CONCRETE PAVEMENT
PI - POINT OF INTERSECTION
PL - PROPERTY LINE
PVI - POINT OF VERTICAL INTERSECTION
PVC - POLYVINYL CHLORIDE PIPE
PET - CROSS-LINKED POLYETHYLENE PRESSURE TUBING
PVT - POINT OF TANGENCY (VERTICAL CURVE)
R - RADIUS
RCP - REINFORCED CONCRETE PIPE
RGS - RIGID GALVANIZED STEEL
ROFA - RUNWAY OBJECT FREE AREA
RSA - RUNWAY SAFETY AREA
ROW - RIGHT OF WAY
RPZ - RUNWAY PROTECTION ZONE
RT - RIGHT
RWY - RUNWAY
SHDR - SHOULDER
SICPP - SMOOTH INTERIOR CORRUGATED POLYETHYLENE PIPE
STA - STATION
TLOFA - TAXILANE OBJECT FREE AREA
TOFA - TAXIWAY OBJECT FREE AREA
TSA - TAXIWAY SAFETY AREA
TWY - TAXIWAY
TYP. - TYPICAL
UG - UNDERGROUND
B4 ABBREVIATIONS
TOFA
TLOFA
LEGEND
SV
T
C
A
W
EMH
LS
TAXILANE CENTERLINE MARKING
WATER LINE
GATE VALVE
EXISTING WATER METER
COMMUNICATION UTILITY STRUCTURE
TELECOM BOX
ELECTRICAL PULL BOX
AIR CONDITIONING UNIT
SANITARY LIFT STATION AND
PANEL/EMERGENCY SHUT OFF
SANITARY MANHOLE
BOLLARD
STREET SIGN
BENCHMARK
SANITARY VALVE
BEACON
EXISTING AIRFIELD MARKER
AIRFIELD ELECTRICAL MANHOLE
UNDERGROUND TELECOM LINE
SANITARY FORCE MAIN
SANITARY GRAVITY MAIN
AIRPORT FENCELINE
TAXIWAY OBJECT FREE AREA
TAXILANE OBJECT FREE AREA
BUILDING
CONCRETE PAVEMENT
BURIED ELECTRICAL LINE
TREE/BUSH
HOSE REEL
ELECTRICAL TRANSFORMER
ELECTRICAL METER
YH
AIRPORT PROPERTY LINE
DITCH CENTERLINE
DITCH TOP OF BANK
DRAINAGE PIPE
MITERED END SECTION
EXISTING RECLAIMED WATER UTILITY
LINE
UTILITY/LIGHT POLE
SURVEY BENCHMARK
A3 LEGEND
E
WATER
UGC
S
SHEET INDEX TABLE
SHEET
NUMBER SHEET TITLE
101 COVER SHEET
102 GENERAL NOTES, LEGEND, ABBREVIATIONS AND SHEET INDEX
103 CONSTRUCTION SAFETY AND PHASING PLAN
104 CONSTRUCTION SAFETY AND PHASING PLAN DETAILS
105 EXISTING CONDITIONS AND DEMOLITION PLAN
106 CIVIL SITE PLAN
107 CIVIL SITE PLAN DETAILS
108 GRADING AND DRAINAGE PLAN
109 GRADING PLAN TYPICAL SECTIONS & DETAILS
110 UTILITY PLAN
111 UTILITY PLAN DETAILS
112 UTILITY PLAN DETAILS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
UGC UGC UGC UGC UGC UGC UGC UGC UGC UGC UGC UGC UGC UGC UGC UGC UGC UGC UGC UGC UGC UGC
U G C
U G C
U G C
U G C
U G C
U G C
U G C
U G C ev
R
SA
R O
FA
R O
FA
R O
FA
R O
FA
R O
FA
E
E
W W
W W
W W
W W W W W W W W W W W W W
W W
W W
W W W W W W W W W W W
SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS
SS
SS
SS
U G
C U
G C
U G
C U
G C
U G
C U
G C
UGC UGC UGC UGC UGC UGC UGC UGC
W
UGC UGC UGC UGC UGC UGC UGC UGC UGC UGC UGC UGC UGC UGC UGC UGC UGC UGC UGC UGC UGC UGC UGC UGC UGC
U G
C U
G C
U G
C U
G C
U G
C U
G C
U G
C U
G C
U G
C U
G C
U G
C U
G C
U G
C
UGCUGCUGCUGCUGCUGC
UGC
U G
C U
G C
U G
C U
G C
U G
C U
G C
U G
C U
G C
SS
SS
SS
SS
SS
SS
SS
SS
WATER
WATER
WATER
WATER
WATER
WATER
WATER
WATER
WATER
FO
FO
FO
SS
SS
FO
S S
S S
RW RW RW RW RW RW RW RW RW RW RW RW
UGE UGE UGE UGE UGE UGE UGE UGE UGE
UGE
UGE
U G
E
UGE
U G
E U
G E
U G
E U
G E
UGE
UGEUGEUGEUGEUGE
UGE UGE UGE UGE
UGE U
G E
UGE UGE
UGE UGE UGE UGE UGE UGE UGE UGE UGE
U G
E
UGE
U G
E U
G E
U G
E U
G E
UGE
UGE UGE UGE UGE UGE
U G
E U
G E
U G
E
U G
E U
G E
U G
E
UGE
UGEUGEUGEUGEUGEUGEUGEUGE
UGE
U G
E
U G
E U
G E
U G
E U
G E
U G
E U
G E
UG
E
UG
E
UG
E
U G
E U
G E
U G
E U
G E
UGE
UGE
U G
E U
G E
U G
E U
G E
U G
E U
G E
U G
E
U G
E
U G
E
UGE
U G
E U
G E
U G
E
UGE
UGE
UGE
UGE
UGE
U G
E
UGE
U G
E U
G E
UGE
UGE
UGE
UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE
UGE UGE UGE
UGE UGE UGE UGE
UGE
UGE UGE UGE UGE UGE UGE UGE UGE
UGE
UGE
UGE UGE UGE UGE UGE UGE UGE
UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE
UGE UGE UGE UGE UGE
UGE
RWRWRWRWRWRWRWRWRW
S
UGE UGE UGE UGE
W
UG
E
U G
E U
G E
UGE
UGE
UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE
U G
E U
G E
U G
E
UGEUGE
U G
E
W
W
W
SS
SS
SS
W
W W
W
W
W W W
W
W
WW
W
R O
FZ
R O
FZ
R O
FZ
R O
FZ
S
W M
W M
UGEUGEUGEUGEUGEUGEUGEUGEUGEUGE
UGEUGEUGEUGE
UGEUGEUGEUGEUGEUGEUGEUGE
RW RW RW RW RW RW RW RW RW RW RW RW RW RW RW RW RW RW RW RW RW RW RW RW
RW
R W
R W
R W
R W
R W
R W
R W
R W
R W
R W
R W
R W
G
AS
G
AS
G
AS
G
AS
G
AS
G
AS
G
AS
G
AS
G
AS
G
AS
G
AS
G
AS
G
AS
G
AS GAS
GAS GAS GAS GAS
GAS
GAS
GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS
RW RW RW RW RW RW RW RW RW RW RW RW RW RW RW RW
RW RW RW RW RW RW RW RW RW RW RW RW RW RW RW RW RW RW RW RW RW RW RW RW RW RW RW RW RW RW RW RW
RW
R W
R W
R W
R W
R W
R W
R W
R W
R W
R W
R W
R W
R W
R W
R W
W
W M
UGE UGE
SS SS SS SS SS SS SS
SS
SS
SS
SS
SS
SS
SS SS
SS
SS
SS
SS
SS
SS
SS
SS
S
SS
SS
SS
S
LS
S
SS
SS SS SS SS SS SS SS SS SS
S
SSSS
SS
SS
SS
SS
SSS SS SS SS SS SS SS SS
SS
SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS
S
SS
SS
SS
S
S
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
S
SS
SS
SS
SS
SS SS SS SS SS SS SS
W W W W W
W
W
W
W
G as
G as
G as
G as
G as
G as
G as
G as
Gas Gas Gas Gas
G as
G as
G as
Ga s
G as
G as
G as
G as
Gas Gas Gas Gas Gas Gas Gas Gas Gas Gas Gas Gas Gas Gas Gas Gas Gas Gas Gas
Gas Gas Gas
Gas Gas Gas Gas Gas Gas Gas Gas Gas Gas Gas Gas Gas Gas Gas Gas Gas Gas Gas Gas Gas
G as
G as
G as
G as
G as
G as
G as
G as
Gas Gas Gas Gas Gas
Gas Gas
Gas Gas Gas Gas Gas Gas Gas Gas Gas
S
SS
SS
SS SS SS SS
SS
SS
SS
SS
S
SSSSSSSSSSSS
SS
W
W
W W
W
S S
S
S
SSW
W W
W
S
CO
CO
CO
CO
CO CO
COCO
WATER
WATER
W
I
I
WATERWATER
WATERWATER
WATERWATER
WATER
WATER
I II
FO
FO
FO
F
I
W W
W
W
FOC FOC FOC FOC FOC FOC FOC FOCFOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC
FOC FOC FOC FOC
UGE
UGE
UGE UGE UGE UGE UGE UGE UGE
UGE UGE UGE UGE UGE UGE UGE
UGE UGE UGE UGE UGE UGE UGE UGE
U G
E U
G E
SRVC
ELEC
E
W
W M
CO COCOCO
C O
W
W M W M W MW MW M W MW M W M
LEGEND
WORK AREA A
CONTRACTOR'S STAGING,
LAY-DOWN, STOCKPILE, AND
PERSONAL VEHICLE
PARKING AREA
NEW 4 UNIT COMMERCIAL
HANGAR BUILDING
NEW CONCRETE
PAVEMENT, SEE SHEET
106 FOR MORE
INFORMATION
WORK AREA A AIRCRAFT
TRAFFIC ROUTE, (TYP.)
CONTRACTOR ACCESS
ROUTE, (TYP.)
LOW-PROFILE BARRICADES
INTENDED FOR USE DURING
THE DESIGNATED WORK
AREA, SEE DETAIL A4/104.
COLOR CODED BASED ON
WORK AREA
CONSTRUCTION SAFETY PHASING NOTES:
1. WORK AREA A SHALL CONSIST OF ALL PROJECT RELATED SCOPE WITHIN WORK AREA
A, INCLUDING, BUT NOT LIMITED TO, EXCAVATION/GRADING, CONCRETE PAVEMENT,
ERECTION OF ONE 4-UNIT COMMERCIAL HANGAR BUILDING, AND INSTALLATION OF
PROPOSED UTILITIES CONNECTIONS.
2. WORK AREA A SHALL INCLUDE THE PARTIAL CLOSURE OF TAXILANE T-1. THE
REMAINING PORTION OF TAXILANE T-1, AND ADJACENT TAXILANES SHALL REMAIN
OPEN AT ALL TIMES FOR THE DURATION OF THE WORK AREA. THE TENANTS AND
OWNER SHALL BE NOTIFIED TWO WEEKS IN ADVANCE OF THE START OF WORK AREA A.
3. WORK IN WORK AREA A SHALL TAKE PLACE IN THE VICINITY OF AIRCRAFT TRAVEL
ROUTES. IT IS THE CONTRACTOR'S RESPONSIBILITY TO YIELD TO AIRCRAFT TRAFFIC
AT ALL TIMES. CONTRACTOR MAY ALSO REQUEST TO USE MULTIPLE FLAGGERS TO
ENSURE THE SAFE AND EFFECTIVE TRAVEL TO THE DESIGNATED WORK AREA. ANY
ADDITIONAL FLAGGERS SHALL BE APPROVED BY THE RPR OR ENGINEER OF RECORD.
4. WORK AREA A SHALL BE LIMITED TO 150 CALENDAR DAYS. WORKING HOURS SHALL
BE MONDAY THROUGH FRIDAY, 7:00AM - 5:00PM.
5. WORK AREA A SHALL INCLUDE CONSTRUCTION IN THE VICINITY OF AIRPORT
BOULEVARD. IT IS THE CONTRACTOR'S RESPONSIBILITY TO IMPLEMENT AND INSTALL
ALL NECESSARY FDOT MOT SAFETY MEASURES IN ORDER TO FACILITATE PUBLIC
TRAFFIC APPROPIATELY DURING CONSTRUCTION OPERATIONS. ALL SAFETY MOT
MEASURES SHALL BE IN ACCORDANCE WITH THE FDOT TEMPORARY TRAFFIC
CONTROL (MAINTENANCE OF TRAFFIC) HANDBOOK, CURRENT EDITION.
6. WORK AREA B SHALL CONSIST OF ALL PROJECT RELATED SCOPE WITHIN WORK AREA
A, INCLUDING, BUT NOT LIMITED TO, EXCAVATION/GRADING, AND INSTALLATION OF
PROPOSED UTILITIES CONNECTIONS.
7. WORK AREA B SHALL INCLUDE THE PARTIAL CLOSURE OF TAXILANE T-6. THE
REMAINING PORTION OF TAXILANE T-6, AND ADJACENT TAXILANES SHALL REMAIN
OPEN AT ALL TIMES FOR THE DURATION OF THE WORK AREA. THE TENANTS AND
OWNER SHALL BE NOTIFIED TWO WEEKS IN ADVANCE OF THE START OF WORK AREA B.
8. WORK IN WORK AREA B SHALL TAKE PLACE IN THE VICINITY OF AIRCRAFT TRAVEL
ROUTES. IT IS THE CONTRACTOR'S RESPONSIBILITY TO YIELD TO AIRCRAFT TRAFFIC
AT ALL TIMES. CONTRACTOR MAY ALSO REQUEST TO USE MULTIPLE FLAGGERS TO
ENSURE THE SAFE AND EFFECTIVE TRAVEL TO THE DESIGNATED WORK AREA. ANY
ADDITIONAL FLAGGERS SHALL BE APPROVED BY THE RPR OR ENGINEER OF RECORD.
9. WORK AREA B SHALL TAKE PLACE CONCURRENTLY TO WORK WITHIN WORK AREA A
AND SHALL BE LIMITED TO 5 CALENDAR DAYS. WORKING HOURS SHALL BE MONDAY
THROUGH FRIDAY, 7:00AM - 5:00PM. WORK IN WORK AREA B SHALL BE COORDINATED
AND SCHEDULED WITH THE AIRPORT. THE CONTRACTOR SHALL NOTIFY THE AIRPORT
AT LEAST 72 HOURS PRIOR TO CONDUCTING ANY WORK WITHIN WORK AREA B. IN
THE EVENT THAT CONTRACTOR HAS A PAUSE IN BETWEEN THE 5 ALLOTTED
SCHEDULED DAYS FOR WORK WITHIN WORK AREA B THE CONTRACTOR SHALL
CLEAN, AND ENSURE THAT THE WORK AREA IS CLEANED PER ALL FAA/FDOT/LOCAL
REGULATIONS FOR AIRCRAFT AND VEHICULAR TRAFFIC.
14. UNDER NO CIRCUMSTANCE SHALL THE CONTRACTOR LEAVE THE MARKED WORK AREA
WITHOUT PRIOR APPROVAL OR PROPER COORDINATION WITH THE REQUIRED PARTIES.
DOING SO MAYRESULT IN THE PERMANENT EXPULSION OF THE CONTRACTOR FROM
THE AIRPORT.
15. CONTRACTOR SHALL BE REQUIRED TO MAINTAIN A SAFE AND SECURE JOB SITE AT ALL
TIMES.
16. CONTRACTOR SHALL TAKE NOTE OF THE EXISTING CONDITIONS OF ANY AIRPORT
OWNED FENCING THAT IS USED FOR CONSTRUCTION ACCESS. IF DAMAGED, ANY
EXISTING AIRPORTFENCE SHALL BE REPLACED OR RESTORED TO ITS ORIGINAL
CONDITIONS AT NO ADDITIONAL COST TO THE OWNER.
17. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO COORDINATE WITH THE
ENGINEER AND/OR RPR REGARDING CONSTRUCTION SCHEDULE AND PLANNING.
NOTAMS FOR LOCALIZED CLOSURES SHALL BE PLANNED AND COORDINATED WITH THE
OWNER AND ATCT PERSONNEL IN ADVANCE OF THE START OF WORK. THE
CONTRACTOR SHALL HAVE A QUALIFIED REPRESENTATIVE CAPABLE OF
COMMUNICATING WITH THE ATCT AND KNOWLEDGEABLE ABOUT MOVEMENT ON
ACTIVE AIRFIELD PAVEMENT AREAS. CONTRACTORS SHALL CLOSELY COORDINATE
ACCESS ON AND ACROSS OPEN AND ACTIVE AIRFIELD PAVEMENT WITH THE AIRPORT,
ATCT, AND THE RESIDENT ENGINEER.
18. CONTRACTOR PERSONAL VEHICLES SHALL NOT BE PERMITTED, UNDER ANY
CIRCUMSTANCES, OUTSIDE THE DESIGNATED STAGING, LAY-DOWN, PERSONAL
VEHICLE PARKING AREA. ONLY PROPERLY MARKED AND LIGHTED CONTRACTOR
VEHICLES OR CONSTRUCTION VEHICLES SHALL BE PERMITTED OUTSIDE THE STAGING
AREA OR THE ACTIVE WORK AREA UNLESS OTHERWISE APPROVED BY THE RPR.
19. ACTIVE AIRFIELD PAVEMENTS ADJACENT TO THE ACTIVE WORK AREA SHALL BE
CONTINUALLYSWEPT AND MAINTAINED BY THE CONTRACTOR TO ENSURE THAT ACTIVE
AIRFIELD PAVEMENT.
0'
GRAPHIC SCALE (FT)
100' 200'
NORTH
B1 CONSTRUCTION SAFETY AND PHASING PLAN
A1 CONSTRUCTION SAFETY AND PHASING PLAN NOTES
S US HIGHWAY 441
S US HIGHWAY 441 S US HIGHWAY 441
ECHO
DRIVE
HANGAR
HANGAR
HANGAR
HANGAR
HANGAR
HANGAR
HANGAR
HANGAR
HANGAR
HANGAR
HANGAR
HANGAR
HANGAR
HANGAR
TAXILANE T-1
TAXILANE T-4
TAXILANE T-5
TAXILANE T-2
TAXILANE T-3
AIRPORT BOULEVARD
AIRPORT BOULEVARD
W
ILCO
DRIVE
BUILDING
BUILDING
BUILDING BUILDING
HANGAR
HANGAR
HANGAR
HANGAR
HANGAR
AIRPORT
ADMINISTRATION
BUILDING
EXISTING FBO
TAXIWAY B
TA
XI
W
AY
B
TAXIWAY J
BUILDING
BUILDING
BUILDING
BUILDING
HANGAR
BUIDLING
EXISTING AIRPORT FENCELINE
EXISTING WET
POND
CONSTRUCTION
SAFETY AND
PHASING PLAN
ALB
JCW
ALB
GENERAL AIRCRAFT
PARKING APRON
WORK AREA B
A4 SHEET LEGEND AND KEYED NOTES
ATTENTION:
THIS DOCUMENT CONTAINS PRIVILEGED AND PROPRIETARY
INFORMATION, ALL OF WHICH IS EXPRESSLY PROVIDED BY AVCON, INC.,
FOR USE BY THE INTENDED RECIPIENT, AND FOR A SPECIFIC PURPOSE.
WITHOUT THE EXPRESS WRITTEN CONSENT OF AVCON, INC. ANY
DISTRIBUTION, REPRODUCTION, OR OTHER USE OF THIS DOCUMENT, IN
WHOLE OR IN PART, IS STRICTLY PROHIBITED
V:
\2
5\
.2
.0
- L
EE
C om m er ci al
H an ga r D es
B id
\2
5.
6.
C
AD
D
\x
2_ G
C S er ie s.
dw g 3/
/2
4:
P M
LEESBURG INTERNATIONAL
AIRPORT
LEESBURG, FLORIDA
COMMERCIAL HANGAR
BUILDING
XR
EF
S:
x xx _O ld H or iz on ta l A lig nm en ts x
2_
Ba se x
2_ C
SP
P x2
_S ch em at ic _G eo m et ry x
2_ U til iti es x
2_
St an da rd
_t b
X2523602_GC SERIES
PROFESSIONAL SEAL
CLIENT LOGO
B
ID
D O
C U
M
EN
TS
CADD:
CITY IFB NO. 26-011-HG
DRAWING
DATE:
APPROVED BY:
CHECKED BY:
DRAWN BY:
DESIGNED BY:
MARCH 2026
DJN
SCALE (US SVY FT): GRAPHIC
NO. DATE BY DESCRIPTION
REVISIONS:
AVCON, INC.
ENGINEERS & PLANNERS
5555 E. MICHIGAN ST., SUITE 200 - ORLANDO, FL 32822-2779
OFFICE: (407) 599-1122 - FAX: (407) 599-1133
CORPORATE CERTIFICATE OF AUTHORIZATION NUMBER: 5057
www.avconinc.com
Printed copies of this document are not considered signed and sealed and the signature must be verified on any electronic copies.
This item has been digitally signed and sealed by:
A
B
C
1 2 3 4
A
B
C
1 2 3 4
TH
IS
S H
EE
T
SH
A
LL
B
E
PR
IN
TE
D
IN
C O
LO
R
, S H
EE
TS
N O
T
PR
IN
TE
D
IN
C O
LO
R
A R
E
IN
VA
LI
D
AVCON PROJECT NO. 2025.236.02
AIRPORT PROPERTY
LINE, (TYP.)
TAXILAN
E T-5
EXISTING
DRY POND
EXISTING
DRY POND
HANGAR
HANGAR
KEYED NOTES:
1. CONTRACTOR AND CONSTRUCTION ACCESS TO THE SITE SHALL BE VIA THE EXISTING
AUTOMATIC ENTRY/EXIT SWING GATE. CONTRACTOR SHALL COORDINATE WITH THE
CITY OF LEESBURG FOR GATE ACCESS.
2. NEW UTILITY INFRASTRUCTURE TO BE INSTALLED. SEE SHEET 110 FOR MORE
INFORMATION.
3. NEW CONCRETE APRON, (TYP.) SEE SHEET 106 FOR MORE INFORMATION.
4. NEW PRE-ENGINEERED 4-UNIT COMMERCIAL AIRCRAFT HANGAR. PLEASE SEE THE
COMMERCIAL HANGAR DESIGN CRITERIA PACKAGE FOR MORE INFORMATION.
5. NEW ASPHALT PAVEMENT PARKING AREA. SEE SHEET 106 FOR MORE INFORMATION.
TAXILAN
E T-6
TAXILAN
E T-5
AutoCAD SHX Text S
CONSTRUCTION SAFETY PHASING NOTES:
1. ALL VEHICLES IN THE CONSTRUCTION AREA MUST BE EQUIPPED WITH AN ORANGE
AND WHITE CHECKERED FLAG ON THE HIGHEST POINT OR A FLASHING/ROTATING
AMBER CONSTRUCTION BEACON.
2. ACCESS TO THIS PROJECT REQUIRES USE OF EXISTING CITY AND AIRPORT ROADS. IT
SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO ENSURE THAT ALL ACCESS
SURFACES REMAIN CLEAN AND CLEAR OF DIRT AND DEBRIS AT ALL TIMES.
3. ADDITIONALLY, THE CONTRACTOR SHALL BE RESPONSIBLE FOR REPAIRING ANY AN
ALL DAMAGE INFLICTED UPON THE ACCESS ROUTES OVER THE DURATION OF THE
PROJECT. THE ENGINEER/OWNER SHALL DOCUMENT THE EXISTING CONDITION AND
POST-CONDITION OF ALL ACCESS ROUTES. ANY MEASURABLE DAMAGE SHALL BE
REPAIRED BY THE CONTRACTOR AT NO ADDITIONAL COST TO THE OWNER.
4. THE WORK OF THIS PROJECT REQUIRES WORKING IN THE VICINITY OF AN ADJACENT
TO EXISTING TAXILANES AND AIRCRAFT STORAGE HANGARS. THE CONTRACTOR
SHALL YIELD TO AIRCRAFT TRAFFIC AT ALL TIMES, AND SHALL MAKE ALL NECESSARY
ARRANGEMENTS TO PREVENT IMPACTS TO EXISTING TENANTS WITHOUT
PROPER/EXTENDED NOTICE.
5. THE CONTRACTOR SHALL CONDUCT ALL WORK IN ACCORDANCE WITH FAA ADVISORY
CIRCULAR AC 150/5370-2, LATEST EDITION.
6. THE CONTRACTOR SHALL CONTACT THE ENGINEER FOR CONTACT INFORMATION OF
KEY AIRPORT PERSONNEL.
7. THE BARRICADES INDICATED ON THE PLAN REPRESENT THE TRAFFIC CONTROL
REQUIRED DURING CONSTRUCTION. IN THE EVENT THAT MORE TRAFFIC CONTROL IS
REQUIRED DURING CONSTRUCTION, IT IS THE CONTRACTOR'S RESPONSIBILITY TO
DETERMINE THE NUMBER AND LOCATION OF BARRICADES REQUIRED TO KEEP THE
ACTIVE WORK AREA PROTECTED.
8. THE CONTRACTOR IS REQUIRED TO SUBMIT A SAFETY PLAN COMPLIANCE
CERTIFICATION (SPCC). THIS DOCUMENT CERTIFIES THAT THE CONTRACTOR HAS
READ AND UNDERSTANDS THE SAFETY AND PHASING REQUIREMENTS OF THE
PROJECT. ADDITIONALLY THE CONTRACTOR AGREES TO FOLLOW THE RULES AND
REQUIREMENTS OF THIS SAFETY AND PHASING PLAN, THE CONTRACT DOCUMENTS
AND THE REQUIREMENTS OF FAA ADVISORY CIRCULAR 150/5370-2, LATEST EDITION. A
NOTICE TO PROCEED (NTP) WILL NOT BE ISSUED UNTIL THE SPCC IS SUBMITTED.
9. NO BADGING IS REQUIRED FOR THIS PROJECT/AIRPORT, HOWEVER THE CONTRACTOR
SHALL BE REQUIRED TO COORDINATE WITH THE OWNER FOR ACCESS THROUGH THE
AUTOMATED GATES.
INSPECTION REQUIREMENTS:
1. AT THE END OF EACH DAY, THE CONSTRUCTION AREA SHALL BE INSPECTED FOR ANY
FOREIGN OBJECT DEBRIS (FOD) ON AIRFIELD OR NON AIRFIELD PAVEMENTS AND FOR
ANY EXCESS CONSTRUCTION MATERIALS LEFT IN THE TAXIWAY OR TAXILANE OBJECT
FREE AREA.
2. AT THE BEGINNING OF EACH CONSTRUCTION DAY, THE CONTRACTOR SHALL VERIFY
ALL BARRICADES ARE PLACED CORRECTLY.
SAFETY REQUIREMENTS:
1. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO REMOVE ANY CONSTRUCTION
EQUIPMENT FROM WITHIN THE TLOFA DURING INTRUSIVE CONSTRUCTION ACTIVITIES
WHENEVER AIRCRAFT IS PRESENT. REQUIRED WORK WITHIN THE TLOFA SHALL BE
DONE ON A PULLBACK BASIS.
2. DURING PERFORMANCE OF THIS CONTRACT, AIRPORT TAXILANES SHALL REMAIN IN
USE BY AIRCRAFT TO THE MAXIMUM EXTENT POSSIBLE. AIRCRAFT USE OF AREAS
NEAR THE CONTRACTOR'S WORK WILL BE CONTROLLED TO MINIMIZE DISTURBANCE
TO THE CONTRACTOR'S OPERATION. THE CONTRACTOR SHALL NOT ALLOW
EMPLOYEES, SUBCONTRACTORS, SUPPLIERS OR ANY OTHER UNAUTHORIZED
PERSON TO ENTER OR REMAIN IN ANY AIRPORT AREA WHICH WOULD BE HAZARDOUS
TO PERSONS OR TO AIRCRAFT OPERATIONS.
3. ALL WORK WHICH IS TOO CLOSE TO AN ACTIVE TAXILANE TO BE PERFORMED UNDER
OPERATIONAL CONDITIONS SHALL BE PERFORMED WHEN THE TAXILANE IS NOT IN
USE. SUCH WORK SHALL NOT BE ACCOMPLISHED WITHOUT PRIOR PERMISSION FROM
THE OWNER OR ENGINEER.
4. THE CONTRACTOR SHALL TAKE ALL PRECAUTIONS NECESSARY TO ENSURE THE
SAFETY OF OPERATING AIRCRAFT AS WELL AS THAT OF HIS OWN EQUIPMENT AND
PERSONNEL. THE CONTRACTOR SHALL OBEY ALL INSTRUCTIONS AS TO ROUTES TO
BE TAKEN BY EQUIPMENT TRAVELING WITHIN THE AIRPORT AREA. THE CONTRACTOR
SHALL MAKE HIS OWN ESTIMATE OF ALL DIFFICULTIES TO BE ENCOUNTERED.
5. THE CONTRACTOR OR THEIR PROJECT REPRESENTATIVE SHALL NOTIFY THE AIRPORT
REPRESENTATIVE PRIOR TO STARTING WORK EACH DAY AND WHEN WORK HAS BEEN
COMPLETED FOR THE DAY. IT SHALL ALSO BE THE CONTRACTOR OR THEIR
REPRESENTATIVE'S RESPONSIBILITY TO MAKE A THOROUGH CHECK OF THE WORK
AREAS, TO SEE THAT ALL EQUIPMENT HAS BEEN RETURNED AND PARKED IN THE
PARKING AREAS DESIGNATED BY THE ENGINEER.
6. EQUIPMENT NOT IN OPERATION SHALL BE KEPT CLEAR OF ACTIVE OPERATIONAL
AREAS; PERSONNEL SHALL NOT ENTER OR OPERATE EQUIPMENT WITHIN ACTIVE
OPERATIONAL AREAS OF THE AIRPORT WITHOUT SPECIFIC PERMISSION FROM THE
OFFICE OF THE AIRPORT REPRESENTATIVE.
7. ALL CONSTRUCTION EQUIPMENT AND VEHICLES WILL BE REQUIRED TO HAVE A FLAG
ON STAFF OR A YELLOW/AMBER LENS ROTATING/FLASHING LIGHT MOUNTED ON THE
ROOF OR SO ATTACHED TO THE VEHICLE THAT THE FLAG OR LIGHT WILL BE READILY
VISIBLE. THE FLAG SHOULD BE NO LESS THAN 3 FEET SQUARE CONSISTING OF A
CHECKERED PATTERN OF INTERNATIONAL ORANGE AND WHITE SQUARES OF NOT
LESS THAN ONE FOOT ON EACH SIDE. THE CONTRACTOR SHALL HAVE A SUFFICIENT
NUMBER OF FLAGS AND STAFFS TO PROVIDE FOR ALL VEHICLE AND EQUIPMENT
NEEDS.
8. EMPLOYEE PARKING AND ACCESS TO THE JOB SITE BY ALL CONTRACTOR PERSONNEL
AND CONSTRUCTION VEHICLES AND EQUIPMENT SHALL BE AS SHOWN ON SHEET 103.
9. UNAUTHORIZED ENTRANCE OF CONTRACTOR EMPLOYEES AND EQUIPMENT INTO AN
AIR OPERATIONS AREA WILL BE CAUSE FOR IMMEDIATE ACTION AS PROVIDED FOR IN
GENERAL PROVISIONS SUBSECTION TITLED CHARACTER OF WORKERS METHODS AND
EQUIPMENT OF SECTION 80.
10. OPEN FLAME WELDING OR TORCH CUTTING OPERATIONS ARE PROHIBITED UNLESS
ADEQUATE FIRE AND SAFETY PRECAUTIONS ARE PROVIDED AND HAVE BEEN
APPROVED BY THE ENGINEER.
11. OPEN TRENCHES, EXCAVATIONS AND STOCKPILED MATERIAL AT THE CONSTRUCTION
SITE SHALL BE PROMINENTLY MARKED WITH ORANGE FLAGS AND LIGHTED BY LIGHT
UNITS OR LOW PROFILE LIGHTED BARRICADES DURING HOURS OF RESTRICTED
VISIBILITY AND/OR DARKNESS.
12. STOCKPILED MATERIAL SHALL BE CONSTRAINED IN A MANNER TO PREVENT
MOVEMENT RESULTING FROM MAXIMUM ANTICIPATED AIRCRAFT BLAST AND WIND
CONDITIONS.
13. WASTE AND LOOSE MATERIAL CAPABLE OF CAUSING DAMAGE TO AIRCRAFT LANDING
GEARS, PROPELLERS OR BEING INGESTED IN JET ENGINES, SHALL NOT BE PLACED ON
ADJACENT TAXILANE PAVEMENT AREAS. MATERIALS TRACKED ON THESE AREAS
SHALL BE REMOVED CONTINUOUSLY DURING THE PROJECT.
BARRICADE NOTES:
1. LOW-PROFILE, WATER-FILLED BARRICADES SHALL BE USED WHERE WORK IS
ADJACENT TO ACTIVE AIRCRAFT RUNWAYS, TAXIWAYS, TAXILANES, OR APRONS, OR
AS SHOWN ON THE PLANS. CAUTION LIGHTS TO BE HIGH INTENSITY RED IN COLOR
AND FLASHING DURING HOURS OF DARKNESS. BARRICADE LIGHTS SHALL BE 360°
OMNIDIRECTIONAL. ALL BARRICADE LIGHTING SHALL BE VERIFIED BY THE
CONTRACTOR FOR PROPER OPERATION AT THE END OF EACH DAY OR NIGHT BEFORE
CONTRACTOR CEASES OPERATION.
2. BARRICADES SHALL NOT BE PLACED INSIDE ANY ACTIVE RUNWAY SAFETY AREA, OR
INSIDE ANY ACTIVE TAXIWAY OR TAXILANE OBJECT FREE AREA.
3. ALL BARRICADES SHALL BE CHECKED VISUALLY FOR SIGNS OF WEAR AND TEAR ON A
WEEKLY BASIS AND SHALL BE REPAINTED WHEN DEEMED APPROPRIATE BY THE RPR.
THE CONDITIONS OF LIGHTING UNITS SHALL BE CHECKED DAILY. ALL LIGHT FIXTURES
SHALL BE VERIFIED OPERATING BY THE CONTRACTOR ON A DAILY BASIS BEFORE THE
CONTRACTOR CEASES OPERATION FOR THE DAY.
4. ALL BARRICADES SHALL BE MOVED AT LEAST ONCE A WEEK AND THE CONTRACTOR
SHALL SWEEP THE DEBRIS WHICH HAS ACCUMULATED AND REMOVE FROM THE SITE.
THE BARRICADES SHALL THEN BE REPLACED AT THE APPROPRIATE LOCATION.
5. BARRICADES SHALL BE SPACED 4' MAXIMUM, END-TO-END, OR AS DIRECTED BY THE
RPR. AT LEAST ONE 15' GAP IN EACH LINE OF BARRICADES SHALL BE PROVIDED FOR
EMERGENCY VEHICLE ACCESS.
6. CAUTION LIGHTS SHALL BE RED IN COLOR AND FLASHING OR STEADY BURNING
DURING HOURS OF DARKNESS.
7. ALL BARRICADES SHALL BE FILLED WITH WATER OR WEIGHED DOWN WITH 2 50-LB
SAND BAGS.
A1 CONSTRUCTION SAFETY PHASING NOTES
CONSTRUCTION
SAFETY AND
PHASING PLAN
DETAILS
ALB
JCW
ALB
ATTENTION:
THIS DOCUMENT CONTAINS PRIVILEGED AND PROPRIETARY
INFORMATION, ALL OF WHICH IS EXPRESSLY PROVIDED BY AVCON, INC.,
FOR USE BY THE INTENDED RECIPIENT, AND FOR A SPECIFIC PURPOSE.
WITHOUT THE EXPRESS WRITTEN CONSENT OF AVCON, INC. ANY
DISTRIBUTION, REPRODUCTION, OR OTHER USE OF THIS DOCUMENT, IN
WHOLE OR IN PART, IS STRICTLY PROHIBITED
V:
\2
5\
.2
.0
- L
EE
C om m er ci al
H an ga r D es
B id
\2
5.
6.
C
AD
D
\x
2_ G
C S er ie s.
dw g 3/
/2
4:
P M
LEESBURG INTERNATIONAL
AIRPORT
LEESBURG, FLORIDA
COMMERCIAL HANGAR
BUILDING
XR
EF
S:
x xx _O ld H or iz on ta l A lig nm en ts x
2_
Ba se x
2_ C
SP
P x2
_S ch em at ic _G eo m et ry x
2_ U til iti es x
2_
St an da rd
_t b
X2523602_GC SERIES
PROFESSIONAL SEAL
CLIENT LOGO
B
ID
D O
C U
M
EN
TS
CADD:
CITY IFB NO. 26-011-HG
DRAWING
DATE:
APPROVED BY:
CHECKED BY:
DRAWN BY:
DESIGNED BY:
MARCH 2026
DJN
SCALE (US SVY FT): GRAPHIC
NO. DATE BY DESCRIPTION
REVISIONS:
AVCON, INC.
ENGINEERS & PLANNERS
5555 E. MICHIGAN ST., SUITE 200 - ORLANDO, FL 32822-2779
OFFICE: (407) 599-1122 - FAX: (407) 599-1133
CORPORATE CERTIFICATE OF AUTHORIZATION NUMBER: 5057
www.avconinc.com
Printed copies of this document are not considered signed and sealed and the signature must be verified on any electronic copies.
This item has been digitally signed and sealed by:
A
B
C
1 2 3 4
A
B
C
1 2 3 4
TH
IS
S H
EE
T
SH
A
LL
B
E
PR
IN
TE
D
IN
C O
LO
R
, S H
EE
TS
N O
T
PR
IN
TE
D
IN
C O
LO
R
A R
E
IN
VA
LI
D
AVCON PROJECT NO. 2025.236.02
CAUTION LIGHT
SECURED TO BARRIER
(TWO PER BARRIER)
COLOR: RED
REFLECTIVE MEDIA (ORANGE
AND WHITE STRIPES)
4' (TYP)
SEE NOTES
BARRICADE
TO BE SAND
BAGGED
ONLY
NOTES:
1. LOW PROFILE BARRICADES SHALL BE SUFFICIENTLY WEIGHTED TO
PRECLUDE MOVEMENT FROM PROP BLAST.
2. FLAT, DIRECTIONAL WARNING LIGHTS SHALL NOT BE ACCEPTABLE.
3. EXACT LOCATIONS SHALL BE DETERMINED DURING CONSTRUCTION
BY THE ENGINEER OR RPR.
4. BARRICADES SHALL BE WEIGHED IN A WAY TO PREVENT MOVEMENT
DUE TO WIND, JET BLAST, OR PROP WASH.
5. PLACEMENT, MAINTENANCE, AND REMOVAL OF BARRICADES SHALL
NOT BE PAID SEPARATELY AND SHALL BE INCIDENTAL TO ITEM GP-80,
CONSTRUCTION SAFETY AND PHASING PLAN COMPLIANCE.
20"x20" BRIGHT ORANGE FLAG, SEE DETAIL A3 THIS
SHEET. PROVIDE 12 GAUGE WIRE STIFFENER (TWO
PER BARRIER) MAX HEIGHT ABOVE GROUND: 14"
A4 LOW PROFILE BARRICADE DETAILA3 AVIATION FLAG DETAIL
AVIATION ORANGE
AVIATION WHITE
20" MIN.
" M
IN
NOTES:
1. THE CONTRACTOR SHALL PROMINENTLY DISPLAY AVIATION SAFETY FLAGS ON ALL
CONSTRUCTION VEHICLES AND EQUIPMENT AT THE HIGHEST POINT ON EACH
PIECE OF CONSTRUCTION EQUIPMENT.
2. COST SHALL BE INCIDENTAL TO GP-80, CONSTRUCTION SAFETY AND PHASING
PLAN COMPLIANCE.
3. IF FLASHING AMBER BEACONS ARE PRESENT ON CONSTRUCTION EQUIPMENT OR
CONTRACTOR VEHICLES, FLAGS SHALL NOT BE REQUIRED. BEACONS MUST BE
LOCATED AT THE HIGHEST POINT OF THE CONSTRUCTION EQUIPMENT TO
SUPERCEDE THE NEED FOR CONSTRUCTION FLAGS.
UGC UGC UGC UGC UGC UGC UGC UGC UGC UGC UGC
UGC UGC UGC UGC UGC UGC UGC UGC UGC UGC UGC UGC UGC UGC UGC UGC UGC UGC UGC UGC UG
C
UG
C
UG
C
UG
C
U G C
U G C
U G C
U G C
U G C
U G C
U G C
U G C
U G C
U G C
U G C
U G C
U G C
U G C
W W W W W W
W
SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS
UGC UGC UGC UGC UGC UGC UGC UGC UGC UGC UGC UGC UGC UGC UGC UGC UGC UGC UGC UGC UGC UGC UGC UGC UGC UGC UGC UGC UGC UGC UGC UGC UGC UGC UGC UGC UGC UGC UGC UGC UGC UGC UGC UGC UGC UGC UGC UGC UGC UGC UGC UGC UGC UGC UGC UGC UGC UGC UGC UGC UGC UGC
UGE UGE
UGEUGEUGEUGEUGEUGEUGE
UGE
UGE
UGE UGE UGE UGE
U G
E U
G E
U G
E
UGE
UGE
UGE
UGE
UGE
UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE
UGE
UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE
UGE
U G
E U
G E
U G
E
UGE U
G
E
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
U G
E
UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE
U G
E
UGE
UGE
U
G E
UGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGE
UGE
S
E
E
UGE UGE UGE UGE UGE UGE
U G
E U
G E
U G
E U
G E
U G
E U
G E
U G
E U
G E
U G
E U
G E
U G
E U
G E
U G
E U
G E
U G
E U
G E
UGEUGEUGEUGEUGEUGE
W W W W W W
W W
W W
TLO
FA
TLO
FA
TLOFA
TLO
FA
TLO
FA
TLOFA TLOFA TLOFA TLOFA TLOFA TLOFA
TLO
FA
TLO
FA
TLO
FA
TLO
FA
TLO
FA
CB
CB
YDYD
CB
CB
UGEUGE
U G
E U
G E
UGEUGEUGEUGEUGEUGEUGEUGE
RW RW RW RW RW RW RW RW RW RW RW RW RW RW RW RW RW
RW RW RW RW RW RW RW RW RW RW RW RW RW RW RW RW RW RW RW RW RW RW RW RW RW RW RW RW RW RW RW RW
RW
RW
RW
RW
RW
R W
R W
R W
R W
R W
R W
R W
R W
R W
R W
R W
R W
R W
R W
R W
R W
R W
R W
R W
R W
R W
TLOFA
TLOFA
TLO
FA
TLO
FA
TLO
FA
TLO
FA
TLO
FA
TLOFA TLOFA TLOFA TLOFA TLOFA TLOFA TLOFA
RW RW RW RW RW RW RW RW RW RW RW RW RW RW RW RW RW RW RW RW RW RW RW RW RW RW RW RW RW RW RW RW RW RW RW RW RW RW RW RW RW RW RW RW RW RW RW RW RW RW RW RW RW RW RW RW RW RW RW RW RW RW RW RW RW RW RW RW RW RW RW
Gas Gas Gas Gas Gas Gas Gas Gas Gas Gas Gas
Gas Gas Gas Gas Gas Gas Gas Gas Gas Gas Gas Gas Gas Gas Gas Gas Gas Gas Gas Gas
Gas Gas Gas Gas Gas Gas Gas Gas Gas Gas Gas Gas
Gas Gas Gas Gas Gas Gas Gas Gas Gas Gas Gas
Gas Gas Gas Gas Gas Gas Gas Gas Gas Gas Gas Gas Gas Gas Gas Gas Gas Gas Gas
Gas
Gas
Gas
Gas
G as
G as
G as
G as
G as
G as
G as
G as
G as
G as
G as
G as
G as
SS
SSSS SS SS SS SS SS SS SS SS SS SS SS SS SS SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
S
SSSSSSSSSSSSSSSSSSSSSSSSSSSSSS
SS
SS
SS
SS
SS
SS
SS
SS
CBCB
CB
CB
S
E
E
E EE EEE
E
E
EE
E
E
E E
W W
W W
W W
W W
E
E
E
E
FO
FO
FO
FO
FO
F
E
E FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC
FOC
FO
C
FO
C
FO
C
FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC
FOC FOC FOC FOC FOC
FOC
FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC
UGE UGE UGE UGE UGE
U G
E U
G E
UGE UGE UGE UGE UGE
UGE UGE
UGE
U G
E
UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE
UGE
UGE
UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE
U G
E U
G E
UG
E
UG
E
U G
E U
G E
U G
E
UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE
U G
E U
G E
U G
E U
G E
U G
E U
G E
U G
E U
G E
U G
E U
G E
U G
E U
G E
U G
E
SRVC
ELEC
ELEC.
.0
0'
74.00'
76.00'75.00'
78.00'
78.00'
78.00'
78.00'
78.00'
80.00'
80.00'
.00
80.00'
80.00'
.00
80.00'
.0
0'
.0 0'
.0
0'
.0
0'
77.00'
77.00'77.00'
.0
0'
79.00'
79.00'
79.00'
79.00'
.00
79.00'
79.00'
80.00'
81.00'
.0
0'
81.00'
81.00'
81.00' 81.00'
.0
0'
.0
0'
.0
0'
.0 0'
.0
0'
.0
0'
76.00'
76.00'
.0
0'
.0
0'
75.00'
75.00'
78.00'80 .0
0'
79.00'
.0
0'
.0
0'
E
E
LS
LS
CO
CO
CO
CO
CO CO
CO
CO
I
I
I II
FO
FO
F
I
0'
GRAPHIC SCALE (FT)
20' 40'
NORTH
B1 EXISTING CONDITIONS AND DEMOLITION PLAN
A3 SHEET LEGEND AND KEYED NOTESA1 SHEET NOTES A4 KEY PLAN
1. LOCATIONS, ELEVATIONS, AND DIMENSIONS OF EXISTING UTILITIES, STRUCTURES AND
OTHER FEATURES ARE SHOWN ACCORDING TO THE BEST INFORMATION AVAILABLE AT
THE TIME OF PREPARATION OF THESE PLANS. THE CONTRACTOR SHALL FIELD LOCATE,
VERIFY, AND FURTHER IDENTIFY THE LOCATIONS, ELEVATIONS, AND DIMENSIONS OF ALL
EXISTING UTILITIES, STRUCTURES, AND OTHER FEATURES (IDENTIFIED ON THE PLANS OR
NOT) AFFECTING ANY COMPONENT OF WORK HEREIN PRIOR TO THE START OF ANY
CONSTRUCTION. DISCREPANCIES, CONFLICTS, OR POTENTIAL DEVIATIONS SHALL BE
BROUGHT TO THE ATTENTION OF THE ENGINEER PRIOR TO THE START OF ANY
CONSTRUCTION.
2. THE CONTRACTOR SHALL CHECK PLANS FOR CONFLICTS AND DISCREPANCIES PRIOR TO
THE START OF ANY CONSTRUCTION. SPECIAL ATTENTION SHALL BE TAKEN WITH THOSE
EXISTING UTILITIES, STRUCTURES OR FEATURES (IDENTIFIED ON THE PLANS OR NOT)
THAT MAY POTENTIALLY CONFLICT OR CROSS PROPOSED DESIGN COMPONENTS (I.E.
AIRFIELD ELECTRICAL, STORM SEWERS, POTABLE WATER LINES, ETC.) AND ANY
DISCREPANCIES, CONFLICTS OR POTENTIAL DEVIATIONS SHALL BE BROUGHT TO THE
ATTENTION OF THE ENGINEER PRIOR TO THE START OF ANY CONSTRUCTION. ANY COST
ASSOCIATED WITH THE LOCATION OF EXISTING UTILITIES AS OUTLINED ABOVE IS THE
RESPONSIBILITY OF THE CONTRACTOR.
3. ERRORS OR OMISSIONS - DO NOT TAKE ADVANTAGE OF ANY APPARENT ERROR OR
OMISSION DISCOVERED IN THE CONTRACT DOCUMENTS, BUT IMMEDIATELY NOTIFY THE
ENGINEER OF SUCH DISCOVERY. THE ENGINEER WILL THEN MAKE SUCH CORRECTIONS
AND INTERPRETATIONS AS NECESSARY TO REFLECT THE ACTUAL SPIRIT AND INTENT OF
THE CONTRACT DOCUMENTS.
4. THE CONTRACTOR SHALL EXERCISE EXTREME CAUTION IN AREAS OF BURIED UTILITIES
AND SHALL PROVIDE AT LEAST 48-HOURS NOTICE TO THE UTILITY COMPANIES PRIOR TO
CONSTRUCTION TO OBTAIN FIELD LOCATIONS OF EXISTING UNDERGROUND UTILITIES.
5. THE CONTRACTOR IS RESPONSIBLE FOR REPAIRING ANY DAMAGE TO EXISTING
FACILITIES, ABOVE OR BELOW GROUND, THAT MAY OCCUR AS A RESULT OF THE WORK
PERFORMED BY THE CONTRACTOR CALLED FOR IN THIS CONTRACT. CONTRACTOR
SHALL BE RESPONSIBLE FOR PROTECTING ALL EXISTING SURVEY MONUMENTATION, AND
ANY DISTURBED MONUMENTATION SHALL BE RESTORED AT THE CONTRACTOR'S
EXPENSE BY A SURVEYOR SELECTED BY THE OWNER.
6. EXISTING INFRASTRUCTURE TO REMAIN AND BE PROTECTED INP LACE, SHALL BE
REPLACED WITH NEW ITEMS IF DAMAGED/BROKE/DISPLACED/ADVERSELY AFFECTED BY
THE DEMOLITION OPERATIONS BY THE CONTRACTOR AT NO ADDITIONAL COST TO THE
OWNER OR THE PROJECT. IT IS THE CONTRACTOR'S SOLE RESPONSIBILITY TO PROTECT
THE EXISTING AIRFIELD INFRASTRUCTURE THROUGHOUT THE PROJECT DURATION.
7. CONTRACTOR SHALL STOCKPILE SALVAGED ITEMS IN A NEAT AND ORDERLY MANNER.
SALVAGED ITEMS SHALL BE PROTECTED FROM WEATHER AND OTHER POTENTIAL
CAUSED OF DAMAGE THROUGHOUT THE COURSE OF THE PROJECT.
8. FOR ALL EXISTING UTILITY LOCATIONS WITHIN THE VICINITY OF THE PROJECT, IT IS THE
RESPONSIBILITY OF THE CONTRACTOR TO DETERMINE THE EXACT OR ACTUAL
LOCATION OF ALL UNDERGROUND UTILITIES OR APPURTENANCES, AS NEEDED, PRIOR
TO CONSTRUCTION. NO SEPARATE MEASUREMENT OR PAYMENT SHALL BE MADE FOR
EXPLORATORY SERVICES. ANY DAMAGE TO EXISTING UTILITIES OR FACILITIES NOT
SPECIFICALLY MARKED FOR DEMOLITION OR REMOVAL SHALL BE REPAIRED AND/OR
REPLACED BY THE CONTRACTOR AT NO ADDITIONAL COST TO THE OWNER.
AIRPORT BLVD
AIRPORT BLVD
EXISTING ROADWAY MARKING, (TYP.)
EXISTING TAXILANE T-1
EXISTIN
G
TAXILAN
E T-6
EXISTING ROADWAY
SIGN, (TYP.)
EXISTING TURF AREA
EXISTING TURF AREA
EXISTING
DRY
RETENTION
POND AREA
POND
BOTTOM
ELEV: 72.00'
HANGAR
EXISTING
ROADWAY
MARKING, (TYP.)
EXISTING
TAXILANE
CENTERLINE
MARKING, (TYP.)
EXISTING LEASE LINE
BOUNDARY, (TYP.)
EXISTING
CONDITIONS AND
DEMOLITION PLAN
ALB
JCW
ALB
EXISTING TAXILANE
OBJECT FREE AREA,
(TYP.)
KEYED NOTES:
1. EXISTING DRAINAGE STRUCTURE TO BE PROTECTED IN PLACE.
2. EXISTING DRAINAGE PIPE TO BE PROTECTED IN PLACE, (TYP.).
3. EXISTING UTILITY STRUCTURE TO BE PROTECTED IN PLACE.
4. EXISTING UTILITY LINE TO BE PROTECTED IN PLACE, (TYP.).
5. EXISTING STRUCTURES LINE TO BE PROTECTED IN PLACE, (TYP.).
6. EXISTING EDGE OF PAVEMENT, (TYP.)
1 1 1
EXISTING FENCE LINE, (TYP.)
EXISTING MINOR CONTOURS, (TYP.)
EXISTING MAJOR CONTOURS, (TYP.)
ATTENTION:
THIS DOCUMENT CONTAINS PRIVILEGED AND PROPRIETARY
INFORMATION, ALL OF WHICH IS EXPRESSLY PROVIDED BY AVCON, INC.,
FOR USE BY THE INTENDED RECIPIENT, AND FOR A SPECIFIC PURPOSE.
WITHOUT THE EXPRESS WRITTEN CONSENT OF AVCON, INC. ANY
DISTRIBUTION, REPRODUCTION, OR OTHER USE OF THIS DOCUMENT, IN
WHOLE OR IN PART, IS STRICTLY PROHIBITED
V:
\2
5\
.2
.0
- L
EE
C om m er ci al
H an ga r D es
B id
\2
5.
6.
C
AD
D
\x
2_ C
E Se rie s.
dw g
3/
/2
4:
P
M
LEESBURG INTERNATIONAL
AIRPORT
LEESBURG, FLORIDA
COMMERCIAL HANGAR
BUILDING
XR
EF
S:
x xx _O ld H or iz on ta l A lig nm en ts x
2_
St an da rd
_t b x2
_B as e x2
_D em ol iti on x
2_ Ex
Su rfa ce _C om bi ne d
X2523602_CE SERIES
PROFESSIONAL SEAL
CLIENT LOGO
B
ID
D O
C U
M
EN
TS
CADD:
CITY IFB NO. 26-011-HG
DRAWING
DATE:
APPROVED BY:
CHECKED BY:
DRAWN BY:
DESIGNED BY:
MARCH 2026
DJN
SCALE (US SVY FT): GRAPHIC
NO. DATE BY DESCRIPTION
REVISIONS:
AVCON, INC.
ENGINEERS & PLANNERS
5555 E. MICHIGAN ST., SUITE 200 - ORLANDO, FL 32822-2779
OFFICE: (407) 599-1122 - FAX: (407) 599-1133
CORPORATE CERTIFICATE OF AUTHORIZATION NUMBER: 5057
www.avconinc.com
Printed copies of this document are not considered signed and sealed and the signature must be verified on any electronic copies.
This item has been digitally signed and sealed by:
A
B
C
1 2 3 4
A
B
C
1 2 3 4
TH
IS
S H
EE
T
SH
A
LL
B
E
PR
IN
TE
D
IN
C O
LO
R
, S H
EE
TS
N O
T
PR
IN
TE
D
IN
C O
LO
R
A R
E
IN
VA
LI
D
AVCON PROJECT NO. 2025.236.02
NORTH
00.00'
00.00'
EXISTIN
G
TAXILAN
E T-5
EXISTING
TRAFFIC SIGN,
(TYP.)
CATCH BASIN
GRATE EL. = 80.10'
S. INV. EL.= 76.29'
E. INV. EL. = 76.30'
W. INV. EL. = 76.48'
BTM. EL. = 76.30'
CATCH BASIN
GRATE EL. = 80.05'
E. INV. EL. = 76.05'
W. INV. EL. = 76.03'
BTM. EL. = 76.06'
YARD DRAIN
GRATE: 80.31'
NW INV: 76.07'
SE INV: 76.07'
YARD DRAIN
GRATE: 80.31'
NW INV: 75.83'
SE INV: 75.83'
CATCH BASIN
GRATE: 80.85'
NE INV: 77.80'
CATCH BASIN
GRATE: 79.25'
NW INV: 75.52'
SE INV: 72.53'
MES
INV: 72.00'
MES
INV. 15" RCP = 72.01'
MES
INV: 72.00'
CATCH BASIN
GRATE: 76.50'
SW INV: 72.18'
CATCH BASIN
GRATE EL. = 76.12'
E. INV. EL. = 72.70'
BTM. EL. = 72.92'
SEWER MANHOLE
RIM EL. = 76.41'
E. INV. EL. = 64.86'
S. INV. EL. = 64.96'
W. INV. EL. = 64.98'
SEWER MANHOLE
RIM EL. = 79.79'
N. INV. EL. = 74.93'
S. INV. EL. = 72.03'
W. INV. EL. = 72.03'
N.W. INV. EL. = 72.11'
CATCH BASIN
GRATE EL. = 79.04'
N. INV. EL. = 76.69'
BTM. EL. = 76.88'
MITERED END
SECTION
INV. 10" PVC = 79.29'
SEWER MANHOLE
RIM EL. = 81.05'
S. INV. EL. = 75.64'
W. INV. EL. = 75.67'
10" PVC10" PVC 10" PVC 10" PVC
15" PVC
10" PVC
" P
VC
15" PVC
15" PVC
AutoCAD SHX Text S
C
UG
C
UG
C
UG
C
U G C
U G C
U G C
U G C
U G C
U G C
U G C
U G C
U G C
U G C
U G C
U G C
U G C
U G C
W W W W W W
W
SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS
UGC UGC UGC UGC UGC UGC UGC UGC UGC UGC UGC UGC UGC UGC UGC UGC UGC UGC UGC UGC UGC UGC UGC UGC UGC UGC UGC UGC UGC UGC UGC UGC UGC UGC UGC UGC UGC UGC UGC UGC UGC UGC UGC UGC UGC UGC UGC UGC UGC UGC UGC UGC UGC UGC UGC UGC UGC UGC UGC UGC UGC UGC
WATER
WATER
UGE UGE
UGEUGEUGEUGEUGEUGEUGE
UGE
UGE
UGE UGE UGE UGE
U G
E U
G E
U G
E
UGE
UGE
UGE
UGE
UGE
UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE
UGE
UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE
UGE
U G
E U
G E
U G
E
UGE U
G
E
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
U G
E
UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE
U G
E
UGE
UGE
U
G E
UGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGE
UGE
S
E
E
UGE UGE UGE UGE UGE UGE
U G
E U
G E
U G
E U
G E
U G
E U
G E
U G
E U
G E
U G
E U
G E
U G
E U
G E
U G
E U
G E
U G
E U
G E
UGEUGEUGEUGEUGEUGE
W W W W W W
W W
W W
TLO
FA
TLO
FA
TLOFA
TLO
FA
TLO
FA
TLOFA TLOFA TLOFA TLOFA TLOFA TLOFA
TLO
FA
TLO
FA
TLO
FA
TLO
FA
TLO
FA
CB
CB
YDYD
CB
CB
UGEUGE
U G
E U
G E
UGEUGEUGEUGEUGEUGEUGEUGE
RW RW RW RW RW RW RW RW RW RW RW RW RW RW RW RW RW
RW RW RW RW RW RW RW RW RW RW RW RW RW RW RW RW RW RW RW RW RW RW RW RW RW RW RW RW RW RW RW RW
RW
RW
RW
RW
RW
R W
R W
R W
R W
R W
R W
R W
R W
R W
R W
R W
R W
R W
R W
R W
R W
R W
R W
R W
R W
R W
TLOFA
TLOFA
TLO
FA
TLO
FA
TLO
FA
TLO
FA
TLO
FA
TLOFA TLOFA TLOFA TLOFA TLOFA TLOFA TLOFA
RW RW RW RW RW RW RW RW RW RW RW RW RW RW RW RW RW RW RW RW RW RW RW RW RW RW RW RW RW RW RW RW RW RW RW RW RW RW RW RW RW RW RW RW RW RW RW RW RW RW RW RW RW RW RW RW RW RW RW RW RW RW RW RW RW RW RW RW RW RW RW
Gas Gas Gas Gas Gas Gas Gas Gas Gas Gas Gas
Gas Gas Gas Gas Gas Gas Gas Gas Gas Gas Gas Gas Gas Gas Gas Gas Gas Gas Gas Gas
Gas Gas Gas Gas Gas Gas Gas Gas Gas Gas Gas Gas
Gas Gas Gas Gas Gas Gas Gas Gas Gas Gas Gas
Gas Gas Gas Gas Gas Gas Gas Gas Gas Gas Gas Gas Gas Gas Gas Gas Gas Gas Gas
Gas
Gas
Gas
Gas
G as
G as
G as
G as
G as
G as
G as
G as
G as
G as
G as
G as
G as
SS
SSSS SS SS SS SS SS SS SS SS SS SS SS SS SS SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
S
SSSSSSSSSSSSSSSSSSSSSSSSSSSSSS
SS
SS
SS
SS
SS
SS
SS
SS
CBCB
CB
CB
W
S
W
W
E
E
E EE EEE
E
E
EE
E
E
E E
W W
W W
W W
W W
W
E WATERWATER
WATERWATER
WATERWATER
E
E
E
FO
FO
FO
FO
FO
F
E
E
W
FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC
FOC
FO
C
FO
C
FO
C
FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC
FOC FOC FOC FOC FOC
FOC
FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC
UGE UGE UGE UGE UGE
U G
E U
G E
UGE UGE UGE UGE UGE
UGE UGE
UGE
U G
E
UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE
UGE
UGE
UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE…