IFB_26-001-HG_Attachment_C_-_Itemized_Price_Schedule-R1.pdf

PDF 132 KB Posted

Attached to
U. S Highway 27 Utility (Sewer/Water) Turnpike Relocation Project
Solicitation number
IFB 26-001-HG
Issued by
Jackson County, Florida

About this file

This document is an Itemized Price Schedule (Attachment C) for Invitation for Bid (IFB) 26-001-HG involving a utility relocation project for the Florida's Turnpike. The project specifically involves relocating sewer and water utilities along US-27, with the bid schedule detailing 19 line items for various construction and utility installation activities. The line items include lump sum (LS) and linear foot (LF) unit measurements for tasks such as mobilization/demobilization, maintenance of traffic, construction staking, density testing, pressure testing, erosion control, pipe installations (6" and 12" pipes in various materials like PVC and HDPE), valve installations, connections to existing mains, and site restoration using Bahia sod.

The pricing schedule provides a structured format for bidders to quote unit prices for each project component, with spaces for entering unit prices and total amounts. The items cover a comprehensive range of utility relocation activities, including technical specifications like 6" epoxy-covered API 5 LX42 pipe, 12" C900 PVC pipe, 14" SDR-11 PE4710 HDPE pipe, and associated fittings and valves. The document appears designed to facilitate competitive bidding by allowing contractors to price out specific components of the utility relocation project, with the ultimate goal of systematically replacing and upgrading utility infrastructure along the Florida's Turnpike corridor.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

NAME OF BIDDER: ________________________________________________________________________________

00300 - 4

IFB 26-001-HG ATTACHMENT C - ITEMIZED PRICE SCHEDULE

Item Description Quantity Unit Unit Price Amount

1 Mobilization/Demobilization LS 2 Maintenance of Traffic LS 3 Construction Staking/As Built LS 4 Density Testing LS 5 Pressure Test Force Main LS

6 Pressure Test Water Main LS 7 Erosion Control/Silt Fence LS 8 6” Epoxy Covered API 5 LX42 LF 9 6” Fittings LS

10 Trench Safety & Temporary Shoring LS

11 12” C900 PVC Pipe LF 12 12” Gate Valves & Plug Valves, w/Box EA 13 12” DIP Fittings LS 14 14” SDR-11 PE4710 HDPE Pipe LF 15 2” Air Release Valve & Vault EA 16 Connect to Existing Force Main EA

17 Connect to Existing Water Main EA

28 Grout Fill 6”, 8”, or 12” Pipe LF

19 Restoration – Bahia Sod SY

Total:

Project Name:US-27 Utility (Sewer/Water) Relocation at Florida’s Turnpike