This is Addendum No. 3 for IFB #25-85-3249AM issued by Hanover County Public Schools on January 28, 2025, regarding the Vet Science and Engineering Lab Renovations project at Hanover High School. The addendum modifies the original bidding documents dated December 20, 2024, and bidders must acknowledge receipt of this addendum in their bid form to avoid disqualification.
The addendum clarifies two pre-bid questions regarding utilities and insurance. It specifies that existing utilities on site can be used by the General Contractor (GC) and will be paid for by the Owner, while any additional temporary utilities beyond what is currently on site will be the GC's responsibility. Regarding Builder's Risk Insurance, the GC will be responsible for insurance coverage for the value of the construction contract, while the Owner will maintain coverage for the existing building.
View the file
Other files
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Addendum No. 3 Page 1
ADDENDUM NO. 3
VET SCIENCE AND ENGINEERING LAB RENOVATIONS
HANOVER HIGH SCHOOL
Hanover County Public Schools
IFB # 25-85-3249AM
January 28, 2025
This Addendum forms a part of the Construction Documents and modifies the original bidding documents dated December 20, 2024.
The information in this Addendum supersedes any contradictory information or omission set forth in the Contract Documents. Where any component of the Contract Documents is modified or deleted by this Addendum, the unaltered components of that Section, Article, or Drawing shall remain in effect. Acknowledge receipt of this Addendum by inserting its number and date in the BID FORM. Failure to do so may subject Bidder to disqualification.
This Addendum consists of one (1) page:
one (1) page of Addendum No. 3
PRE-BID QUESTIONS
Please make the following changes/clarifications/additions:
1.1 Question: Paragraph 3.4.1 of the Supplementary General Conditions notes the cost of the temporary utilities is the responsibility of the contractor. Please confirm this is correct.
Answer: Existing utilities on site can be used by the GC and will be paid for by the Owner. If any temporary utilities beyond what is currently on site will be required, those costs shall be the responsibility of the GC.
1.2 Question: For the Builder’s Risk Insurance, will the GC be responsible for the value of the contract and the Owner will maintain coverage on the existing building?
Answer: GC will be responsible for the value of the construction contract, and Owner will maintain coverage for the existing building.
End of Addendum No. 3