IFB 2027- Navajo Boat Ramp Ph3-1 - Construction Drawings.pdf
PDF 2 MB Posted
- Solicitation number
- IFB1 PMAA 2027000014 1
- Issued by
- Denver County, Denver City, Colorado
About this file
This document contains construction drawings for the Navajo State Park Boat Ramp Resurfacing Phase 3 project, issued by Colorado Parks and Wildlife, a division of the State of Colorado. The project, identified as C25NJ1 under IFB 2027*014, involves the repair and resurfacing of the boat ramp facility at Navajo State Park located in Archuleta County, Colorado, approximately 18 miles from the New Mexico state line. The invitation for bid was issued with a pre-bid conference scheduled for August 20, 2026, at 11:00 a.m., and bid opening set for September 3, 2026, at 2:00 p.m. The construction drawings package includes four sheets containing a cover sheet, site map and work summary, plan and profile views, and construction details necessary for bidders to prepare accurate proposals.
The document establishes key project contacts including the Capital Development Section (303-291-7391), Park Manager Jonathan Meats (970-883-2208), Project Manager Tony Marusiak (970-637-1568), and Design Manager Joe Decrescentis (303-291-7392). Prospective bidders are directed to call 811 two business days before beginning any excavation work to identify buried utilities. Colorado Parks and Wildlife has committed to providing equitable access and accessibility assistance for all interested parties, with the agency pledging to respond to accessibility requests within two business days through its designated accessibility specialist.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| IFB 2027- Navajo Boat Ramp Ph3-1 - Appendices.pdf | ||
| IFB 2027- Navajo Boat Ramp Ph3-1 - Bidding Information and Specifications.pdf | ||
| SBP-6.14 BidBond.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Navajo SP - Boat Ramp Resurfacing Phase 3
CONSTRUCTION DRAWINGS
PROJECT I.D. NO. C25NJ1
IFB1: 2027*014
PRE-BID CONFERENCE: August 20, 2026, at 11:00 a.m.
BID OPENING: September 3, 2026, at 2:00 p.m.
Navajo State Park
Legend .. J-L, Colorado
• Cities/Towns
@ State Parks c:J Park Boundary
- USFS
------- State Line
Sheet List Table
New Mexico
PROJECT VICINITY MAP
Sheet Number Sheet Title
Cover Sheet
2 Site Map & Work Summary
3 Plan and Profile
4 Details est from hen tum r 18 miles County
DAY USE AREAS
Allison
-Tolgn,clo
SAMBRITOWETLAND .,
COLORADO
New Mexico
PROJECT
LOCATION
COLORADO
PARKS AND WILDLIFE
NAVAJO STATE PARK
LEGEND
GI Park Headquarters
El Amphitheatre g Campground
� Day Use Parking m Picnic Area a, Boat Ramp
!! Boat Mooring
61 Cabins
� Dump Station
- Unpaved Road
I 000 feet
Scale
PROJECT LOCATION MAP
PARKS & WILDLIFE PROJECT CONTACTS
CAPITAL DEVELOPMENT SECTION 303-291-7391
PARK MANAGER - JONATHAN MEATS 970-883-2208
PROJECT MANAGER - TONY MARUSIAK 970-637-1568
DESIGN MANAGER - JOE DECRESCENTIS 303-291-7392
THE STAlE OF COLORADO IS COMMITTED 10 PROVIDING EQUITABLE ACCESS TO OUR SERVICES
TO ALL PLEASE CONTACT OUR COLORADO P.MKS AND WILDLIFE ACCESSIBILITY SPECIAUST
(ACCESSDNROSTATE.CO.US OR 303-297-1192) FOR PERSONALIZED ACCESSIBILITY ASSISTANCE WITH PROJECT CONSTRUCTION LAYOUlS AND DETAILS BELOW. WE WIU. CONTACT YOU DIRECTlY WITHIN 1V«> BUSINESS DAYS. VISIT OUR ACCESSIBIUTY WEBPliGE FOR MORE INFORMATKJN AND
SERVICES, INCWDING AIRA. OUR FREE SERVICE FOR BLIND AND LOW-VISION USERS.
FOR BURIED UTILITY INFORMATION
CALL 811
TWO BUSINESS DAYS
BEFORE YOU DIG
UTILITY NOTIFICATION CENTER
OF COLORADO (UNCC) OR
COMMON GROUND ALLIANCE (CGA)
_J z o_ en n w o_ u 0:::
w
0:::
o_ L 0:::
m f w w
::r::
0:::
w u
AutoCAD SHX Text #5S @ 24" O.C. B.W.
AutoCAD SHX Text
BOAT RAMP - SECTION A-A - TYP. BOTH SIDES NTS
AutoCAD SHX Text
EX. 8" CONC. RAMP
AutoCAD SHX Text
NEW 6" CONC. OVERLAY
AutoCAD SHX Text #5's @ 24" O.C. B.W.
AutoCAD SHX Text
SURFACE FINISH - DETAIL 1 NTS
AutoCAD SHX Text 14" WIDE x 2" DEEP CONTROL CRACK JOINT. SEAL WITH SIKAFLEX 1a CAULK & BACKER ROD. MAX. SPACING 20'
AutoCAD SHX Text
NOTE: MATCH ANGLE AND DEPTH OF PREVOUS RAMP OVERLAY CONSTRUCTION
AutoCAD SHX Text 2"
AutoCAD SHX Text 3"
AutoCAD SHX Text 90°
AutoCAD SHX Text
BOAT RAMP TRANSITION - SECTION B-B STA 9+20 NTS
AutoCAD SHX Text
BOAT RAMP END - SECTION C-C STA TBD NTS
AutoCAD SHX Text
#5 DOWELS @ 12" 18" LONG
AutoCAD SHX Text
NEW RAMP TRANSITION 5'-0"
AutoCAD SHX Text #5's @12" O.C. B.W. BOTH FACES
AutoCAD SHX Text
#5 DOWELS @ 12" 18" LONG
AutoCAD SHX Text
EXISTING
AutoCAD SHX Text
NEW RAMP TRANSITION TO EXISTING ±10'-0"
AutoCAD SHX Text
#5 DOWELS ±14" LONG @ 12" SPACING
AutoCAD SHX Text 18"
AutoCAD SHX Text
STA. 9+20
AutoCAD SHX Text 18"
AutoCAD SHX Text 6"
AutoCAD SHX Text
STA. TBD
AutoCAD SHX Text
UNDISTURBED NATIVE SOIL
AutoCAD SHX Text
UNDISTURBED NATIVE SOIL
AutoCAD SHX Text
DRAINAGE GROOVE - DETAIL 3 NTS
AutoCAD SHX Text
SURFACE GROOVE TREATMENT (TYP.) SLANT 2' IN 10'
AutoCAD SHX Text
NOTE: MATCH WIDTH AND LOCATION OF GROOVES OF 2014 RAMP OVERLAY CONSTRUCTION.
AutoCAD SHX Text #5s @24" O.C. B.W.
AutoCAD SHX Text 6"
AutoCAD SHX Text
#5 DOWELS @ 12" 18" LONG
AutoCAD SHX Text 8"
AutoCAD SHX Text
GROOVES (TYP.)
AutoCAD SHX Text 6"
AutoCAD SHX Text 1"
AutoCAD SHX Text
FLOW
AutoCAD SHX Text
RAMP CONSTRUCTION JOINT- DETAIL 5 NTS
AutoCAD SHX Text
DRAINAGE CHANNEL - DETAIL 4 NTS
AutoCAD SHX Text
NEW 6" OVERLAY
AutoCAD SHX Text
GROOVE TEXTURING ON SURFACE
AutoCAD SHX Text 2x4 KEY
AutoCAD SHX Text
CONSTRUCTION JOINT @ , AND GRADE BREAKS AS DIRECTED BY PROJECT MANAGER
AutoCAD SHX Text
DATE
AutoCAD SHX Text
BY
AutoCAD SHX Text
DESIGNER:
AutoCAD SHX Text
DRAFTER:
AutoCAD SHX Text
CHECKED BY:
AutoCAD SHX Text
APPROVED:
AutoCAD SHX Text
APPROVED:
AutoCAD SHX Text
CHIEF ENGR.:
AutoCAD SHX Text
REVISIONS:
AutoCAD SHX Text
DATE
AutoCAD SHX Text
PROJECT NO.
AutoCAD SHX Text
SHEET NO.
AutoCAD SHX Text
NAVAJO SP
AutoCAD SHX Text
FINAL
AutoCAD SHX Text
BOAT RAMP RESURFACING PHASE 3
AutoCAD SHX Text
NB
AutoCAD SHX Text 08/26
AutoCAD SHX Text
JTN
AutoCAD SHX Text 08/26
AutoCAD SHX Text
C25NJ1
AutoCAD SHX Text
DETAILS
AutoCAD SHX Text
AutoCAD SHX Text
OF 4
AutoCAD SHX Text 4'-0"
AutoCAD SHX Text 5'-0"
AutoCAD SHX Text
10'-0" WALKWAY
AutoCAD SHX Text
EXISTING CONCRETE RAMP
AutoCAD SHX Text 60'-0"
AutoCAD SHX Text GROOVED SURFACE FOR DRAINAGE 10ft FROM EACH EDGE
AutoCAD SHX Text
NOTE: NO UTILITY CHASE OR RAISED CURB ON EITHER SIDE FOR NEW WORK
AutoCAD SHX Text 08/26
| 2027 Navajo SP - Boat Ramp Resuracing Drawing Cover.pdf |
| 2025 Navajo SP - Boat Ramp Resurfacing Phase 3-1 Cover Sheet.pdf |
| Sheets and Views |
| 1 Cover Sheet |
| 2025 Navajo SP - Boat Ramp Resurfacing Phase 3-2 Site Map & Work Summary.pdf |
| Sheets and Views |
| 2 Site Map & Work Summary |
| 2025 Navajo SP - Boat Ramp Resurfacing Phase 3-3 Plan and Profile.pdf |
| Sheets and Views |
| 3 Plan and Profile |
| 2025 Navajo SP - Boat Ramp Resurfacing Phase 3-4 Details.pdf |
| Sheets and Views |
| 4 Details |
| 2025 Navajo SP - Boat Ramp Resurfacing Phase 3-2 Site Map & Work Summary.pdf |
| Sheets and Views |
| 2 Site Map & Work Summary |
File details come from the government source that posted it. Updated .