IFB-159-26-Specification.pdf

PDF 3 MB Posted

Attached to
IFB 159-26 - Widett Layover Facility Distribution Switchboards
Solicitation number
BD-27-1206-40000-40000-135570
Issued by
Suffolk County, Massachusetts

About this file

This procurement specification document is issued by the Massachusetts Bay Transportation Authority (MBTA) for the furnishing of distribution switchboards as part of Contract No. F60PS01 for the Widett Layover Facility project in Boston, Massachusetts. The contract calls for the supply of three distribution switchboards (models YP-SB41, YP-SB42, and YP-SB43) on a procurement-only basis, with the supplier responsible for design, manufacture, quality control, testing, and delivery to 100 Foodmart Road, Boston, MA 02118. Delivery is required by September 2, 2027. The switchboards must be rated for 480/277 volt, 3-phase, 4-wire, 60 Hz service with specifications including metal-enclosed, dead-front construction complying with NEMA Standards No. PB-2 and UL Standard No. 891. Prior to manufacture, the supplier must submit complete shop drawings including single-line diagrams, physical arrangement drawings, unit wiring diagrams, and schematic diagrams. The supplier shall also coordinate submittals, provide manufacturer certifications, bills of lading, and shipping manifests at least ten business days prior to delivery. The electrical contractor will be responsible for installation, site infrastructure, and final site testing in a separate contract. Field training for MBTA personnel on operation and maintenance is required before April 1, 2028, accommodating a minimum of six attendees for not less than two sessions of four hours each of classroom and hands-on training.

The specification requires the switchboards to include surge protection devices, molded case and power circuit breakers with microprocessor-based electronic trip units, ground buses, and multiple circuit breaker positions with field-adjustable settings. All switchboards must be furnished completely assembled, wired, and tested at the manufacturer's plant and must include a 24-month warranty from the date of shipment, with an additional one-year warranty extension upon completion of an accepted commissioning process. The supplier is responsible for all freight, transport, and delivery costs, and materials rejected for non-compliance will be returned and replaced at the manufacturer's expense within one month. Storage testing prior to installation by the electrical contractor must verify that all components including breakers, relays, metering, bus connections, transformers, and shunt trip devices operate as intended. No specific set-asides or pricing information is provided in this specification document; payment will be made separately for each of the three switchboards under contract unit price items 1620.011P, 1620.012P, and 1620.013P.

View the file

Other files

File Type Posted
IFB-159-26-COMMBUYS_Bid Document.pdf PDF
3. MBTA Minimum Insurance Requirements (SAVE AS).dotm DOTM file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MASSACHUSETTS BAY TRANSPORTATION AUTHORITY

WIDETT LAYOVER FACILITY

Contract No.: F60PS01

Distribution Switchboards

Material

Summary

Item Distribution Switch

Board

Name Distribution

Switchboards

Spec No. 16470P

Quantity 3

Unit EA

Delivery:

• FOB to 100 Foodmart Road, Boston, MA 02118

• Delivery is within the Boston area at a location provided by the General

Contractor/Electrical Contractor.

• Delivery: By September 2, 2027

• Materials will be at manufacturer’s risk until accepted by the Authority.

• Materials rejected for non-compliance with these specifications will be returned and replaced at Manufacturer’s expense within one month

Submittal:

• Prior to manufacture, the manufacturer shall submit complete shop drawings for each item.

F60PS01 DISTRIBUTION SWITCHBOARDS MBTA N.A.

2026 16470P - 1

SECTION 16470 P

DISTRIBUTION SWITCHBOARDS

PROCUREMENT ONLY

This work consists of activities relating to the Distribution Switch Boards procurement and final testing

(SUPPLIER) (This Contract) and installation and final testing (EC) (separate contract).

The Supplier shall be responsible for the design, manufacture, purchase, quality control, and testing of the switchboards at the point of manufacture, as well as coordinating and executing all freight, transport, and deliv-ery of the switchboards to the designated drop-off location. Additionally, the Supplier shall provide all rele-vant material certifications, bills of lading, and shipping manifests to the Contractor at least ten (10) business days prior to delivery and must ensure that all transport vehicles are properly equipped to allow for safe unload-ing operations by the Contractor's personnel. The EC will be responsible for all the site infrastructure including all site, civil, structural, electrical elements and installation on site including final site testing.

These references will be used within this specification to define the applicable scope of work and responsible party. Sections not identified as GC, EC or SUPPLIER shall apply equally to all parties.

PART 1 - GENERAL

1.1 DESCRIPTION OF WORK

A. Work Included: This Section specifies furnishing and installing distribution switchboards.

1.2 PROCUREMENT INFORMATION

A. Attention is directed to the procurement requirements of the CONTRACT

B. Definitions

1. Installation Contract: The MBTA will advertise and award a future project which involves the installation of the new electrical equipment in a new MBTA railyard.

2. General Contractor (GC) – General Contractor who is awarded the above-mentioned project.

3. Electrical Contractor (EC) – The electrical contractor for the above-mentioned project.

4. MBTA – The Massachusetts Bay Transportation Authority, owner of the railyard being constructed.

5. Supplier (vendor) – The supplier of the switchboards described in this specification and the provided design documents.

C. Responsibilities

1. MBTA

2026 16470P - 2

a. The MBTA will be responsible for pre-purchasing the distribution switchboards and all associated components.

b. Coordinating ship dates with the manufacturer and storage of the switchboards until the

EC is given an executed contract.

2. General Contractor

a. The General Contractor is responsible for coordinating the transfer/delivery of the switchboards to the EC’s responsibility. The EC and the GC will coordinate the unloading the switchboards.

3. Electrical Contractor

a. The electrical contractor’s tasks shall include but not be limited to the following tasks:

1). Taking responsibility for the storage of the switchboards once the switchboards arrive or once an executed contract for the project is completed. If the switchboards are already in storage by the MBTA then the electrical contractor will transfer the switchboards to their own climate controlled storage facility within 30 days of the executed contract.

2). Installation of the switchboards and all associated components

3). All rigging and staging required for the installation of the switchboards

4). Providing Manufacturer representation for supervision of the installation, commissioning, and testing.

5). Participating with the commissioning agent, if one is a part of the project, during startup and commissioning of the switchboards and associated accessories.

4. Supplier

a. The Supplier is responsible for providing a switchboard manufacturer that can meet the specifications and design documents. The Supplier is responsible for coordinating submittals to the MBTA, coordinating the delivery of the switchboards from the manufacturer, and providing support through the purchase process.

1.3 SUBMITTALS

A. The Supplier will be responsible for submitting the required submittals.

B. Shop Drawings. Submit shop drawings including:

1. Single line diagrams.

2. Physical arrangement drawings.

3. Unit wiring diagrams.

2026 16470P - 3

4. Drawings showing space available for conduit entrance and for routing and training of cables.

5. Schematic diagrams for electrically operated equipment.

6. Catalog cuts of standard catalog items.

C. Working Drawings. Submit working drawings including:

1. Setting diagrams if anchoring in concrete is required.

2. Erection diagrams if shipped in sections or if parts are shipped separately and not installed at factory.

3. Interconnection diagrams for circuits have externally located Instruments, controls, alarms or similar devices.

D. Test Reports. Submit certified test reports for all tests at the manufacturer's plant and all field tests.

1.4 QUALITY ASSURANCE

A. The Supplier shall be responsible for ensuring the testing is completed and sending the testing reports to the MBTA.

B. Perform the following tests at the manufacturer's plant, in addition to the manufacturer's standard tests, on the assembled switchboards:

1. 60 Hz dielectric tests.

2. Mechanical operations tests.

3. Grounding of instrument;

4. Transformer case tests.

5. Electrical operations tests.

6. Control wiring checks.

1.5 PRODUCT DELIVERY, STORAGE, AND HANDLING

A. Ship equipment in assembled sections of maximum size as defined for each switchboard by the Engineer.

B. Temporary Bracing. Brace and package the equipment to permit hoisting, lowering, and skidding into position. Clearly label any temporary internal bracing of equipment as TEMPORARY BRACING: TO

BE REMOVED BEFORE OPERATION.

C. Protection Against Concealed Damage. Package equipment which may be subject to non-visible damage during shipment, with mechanical impact recorders which will register the maximum acceleration to

2026 16470P - 4 which the equipment has been subjected along each axis. Unpack such equipment in the presence of the

Engineer.

PART 2 - PRODUCTS

2.1 GENERAL

A. The Supplier shall be responsible for providing the switchboards as described below and on the design drawings.

B. Furnish distribution switchboards (YP-SB41, YP-SB42, & YP-SB43) which are completely metal enclosed, self-supporting, dead front, free standing, circuit breaker type for indoor service and which conform to NEMA Standards No. PB-2, UL Standard No. 891, and the NEC. Enclosure frame and interior barriers shall be fabricated of not less than 11-gauge steel. Construction shall prevent entry of rodents into the interior.

C. Furnish switchboards consisting of the required number of vertical sections bolted together to form one rigid switchboard and incorporating switching and protective devices of the number and type rating specified herein and shown on the Contract Drawings.

D. Furnish switchboards completely assembled, wired and tested at the manufacturer's plant. If approved by the Engineer, switchboards may be broken down into convenient shipping sections subsequent to the completion of the tests.

E. Furnish surge protection devices, SPD, as shown on drawings in accordance with the NEC article 242.

F. All front covers will be removable with a single tool

G. All doors shall be hinged with removable hinge pins.

H. All exterior boards shall have a minimum NEMA rating of NEMA 3RX.

I. The incoming main breakers of all switchboards shall include a shunt trip device for emergency push button operation. The shunt trip device must be capable of handling line voltage (480/277V).

2.2 RATINGS

A. Furnish completed switchboards rated for service on 480/277 volt, 3-phase, 4-wire, 60 Hz, power system(s) having a short circuit capacity, breaker frame sizes, number of poles, trip unit characteristics, instrument ratings, control equipment ratings, and basic insulation impulse level (BIL), all as indicated on the Contract Drawings.

2026 16470P - 5

2.3 PHYSICAL SIZE

A. Furnish switchboards of nominal height, and of width and depth of the vertical sections adequate to accommodate and connect the equipment except where greater widths and depth are shown on the

Contract Drawings. All vertical sections shall align front and rear except, subject to approval by the

Engineer.

2.4 ACCESSIBILITY

A. Unless otherwise specified, provide internal components which are removable from the front of the switchboard; incoming and outgoing wiring connections which are front accessible

2.5 BUSES

A. Electro-tin plated or silver plated copper of sufficient cross-sectional area to continuously conduct rated full load current with a temperature rise of 50 degrees C. above an ambient temperature of 40 degrees

C. Brace bus bars rigidly to comply with the integrated equipment rating of the switchboard. Bus bars shall be isolated from phase-to-phase and phase-to-ground by insulating material.

B. Main Buses. The main horizontal bus bars shall be located at the back of the switchboard to permit a maximum of available conduit area. Extend main buses horizontally from the incoming line sections to and through distribution and motor control sections.

1. The end section shall have bus bar provisions for future addition of a section. The provisions shall include the bus bars installed and extended to the extreme side of the section and fabricated in such a manner that the addition of a future section will require only the installation of standard bolted splice plates. The horizontal main bus bar supports, connections, and joints shall be bolted with a minimum of two bolts per joint, and shall not require periodic maintenance. Type: 4-pole including a full or one-half capacity neutral bus, as indicated.

C. Section Buses. Extend section buses vertically from the main bus through each vertical section to the load side of each distribution device, panel board or motor starter. Bring the neutral bus in to each distribution compartment which contains a distribution device or devices supplying 4-wire or 2-wire line to neutral circuits.

D. Ground Buses. Extend a ground bus full length through the switchboard and firmly bolt to each vertical section in at least two places. Make provision near each end of the ground bus for connection to the building grounding system. Make provision for future extension of the ground bus as specified herein.

E. Phasing. Phase, buses A-B-C from left-to-right, top-to-bottom, and front-to-rear as viewed from the front of the switchboard.

2026 16470P - 6

2.6 SWITCHBOARD CONFIGURATION

A. Provide switchboards having an incoming line section including instrument transformers, surge protection device and meters, and a low voltage section with molded case breakers as shown on the

Contract drawings. Each section shall be separated from the others by steel barriers, but shall be electrically connected and physically joined to form a single, metal-enclosed structure. A bus connection shall be provided for connecting the neutral to the ground bus with a removable isolating link.

2.7 MOLDED CASE CIRCUIT BREAKERS

A. Provide insulated case circuit breakers as allowed based on the fault current and setting requirements.

B. Short circuit rating of all circuit breakers: equal to or greater than the maximum short circuit to which they would be subjected when directly connected to the power system specified herein.

C. Breakers shall have an interrupting rating as required to provide the short circuit current rating indicated on the design drawings..

D. Listed and labeled complying with UL 489. Comply with FS W-C-375.

E. All breakers shall be electronic trip circuit breakers.

F. Electronic Trip Units

1. Microprocessor based, with circuit breaker status display and LED trip indicators

2. Provide the field adjustable settings indicated on the drawings for each breaker.

3. Provide network monitoring capability for amperage, voltage, power, energy, and harmonics.

G. Provide the following where indicated or required:

1. Ground fault protection: Integral to circuit breaker with adjustable pickup and time delay settings, push to test feature, and ground fault indicator, as indicated on the drawings.

2.8 POWER CIRCUIT BREAKERS

A. Description: Quick make, quick break, circuit breakers with two-step stored energy closing mechanism;

maximum five-cycle closing time.

B. Provide power circuit breakers for all incoming lines and outgoing feeders except where insulated case or molded case circuit breakers are specifically called for on the Contract Drawings.

C. Short circuit rating of all circuit breakers: equal to or greater than the maximum short circuit to which they would be subjected when directly connected to the power system specified herein.

2026 16470P - 7

D. Breakers shall have an interrupting rating as required to provide the short circuit current rating indicated on the design drawings..

E. Listed and labeled complying with UL 1066.

F. Provide fixed mount circuit breakers for circuit breaker sizes 1000A or less.

G. Draw-out Circuit Breakers: Provide draw-out circuit breakers for circuit breaker sizes more than 1000 amperes.

H. All breakers shall be electronic trip circuit breakers.

I. Electronic Trip Units

1. Microprocessor based, with circuit breaker status display and LED trip indicators

2. Provide energy reduction maintenance settings (ERMS).

3. Provide the field adjustable settings indicated on the drawings for each breaker.

4. Provide network monitoring capability for amperage, voltage, power, energy, and harmonics.

J. Provide the following where indicated or required:

1. Remote trip indication and control.

2. Ground fault protection: Integral to circuit breaker with adjustable pickup and time delay settings, push to test feature, and ground fault indicator, as indicated on the drawings.

K. Control voltage:

1. As required by the manufacturer.

2.9 SMALL WIRING

A. Furnish small wiring, necessary fuse blocks and terminal blocks within the switchboard when required.

Provide all groups of control wires leaving the switchboard with terminal blocks with suitable numbering strips. On conductors, use hardware having a high tensile strength and an anticorrosive zinc plating. Provide each terminal block with 10 percent spare wire terminals. Provide control switches and red and green indicating lights for electrically operated circuit breakers.

2.10 MAINTENANCE MODE SWITCHES

A. Description: Local, lockable switch with blue status indicator light that permits selection of maintenance mode with alternate electronic trip unit settings for reduced fault clearing time in accordance with NFPA

70.

B. Provide for all circuit breakers 1,200A and larger.

2026 16470P - 8

C. Switch Type: Provide energy reduction maintenance switches (ERMS)

1. ERMS Switches: Clearing time of less than 50 milliseconds when activated.

2.11 TERMINAL LUGS

A. Provide terminal lugs for all incoming and outgoing wiring including neutral and ground wires.

B. For power wiring, provide terminal lugs of the anti-turn, solderless type which will grip the wire firmly without damage and does not have bolts or screws which are directly in contact with the wire or cable strands.

C. Terminals for control wiring may be of the screw or clamp type.

D. Provide terminals and terminal lugs made of materials compatible with the wiring materials with which they will be used. The thermal expansion characteristics of the material in which the wiring is clamped shall be essentially identical to the wire material.

E. Provide terminal lugs of the sizes required for the wiring shown on the Contract Drawings.

2.12 CONDUIT SPACE

A. Provide conduit space for all incoming and outgoing wiring where and as shown on the Contract

Drawings, adequate for terminating conduits, pulling wiring and training of wiring within the switchboard.

B. Unless otherwise noted all conduits/feeders shall enter and exit from the bottom of the switchboard sections.

2.13 NAMEPLATES

A. Provide engraved laminated plastic nameplates for each switchboard device, with legends and colors as shown on the Contract Drawings.

B. Provide all switching and protective devices with permanent, visible on-off identifications and neutral position identification for devices with neutral positions.

C. Provide nameplates bearing equipment ratings, tap changing information, manufacturer identification, and reference serial numbers mounted on the front of distribution switchboard.

2.14 SURGE PROTECTION DEVICES

A. Integral Surge Suppressor (as shown on one line diagram)

1. SPD shall be Listed and Component Recognized in accordance with UL 1449 to include Section

37.3 highest fault current category. SPD shall be UL 1283 listed.

2026 16470P - 9

2. SPD shall be installed by and shipped from the electrical distribution equipment manufacturer’s factory.

3. SPD type shall be Type 2 with standard built in surge counter

4. SPD shall provide surge current diversion paths for all modes of protection; L-N, L-G, L-L, N-G in WYE systems, and L-L, L-G in DELTA systems.

5. SPD shall be modular in design. SPD for service entrance application shall provide two modules per phase for redundant protection. Each mode including N-G shall be fused with a 200kAIC UL recognized surge rated fuse and incorporate a thermal cutout device.

6. Audible diagnostic monitoring shall be by way of audible alarm. This alarm shall activate upon a fault condition. An alarm on/off switch shall be provided to silence the alarm. An alarm push to test switch shall be provided.

7. The absence of a green light and the presence of a red light shall indicate that damage has occurred on the respective phase or mode. All protection status indicators must indicate the actual status of the protection on each phase or mode. If power is removed from any one phase, the indicator lights must continue to indicate the status of the protection on all other phases and protection modes. Diagnostics packages that simply indicate whether power is present on a particular phase shall not be accepted.

8. Remote Status Monitor – The SPD must include Form C dry contacts (one NO and one NC) for remote annunciation of its status. Both the NO and NC contacts shall change state under any fault condition.

9. SPD shall have a built in surge counter with a reset button to record surge events

10. If a dedicated breaker for the SPD is not provided, the SPD shall include a UL recognized disconnect switch. A dedicated breaker shall serve as a means of disconnect for distribution SPDs

11. SPD shall have the following:

a. Green and Red LED’s per phase to indicate protection status

b. Green and Red LED’s on Wye units to indicate protection status of the Neutral-to-Ground mode

c. Form C Contact relay

12. SPD shall meet or exceed the following criteria:

a. Minimum surge current capability (single pulse rated) per phase shall be:

1). Service entrance switchboard: 300kA per phase

b. UL 1449 Suppression Voltage Ratings:

13. VOLTAGE LOCATION L-N L-G N-G

2026 16470P - 10

14. 208Y/120V Service Entrance 330V 330V 330V

15. Distribution 330V 330V 330V

16. 480Y/277V Service Entrance 700V 700V 700V

17. Distribution 600V 600V 600V

18. SPD shall have a minimum EMI/RFI filtering of -50dB at 100kHz with an insertion ration of 50:1 using MIL-STD-220A methodology.

19. SPD shall be provided with one set of NO/NC dry contacts.

20. SPD shall have a warranty for a period of five years, incorporating unlimited replacement of suppressor parts. Warranty shall be the responsibility of the electrical distribution equipment manufacturer and shall be supported by their respective field service division.

21. The SPD shall be maintenance free and shall not require any user intervention throughout its life.

SPDs containing items such as replaceable single-mode modules, replaceable fuses, or replaceable batteries shall not be accepted. SPDs requiring any maintenance of any sort such as periodic tightening of connections shall not be accepted. SPDs requiring user intervention to test the unit via a diagnostic test kit or similar device shall not be accepted.

2.15 GROUNDING

A. All switchboards to be solidly grounded to the sites grounding system.

2.16 YP-SB41 BREAKER POSITIONS

A. Unless otherwise noted, the main breakers on either end of YP-SB41 shall be normally closed.

B. Unless otherwise noted the tie breakers in the center of YP-SB41 shall be normally open.

2.17 GENERATOR & ATS CONNECTION

A. Provisions for programming and a connection between the Automatic Transfer Switch (ATS), to be purchased in the future, and YP-SB41 must be provided. The connection must allow the following:

1. Communication of the source status at the ATS and the switchboard

a. The ATS will initiate the generator start up, but only after confirmation from the switchboard that both switchboard sources have been lost. The loss of the normal source on the ATS will not automatically initiate generator startup.

2. Switchboard programming provisions: This list is not meant to include all provisions but is meant to show intent of the programming of the main/tie breakers as it relates to the generator/ats connection. Source A is defined as the Non-ATS source on YP-SB41 and Source B is defined as the ATS source on YP-SB41.

2026 16470P - 11

a. If the ATS’s normal source (Source B) is lost but Source A is not lost, the switchboard will open Source B’s main breaker and close the tie breaker. The ATS will not initiate startup of the generator.

1). If Source A is lost after Source B, then the Switchboard will Open Source A’s breaker, close the tie breaker (if required), close Source B’s breaker, and initiate the generator start signal to the ATS.

b. If Source A is lost, then the switchboard will open Source A’s breaker and close the tie breaker. The ATS will not initiate startup of the generator.

1). If Source B is then lost, the switchboard will initiate the generator start signal to the

ATS.

c. If Source A & B are lost simultaneously, the switchboard will open Source A’s breaker, close the tie breaker, and initiate the generator start signal to the ATS.

2.18 WARRANTY

A. All switchboards shall be provided with a warranty of at least twenty four (24) months from the date of shipment from the factory. The warranty shall repair or replace defective materials, equipment, workmanship, and installation that develop within this period, promptly and to the Designer’s satisfaction and correct the damage caused in marking necessary repairs and replacements under guarantee within Contract Price. Commissioning of the switchboards is to be undertaken by a certified manufacturer’s representative. This commissioning process must provide at least one (1) additional year of warranty on top of the standard manufacturer warranty starting from the date of the completed and accepted commissioning process.

PART 3 - EXECUTION

3.1 PRODUCT DELIVERY, STORAGE, AND HANDLING

A. All equipment shall be delivered to the GC and EC for storage. Equipment shall be suitably packaged and protected for overland trucking using heavy-duty protective shrink-wrap plastic. Where multiple units are required, a schedule of priority will be furnished which shall determine the manufacturing and delivery sequence. In general, switchboard sections shall be delivered in one piece unless indicated otherwise. The GC and EC shall coordinate and be responsible for accepting delivery, unloading and safe keeping of products in a secure climate controlled facility.

3.2 TESTING & INSTALLATION

A. The Supplier is responsible for coordinating the testing and factory commissioning agents as described below.

2026 16470P - 12

B. The switchboard manufacturer, as part of the purchasing of the switchboards, shall perform the necessary testing and installation certifications listed in this section at such a time as the switchboards are installed. The switchboard manufacturer shall assume that the switchboards will be installed and require testing before February 1st, 2028.

C. Switchboards Field Quality Control

1. Include necessary material, equipment, labor, and technical supervision.

2. Replace damaged or malfunctioning equipment and report discrepancies or installation issues.

3. Identify switchboards with label indicating inspection/testing agency and date of service.

4. Provide the services of a qualified factory trained manufacturer’s representative to assist the contractor in installation and startup of the equipment specified under this section for a period specified by the GC or electrical contractor. The manufacturer’s representative shall provide technical direction and assistance to the Contractor in general assembly of the equipment, connections and adjustments, and testing of the assembly and components contained herein.

5. The Contractor shall provide three (3) copies of the manufacturer’s field startup report

6. Provide a factory trained representative to perform the final commissioning services for final equipment startup. This commissioning process will provide an additional year of warranty the equipment the commissioning is performed on.

7. Inspect and test equipment and associated systems for conformance to Contract Documents, including equipment manufacturer’s recommendations for operation.

a. Visually inspect for physical damage and proper installation.

b. Perform tests in accordance with manufacturer's instructions.

c. Perform tests to verify compliance with Contract Documents.

d. Perform tests to verify equipment is ready for operation.

e. Touch-up paint chips and scratches with manufacturer-supplied paint.

f. Test insulation resistance for each switchboard bus, component, connecting supply, feeder, and control circuit.

g. Measure, using high potential testing, insulation resistance of each bus structure phase-to-phase and phase-to-ground for one minute each, at minimum test voltage of 1,000 VDC.

1). Comply with manufacturer's documented specific testing procedures.

2). Minimum Insulation Resistance: 1 megohm.

h. Test the continuity of each circuit.

2026 16470P - 13

i. Perform each electrical test and visual/mechanical inspection listed in NETA ATS as applicable.

D. Manufacturer’s Certification

1. A qualified factory-trained manufacturer’s representative shall certify in writing that the equipment has been installed, adjusted, and tested in accordance with the manufacturer’s recommendations.

2. The contractor shall provide three (3) copies of the manufacturer’s representative’s certification.

E. Storage Testing

1. The switchboard manufacturer, as part of the purchasing of the switchboards, shall perform testing to verify that all components operate as intended and no deficiencies are present before the EC performs the installation. This includes but is not limited to the following components:

a. Breakers

b. Relays

c. Metering

d. Bus and Bus connections

e. PLC’s

f. Transformers

g. CT’s

h. Switches

i. Displays

j. Instrument panels

k. Batterys

l. Shunt Trip Devices

2. Any deficiency’s identified shall be brought to the attention of the EC and the project team immediately and a recommended course of action provided. Any equipment that is deficient that falls under the manufacturer’s warranty shall be replaced immediately.

3.3 TRAINING

A. The Supplier is responsible for coordinating the training as described below.

B. The switchboard manufacturer, as part of the purchasing of the switchboards, shall perform the necessary training listed in this section at such a time as the switchboards are installed. The switchboard

2026 16470P - 14 manufacturer shall assume that the switchboards will be installed and the MBTA will require training before April 1st, 2028.

C. Train the Owner’s personnel on operation and maintenance of the system provided.

1. Accommodate a minimum of six (6) attendees

2. Provide not less than two (2) sessions with four (4) hours of classroom and hand-on training

3. Training Reference: Use the submitted operations and maintenance manuals. Provide details on how to access all controls functions, maintenance information, and any software or web based interfaces that are a part of the system

4. Instructor: Factory-trained manufacturer’s representative

5. Location: Boston, MA

D. Provide sufficient time and detail in each session to cover the following:

1. Operational Theory

2. Major equipment components

3. Equipment operation

4. Equipment configurations

5. Maintenance, troubleshooting, and repair

6. Component level parts replacement.

PART 4 - MEASUREMENT AND PAYMENT

4.1 MEASUREMENT

A. Separate measurement will be made for the work of this Section. The cost for all work, complete in place; furnishing (Supplier) and installing (EC) all materials, equipment and accessories required;

providing all tools, labor, transportation, handling and storage; and performing all work incidental to completion of work of this Section, as it pertains to the Supplier, shall be included in the Contract Unit price payment items below.

4.2 PAYMENT

A. All costs of the Suppliers scope for the distribution switchboards in this Section shall be included in the total Contract Unit Price for item 1620.011P Furnishing Distribution Switchboard YP-SB41.

2026 16470P - 15

B. All costs of the Suppliers scope for the distribution switchboards in this Section shall be included in the total Contract Unit Price for item 1620.012P Furnishing Distribution Switchboard YP-SB42.

C. All costs of the Suppliers scope for the distribution switchboards in this Section shall be included in the total Contract Unit Price for item 1620.013P Furnishing Distribution Switchboard YP-SB43.

4.3 PAY ITEMS

Item No. Description Unit

1620.011P Furnishing Distribution Switchboard YP-SB41 Each

1620.012P Furnishing Distribution Switchboard YP-SB42 Each

1620.013P Furnishing Distribution Switchboard YP-SB43 Each

END OF SECTION

3000AF

2000AT

GFP

EO

2 3

800AF

225AT

800AF

125AT

800AF

125AT

GFP

800AF

400AT

GFP

LT

ST

LTD

INST

YP-SB41

PAD MOUNTED DOUBLE ENDED

SWITCHBOARD

3000A, 480/277V, 3P, 4W, 65KAIC

TIE BREAKER NEMA 3RX

100% RATED MAIN & TIE BREAKERS

30AF

30AT

SPD

2000 AT

3000 AF

3#600KCMIL

& #2G IN 4"C

L

NS

G

GEN-1

500kW 480/277V PAD MOUNTED

DIESEL FIRED GENERATOR WITH

24-HOUR FUEL TANK AND A

WEATHERPROOF

SOUND-ATTENUATED ENCLOSURE

UT-5

PAD MOUNTED

TRANSFORMER

1500kVA 13.8kV-480V

GFPGFP

YPP41

480/277V

PANEL

YPP21

208/120V

PANEL

T-1

15KVA TRANSFORMER

480V-208Y/120V 3P, 4W

YPC-1

3#10 & #10G

IN 1"C

4#6 & #8G

IN 1" C

YPP46

480/277V

PANEL

YPP26

208/120V

PANEL

T-6

15KVA TRANSFORMER

480V-208Y/120V 3P, 4W

YPC-6

3#10 & #10G

IN 1"C

4#6 & #8G

IN 1" C

YPP43

480/277V

PANEL

YPP23

208/120V

PANEL

T-3

15KVA TRANSFORMER

480V-208Y/120V 3P, 4W

YPC-3

3#10 & #10G

IN 1"C

4#6 & #8G

IN 1" C

LT

ST

LTD

INST

LT

ST

LTD

INST

LT

ST

LTD

INST

800AF

125AT

800AF

125AT

800AF

400AT

GFP

800AF

400AT

GFP

LT

ST

LTD

INST

30AF

30AT

SPD

3#350KCMIL

& #1G IN 4"CSPARE

GFP GFP

YPP42

480/277V

PANEL

YPP22

208/120V

PANEL

T-2

15KVA TRANSFORMER

480V-208Y/120V 3P, 4W

YPC-2

3#10 & #10G

IN 1"C

4#6 & #8G

IN 1" C

3#1 & #6G IN

2"C

YPP45

480/277V

PANEL

YPP25

208/120V

PANEL

T-5

15KVA TRANSFORMER

480V-208Y/120V 3P, 4W

YPC-5

3#10 & #10G

IN 1"C

4#6 & #8G

IN 1" C

LT

ST

LTD

INST

LT

ST

LTD

INST

LT

ST

LTD

INST

LT

ST

LTD

INST

3000AF

2000AT

GFP

EO

LT

ST

LTD

INST

23 24 25 26

ATS-1

480/277V, 2000A, 4P

WITH ISOLATION

BYPASS SWITCH

5 SETS OF 3#600 KCMIL &

#250G IN 4"C, 2-4"C SPARE

YPP44

480/277V

PANEL

YPP24

208/120V

PANEL

T-4

15KVA TRANSFORMER

480V-208Y/120V 3P, 4W

YPC-4

3#10 & #10G

IN 1"C

4#6 & #8G

IN 1" C

YPP47

480/277V

PANEL

YPP27

208/120V

PANEL

T-7

15KVA TRANSFORMER

480V-208Y/120V 3P, 4W

YPC-7

3#10 & #10G

IN 1"C

4#6 & #8G

IN 1" C

800AF

800AT

600AF

500AT

400AF

400AT

SPARE

250kW ROOF

MOUNTED

LOADBANK

1#4/0 IN 1"C TO

EXISTING GROUND.

BOND NEUTRAL

TO GROUND.

GENERATOR

EMERGENCY

SHUTDOWN

BUTTON

E

2000AF/2000AT SERVICE ENTRANCE

RATED BREAKER

3#250KCMIL

& #3G IN 4"C

3#250KCMIL

& #3G IN 4"C

EO

2 SETS OF

3#600 KCMIL &

#1/0G IN 4"C,

1-4"C SPARE

5 SETS OF

3#600 KCMIL &

#250G IN 4"C,

2-4"C SPARE

UT-4

PAD MOUNTED

TRANSFORMER

1500kVA 13.8kV-480V

5 SETS OF 3#600

KCMIL & #250G IN 4"C,

2-4"C SPARE

2-5"C.

CONDUCTORS BY

EVERSOURCE2-5"C

CONDUCTORS BY

EVERSOURCE

(3) SETS OF 2#10 FOR START SIGNALS.

COORDINATE EXACT START SIGNAL WIRING

REQUIREMENTS WITH THE GENERATOR

AND ATS MANUFACTURER.

3#350KCMIL

& #3G IN 4"C

3#1 & #6G IN

2"C

800AF

400AT

GFP

SPARE

LT

ST

LTD

INST

800AF

400AT

GFP

SPARE

LT

ST

LTD

INST

800AF

400AT

GFP

SPARE

LT

ST

LTD

INST

800AF

400AT

GFP

SPARE

LT

ST

LTD

INST

800AF

400AT

GFP

SPARE

LT

ST

LTD

INST

800AF

125AT

GFP

SPARE

LT

ST

LTD

INST

s o s o

L vc

PME-9 SWITCH,

PRIMARY & SECONDARY

FEEDERS AND TERMINATIONS

BY EVERSOURCE, PAD BY EC.

MH-EV01

FOR CONTINUATION

SEE E-601

EV-WC02A

EV-WC01

CT X 3

3000:5

DMS

CT X 3

3000:5

DMS

EV-WC01A

CT X 3 M

EVERSOURCE UTILITY

METERCT X 3EVERSOURCE UTILITY

METER

M

800AF

400AT

GFP

SPARE

LT

ST

LTD

INST

800AF

125AT

GFP

SPARE

LT

ST

LTD

INST

800AF

400AT

GFP

SPARE

LT

ST

LTD

INST

PROVISION

PROVISION

800AF

400AT

GFP

SPARE

LT

ST

LTD

INST

800AF

400AT

GFP

SPARE

LT

ST

LTD

INST

800AF

400AT

GFP

SPARE

LT

ST

LTD

INST

PROVISION

PROVISION

AS NOTED

WH 5/7/2026 AR SD

NOTES

1. FOR LEGEND, NOTES, AND ABBREVIATIONS, SEE SHEET E-001.

2. TRANSFORMER PROVIDED AND INSTALLED BY EVERSOURCE. PRIMARY MV

CABLES AND TERMINATIONS BY EVERSOURCE. SECONDARY TERMINATIONS

BY THE EC.

MASSACHUSETTS BAY TRANSPORTATION AUTHORITY

PL

O

TT

ED

D

R

AW

IN

G

MBTA CONTRACT NO. F60PS01

BOSTON, MASSACHUSETTS

.0 5.

:4 4:

P

M

WIDETT LAYOVER FACILITY

DP1 - DEMOLITION & SIX LAYOVER TRACKS

C :\U se rs

\D ic ke rS

\D C

\A C

C D oc s\

ST

V

In co rp or at ed

\4

-W id et t L ay ov er F ac ilit y\ Pr oj ec t F ile s\

_B

IM

_C

AD

\D P1

\1 4_

E_ El ec tri ca l\3

_P re

-P ur ch as e\ D

P1 _P

U R

-E -6

(G en er al P ow er

-O ne lin e)

.d w g

ONE FINANCIAL CENTER,

8TH FLOOR,

BOSTON, MA 02111

(617) 482-7298 www.stvinc.com

ISSUE

BY

CHECK

BY

DESIGN

BY PLAN NO:SCALE:

DRAWN

SHEET:DATE:

MASSACHUSETTS BAY

TRANSPORTATION AUTHORITY

Project ManagerDateManager of Design Date

REV.

NO

DATE DESCRIPTION BY

100% DESIGN

SUBMISSION

* PROGRESS PRINT *

* PROGRESS PRINT *

NOT AUTHORIZED

FOR CONSTRUCTION

PUR-E-602

PRE-PURCHASE

ELECTRICAL YARD

POWER ONELINES

YARD POWER ONELINE - GENERAL POWER SERVICE

NOT TO SCALE1

90% DESIGN

SUBMISSION

SUBMISSION

5000A, 480V, 3P

100KAIC, NEMA 3RX

100% SERVICE RATED EQUIPMENT

1600AF

900AT

1600AF

900AT

1600AF

900AT

NEW SWITCHBOARD YP-SB42

5 6 7 8

1600AF

900AT

1600AF

900AT

CT X 3

5000AF

4000AT

ST

LTD

LT

INST

DMS

30AF

30AT

S P D

GFP

ST

LTD

LT

INST GFP

ST

LTD

LT

INST GFP

ST

LTD

LT

INST GFP

ST

LTD

LT

INST GFP

ST

LTD

LT

INST

5000A, 480V, 3P

100KAIC, NEMA 3RX

100% SERVICE RATED EQUIPMENT

NEW SWITCHBOARD YP-SB43

SPARE

CT X 3

ST

LTD

LT

INST

DMS

30AF

30AT

S P D s o s o

L vc

480V, 3P

HPC-1

SPARE

1600AF

900AT

1600AF

900AT

1600AF

900AT

7 6 5 4

1600AF

900AT

1600AF

900AT

GFP

ST

LTD

LT

INST GFP

ST

LTD

LT

INST GFP

ST

LTD

LT

INST GFP

ST

LTD

LT

INST GFP

ST

LTD

LT

INST

SPARESPARE

PME-9 SWITCH,

PRIMARY & SECONDARY

FEEDERS AND TERMINATIONS

BY EVERSOURCE, PAD BY EC.

5000AF

4000AT

MH-EV02

FOR CONTINUATION

SEE E-601

480V, 3P

HPC-2

EV-WC05

1 3

3 2 1

2-5"C BY EC. MV CABLES FURNISHED

AND INSTALLED BY EVERSOURCE

2-5"C BY EC. MV CABLES FURNISHED

AND INSTALLED BY EVERSOURCE

EV-WC01

2 SETS OF

4#600 KCMIL

& #1/0G IN 4" C

UT-2

2500KVA

13.8KVA - 480V

UT-1

2500KVA

13.8KVA - 480V

2 SETS OF

4#600 KCMIL

& #1/0G IN 4" C

2 SETS OF

4#600 KCMIL

& #1/0G IN 4" C

2 SETS OF

4#600 KCMIL

& #1/0G IN 4" C

2 SETS OF

4#600 KCMIL

& #1/0G IN 4" C

2 SETS OF

4#600 KCMIL

& #1/0G IN 4" C

10 SETS OF 4#600KCMIL

& 500KCMIL GND IN 4" C

10 SETS OF 4#600KCMIL

& 500KCMIL GND IN 4" C

480V, 3P

HPC-3

480V, 3P

HPC-5

480V, 3P

HPC-4

480V, 3P

HPC-6

1600AF

900AT

9 10

1600AF

900AT

GFP

ST

LTD

LT

INST GFP

ST

LTD

LT

INST

SPARE

1600AF

900AT

10 9

1600AF

900AT

GFP

ST

LTD

LT

INST GFP

ST

LTD

LT

INST

SPARE SPARE

SPARE

1600AF

900AT

12 11

1600AF

900AT

GFP

ST

LTD

LT

INST GFP

ST

LTD

LT

INST

SPARE SPARE

1600AF

900AT

11 12

1600AF

900AT

GFP

ST

LTD

LT

INST GFP

ST

LTD

LT

INST

SPARE SPARE

NOT TO SCALE

NOTES

1. FOR SYMBOL LIST, ABBREVIATIONS, AND GENERAL NOTES SEE SHEET E-001.

2. TRANSFORMER PROVIDED AND INSTALLED BY EVERSOURCE. PRIMARY MV

CABLES AND TERMINATIONS BY EVERSOURCE. SECONDARY TERMINATIONS BY

THE EC.

MASSACHUSETTS BAY TRANSPORTATION AUTHORITY

PL

O

TT

ED

D

R

AW

IN

G

MBTA CONTRACT NO. F60PS01

BOSTON, MASSACHUSETTS

.0 5.

:4 4:

P

M

WIDETT LAYOVER FACILITY

DP1 - DEMOLITION & SIX LAYOVER TRACKS

C :\U se rs

\D ic ke rS

\D C

\A C

C D oc s\

ST

V

In co rp or at ed

\4

-W id et t L ay ov er F ac ilit y\ Pr oj ec t F ile s\

_B

IM

_C

AD

\D P1

\1 4_

E_ El ec tri ca l\3

_P re

-P ur ch as e\ D

P1 _P

U R

-E -6

(H ot el

P ow er -O ne lin

e) .d w g

ONE FINANCIAL CENTER,

8TH FLOOR,

BOSTON, MA 02111

(617) 482-7298 www.stvinc.com

ISSUE

BY

CHECK

BY

DESIGN

BY PLAN NO:SCALE:

DRAWN

SHEET:DATE:

MASSACHUSETTS BAY

TRANSPORTATION AUTHORITY

Project ManagerDateManager of Design Date

REV.

NO

DATE DESCRIPTION BY

100% DESIGN

SUBMISSION

* PROGRESS PRINT *

* PROGRESS PRINT *

NOT AUTHORIZED

FOR CONSTRUCTION

PUR-E-603

YP-SB42 & YP-SB43 PRE-PURCHASE ONELINE

HOTEL POWER UTILITY SERVICE ONELINE

NOT TO SCALE1

90% DESIGN

SUBMISSION

MAIN SWITCHBOARD: YP-SB42

SUPPLY FROM: PME-9 SWITCH VIA UT-1

VOLTAGE: 480/277V 3P, 4W MAINS: 5000A

MOUNTING: FREE STANDING MLO/MAIN BREAKER: 4000A MCB

GROUND BUS: SEE SPECIFICATIONS AIC RATING: 100K

CKT. NO. DESIGNATION LOAD (VA)

BREAKERS

REMARKSFRAME TRIP POLE

1 Main Disconnect 0.00 2500A 2000A 3

2 SPD 0.00 30A 30A 3

3 Metering 0.00 - -

4 HPC-1 665088.00 1600A 900A 3

5 SPARE 0.00 1600A 900A 3

6 HPC-3 665088.00 1600A 900A 3

7 SPARE 0.00 1600A 900A 3

8 HPC-5 665088.00 1600A 900A 3

9 SPARE 0.00 1600A 900A 3

10 SPARE 0.00 1600A 900A 3

11 SPARE 0.00 1600A 900A 3

12 SPARE 0.00 1600A 900A 3

TOTAL CONNECTED KVA = 1995264.00 DIVIDE BY: 830 AMPS: 2403.9 AMPS

TOTAL DEMAND KVA = 1296927.60 DIVIDE BY: 830 AMPS: 1562.6 AMPS

MAIN SWITCHBOARD: YP-SB43

SUPPLY FROM: PME-9 SWITCH VIA UT-2

VOLTAGE: 480/277V 3P, 4W MAINS: 5000A

MOUNTING: FREE STANDING MLO/MAIN BREAKER: 5000A MCB

GROUND BUS: SEE SPECIFICATIONS AIC RATING: 100K

CKT. NO. DESIGNATION LOAD (VA)

BREAKERS

REMARKSFRAME TRIP POLE

1 Main Disconnect 0.00 2500A 2000A 3

2 SPD 0.00 30A 30A 3

3 Metering 0.00 - -

4 HPC-2 665088.00 1600A 900A 3

5 SPARE 0.00 1600A 900A 3

6 HPC-4 665088.00 1600A 900A 3

7 SPARE 0.00 1600A 900A 3

8 HPC-6 665088.00 1600A 900A 3

9 SPARE 0.00 1600A 900A 3

10 SPARE 0.00 1600A 900A 3

11 SPARE 0.00 1600A 900A 3

12 SPARE 0.00 1600A 900A 3

TOTAL CONNECTED KVA = 1995264.00 DIVIDE BY: 830 AMPS: 2403.9 AMPS

TOTAL DEMAND KVA = 1296927.60 DIVIDE BY: 830 AMPS: 1562.6 AMPS

MAIN SWITCHBOARD: YP-SB41

SUPPLY FROM: PME VIA UT-4 & UT-5

VOLTAGE: 480/277V 3P, 4W MAINS: 3000A

MOUNTING: FREE STANDING MLO/MAIN BREAKER: 3000A MCB

GROUND BUS: SEE SPECIFICATIONS AIC RATING: 65K

CKT. NO. DESIGNATION

LOAD

(VA)

BREAKERS

REMARKSFRAME TRIP POLE

- Main Disconnect 0.00 3000A 2000A 3

- Metering 0.00 - -

- SPD 0.00 30A 30A 3

1 YPP41 20083.80 800A 400A 3

2 YPP43 13301.70 800A 400A 3

3 YPP46 2400.00 800A 400A 3

4 YPP47 1440.00 800A 400A 3

5 SPACE 0.00 - - 3

6 SPACE 0.00 - - 3

7 SPARE 0.00 800A 400A 3

8 SPARE 0.00 800A 400A 3

9 SPARE 0.00 800A 400A 3

10 SPARE 0.00 800A 400A 3

11 SPARE 0.00 800A 400A 3

12 SPARE 0.00 800A 400A 3

- TIE BREAKER 0.00 3000A 2000A 3

13 SPARE 0.00 800A 400A 3

14 SPARE 0.00 800A 400A 3

15 SPARE 0.00 800A 400A 3

16 SPARE 0.00 800A 400A 3

17 SPARE 0.00 800A 400A 3

18 SPARE 0.00 800A 400A 3

19 SPARE 0.00 800A 400A 3

20 SPACE 0.00 - - 3

21 SPACE 0.00 - - 3

22 YP445 1440.00 800A 400A 3

23 YPP44 22940.00 800A 400A 3

24 YPP42 16960.00 800A 400A 3

- SPD 0.00 30A 30A 3

- Metering 0.00 - -

- Main Disconnect 0.00 3000A 2000A 3

TOTAL CONNECTED KVA = 78565.50 DIVIDE BY: 830 AMPS: 94.7 AMPS

TOTAL DEMAND KVA = 51073.58 DIVIDE BY: 830 AMPS: 61.5 AMPS

AS NOTEDNOTES

1. FOR LEGEND NOTES AND ABBREVIATIONS, SEE SHEET E-001.

MASSACHUSETTS BAY TRANSPORTATION AUTHORITY

PL

O

TT

ED

D

R

AW

IN

G

MBTA CONTRACT NO. F60PS01

BOSTON, MASSACHUSETTS

.0 5.

:4 5:

P

M

WIDETT LAYOVER FACILITY

DP1 - DEMOLITION & SIX LAYOVER TRACKS

C :\U se rs

\D ic ke rS

\D C

\A C

C D oc s\

ST

V

In co rp or at ed

\4

-W id et t L ay ov er F ac ilit y\ Pr oj ec t F ile s\

_B

IM

_C

AD

\D P1

\1 4_

E_ El ec tri ca l\3

_P re

-P ur ch as e\ D

P1 _P

U R

-E -9

(S ch ed ul es

2) .d w g

ONE FINANCIAL CENTER,

8TH FLOOR,

BOSTON, MA 02111

(617) 482-7298 www.stvinc.com

ISSUE

BY

CHECK

BY

DESIGN

BY PLAN NO:SCALE:

DRAWN

SHEET:DATE:

MASSACHUSETTS BAY

TRANSPORTATION AUTHORITY

Project ManagerDateManager of Design Date

REV.

NO

DATE DESCRIPTION BY

100% DESIGN

SUBMISSION

* PROGRESS PRINT *

* PROGRESS PRINT *

NOT AUTHORIZED

FOR CONSTRUCTION

PUR-E-902

PRE-PURCHASE

ELECTRICAL

SCHEDULES

Include Shunt Trip

Include Shunt Trip

Include Shunt Trip

Include Shunt Trip

Include Shunt Trip

90% DESIGN

SUBMISSION

WIDETT CIRCLE

WIDETT CIRCLE

WIDETT CIRCLE

FOODMART ROAD

FOODMART

ROAD

FOODMART ROAD

AM

TRAK TRAIN W

ASH

FOODMART ROAD

E

E

T

T

T

M

M

T

T

E

E

E

E

E

E

E/C

C

E/C

E/C

E/C

E/C

E/C

W W WW W W WW W W W W

S

S

S

W

W

D

D

D

D

D

S

D

D

S

COMMHUT

CCC

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

FOODMART

ROAD

I-93 NORTH

EXIT RAMP

FRONTAGE ROAD

W

IDETT CIRCLE

EX LP RMN

EX LP RMN

EX LP RMN

EX LP RMN

EX LP RMN

EX LP RMN

EX LP RMN

EX LP RMN

EX LP RMN

PROPSED MBTA

STREETLIGHTING

CABINET

EX MH RMN

EX LP RMN

EV-WC01

EV-WC05A

EX PMH10568 RMN

EX MH RMN

(SEE E-601 FOR

MORE INFORMATION)

EV-WC05

EV-WC05

EV-WC06

EV-WC06A

EV-WC0A

EV-WC07

EX RMN

EX MH RMN

EX DUCTBANK RMN

EX DUCTBANK RMN

EX PMH6449 RMN MH-EV01

MV-EV06

MV-EV05

EX PMH18492 RMN

EX PMH18493 RMN

EX MC-1 RMN

EVERSOURCE HAS NO RECORD OF

EQUIPMENT, ASSUMED TO BE

CUSTOMER OWNED. EX RMN

EX PMH6450 RMN

SEE NOTE 3

EX METER REM

INSTALL EV-WC05 INTO

MH27460. COORDINATE

WITH EVERSOURCE THE

EXACT CONNECTION POINT

EX METER LOCATED INSIDE

NORTHEAST OF BLDG, REM.

SEE NOTE 7.

EX METER LOCATED INSIDE

SOUTHEASTOF BLDG, REM.

SEE NOTE 7.

EX METER LOCATED INSIDE BLDG,

REM.

SEE NOTE 7.

EX MH23583 RMN

UT-4

GEN. 1

ATS

YP-SB41

EV-WC01B

UT-5

MH-MP05

MH-MP06

MH-MP08

MH-MP07

MP-WC05

MP-WC06

EX LP RMN

AMTRAK

TRAINWASH

PME-9

SWITCH

MH-EV02

PME-9

EV-WC01

EV-WC01A

MH-MP01

MH-MP02

EV-WC02

MP-WC01

MP-WC03

MP-WC02

MP-WC04

MP-WC04C

UT-1

PME-9

UT-2

UT-3

EXISTING AMTRAK WET LOOP TRACK

EXISTING AMTRAK DRY LOOP TRACKEXISTING BOSTON MAIN INTERCEPTOR

FRONTAGE ROAD

E-201

ELECTRIC UTILITIES COORDINATION LAYOUT

AS NOTED

WH 3/27/2026 AR SD

NOTES

1. FOR LEGEND NOTES AND ABBREVIATIONS. SEE SHEET E-001

2. ALL PRIMARY EVERSOURCE CONDUITS SHOWN FOR DEMOLITION WILL HAVE FEEDER REMOVED BY EVERSOURCE OR AN EVERSOURCE

APPROVED CONTRACTOR. CONTRACTOR TO ABANDON THE CONDUITS, MANHOLES, BOLLARDS, PADS, AND OTHER INFRASTRUCTURE.

3. EXISTING PME SWITCH FOR AMTRAK TRAINWASH. COORDINATE REMOVAL WITH EVERSOURCE ONCE LOADS HAVE BEEN DISCONNECTED.

4. ALL EXISTING LIGHT POLES CALLED OUT TO BE REMOVED, WITH ALL ASSOCIATED WIRES. CONDUITS WILL BE ABANDONDED AND CAPPED .

5. NEW 2'X2' HANDHOLE FOR STREET LIGHTING. INTERCEPT THE EXISTINGS STREETLIGHTING CONDUIT AND BRING CONDUITS INTO THE NEW

HANDHOLE. PULL NEW CONDUCTORS FROM THE HANDHOLE TO THE NEXT POLE THAT IS SCHEDULED TO REMAIN. CONNECT NEW 2" CONDUIT

FROM THE NEW LIGHTING CONTROL CABINET INTO THE NEW HANDHOLE.

6. EVERSOURCE IS RESPONSIBLE FOR DEMOING ALL PRIMARY FEEDERS, PME SWITCHES, UTILITY TRANSFORMERS, AND METERING EQUIPMENT. EC IS RESPONSIBLE FOR DEMOING ALL NON-UTILITY EQUIPMENT, SUCH AS TRANSFORMERS, SECONDARY FEEDERS, AND METER ENCLOSURES FOR

ALL EXISTING SERVICES NOTED. EQUIPMENT PADS TO BE REMOVED AS PART OF SITE DEMO.

7. EC TO COORDINATE WITH EVERSOURCE TO CONFIRM EXACT METER LOCATIONS.

8. CONNECT NEW 2"C FROM NEW LIGHTING CONTROL CABINET INTO THE EXISTING POLE BASE.

9. EXISTING TELECOMMUNICATION EQUIPMENT IN BUILDING TO BE REMOVED BY EQUIPMENT OWNER.

MASSACHUSETTS BAY TRANSPORTATION AUTHORITY

PL

O

TT

ED

D

R

AW

IN

G

MBTA CONTRACT NO. F60PS01

BOSTON, MASSACHUSETTS

.0 5.

:3 7:

P

M

WIDETT LAYOVER FACILITY

DP1 - DEMOLITION & SIX LAYOVER TRACKS

c:

\U se rs

\p al m er tg \D

C \A

C C

D oc s\ st v in co rp or at ed \4

-w id et t l ay ov er fa ci lit y\ pr oj ec t f ile s\

_b im _c ad \D

P1 \1

4_ E_

El ec tri ca l\D P1

_E -2

(U til C oo rd

).d w g

ONE FINANCIAL CENTER,

8TH FLOOR,

BOSTON, MA 02111

(617) 482-7298 www.stvinc.com

ISSUE

BY

CHECK

BY

DESIGN

BY PLAN NO:SCALE:

DRAWN

SHEET:DATE:

MASSACHUSETTS BAY

TRANSPORTATION AUTHORITY

Project ManagerDateManager of Design Date

REV.

NO

DATE DESCRIPTION BY

100% DESIGN

SUBMISSION

NOT AUTHORIZED

FOR CONSTRUCTION

40'

SCALE: 1"=40'

40' 020'

N

MATCHLINE - SEE SHEET E-202

KEY PLAN

N

E-201

E-202 E-203

YP-SB42

YP-SB43

FOODMART ROAD

W

IDETT CIRCLE

1-63

FOODMART ROAD

SL SL SL SL SL SL

SL

SL

SL

E

E/C

E/C E/C E/C E/C E/C E/C

E

E/C

E E

E/CC C C C C

C

C

C

C

C

C

E

E

E

E/C E/C E/C

E E E

E

E/C/SG

E/C/SG

E/C/SG

E/C/SG

C

E/C

E/ C

E

484950515253545556

S

S

S

S S

S

W

W W W W W W W W W W W W

W

G

G G G G G

GG G G G G

G

G

G

W

W

W

W

W

D

D

D

D

D

D

D D

D

D

G G

G

G

G G G

D

D

D

D

D

D

D

D

D

D

D

D

D D

D

G G

D

S

C C C

C

C

C

C

C

C

C

C

C

C

C C

C

DTMF7

DTMF6

SIH

HH

HH

HH

WIDETT CIRCLE

REM EX LP

REM EX LP

REM EX LP

REM EX LP

REM EX LP COORDINATE REMOVAL OF THE

BTD CABINET. RETURN TO

BTD.

MH23585 EX REM

REM EX LP

REM EX LP

(SEE NOTE 4)

COORDINATE

REMOVAL OF

THE BTD CABINET.

RETURN TO

BTD. (SEE NOTE 3)

PROPOSED STREETLIGHTING

HANDHOLE. (SEE NOTE 4)

REM EX LP

EX REM. 500 KVA

EVERSOURCE TRANSFORMER

PROPOSED MBTA

STREET LIGHTING

CABINET

EX PMH263 REM

EX PMH16061 REM

EX PMH10557 REM

EX PMH264 REM

EX PMH22412

REM

EX PMH836 REM

EX PMH265 REM

EX MH23584 REM

MH23584 EX REM

EX METER LOCATED INSIDE

NORTHEAST OF BLDG, REM.

SEE NOTE 7 ON E-201.

EXISTING EVERSOURCE DUCTBANK

TO AMTRAK FEEDER TO REMAIN

TIE PROPOSED

EVERSOURCE

EV-WC1 FEEDER

CONDUITS INTO

XMH5731

MH-EV03

EV-WC02

EV-WC03

MH-MP03

MH-MP04

MP-WC03

MP-WC04

MH-MP09

MP-WC04AMP-WC04B

MP-WC04B

MP-WC09A

MP-WC09B

MP-WC09C

MP-WC04C

MP-WC03B

MP-WC03A

MP-WC04D

EXISTING DORCHESTER

BROOK CONDUIT

(APPROXIMATE LOCATION)

EXISTING WARMING SHED

EXISTING WARMING TRACK

EXISTING BWSCB-STREET CULVERT

E-202

ELECTRIC UTILITIES COORDINATION LAYOUT

AS NOTED

WH 3/27/2026 AR SD

MASSACHUSETTS BAY TRANSPORTATION AUTHORITY

PL

O

TT

ED

D

R

AW

IN

G

MBTA CONTRACT NO. F60PS01

BOSTON, MASSACHUSETTS

.0 5.

:3 8:

P

M

WIDETT LAYOVER FACILITY

DP1 - DEMOLITION & SIX LAYOVER TRACKS

c:

\U se rs

\p al m er tg \D

C \A

C C

D oc s\ st v in co rp or at ed \4

-w id et t l ay ov er fa ci lit y\ pr oj ec t f ile s\

_b im _c ad \D

P1 \1

4_ E_

El ec tri ca l\D P1

_E -2

(U til C oo rd

).d w g

ONE FINANCIAL CENTER,

8TH FLOOR,

BOSTON, MA 02111

(617) 482-7298 www.stvinc.com

ISSUE

BY

CHECK

BY

DESIGN

BY PLAN NO:SCALE:

DRAWN

SHEET:DATE:

MASSACHUSETTS BAY

TRANSPORTATION AUTHORITY

Project ManagerDateManager of Design Date

REV.

NO

DATE DESCRIPTION BY

100% DESIGN

SUBMISSION

NOT AUTHORIZED

FOR CONSTRUCTION

40'

SCALE: 1"=40'

40' 020'

N

MATCHLINE - SEE SHEET E-201

NOTES

1. FOR LEGEND NOTES AND ABBREVIATIONS, SEE SHEET E-001.

MATC

HLIN

E - S

EE S

HEET E

-20

M

AT

C H

LI

N

E

- S

EE

S

H

EE

T E-

KEY PLAN

N

E-201

E-203E-202

FOR INFORMATION ONLY

WIDETT

CIRCLE

WIDETTT CIRCLE

E

E

E

E/C/SG

E/C/SG

E/C/SG

E/C/SG

E/C/SG

E/C/SG

E/C/SG

E/C/SG

E/C

E

E

E

S

G G

G

G G

G

D

D

D

D

D

D

D

D D

D

D

G G

G

FO

CM

CM

FO

FO

FO

C

C

C

DTMF7

DTMF6

DTMF4

DTMF2

DTMF3

DTMF1

DTMF5

SIH

HH

HH

HH

HH

HH

COORDINATE

REMOVAL OF

THE BTD CABINET.

RETURN TO

BTD. (SEE NOTE 3)

EVERSOURCE HAS NO RECORD

OF EQUIPMENT. ASSUMED TO BE

CUSTOMER OWNED. EX RMN

EX PMH3343 RMN

EX PMH3342 RMN

EX PMH920 RMN

EX PMH10215

RMN

EX PMH10214 RMN

EX METER LOCATED INSIDE

NORTHEAST OF BLDG, REM.

SEE NOTE 7 ON E-201.

MH-EV03

MH-EV04

EV-WC02

EV-WC03

EV-WC03

EV-WC04

MP-WC03B

MP-WC03A

INSTALL EV-WC04 INTO

MH23687. COORDINATE

WITH EVERSOURCE THE

EXACT CONNECTION POINT

EXISTING BWSC

B-STREET CULVERT

EXISTING DORCHESTER

BROOK CONDUIT

EXISTING AMTRAK WET LOOP TRACK

EXISTING AMTRAK WET LOOP TRACK

EXISTING MOW TRACKS

EXISTING WARMING TRACK

E-203

AS NOTED

MASSACHUSETTS BAY TRANSPORTATION AUTHORITY

PL

O

TT

ED

D

R

AW

IN

G

MBTA CONTRACT NO. F60PS01

BOSTON, MASSACHUSETTS

.0 5.

:3 9:

P

M

WIDETT LAYOVER FACILITY

DP1 - DEMOLITION & SIX LAYOVER TRACKS

c:

\U se rs

\p al m er tg \D

C \A

C C

D oc s\ st v in co rp or at ed \4

-w id et t l ay ov er fa ci lit y\ pr oj ec t f ile s\

_b im _c ad \D

P1 \1

4_ E_

El ec tri ca l\D P1

_E -2

(U til C oo rd

).d w g

ONE FINANCIAL CENTER,

8TH FLOOR,

BOSTON, MA 02111

(617) 482-7298 www.stvinc.com

ISSUE

BY

CHECK

BY

DESIGN

BY PLAN NO:SCALE:

DRAWN

SHEET:DATE:

MASSACHUSETTS BAY

TRANSPORTATION AUTHORITY

Project ManagerDateManager of Design Date

REV.

NO

DATE DESCRIPTION BY

100% DESIGN

SUBMISSION

NOT AUTHORIZED

FOR CONSTRUCTION

40'

SCALE: 1"=40'

40' 020'

N

MAT

CHLIN

E

- S

EE

S

HEE

T

E-

NOTES

1. FOR LEGEND NOTES AND ABBREVIATIONS, SEE SHEET E-001.

ELECTRIC UTILITIES COORDINATION LAYOUT

WH AR SD

M

ATC

H

LIN

E - SEE SH

EET E-202

KEY PLAN

N

E-201

E-202 E-203

3/27/2026

FOR INFORMATION ONLY

File details come from the government source that posted it. Updated .