About this file

Summary of IFB #10A2902 Addendum One

This is an addendum to an Invitation for Bid issued by the California Department of Transportation (Caltrans), Division of Procurement and Contracts, for Fire Alarm Services in San Joaquin County. The contract requires contractors to provide fire alarm monitoring and maintenance services on an on-call, as-needed basis at two locations: Lodi Maintenance Station (845 East Pine Street, Lodi, CA 95240) and Stockton Maintenance Station (312 South Lincoln Street, Stockton, CA 95203). The primary scope of work includes removing and replacing one fire alarm system at Lodi MS with a new fully functional system within 60 days of Fire Marshal approval, along with ongoing maintenance and repair services at both locations. The revised bid submission deadline is March 26, 2026, at 2:00 p.m., with bid opening scheduled for 2:30 p.m. on the same date. Optional site inspections are scheduled for March 18, 2026, with separate times for each location (12:30 p.m. at Stockton Landscape and 1:30 p.m. at Lodi MS). The agreement will commence on April 1, 2026, and expire on March 31, 2029. Routine services shall be provided during normal business hours (Monday through Friday, 8:00 a.m. to 5:00 p.m.), while non-routine services may be provided outside these hours as specified by the Caltrans Contract Manager.

The bid proposal must include pricing for four line items: 100 hours of routine services, 100 hours of non-routine services, one complete fire alarm system replacement, and 50 hours of routine inspections and monitoring. The total bid proposal cannot exceed $461,000. Contractors must possess a valid C-10 Electrical Contractor license and an Alarm Company Operator (ACO) license, with current registration with the Department of Industrial Relations. A 3% Disabled Veteran Business Enterprise (DVBE) participation requirement applies to this solicitation, and a 5% small business preference is available to certified small businesses. Prior to commencing work on service requests exceeding $25,000, contractors must provide a payment bond equal to 100% of the service request price. All parts and workmanship must be guaranteed against defect or failure for a minimum of one year from satisfactory completion. Commercial general liability insurance with limits of not less than $1,000,000 per occurrence and $2,000,000 aggregate is required, along with workers' compensation, automobile liability, and employer's liability coverage.

View the file

Other files

File Type Posted
IFB_Solicitation_Package_07A6290.pdf PDF
Addendum_2_07A6290_Time_Extension.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CALIFORNIA STATE TRANSPORTATION AGENCY GAVIN NEWSOM, GOVERNOR

California Department of Transportation

ADMINISTRATION

DIVISION OF PROCUREMENT AND CONTRACTS

1727 30th STREET, MS 65

SACRAMENTO, CA 95816-7006

PHONE (916) 227-6000

TTY 711

https://dot.ca.gov/programs/procurement-and-contracts/

March 10, 2026

ADDENDUM ONE (1)

INVITATION FOR BID (IFB) #10A2902

FIRE ALARM SERVICES IN SAN JOAQUIN COUNTY

NOTICE TO ALL PROSPECTIVE BIDDERS:

Addendum No. 1 is being issued for the above-referenced IFB. Bids for this work shall be with the full understanding of this Addendum.

The Final Date for Bid Submission has been extended to March 26, 2026 Refer to the revised IFB Timeline below:

Event Date Time (Pacific Time)

IFB available to prospective bidders 02/24/2026

Written Question Submittal 03/03/2026 5:00 p.m.

Optional Site Inspection 03/18/2026 12:30 p.m.

Final Date and Time for Bid Submission 03/26/2026 2:00 p.m.

Bid Opening 03/26/2026 2:30 p.m.

Site Inspection A. An Optional Site Inspection is scheduled on March 18, 2026, for the purpose of discussing concerns regarding this IFB. Time scheduling per location are the following:

1) Stockton Landscape – 312 Lincoln Street, Stockton, CA 95203 – 12:30 p.m.

2) Lodi Maintenance Station (MS) – 845 East Pine Street, Lodi, CA 95240 – 1:30 p.m.

B. In the event a potential contractor is unavailable to attend the optional site inspection, an authorized representative may attend on its behalf. The representative may only sign in for one (1) company.

Subcontractors may not represent a potential prime contractor at Site Inspection.

C. For bidders who have and need assistance due to a physical impairment, a reasonable accommodation will be provided upon request for the Site Inspection. The bidder must call the designated Contract Analyst contact no later than the fifth (5th) working day prior to the scheduled date and time of the Site Inspection to arrange for a reasonable accommodation.

http://www.dot.ca.gov/dpac/

Revisions All revisions will be noted in red font.

Please refer to the attached Proposed Form of Agreement, Exhibit A, Revised Scope of Work.

Please refer to the attached Revised Attachment 1, Bid Proposal. All bids shall be submitted using the Revised Attachment 1, Bid Proposal. Bids received on the original Attachment 1 shall be deemed non-responsive.

Question and Answer Question 1:

Are there any drawings available for the current fire alarm system in place?

Answer 1:

No.

Question 2:

What is the model of the current system in place in the Stockton location?

Answer 2:

Bosch B921C.

Question 3:

Will there be a site walk made available for both locations?

Answer 3:

Yes.

Question 4:

For all panels to be monitored (not the replacement), please provide a make, model, and zone/points list?

Answer 4:

Please attend the optional pre-bid site inspection for details.

Question 5:

What are the ceiling heights and is a lift required to perform work over 19’?

Answer 5:

Please attend the optional pre-bid site inspection for details.

Question 6:

Are you expecting more non-routine hours on these projects and if so, can you explain the need?

Answer 6:

Please refer to the attached Revised Attachment 1, Bid Proposal.

Question 7:

Are you requesting 24/7 monitoring and a monthly price plus annual inspection, and if so, why is it at 50 hours instead of 36 months?

Answer 7:

Please refer to the attached Revised Attachment 1, Bid Proposal.

Question 8:

Due to current State Fire Marshall office wait times, may we get an extension on the 60 day requirement outlined in Exhibit A, Item 7?

Answer 8:

Please refer to the attached Proposed Form of Agreement, Exhibit A, Revised Scope of Work.

NOTE: ALL OTHER TERMS AND CONDITIONS SET FORTH IN THE INVITATION FOR BID, SHALL

REMAIN IN FULL FORCE AND EFFECT.

Sincerely, Matthew Stephens Contract Analyst

Contractor’s Name TBD Agreement Number 10A2902

Revised Exhibit A

Public Works - State

Scope of Work

1. Contractor agrees to provide to the California Department of Transportation (Caltrans) Fire

Alarm Monitoring and Maintenance as described herein:

Contractor agrees to provide, on an on-call, as needed basis, all necessary labor, tools, materials, and equipment necessary to provide maintenance of fire alarm systems, and to remove and replace one (1) fire alarm system in San Joaquin County.

2. The services shall be performed at the following locations in Calaveras, and San Joaquin Counties:

A. Lodi Maintenance Station (MS), 845 East Pine Street, Lodi, CA 95240 B. Stockton MS, 312 South Lincoln Street, Stockton, CA 95203

3. Any reference to Caltrans Contract Manager shall also include their designee.

4. This Agreement will commence on April 1, 2026 (estimate), or upon approval by Caltrans, whichever is later, and no work shall begin before that time. This Agreement is of no effect unless approved by Caltrans. Contractor shall not receive payment for work performed prior to approval of the Agreement and before receipt of notice to proceed by Caltrans Contract Manager. This Agreement will expire on March 31, 2029 (estimate). The routine services shall be provided during normal business hours Monday through Friday 8:00 a.m. to 5:00 p.m., excluding State holidays. The non-routine services shall be provided on days and times specified by Caltrans Contract Manager and may take place outside the normal business hours of Monday through Friday, 8:00 a.m. to 5:00 p.m., and on State holidays.

The parties may amend this Agreement as permitted by law.

5. All inquiries during the term of this Agreement will be directed to the project representatives listed below. Contractor shall provide advance written notice and receive advance written approval by Caltrans Contract Manager, without the necessity of an amendment, before changing the Project Manager noted below.

California Department of Transportation (Caltrans)

Contractor: TBD

Section/Unit: District 10/Maintenance Project Manager:

Caltrans Contract Manager: TBD

Address Address

Business Phone Number: Business Phone Number:

Email: Email:

Revised Exhibit A

Public Works - State

6. Assignment of Work A. Caltrans Contract Manager shall issue a Service Request via email to Contractor for routine and non-routine services. See Attachment 3, Service Request.

B. The Service Request shall include the following information:

1) Agreement Number 10A2902

2) Service Request Number

3) Date of Request

4) Contact name, requestor, and/or District Single Point of Contact (DSPOC)

5) Caltrans Contract Manager’s name

6) Prospective Date of Service

7) Type of Service (routine or non-routine)

8) Time of Service (day(s) and time(s))

9) Location Address of service

10) Specific Scope of Work to be performed under the Service Request, in accordance with the Scope of Work in this Exhibit A

11) Signatures of DSPOC and/or Caltrans Contract Manager

C. A Service Request may be classified as either of the following types:

1) Routine: work that requires maintenance and/or repair services where there is no immediate danger, no risk to public health, and no unsafe conditions posed to State property and/or employees.

2) Non-Routine: vital work that requires repair services to be done in order to limit imminent damage, or safety hazard of State property and/or employees.

D. Contractor shall respond to routine Service Requests within 48 hours of issuance. A non-routine Service Request shall be initiated first via phone call and shall be followed up with the written Service Request. Once contacted for non-routine services, Contractor shall have two (2) hours to respond to Caltrans Contract Manager.

7. Detailed Description of Work:

A. Lodi MS

1) Contractor shall provide all labor, equipment, parts, materials, licenses, permits, travel, drawings, designs, submittal, programming, and incidentals necessary to remove existing alarm system and install, connect, and activate a new fully functional fire alarm system within 60 days after plans are approved by the Fire Marshalls office. Contractor shall provide proof of submission of plans and submittals to the Fire Marshalls office within 30 days of execution of this Agreement.

2) Contractor shall install all devices and program fire alarm control panels to communicate with new devices, any automatic shutdown of existing air handling units, and all other related components for a complete and functional fire alarm system.

Revised Exhibit A

Public Works - State

3) Services for a complete installation include, but are not limited to, conduits, wiring heat sensors, strobes, smoke detectors, flow sensors, valve switches, switch for door closers and all signal and communications related to the fire alarm system.

Contractor shall furnish new fire alarm control panels, relays and any other components necessary to ensure the system automatically transmits trouble and alarm indicators.

4) Fire alarm system shall be equivalent to the existing and include at least 16 smoke detectors, six (6) emergency lighting devices, two (2) fire alarm pull switches, and eight (8) magnetic door releases.

5) Contractor shall coordinate the routing of all electrical conduits with Caltrans Contract Manager.

6) Contractor shall provide programming, final inspection, testing, and acceptance in phases.

7) Contractor shall provide operations and maintenance data and final as-built drawings at completion of the project.

8) Contractor shall verify the proper installation and operation of the fire alarm signals and reporting devices and test all components prior to Caltrans Contract Manager and Fire Marshall inspection.

9) Contractor shall provide testing acceptance and training to include:

a) Testing and Office of the State Fire Marshall Inspection and Approval.

b) Training for Caltrans Contract Manager and Caltrans staff.

B. Fire alarm system maintenance shall be provided as needed, upon request, as directed by Caltrans Contract Manager. Caltrans Contract Manager will contact Contractor to repair or replace components if they fail to operate properly. All repairs are to be preapproved by Caltrans Contract Manager prior to start of work.

C. Contractor shall respond to Caltrans Contract Manager for repair requests within 48 hours of being contacted. Contractor shall provide Caltrans Contract Manager with the name and phone number of the contact person from Contractor’s staff assigned to the repair, ensuring they can be reached within the 48-hour time limit.

D. Maintenance shall include resetting sensors or keypad if alarm goes off.

E. Contractor shall replace batteries, DCM0012 12 Volts 12 Amp Hours Non Spillable

Deep Cycle Battery, when needed.

F. Caltrans Contract Manager will contact Contractor via telephone or email to repair or replace the below components if they fail to operate properly. Caltrans Contract Manager will inspect all repairs or replacement of alarm components. Repairs shall be done to the following components:

1) Control panel.

2) Batteries.

3) Phone connection (including cellular).

4) Initiating devices.

Revised Exhibit A

Public Works - State

5) Notification devices.

6) Dual power supply.

7) Sprinkler system components including, valves, heads, piping and hangers, pressure gauges and alarm system.

8) Manage and monitor sprinkler system water flow.

9) Automatic door lock release system.

10) Manual Override Door Lock Switches.

8. Warranty All parts and Contractor workmanship shall be guaranteed against defect or failure by Contractor for a period of no less than one (1) year from the date of satisfactory completion of the repair. Repairs that are defective or have failed and is within a 365-calendar day period immediately following the satisfactory completion of the repair shall be corrected by Contractor within 24 hours after Contractor is notified or at no additional charge to Caltrans.

Repairs that are corrected shall be guaranteed for one (1) year from the date the repairs have been corrected. This one (1) year warranty period shall survive and remain in full force and effect past the termination or expiration date of this agreement.

9. General Contractor Responsibilities A. Contractor shall ensure that only qualified and competent employee(s) are permitted on the job site and that the work shall be safely performed by the highest industry standards, in the sole opinion of Caltrans Contract Manager. Contractor shall take all the necessary precautions to prevent injury or hazard to Caltrans employee(s), invitee(s) and/or the general public.

B. Contractor shall conduct its operation in such a manner as to avoid injury or damage to the property of Caltrans or any adjacent property.

C. Contractor shall avoid causing unreasonable inconvenience (in the sole opinion of Caltrans Contract Manager) to any person(s) doing business on Caltrans property. In the event Contractor’s operation creates a condition hazardous to Caltrans property, its occupants, or the general public, Contractor shall provide warning signs alerting to any dangerous conditions at Contractor’s own expense and without cost to Caltrans.

D. Contractor shall obtain and pay for all permits, licenses, registrations, and certificates required by local ordinances as applicable to this Agreement and its Exhibit A, Scope of Work.

E. No hazardous materials or waste shall be handled by Contractor. Contractor shall notify Caltrans Contract Manager of any hazardous materials immediately upon discovery.

10. Contractor Project Manager Responsibilities A. Contractor Project Manager shall coordinate work-related matters and Contractor’s operations under this Agreement.

B. In addition to other responsibilities described in this Agreement, Contractor Project

Manager shall be responsible for all matters related to Contractor’s personnel including, but not limited to, the following:

Revised Exhibit A

Public Works - State

1) Ensure deliverables meet the criteria established by the Agreement.

2) Supervise, review, monitor, train, and direct Contractor’s personnel.

3) Include Caltrans Contract Manager in written communications to other Caltrans personnel for any clarification on the Scope of Work.

4) Assign qualified personnel to complete the required work, as specified, in coordination with Caltrans Contract Manager.

5) Administer personnel actions for Contractor personnel.

6) Implement and maintain quality control procedures to ensure product and service accuracy.

7) Ensure all applicable safety measures are in place.

8) Provide invoices in a timely manner.

9) Review invoices for accuracy and completion before billing to Caltrans.

10) Ensure the schedules, deliverables and the deliverables’ requirements set forth in the Agreement are satisfied.

11) Ensure compliance with the provisions in this Agreement and all specific work requirements.

11. Discovery of Asbestos, Lead-based Paint, or Other Hazardous Substances/Material

A. If Contractor discovers or suspects asbestos, lead-based paint, or other known hazardous substances/materials in the area affected by the Agreement, Contractor must stop work immediately. Contractor shall verbally notify Caltrans Contract Manager of these findings immediately and confirm verbal notification in writing within 24 hours of the discovery. Contractor is not responsible for any work related to clean up or disposal of these substances.

B. Continuation of work shall not commence until Contractor has been authorized to do so in writing by Caltrans Contract Manager.

C. Should it become necessary to terminate the service request, Contractor shall be compensated only for work in progress or actually completed to Caltrans Contract Manager’s satisfaction. No payment shall be made for delay or lost profits anticipated for uncompleted work.

D. Failure to notify Caltrans Contract Manager of the discovery of asbestos, lead-based paint, or other hazardous substances/materials may result in immediate termination of the Agreement for default per Exhibit D, Termination. Contractor shall be responsible for all damages arising from failure to disclose the discovery of any hazardous substances.

12. Damages to State Property In the event that any Caltrans property is damaged as a result of the actions of Contractor, or its employees, Contractor shall repair, at its sole expense, the damage which has occurred as a direct result of Contractor, or its employees. Repair efforts must be performed in a manner which ensures all warranties are maintained for any products that are damaged.

Repair efforts shall include the full costs for all required labor and materials. If the repair

Revised Exhibit A

Public Works - State must be completed by an outside entity, Caltrans Contract Manager shall approve of who shall be hired to complete the work.

13. Code of Conduct Contractor and its employees shall be aware that they are working on Caltrans property and be courteous and respectful at all times. Contractor and its employees shall refrain from using loud voices, inappropriate language, and shall conduct themselves in a professional manner at all times. If Contractor’s employees display any behavior that Caltrans Contract Manager deems inappropriate or offensive, Caltrans Contract Manager shall have the right to remove that employee from doing further work on this Agreement.

14. Final Clean Up A. Contractor shall leave the work site in a neat and clean condition. Contractor shall clean and keep the area in an orderly, safe, and clean condition including, but not limited to, spills and smudges. If work site is not left in a clean and orderly condition, Contractor shall be called back to correct the condition at no extra charge to Caltrans. Contractor must respond within a 24-hour period following the request to correct any unacceptable condition, unless instructed otherwise by Caltrans Contract Manager.

B. Contractor shall own and assume all responsibility for litter, waste, debris, and similar materials arising from or produced by the work performed under this Agreement.

Contractor shall haul away and legally discard any materials or debris caused by its work actions from the job site.

C. Contractor’s bid shall include the cost to dispose of the discarded materials and Contractor shall be responsible for such disposal cost.

15. Inspection and Acceptance for Payment It is the responsibility of Contractor to notify Caltrans Contract Manager that the work is complete and ready for inspection. Work is subject to inspection and acceptance by Caltrans Contract Manager. Caltrans Contract Manager shall have the ultimate responsibility and authority to determine whether Contractor’s satisfied Contractor’s duties and obligations under the Agreement, including specifically whether Contractor delivered all work product and deliverables and whether Contractor’s work product and deliverables satisfied all of the applicable contract requirements. Approval of work constitutes approval for payment and not transference or termination of Contractor’s responsibility to perform work in accordance with the terms of the Agreement, and any work that needs corrections shall be at Contractor's sole cost and expense in a timely manner. Regardless of any prior inspections and acceptances of work during the term of this Agreement, all work is subject to final inspection and approval by Caltrans Contract Manager. Failure to complete work, as required by this Agreement, shall be considered grounds for termination of this Agreement for default, per Exhibit D, Termination.

16. Waste Disposal Prior to the commencement of waste disposal, Contractor must adhere to the provisions highlighted in Senate Bill 1383 (Lara) of 2016 Title 14, CCR, General Provisions section 18981.2, Public Resources Code sections 42652 et. Seq.

STATE OF CALIFORNIA ∙ DEPARTMENT OF TRANSPORTATION Agreement Number 10A2902 BID PROPOSAL Page 1 of 1 ADM-1412 (REV. 9/2025) Revised Attachment 1

Contractor’s Name (Please Print):

Item Number

Estimated Quantity

Unit of Measure Item

Unit Price (Price Per Unit of

Measure)

Total (Estimated Quantity

X Unit Price)

1 100 Hours

All labor, tools, materials, travel, vehicles, incidentals, and testing equipment necessary for performing all Routine services to check out, test, service, repair, and adjust fire alarm systems for proper performance and operation, as described in Exhibit A, Scope of Work.

2 100 Hours

All labor, tools, materials, travel, vehicles, incidentals, and testing equipment necessary for performing all Non-Routine services for proper performance and operation as described in Exhibit A, Scope of Work.

3 1 Each

All labor, tools, materials, travel, vehicles, incidentals, and testing equipment necessary to remove and replace operational fire alarm system as described in Exhibit A, Scope of Work.

4 50 Hours All labor, tools, materials, travel, vehicles, incidentals, and testing equipment necessary to provide routine inspections monitoring as described in Exhibit A, Scope of Work.

1) The above quantities are estimates only and are given as a basis for comparison of bids. No guarantee is made or implied as to the exact quantity that will be needed.

2) In case of discrepancy between the unit price and the total set forth for a unit basis item, the unit price shall prevail.

3) Do not alter, modify, or change this bid proposal sheet. Any alterations, modifications, or changes to this bid proposal sheet will be grounds to reject the bid.

4) Each line item must be bid. Do not leave any unit price column blank or this bid proposal sheet will be deemed non-responsive.

Total This Proposal $

Matthew Stephens Cross-Out

Matthew Stephens Cross-Out

STD 213 Exhibits 10A2902 - Revised.pdf
1. Contractor agrees to provide to the California Department of Transportation (Caltrans) Fire Alarm Monitoring and Maintenance as described herein:
Contractor agrees to provide, on an on-call, as needed basis, all necessary labor, tools, materials, and equipment necessary to provide maintenance of fire alarm systems, and to remove and replace one (1) fire alarm system in San Joaquin County.
2. The services shall be performed at the following locations in Calaveras, and San Joaquin Counties:
A. Lodi Maintenance Station (MS), 845 East Pine Street, Lodi, CA 95240
B. Stockton MS, 312 South Lincoln Street, Stockton, CA 95203
3. Any reference to Caltrans Contract Manager shall also include their designee.
4. This Agreement will commence on April 1, 2026 (estimate), or upon approval by Caltrans, whichever is later, and no work shall begin before that time. This Agreement is of no effect unless approved by Caltrans. Contractor shall not receive payment f...
5. All inquiries during the term of this Agreement will be directed to the project representatives listed below. Contractor shall provide advance written notice and receive advance written approval by Caltrans Contract Manager, without the necessity o...
6. Assignment of Work
7. Detailed Description of Work:
A. Lodi MS
1) Contractor shall provide all labor, equipment, parts, materials, licenses, permits, travel, drawings, designs, submittal, programming, and incidentals necessary to remove existing alarm system and install, connect, and activate a new fully function...
2) Contractor shall install all devices and program fire alarm control panels to communicate with new devices, any automatic shutdown of existing air handling units, and all other related components for a complete and functional fire alarm system.
3) Services for a complete installation include, but are not limited to, conduits, wiring heat sensors, strobes, smoke detectors, flow sensors, valve switches, switch for door closers and all signal and communications related to the fire alarm system....
4) Fire alarm system shall be equivalent to the existing and include at least 16 smoke detectors, six (6) emergency lighting devices, two (2) fire alarm pull switches, and eight (8) magnetic door releases.
5) Contractor shall coordinate the routing of all electrical conduits with Caltrans Contract Manager.
6) Contractor shall provide programming, final inspection, testing, and acceptance in phases.
7) Contractor shall provide operations and maintenance data and final as-built drawings at completion of the project.
8) Contractor shall verify the proper installation and operation of the fire alarm signals and reporting devices and test all components prior to Caltrans Contract Manager and Fire Marshall inspection.
9) Contractor shall provide testing acceptance and training to include:
a) Testing and Office of the State Fire Marshall Inspection and Approval.
b) Training for Caltrans Contract Manager and Caltrans staff.
B. Fire alarm system maintenance shall be provided as needed, upon request, as directed by Caltrans Contract Manager. Caltrans Contract Manager will contact Contractor to repair or replace components if they fail to operate properly. All repairs are t...
C. Contractor shall respond to Caltrans Contract Manager for repair requests within 48 hours of being contacted. Contractor shall provide Caltrans Contract Manager with the name and phone number of the contact person from Contractor’s staff assigned t...
D. Maintenance shall include resetting sensors or keypad if alarm goes off.
E. Contractor shall replace batteries, DCM0012 12 Volts 12 Amp Hours Non Spillable Deep Cycle Battery, when needed.
F. Caltrans Contract Manager will contact Contractor via telephone or email to repair or replace the below components if they fail to operate properly. Caltrans Contract Manager will inspect all repairs or replacement of alarm components. Repairs shal...
1) Control panel.
2) Batteries.
3) Phone connection (including cellular).
4) Initiating devices.
5) Notification devices.
6) Dual power supply.
7) Sprinkler system components including, valves, heads, piping and hangers, pressure gauges and alarm system.
8) Manage and monitor sprinkler system water flow.
9) Automatic door lock release system.
10) Manual Override Door Lock Switches.
8. Warranty
All parts and Contractor workmanship shall be guaranteed against defect or failure by Contractor for a period of no less than one (1) year from the date of satisfactory completion of the repair. Repairs that are defective or have failed and is within ...
9. General Contractor Responsibilities
A. Contractor shall ensure that only qualified and competent employee(s) are permitted on the job site and that the work shall be safely performed by the highest industry standards, in the sole opinion of Caltrans Contract Manager. Contractor shall ta...
B. Contractor shall conduct its operation in such a manner as to avoid injury or damage to the property of Caltrans or any adjacent property.
C. Contractor shall avoid causing unreasonable inconvenience (in the sole opinion of Caltrans Contract Manager) to any person(s) doing business on Caltrans property. In the event Contractor’s operation creates a condition hazardous to Caltrans propert...
D. Contractor shall obtain and pay for all permits, licenses, registrations, and certificates required by local ordinances as applicable to this Agreement and its Exhibit A, Scope of Work.
E. No hazardous materials or waste shall be handled by Contractor. Contractor shall notify Caltrans Contract Manager of any hazardous materials immediately upon discovery.
10. Contractor Project Manager Responsibilities
A. Contractor Project Manager shall coordinate work-related matters and Contractor’s operations under this Agreement.
B. In addition to other responsibilities described in this Agreement, Contractor Project Manager shall be responsible for all matters related to Contractor’s personnel including, but not limited to, the following:
1) Ensure deliverables meet the criteria established by the Agreement.
2) Supervise, review, monitor, train, and direct Contractor’s personnel.
3) Include Caltrans Contract Manager in written communications to other Caltrans personnel for any clarification on the Scope of Work.
4) Assign qualified personnel to complete the required work, as specified, in coordination with Caltrans Contract Manager.
5) Administer personnel actions for Contractor personnel.
6) Implement and maintain quality control procedures to ensure product and service accuracy.
7) Ensure all applicable safety measures are in place.
8) Provide invoices in a timely manner.
9) Review invoices for accuracy and completion before billing to Caltrans.
10) Ensure the schedules, deliverables and the deliverables’ requirements set forth in the Agreement are satisfied.
11) Ensure compliance with the provisions in this Agreement and all specific work requirements.
11. Discovery of Asbestos, Lead-based Paint, or Other Hazardous Substances/Material
A. If Contractor discovers or suspects asbestos, lead-based paint, or other known hazardous substances/materials in the area affected by the Agreement, Contractor must stop work immediately. Contractor shall verbally notify Caltrans Contract Manager o...
B. Continuation of work shall not commence until Contractor has been authorized to do so in writing by Caltrans Contract Manager.
C. Should it become necessary to terminate the service request, Contractor shall be compensated only for work in progress or actually completed to Caltrans Contract Manager’s satisfaction. No payment shall be made for delay or lost profits anticipated...
D. Failure to notify Caltrans Contract Manager of the discovery of asbestos, lead-based paint, or other hazardous substances/materials may result in immediate termination of the Agreement for default per Exhibit D, Termination. Contractor shall be res...
12. Damages to State Property
In the event that any Caltrans property is damaged as a result of the actions of Contractor, or its employees, Contractor shall repair, at its sole expense, the damage which has occurred as a direct result of Contractor, or its employees. Repair effor...
13. Code of Conduct
Contractor and its employees shall be aware that they are working on Caltrans property and be courteous and respectful at all times. Contractor and its employees shall refrain from using loud voices, inappropriate language, and shall conduct themselve...
14. Final Clean Up
A. Contractor shall leave the work site in a neat and clean condition. Contractor shall clean and keep the area in an orderly, safe, and clean condition including, but not limited to, spills and smudges. If work site is not left in a clean and orderly...
B. Contractor shall own and assume all responsibility for litter, waste, debris, and similar materials arising from or produced by the work performed under this Agreement. Contractor shall haul away and legally discard any materials or debris caused b...
C. Contractor’s bid shall include the cost to dispose of the discarded materials and Contractor shall be responsible for such disposal cost.
15. Inspection and Acceptance for Payment
It is the responsibility of Contractor to notify Caltrans Contract Manager that the work is complete and ready for inspection. Work is subject to inspection and acceptance by Caltrans Contract Manager. Caltrans Contract Manager shall have the ultimate...
16. Waste Disposal
Prior to the commencement of waste disposal, Contractor must adhere to the provisions highlighted in Senate Bill 1383 (Lara) of 2016 Title 14, CCR, General Provisions section 18981.2, Public Resources Code sections 42652 et. Seq.
1. Invoicing and Payment
A. For services satisfactorily rendered and approved by Caltrans Contract Manager, and upon receipt and approval of the invoices, Caltrans agrees to compensate Contractor in accordance with the Bid Proposal, Attachment 1, and this Exhibit B. Incomplet...
B. Invoice(s) shall be itemized in accordance with Bid Proposal, Attachment 1, and shall be signed and submitted in triplicate not more frequently than monthly in arrears of the service.
C. Each invoice shall include:
1) Agreement Number 10A2902
2) Dates of Service
3) Location of Service
4) Hourly Rates
5) Description of Work Performed
6) Copy(ies) of Service Requests
D. Each invoice shall be submitted in triplicate to:
E. Contractor shall submit a certified copy of all payroll records for verification by Caltrans Contract Manager and/or designee with each invoice. Delinquent or inadequate certified payrolls or other required documents will result in the withholding ...
2. Budget Contingency Clause
A. It is mutually understood between the parties that this Agreement may have been written before ascertaining the availability of congressional or legislative appropriation of funds, for the mutual benefit of both parties in order to avoid program an...
B. This Agreement is valid and enforceable only if sufficient funds are made available to Caltrans by United States Government or California State Legislature for the purpose of this program. In addition, this Agreement is subject to any additional re...
C. It is mutually agreed that if Congress or State Legislature does not appropriate sufficient funds for the program, Agreement shall be amended to reflect any reduction in funds.
D. Pursuant to Government Code Section 927.13, no late payment penalty shall accrue during any time period for which there is no Budget Act in effect, nor on any payment or refund that is the result of a federally mandated program or that is directly ...
E. Caltrans has the option to terminate the Agreement under the 30-day termination clause or to amend the Agreement to reflect any reduction of funds.
3. Prompt Payment Clause
A. Payment will be made in accordance with, and within the time specified in, Government Code, Chapter 4.5, commencing with Section 927 and all agreements must comply with Public Contract Code Sections 10262 and 10262.5.
B. Pursuant to Public Contract Code Section 10262, Contractor shall pay its Subcontractor(s) within seven (7) calendar days from receipt of each payment made to Contractor by Caltrans.
C. Failure of Contractor adhering to Public Contract Code Section 10262 may result in termination of this Agreement per Public Contract Code Section 10253 and disciplinary action by the Contractors State License Board may be implemented.
4. Cost Limitation
A. Total amount of this Agreement shall not exceed $TBD.
B. It is understood and agreed that this total is an estimate, and that Caltrans will pay only for those services actually rendered as authorized by Caltrans Contract Manager up to the total amount set forth in Section 4A, above.
5. Excise Tax
6. Costs Included in Bid Rates
A. The cost of employer payments to or on behalf of employees, subsistence, travel, compensation insurance premiums, unemployment contributions, social security taxes, Agreement bond premiums, and any other taxes or assessments including sales and use...
B. Contractor shall make travel and subsistence payments to each worker in compliance with Labor Code Sections 1773.1 and 1773.9. Travel and subsistence requirements are available on the of Department of Industrial Relations (DIR) website at https://w...
7. Cost Principles
A. Contractor agrees that the Contract Cost Principles and Procedures, 48 CFR, Part 31, and the Uniform Administrative Requirements, Cost Principles, and Audit Requirements for Federal Awards, in 2 CFR, Part 200, shall be used to determine the allowab...
B. Any costs for which payment has been made to Contractor that are determined by subsequent audit to be unallowable under 48 CFR Part 31 or 2 CFR Part 200 are subject to repayment by Contractor to Caltrans.
C. Any subcontract entered into as a result of this Agreement shall contain all the provisions of this clause.
8. Payroll Records
A. Contractor and each Subcontractor shall comply with the following provisions. Contractor shall be responsible for compliance by its Subcontractors.
1) Each Contractor and Subcontractor shall keep accurate payroll records and supporting documents as mandated by California Labor Code Section 1776 and as defined in Section 16000 of Title 8 of the California Code of Regulations, showing the name, add...
2) The payroll records enumerated under paragraph 1, above, shall be certified. The certified payrolls and records related to employee wages, fringe benefits, payroll tax and deductions shall be available for inspection and copying by Caltrans represe...
3) Each Contractor shall submit a certified copy of the records enumerated in paragraph 1, above, to the entity that requested the records within 10 days after receipt of a written request.
4) Any copy of records made available for inspection as copies and furnished upon request to the public or any public agency by Caltrans shall be marked or obliterated in such a manner as to prevent disclosure of each individual's name, address and so...
5) Contractor shall inform Caltrans of the location of the records enumerated under paragraph 1, above, including the street address, city, and county, and shall, within five (5) working days, provide a notice of a change of location and address.
6) Contractor or Subcontractor shall have 10 days in which to comply subsequent to receipt of written notice requesting the records enumerated in paragraph 1, above. In the event Contractor or Subcontractor fails to comply within the 10-day period, th...
B. The penalties specified in paragraph 6, above, for noncompliance with the provisions of said Section 1776 will be deducted from any monies due or which may become due to Contractor. Penalties assessed for failure to submit certified payrolls are fo...
C. Payrolls shall contain the full name, address and social security number of each employee, the correct work classification (including apprentices, if applicable), rate of pay, daily and weekly number of hours worked, itemized deductions made, and a...
D. Contractor and each Subcontractor shall preserve their payroll records for a period of three (3) years from the date of completion of the Agreement.
E. Contractor shall submit a certified copy of all payroll records for verification by Caltrans Contract Manager and/or designee with each invoice. When progress payments are called for, Contractor shall submit a certified copy of all payroll records ...
F. Any subcontract entered into as a result of this Agreement shall contain all the provisions of this clause.
9. Penalty
A. Contractor and any Subcontractor under Contractor shall comply with Labor Code Sections 1774 and 1775. In accordance with said Labor Code Section 1775, Contractor shall forfeit, as a penalty to Caltrans, not more than two hundred dollars ($200) for...
B. The amount of this forfeiture shall be determined by Labor Commissioner and shall be based on consideration of the mistake, inadvertence, or neglect of Contractor or Subcontractor in failing to pay the correct rate of prevailing wages, or the previ...
C. If a worker employed by a Subcontractor on a public works project is not paid the general prevailing per diem wages by Subcontractor, Prime Contractor of the project is not liable for any penalties described above unless Prime Contractor had knowle...
1) The Agreement executed between Contractor and Subcontractor for the performance of work on the public works project shall include a copy of the provisions of Labor Code Sections 1771, 1775, 1776, 1777.5, 1813, and 1815.
2) Contractor shall monitor the payment of the specified general prevailing rate of per diem wages by the Subcontractor to the employees by periodic review of the certified payroll records of the Subcontractor.
3) Upon becoming aware of failure of Subcontractor to pay his or her workers the specific prevailing rate of wage, Contractor shall diligently take corrective action to halt or rectify the failure, including, but not limited, to retaining sufficient f...
4) Prior to making final payment to the Subcontractor for work performed on the public works project, Contractor shall obtain an affidavit signed under penalty of perjury for the Subcontractor that the Subcontractor has paid the specified general prev...
D. Pursuant to Labor Code Section 1775, Caltrans shall notify Contractor on a public works project within 15 days of receipt of a complaint that a Subcontractor has failed to pay workers the general prevailing rate of per diem wages.
E. If Caltrans determines that employees of a Subcontractor were not paid the general prevailing rate of per diem wages and if Caltrans did not retain sufficient money under the Agreement to pay those employees the balance of wages owed under the gene...
F. Any subcontract entered into as a result of this Agreement shall contain all the provisions of this clause.
10. State General Prevailing Wage Rates
A. Contractor agrees to comply with all the applicable provisions of the Labor Code including those provisions requiring the payment of not less than the general prevailing rate of wages. Contractor further agrees to the penalties and forfeitures prov...
B. Pursuant to Labor Code Section 1771.5, not less than general prevailing wage rate of per diem wages and general prevailing rate of per diem wages for holiday and overtime work for work of a similar character in the county in which the work is to be...
1) More than $25,000 for public works construction, or
2) More than $15,000 for the alteration, demolition, installation, repair, or maintenance of public works.

C. Any subcontract entered into as a result of this Agreement shall contain all of the provisions of this clause.

11. State Prevailing Wage Rate Determinations
A. The General Prevailing Wage Rate Determinations applicable to the project are available and on file with the Caltrans Regional/District Labor Compliance Office. These wage rate determinations are made a specific part of this Agreement by reference ...
B. General Prevailing Wage Rate Determinations applicable to this project may also be obtained from the DIR website at: https://www.dir.ca.gov/OPRL/DPreWageDetermination.htm.
C. After award of the Agreement, and prior to commencing work, all applicable General Prevailing Wage Rate Determinations are to be obtained by Contractor from DIR. These wage rate determinations are to be posted by Contractor at the job site in accor...
D. After the award of the Agreement, questions pertaining to predetermined wage rates should be directed to the Caltrans Labor Compliance Office:
Caltrans Headquarters Labor Compliance Office
1120 N Street, MS-44
Sacramento, CA 95814
Email: labor.compliance@dot.ca.gov
12. Hours of Labor
A. Eight (8) hours labor constitutes a legal day's work. Contractor shall forfeit, as a penalty to the State of California, twenty-five dollars ($25) for each worker employed in the execution of the Agreement by Contractor or any Subcontractor under C...
B. Any subcontract entered into as a result of this Agreement shall contain all the provisions of this clause.
13. Employment of Apprentices
A. Where the prime contract is $30,000 or more, Contractor and any Subcontractors under them shall comply with all applicable requirements of Labor Code Sections 1777.5, 1777.6 and 1777.7 in the employment of apprentices.
B. Contractors and Subcontractors are required to comply with all Labor Code requirements regarding the employment of apprentices, including mandatory ratios of journey level to apprentice workers. Prior to commencement of work, Contractors and Subcon...
C. Any subcontract entered into as a result of this Agreement shall contain all the provisions of this clause.
1. Settlement of Disputes
2. Termination
A. If, after award and execution of the Agreement, Contractor’s performance is unsatisfactory, the Agreement may be terminated immediately for default. Additionally, Contractor may be liable to Caltrans for damages including the difference between Con...
B. Caltrans reserves the right to terminate this Agreement for any or no cause upon 30 days’ written notice to Contractor. Upon such termination, no compensation shall be due or payable to Contractor except for compensation earned through the date of ...
C. The State may terminate this Agreement immediately for good cause. The term "good cause” may be defined as "impossibility of performance” or “frustration of purpose,” but does not include material breach, default, or termination without cause. In t...
D. In the event that the total Agreement amount is expended prior to the expiration date, Caltrans may, at its discretion, terminate this Agreement with 30 days’ notice to Contractor.
3. Retention of Records/Audits
A. For the purpose of determining compliance with Government Code Section 8546.7, Contractor and Subcontractors shall maintain all books, documents, papers, accounting records, and other evidence pertaining to the performance of the Agreement, includi...
B. Any subcontract entered into as a result of this Agreement shall contain all the provisions of this clause.
A. Nothing contained in this Agreement or otherwise, shall create any contractual relation between Caltrans and any Subcontractors, and no subcontract shall relieve Contractor of its responsibilities and obligations hereunder. Contractor agrees to be ...
B. Contractor shall perform the work contemplated with resources available within its own organization and no portion of the work shall be subcontracted, except for Subcontractors listed on the Bidder Declaration (GSPD-05-105), Attachment 2.
8. DVBE Participation (Required)
A. Contractor has complied with the requirements of Public Contract Code Sections 10115 et seq. DVBE participation requirements achieved are expressed as a percentage of the estimated dollar value of this Agreement, and are identified on the Bidder De...
B. The following participation requirement percentage is are Contractor’s commitment set forth in this Agreement based upon the estimated total dollar amount to be expended.*
9. Substitutions of DVBEs
A. Contractor shall simultaneously notify the DVBE and Caltrans Contract Manager of the intended substitution. The written notice shall contain the reasons for the substitution and be sent by certified mail. Contractor shall submit the following to Ca...
1) A copy of the written notice issued to the DVBE with proof of delivery. In the absence of proof of delivery, provide the certified mail receipts.
2) A copy of the DVBE’s consent or opposition to the substitution. In the absence of the consent or opposition, provide the returned and unopened certified mail.
3) The name and supplier number of the business being substituted and the name and supplier number of the proposed replacement. If a DVBE cannot be identified as a replacement, Contractor shall document the absence of DVBEs. This documentation shall i...
B. The DVBE shall have up to five (5) business days from the postmark date to consent or oppose the substitution. A copy of the DVBE’s reply shall be sent simultaneously by certified mail to Contractor and Caltrans Contract Manager.
C. When written oppositions to a substitution are filed, Caltrans shall grant the DVBE a hearing. The hearing notice shall be issued within five (5) business days from receipt of the opposition. If Caltrans grants the substitution, continue to G, below.
D. Caltrans Contract Manager shall submit the substitution request to DGS, OSDS:
1) The request must meet the criteria as specified above or Public Contract Code Section 4107 for Public Works.
2) The substitution request shall be accompanied by the hearing decision, when applicable.
E. The OSDS will respond to substitution requests within three (3) business days. The OSDS shall consent to the substitution of another DVBE in any of the following situations:
1) When the DVBE becomes bankrupt, insolvent or goes out of business.
2) When the DVBE does not perform as listed in the Bidder Declaration.
3) When the DVBE does not meet the bond requirements of Contractor.
4) When the DVBE’s name is incorrect due to an inadvertent clerical error. In the case of public works contracts, compliance with Public Contract Code Section 4107.5 is required.
5) When the DVBE is not licensed as required by any State of California regulatory agency.
6) When Caltrans, or its duly authorized officer, determines that the DVBE:
F. The DVBE substitution process shall not be used as an excuse for noncompliance with any provision of law. This includes, but is not limited to, the Subletting and Subcontracting Fair Practices Act (Pub. Cont. Code Sections 4100 et seq.) or any Agre...
G. Contractors who proceed with work pending a substitution decision may be subject to contract termination, recovery of damages under rights, remedies and penalties. This is outlined in Military and Veterans Code Section 999.9, Public Contract Code S...
H. Any DVBE firm acting/working under subcontract must be responsible for providing materials, supplies, equipment, or services, and must carry out its responsibility by actually performing, managing, or supervising the work involved that is normal fo...
I. Contractor shall maintain records of all subcontracts entered into with DVBE Subcontractors including records of materials purchased from DVBE suppliers. Such records shall show the name and address of each DVBE Subcontractor or supplier and the to...
11. Laws to be Observed
Contractor shall keep fully informed of all existing and future laws, including State and Federal, county and municipal ordinances and regulations including but not limited to Senate Bill 1383 of 2016 Title 14, CCR, General Provisions section 18981.2,...
12. Specific Legal References
Any reference to specific statutes, regulations, or other legal authority in this Agreement shall not relieve Contractor from the responsibility of complying with all existing and future laws, ordinances, regulations, orders, and decrees of bodies or ...
13. Equipment Indemnification
A. Contractor shall indemnify Caltrans for any claims against Caltrans for loss or damage to Contractor’s property or equipment during its use under this Agreement and shall, at Contractor’s own expense, maintain such fire, theft, liability, or other ...
B. Any subcontract entered into as a result of this Agreement shall contain all the provisions of this clause.
14. Force Majeure
Except for defaults of Subcontractors, neither party shall be liable to the other for any delay in, or failure of, performance, nor shall any such delay in, or failure of, performance constitute default, if such delay or failure is (directly or indire...

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .