This document is an Addendum to an Invitation for Bid (IFB) solicitation issued by the California Department of Water Resources (DWR) for geological exploration drilling well installation services on an as-needed basis across Sacramento County and Sacramento City. The anticipated term of the agreement is one (1) year with two (2) one (1) year options under the same terms and conditions. The scope of work includes sonic and mud-rotary drilling, well installation, development, and testing. Key quantities include 2,400 feet of sonic drilling, 10,500 feet of mud-rotary pilot hole drilling, and up to 8,250 feet of 3-inch monitoring well installation. The bid due date is not specified, but the addendum identifies changes to the original bid documents, including modifications to the bid sheet.

The bid sheet specifies unit prices and estimated quantities for various drilling, well installation, and testing activities. Pricing is provided for both the base term and two option years. There is no indication of any set-asides or incumbent contractor. The solicitation states that there is no guarantee of work under this contract, and unit prices will prevail over extended totals in the event of computational errors.

View the file

Other files

File Type Posted
Addendum_2_-_Answers.pdf PDF
IFB_10198510_Solicitation.pdf PDF
Intent_to_Award_Posting.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATE OF CALIFORNIA – CALIFORNIA NATURAL RESOURCES AGENCY GAVIN NEWSOM, Governor

DEPARTMENT OF WATER RESOURCES

715 P STREET, 7th FLOOR P.O. BOX 942836

SACRAMENTO, CA 94236-0001

INVITATION FOR BID

ADDENDUM # 1

SOLICITATION # 10198510

NOTICE TO PROSPECTIVE BIDDERS

MARCH 4, 2024

To All Prospective Bidders:

Attached for your review is Invitation for Bid #10198510, Addendum 1 which includes changes to the original solicitation issued on February 26, 2024.

Changes have been made to include the following language:

1. Notice to Prospective Bidders, second sentence (Page 1 of 98) Now reads as follows: The anticipated term of this agreement is one (1) year with two (2) one (1) year options under the same terms and conditions.

2. Attachment I, Bid Sheet (Page 19 of 98) and Attachment I, Bid Sheet – Option Year 1 (Page 24 of 98) are hereby replaced with the attached Addendum 1, Attachment I, Bid Sheet, Addendum 1, Attachment I, Bid Sheet – Option Year 1, and Addendum 1, Attachment I, Bid Sheet – Option Year 2 and must be completed and submitted with your proposal.

3. Exhibit E, Additional Provisions, 5. Option to Renew (page 85 of 98) Now reads as follows: The Department reserves the right to renew this Agreement for two (2) additional one (1) year terms under the same terms and conditions.

IFB# 10198510

ATTACHMENT I

BID SHEET

The estimated units indicated below will be used solely for computing the cost as a fair and equitable formula to determine the low bidder and is not binding on the contracting agency. However, the actual costs quoted below by the bidder shall be binding for the term of the Agreement.

The bidder hereby agrees to provide all labor, materials, licenses, permits, and transportation necessary to perform all services required for the foregoing titled work in accordance with the Scope of Work, Exhibit A. The rates listed on this Bid Sheet shall include every item of expense, direct and indirect, including taxes incidental to the specified rates.

The bidder is required to bid each item. Failure to indicate a dollar amount in any item will be grounds to reject the entire bid. A zero dollar ($0.00) amount listed for any and all items will be interpreted and understood by the State to mean that the bidder indicating a zero dollar amount shall perform any such services, up to and including the quantity indicated, at no cost to the state.

A. Sonic Drilling

Bid Item Description Unit

Price Unit Quantity Subtotal

A1 Mob / Demob Sonic Rig to Imperial County6 $ Each 1 $ A2 Mob Sonic Rig to next borehole $ Each 2 $ A3 Obtain Well Permit (Imperial County) $ Each 3 $ A4 Sonic Drilling1 $ Foot 2400 $

A5 (Continue from A4) Rate for Additional or Lesser Footage (Per Foot) $ Foot - $

A6 Discrete Depth GW sampling (hydropunch/simulprobe or equivalent) every 100 feet

$ Each 24 $

A7 Annular backfill materials (bentonite, sand, cement, pea gravel)4 $ Foot 2400 $

A8 (Continue from A7) Rate for Additional or Lesser Footage (Per Foot) $ Foot - $

A9 Skid-steer and hopper to move/spread cuttings $ Weekly 52 $ A10 Temporary Fencing for seven sites $ Weekly 104 $ A11 Portable Restroom $ Weekly 52 $ A12 Core boxes $ Each 150 $ A13 Light Tower5 $ Day $

A14 Containment and disposal of non-hazardous cuttings (Price per roll-off bin) (If needed) $ Each - $

A15 Sonic Rig Stand-by Time (Hourly) (If required) $ Hour - $ A16 Borehole Destruction (if required) $ Foot - $

A17 Towing Services (Contingent if drill rig or related equipment gets stuck) $ Each - $

A18 Water truck for water transport/dust suppression (if required) $ Day - $

ADDENDUM 1

B. Mud-Rotary Drilling

A19 Dozer or heavy equipment for road smoothing (if required) $ Day - $

A20 Overtime Rate > 8 working hours On-Site (if required) $ Hour - $

SECTION A TOTAL $

Bid Item Description Unit

Price Unit Quantity Subtotal

B1 Mob / Demob Mud-Rotary Rig to Imperial County6 $ Each 1 $

B2 Mob Mud-Rotary Rig directly to next site (not applicable between boreholes at same site) $ Each 4 $

B3 Obtain Well Permit (Imperial County) $ Each 15 $

B4 Drill and install 16-in I.D. X 0.25 Mild Steel Conductor Casing (100-ft) $ Foot 500 $

B5 (Continue from B4) Rate for Additional or Lesser Conductor Footage (Per Foot) $ Foot - $

B6 Drill and install 18-in to 20-in I.D. X 0.25 Mild Steel Conductor Casing (100-ft) $ Foot 1000 $

B7 (Continue from B6) Rate for Additional or Lesser Conductor Footage (Per Foot) $ Foot - $

B8 Install Cement Sanitary Seal (100-ft) $ Foot 1500 $

B9 (Continue from B8) Rate for Additional or Lesser Seal Footage (Per Foot) $ Foot - $

B10 Pilot Hole Drilling / sonic borehole cleanout (up to 10-inch diameter)1 $ Foot 10500 $

B11 (Continue from B10) Rate for Additional or Lesser Footage (Per Foot) $ Foot - $

B12

Borehole Geophysics (SP; 16-in. short normal and 64-in. long-normal resistivity; Natural Gamma-ray; Temperature; Laterolog 3 (focused resistivity - guard); Nuclear Magnetic Resonance; Borehole Deviation Survey) to 800 feet bgs

$ Each 5 $

B13 Ream EXPLORATORY PILOT HOLE to 14-in diameter (surface to 800-ft depth) $ Foot 10500 $

B14 (Continue from B13) Rate for Additional or Lesser Footage (Per Foot) $ Foot - $

B15 Ream EXPLORATORY PILOT HOLE to 16 to 18-in diameter (if needed) $ Foot 10500 $

B16 (Continue from B15) Rate for Additional or Lesser Footage (Per Foot) $ Foot - $

B17 Install triple nested monitoring well - 3" I.D. SCH 80 PVC Blank Casing2,3 $ Foot 8250 $

B18 (Continue from B17) Rate for Additional or Lesser Footage (Per Foot) $ Foot - $

B19 Install triple nested monitoring well - 3" I.D. SCH 80 PVC Screen2,3 $ Foot 1500 $

B20 (Continue from B19) Rate for Additional or Lesser Footage (Per Foot) $ Foot - $

B21 Monitoring Well - Annular backfill materials (bentonite, sand, cement)4 $ Foot 4000 $

B22 (Continue from B21) Rate for Additional or Lesser Footage (Per Foot) $ Foot - $

B23 Install extraction well - 8" I.D. SCH 80 PVC Blank Casing2,3 $ Foot 5500 $

B24 (Continue from B23) Rate for Additional or Lesser Footage (Per Foot) $ Foot - $

B25 Install extraction well - 8" I.D. SCH 80 PVC Screen2,3 $ Foot 1000 $

B26 (Continue from B25) Rate for Additional or Lesser Footage (Per Foot) $ Foot - $

B27 Production Well - Annular backfill materials (bentonite, sand, cement)4 $ Foot 6500 $

B28 (Continue from B27) Rate for Additional or Lesser Footage (Per Foot) $ Foot - $

B29 Initial well development (airlift and removal of drilling fluids from well casing and sounding tube) $ Day 75 $

B30 Above grade monument and 4 four-inch diameter crash bollards at each location (If needed) $ Each 15 $

B31 Equipment (backhoe/skid steer) to spread cuttings away from drill rig $ Day 520 $

B32 Deviation Survey $ Each 10 $ B33 Caliper Log $ Each 15 $ B34 Light Tower5 $ Day $ B35 Water truck for water transport/dust suppression $ Day - $ B36 Portable Restroom $ Weekly 104 $

B37 Mud-Rotary Rig Stand-by Time (Hourly) (if needed) $ Hour - $

B38 Overtime Rate > 8 working hours On-Site (if needed) $ Hour - $

B39 10-in dia Borehole Abandonment (if needed) $ Foot - $ B40 14-in dia Borehole Abandonment (if needed) $ Foot - $ B41 18-in dia Borehole Abandonment (if needed) $ Foot - $

B42 Towing Services (Contingent if drill rig or related equipment gets stuck) $ Each - $

SECTION B TOTAL $

C. Development and Testing

Bid Item Description Unit

Price Unit Quantity Subtotal

C1 Mob/Demob Well Development Rig $ Each 17 $

C2 Well Development (Monitoring and Production Wells) $ Day 340 $

C3 (Continue from C2) Rate for additional or lessor days $ Day - $

C4 Overtime Rate > 8 working hours On-Site (if needed) $ Hour - $

C5 Supply and install pump and conduct test in extraction wells (8-Hr Step-Drawdown; 24 Hr- Recovery)

$ Day 24 $

C6 Supply and install pump and conduct test in extraction wells (72-Hr Constant Rate; 24 Hr- Recovery)

$ Day 60 $

C7 Fluid Settling Tank (Includes mobilization and demobilization to each well site) (if needed) $ Month 12 $

C8 Washout of Settling Tanks $ lump sum 1 $

C9

Procurement, installation, operation, and removal of piping to transport aquifer testing fluids away from the proposed wells towards designated percolation areas (if needed) (Approximately 500 feet per location)

$ Feet 6000 $

C10 (Continue from C12) Rate increase for additional or lessor piping (Per Foot) $ Foot - $

C11 New pump and motor capable of 300 gpm with (800 feet of total dynamic head) (Installed in 8-inch diameter sch 80 PVC casing)

$ Each 14 $

C12 Installation and testing of new pumps and motors to 600 feet bgs in seven wells and 400 feet in seven wells.

$ Foot 7000 $

C13 (Continue from C15) Rate increase for additional or lessor piping and wiring (Per Foot) $ Foot - $

C14 Portable Restroom $ Weekly 85 $

SECTION C TOTAL $

Table A, B, & C Totals

SECTION A TOTAL $

SECTION B TOTAL $

SECTION C TOTAL $

Grand Total (A+B+C) $

Notes:

1. Overlapping segments of telescoped borehole will only be charged once for the initial footage advanced.

2. Projected MW screen intervals (700-800, 550-650, 400-500)

3. Centralizers to be installed on all casing at a minimum of 80-foot intervals.

4. Uncoated bentonite chips are not to be used as an annular material. Time-release pellets are acceptable.

5. Adequate lighting to be provided by drilling contractor to light work areas as needed.

6. Security to be provided at the driller's cost and discretion.

7. Contractor to provide estimated quantities for the following line items: A18 and B35

NO GUARANTEE OF WORK UNDER THIS CONTRACT.

In the event of computational error, unit prices will prevail over extended totals. The State will check bid calculations and recalculate bid totals.

I certify under penalty of perjury under the laws of the State of California, the foregoing is true and correct.

The Contractor’s signature, in ink, affixed hereon and dated will constitute a certification under the penalty of perjury under the laws of the State of California that the Contractor’s license number and expiration date are true and correct.

Company Name

Contractor’s License Number

Contractor’s License Expiration Date

Printed Name and Title of Bidder

Signature of Bidder Date

The estimated units indicated below will be used solely for computing the cost as a fair and equitable formula to determine the low bidder and is not binding on the contracting agency. However, the actual costs quoted below by the bidder shall be binding for the term of the Agreement.

The bidder hereby agrees to provide all labor, materials, licenses, permits, and transportation necessary to perform all services required for the foregoing titled work in accordance with the Scope of Work, Exhibit A. The rates listed on this Bid Sheet shall include every item of expense, direct and indirect, including taxes incidental to the specified rates.

The bidder is required to bid each item. Failure to indicate a dollar amount in any item will be grounds to reject the entire bid. A zero dollar ($0.00) amount listed for any and all items will be interpreted and understood by the State to mean that the bidder indicating a zero dollar amount shall perform any such services, up to and including the quantity indicated, at no cost to the state.

A. Sonic Drilling

Bid Item Description Unit

Price Unit Quantity Subtotal

A1 Mob / Demob Sonic Rig to Imperial County6 $ Each 1 $ A2 Mob Sonic Rig to next borehole $ Each 2 $ A3 Obtain Well Permit (Imperial County) $ Each 3 $ A4 Sonic Drilling1 $ Foot 2400 $

A5 (Continue from A4) Rate for Additional or Lesser Footage (Per Foot) $ Foot - $

A6 Discrete Depth GW sampling (hydropunch/simulprobe or equivalent) every 100 feet

$ Each 24 $

A7 Annular backfill materials (bentonite, sand, cement, pea gravel)4 $ Foot 2400 $

A8 (Continue from A7) Rate for Additional or Lesser Footage (Per Foot) $ Foot - $

A9 Skid-steer and hopper to move/spread cuttings $ Weekly 52 $ A10 Temporary Fencing for seven sites $ Weekly 104 $ A11 Portable Restroom $ Weekly 52 $ A12 Core boxes $ Each 150 $ A13 Light Tower5 $ Day $

A14 Containment and disposal of non-hazardous cuttings (Price per roll-off bin) (If needed) $ Each - $

A15 Sonic Rig Stand-by Time (Hourly) (If required) $ Hour - $ A16 Borehole Destruction (if required) $ Foot - $

A17 Towing Services (Contingent if drill rig or related equipment gets stuck) $ Each - $

A18 Water truck for water transport/dust suppression (if required) $ Day - $

ADDENDUM 1

ATTACHMENT I

BID SHEET – OPTION YEAR 1

A19 Dozer or heavy equipment for road smoothing (if required) $ Day - $

A20 Overtime Rate > 8 working hours On-Site (if required) $ Hour - $

SECTION A TOTAL $

Bid Item Description Unit

Price Unit Quantity Subtotal

B1 Mob / Demob Mud-Rotary Rig to Imperial County6 $ Each 1 $

B2 Mob Mud-Rotary Rig directly to next site (not applicable between boreholes at same site) $ Each 4 $

B3 Obtain Well Permit (Imperial County) $ Each 15 $

B4 Drill and install 16-in I.D. X 0.25 Mild Steel Conductor Casing (100-ft) $ Foot 500 $

B5 (Continue from B4) Rate for Additional or Lesser Conductor Footage (Per Foot) $ Foot - $

B6 Drill and install 18-in to 20-in I.D. X 0.25 Mild Steel Conductor Casing (100-ft) $ Foot 1000 $

B7 (Continue from B6) Rate for Additional or Lesser Conductor Footage (Per Foot) $ Foot - $

B8 Install Cement Sanitary Seal (100-ft) $ Foot 1500 $

B9 (Continue from B8) Rate for Additional or Lesser Seal Footage (Per Foot) $ Foot - $

B10 Pilot Hole Drilling / sonic borehole cleanout (up to 10-inch diameter)1 $ Foot 10500 $

B11 (Continue from B10) Rate for Additional or Lesser Footage (Per Foot) $ Foot - $

B12

Borehole Geophysics (SP; 16-in. short normal and 64-in. long-normal resistivity; Natural Gamma-ray; Temperature; Laterolog 3 (focused resistivity - guard); Nuclear Magnetic Resonance; Borehole Deviation Survey) to 800 feet bgs

$ Each 5 $

B13 Ream EXPLORATORY PILOT HOLE to 14-in diameter (surface to 800-ft depth) $ Foot 10500 $

B14 (Continue from B13) Rate for Additional or Lesser Footage (Per Foot) $ Foot - $

B15 Ream EXPLORATORY PILOT HOLE to 16 to 18-in diameter (if needed) $ Foot 10500 $

80 PVC Blank Casing2,3 $ Foot 8250 $

B18 (Continue from B17) Rate for Additional or Lesser Footage (Per Foot) $ Foot - $

B19 Install triple nested monitoring well - 3" I.D. SCH 80 PVC Screen2,3 $ Foot 1500 $

B20 (Continue from B19) Rate for Additional or Lesser Footage (Per Foot) $ Foot - $

B21 Monitoring Well - Annular backfill materials (bentonite, sand, cement)4 $ Foot 4000 $

B22 (Continue from B21) Rate for Additional or Lesser Footage (Per Foot) $ Foot - $

B23 Install extraction well - 8" I.D. SCH 80 PVC Blank Casing2,3 $ Foot 5500 $

B24 (Continue from B23) Rate for Additional or Lesser Footage (Per Foot) $ Foot - $

B25 Install extraction well - 8" I.D. SCH 80 PVC Screen2,3 $ Foot 1000 $

B26 (Continue from B25) Rate for Additional or Lesser Footage (Per Foot) $ Foot - $

B27 Production Well - Annular backfill materials (bentonite, sand, cement)4 $ Foot 6500 $

B28 (Continue from B27) Rate for Additional or Lesser Footage (Per Foot) $ Foot - $

B29 Initial well development (airlift and removal of drilling fluids from well casing and sounding tube) $ Day 75 $

B30 Above grade monument and 4 four-inch diameter crash bollards at each location (If needed) $ Each 15 $

B31 Equipment (backhoe/skid steer) to spread cuttings away from drill rig $ Day 520 $

B32 Deviation Survey $ Each 10 $ B33 Caliper Log $ Each 15 $ B34 Light Tower5 $ Day $ B35 Water truck for water transport/dust suppression $ Day - $ B36 Portable Restroom $ Weekly 104 $

B37 Mud-Rotary Rig Stand-by Time (Hourly) (if needed) $ Hour - $

B38 Overtime Rate > 8 working hours On-Site (if needed) $ Hour - $

B39 10-in dia Borehole Abandonment (if needed) $ Foot - $ B40 14-in dia Borehole Abandonment (if needed) $ Foot - $ B41 18-in dia Borehole Abandonment (if needed) $ Foot - $

B42 Towing Services (Contingent if drill rig or related

Bid Item Description Unit

Price Unit Quantity Subtotal

C1 Mob/Demob Well Development Rig $ Each 17 $

C2 Well Development (Monitoring and Production Wells) $ Day 340 $

C3 (Continue from C2) Rate for additional or lessor days $ Day - $

C4 Overtime Rate > 8 working hours On-Site (if needed) $ Hour - $

C5 Supply and install pump and conduct test in extraction wells (8-Hr Step-Drawdown; 24 Hr- Recovery)

$ Day 24 $

C6 Supply and install pump and conduct test in extraction wells (72-Hr Constant Rate; 24 Hr- Recovery)

$ Day 60 $

C7 Fluid Settling Tank (Includes mobilization and demobilization to each well site) (if needed) $ Month 12 $

C8 Washout of Settling Tanks $ lump sum 1 $

C9

Procurement, installation, operation, and removal of piping to transport aquifer testing fluids away from the proposed wells towards designated percolation areas (if needed) (Approximately 500 feet per location)

$ Feet 6000 $

C10 (Continue from C12) Rate increase for additional or lessor piping (Per Foot) $ Foot - $

C11 New pump and motor capable of 300 gpm with (800 feet of total dynamic head) (Installed in 8-inch diameter sch 80 PVC casing)

$ Each 14 $

C12 Installation and testing of new pumps and motors to 600 feet bgs in seven wells and 400 feet in seven wells.

$ Foot 7000 $

C13 (Continue from C15) Rate increase for additional or lessor piping and wiring (Per Foot) $ Foot - $

C14 Portable Restroom $ Weekly 85 $

SECTION C TOTAL $

Table A, B, & C Totals

SECTION A TOTAL $

SECTION B TOTAL $

1. Overlapping segments of telescoped borehole will only be charged once for the initial footage advanced.

2. Projected MW screen intervals (700-800, 550-650, 400-500)

3. Centralizers to be installed on all casing at a minimum of 80-foot intervals.

4. Uncoated bentonite chips are not to be used as an annular material. Time-release pellets are acceptable.

5. Adequate lighting to be provided by drilling contractor to light work areas as needed.

6. Security to be provided at the driller's cost and discretion.

7. Contractor to provide estimated quantities for the following line items: A18 and B35

NO GUARANTEE OF WORK UNDER THIS CONTRACT.

In the event of computational error, unit prices will prevail over extended totals. The State will check bid calculations and recalculate bid totals.

I certify under penalty of perjury under the laws of the State of California, the foregoing is true and correct.

The Contractor’s signature, in ink, affixed hereon and dated will constitute a certification under the penalty of perjury under the laws of the State of California that the Contractor’s license number and expiration date are true and correct.

Company Name

Contractor’s License Number

Contractor’s License Expiration Date

A. Sonic Drilling

Bid Item Description Unit

Price Unit Quantity Subtotal

A1 Mob / Demob Sonic Rig to Imperial County6 $ Each 1 $ A2 Mob Sonic Rig to next borehole $ Each 2 $ A3 Obtain Well Permit (Imperial County) $ Each 3 $ A4 Sonic Drilling1 $ Foot 2400 $

A5 (Continue from A4) Rate for Additional or Lesser Footage (Per Foot) $ Foot - $

A6 Discrete Depth GW sampling (hydropunch/simulprobe or equivalent) every 100 feet

$ Each 24 $

A7 Annular backfill materials (bentonite, sand, cement, pea gravel)4 $ Foot 2400 $

A8 (Continue from A7) Rate for Additional or Lesser Footage (Per Foot) $ Foot - $

A9 Skid-steer and hopper to move/spread cuttings $ Weekly 52 $ A10 Temporary Fencing for seven sites $ Weekly 104 $ A11 Portable Restroom $ Weekly 52 $ A12 Core boxes $ Each 150 $ A13 Light Tower5 $ Day $

A14 Containment and disposal of non-hazardous cuttings (Price per roll-off bin) (If needed) $ Each - $

A15 Sonic Rig Stand-by Time (Hourly) (If required) $ Hour - $ A16 Borehole Destruction (if required) $ Foot - $

A17 Towing Services (Contingent if drill rig or related equipment gets stuck) $ Each - $

A18 Water truck for water transport/dust suppression (if required) $ Day - $

ADDENDUM 1

ATTACHMENT I

BID SHEET – OPTION YEAR 2

The estimated units indicated below will be used solely for computing the cost as a fair and equitable formula to determine the low bidder and is not binding on the contracting agency. However, the actual costs quoted below by the bidder shall be binding for the term of the Agreement.

The bidder hereby agrees to provide all labor, materials, licenses, permits, and transportation necessary to perform all services required for the foregoing titled work in accordance with the Scope of Work, Exhibit A. The rates listed on this Bid Sheet shall include every item of expense, direct and indirect, including taxes incidental to the specified rates.

The bidder is required to bid each item. Failure to indicate a dollar amount in any item will be grounds to reject the entire bid. A zero dollar ($0.00) amount listed for any and all items will be interpreted and understood by the State to mean that the bidder indicating a zero dollar amount shall perform any such services, up to and including the quantity indicated, at no cost to the state.

A19 Dozer or heavy equipment for road smoothing (if required) $ Day - $

A20 Overtime Rate > 8 working hours On-Site (if required) $ Hour - $

SECTION A TOTAL $

Bid Item Description Unit

Price Unit Quantity Subtotal

B1 Mob / Demob Mud-Rotary Rig to Imperial County6 $ Each 1 $

B2 Mob Mud-Rotary Rig directly to next site (not applicable between boreholes at same site) $ Each 4 $

B3 Obtain Well Permit (Imperial County) $ Each 15 $

B4 Drill and install 16-in I.D. X 0.25 Mild Steel Conductor Casing (100-ft) $ Foot 500 $

B5 (Continue from B4) Rate for Additional or Lesser Conductor Footage (Per Foot) $ Foot - $

B6 Drill and install 18-in to 20-in I.D. X 0.25 Mild Steel Conductor Casing (100-ft) $ Foot 1000 $

B7 (Continue from B6) Rate for Additional or Lesser Conductor Footage (Per Foot) $ Foot - $

B8 Install Cement Sanitary Seal (100-ft) $ Foot 1500 $

B9 (Continue from B8) Rate for Additional or Lesser Seal Footage (Per Foot) $ Foot - $

B10 Pilot Hole Drilling / sonic borehole cleanout (up to 10-inch diameter)1 $ Foot 10500 $

B11 (Continue from B10) Rate for Additional or Lesser Footage (Per Foot) $ Foot - $

B12

Borehole Geophysics (SP; 16-in. short normal and 64-in. long-normal resistivity; Natural Gamma-ray; Temperature; Laterolog 3 (focused resistivity - guard); Nuclear Magnetic Resonance; Borehole Deviation Survey) to 800 feet bgs

$ Each 5 $

B13 Ream EXPLORATORY PILOT HOLE to 14-in diameter (surface to 800-ft depth) $ Foot 10500 $

B14 (Continue from B13) Rate for Additional or Lesser Footage (Per Foot) $ Foot - $

B15 Ream EXPLORATORY PILOT HOLE to 16 to 18-in diameter (if needed) $ Foot 10500 $

80 PVC Blank Casing2,3 $ Foot 8250 $

B18 (Continue from B17) Rate for Additional or Lesser Footage (Per Foot) $ Foot - $

B19 Install triple nested monitoring well - 3" I.D. SCH 80 PVC Screen2,3 $ Foot 1500 $

B20 (Continue from B19) Rate for Additional or Lesser Footage (Per Foot) $ Foot - $

B21 Monitoring Well - Annular backfill materials (bentonite, sand, cement)4 $ Foot 4000 $

B22 (Continue from B21) Rate for Additional or Lesser Footage (Per Foot) $ Foot - $

B23 Install extraction well - 8" I.D. SCH 80 PVC Blank Casing2,3 $ Foot 5500 $

B24 (Continue from B23) Rate for Additional or Lesser Footage (Per Foot) $ Foot - $

B25 Install extraction well - 8" I.D. SCH 80 PVC Screen2,3 $ Foot 1000 $

B26 (Continue from B25) Rate for Additional or Lesser Footage (Per Foot) $ Foot - $

B27 Production Well - Annular backfill materials (bentonite, sand, cement)4 $ Foot 6500 $

B28 (Continue from B27) Rate for Additional or Lesser Footage (Per Foot) $ Foot - $

B29 Initial well development (airlift and removal of drilling fluids from well casing and sounding tube) $ Day 75 $

B30 Above grade monument and 4 four-inch diameter crash bollards at each location (If needed) $ Each 15 $

B31 Equipment (backhoe/skid steer) to spread cuttings away from drill rig $ Day 520 $

B32 Deviation Survey $ Each 10 $ B33 Caliper Log $ Each 15 $ B34 Light Tower5 $ Day $ B35 Water truck for water transport/dust suppression $ Day - $ B36 Portable Restroom $ Weekly 104 $

B37 Mud-Rotary Rig Stand-by Time (Hourly) (if needed) $ Hour - $

B38 Overtime Rate > 8 working hours On-Site (if needed) $ Hour - $

B39 10-in dia Borehole Abandonment (if needed) $ Foot - $ B40 14-in dia Borehole Abandonment (if needed) $ Foot - $ B41 18-in dia Borehole Abandonment (if needed) $ Foot - $

B42 Towing Services (Contingent if drill rig or related

Bid Item Description Unit

Price Unit Quantity Subtotal

C1 Mob/Demob Well Development Rig $ Each 17 $

C2 Well Development (Monitoring and Production Wells) $ Day 340 $

C3 (Continue from C2) Rate for additional or lessor days $ Day - $

C4 Overtime Rate > 8 working hours On-Site (if needed) $ Hour - $

C5 Supply and install pump and conduct test in extraction wells (8-Hr Step-Drawdown; 24 Hr- Recovery)

$ Day 24 $

C6 Supply and install pump and conduct test in extraction wells (72-Hr Constant Rate; 24 Hr- Recovery)

$ Day 60 $

C7 Fluid Settling Tank (Includes mobilization and demobilization to each well site) (if needed) $ Month 12 $

C8 Washout of Settling Tanks $ lump sum 1 $

C9

Procurement, installation, operation, and removal of piping to transport aquifer testing fluids away from the proposed wells towards designated percolation areas (if needed) (Approximately 500 feet per location)

$ Feet 6000 $

C10 (Continue from C12) Rate increase for additional or lessor piping (Per Foot) $ Foot - $

C11 New pump and motor capable of 300 gpm with (800 feet of total dynamic head) (Installed in 8-inch diameter sch 80 PVC casing)

$ Each 14 $

C12 Installation and testing of new pumps and motors to 600 feet bgs in seven wells and 400 feet in seven wells.

$ Foot 7000 $

C13 (Continue from C15) Rate increase for additional or lessor piping and wiring (Per Foot) $ Foot - $

C14 Portable Restroom $ Weekly 85 $

SECTION C TOTAL $

Table A, B, & C Totals

SECTION A TOTAL $

SECTION B TOTAL $

1. Overlapping segments of telescoped borehole will only be charged once for the initial footage advanced.

2. Projected MW screen intervals (700-800, 550-650, 400-500)

3. Centralizers to be installed on all casing at a minimum of 80-foot intervals.

4. Uncoated bentonite chips are not to be used as an annular material. Time-release pellets are acceptable.

5. Adequate lighting to be provided by drilling contractor to light work areas as needed.

6. Security to be provided at the driller's cost and discretion.

7. Contractor to provide estimated quantities for the following line items: A18 and B35

NO GUARANTEE OF WORK UNDER THIS CONTRACT.

In the event of computational error, unit prices will prevail over extended totals. The State will check bid calculations and recalculate bid totals.

I certify under penalty of perjury under the laws of the State of California, the foregoing is true and correct.

The Contractor’s signature, in ink, affixed hereon and dated will constitute a certification under the penalty of perjury under the laws of the State of California that the Contractor’s license number and expiration date are true and correct.

Company Name

Contractor’s License Number

Contractor’s License Expiration Date

STATE OF CALIFORNIA – CALIFORNIA NATURAL RESOURCES AGENCY GAVIN NEWSOM, Governor