IFB 04 4101 27 Addendum No 2 contract time revision.pdf

PDF 219 KB Posted

Attached to
IFB 04 4101 27 African American Heritage Trail, Nassau Street Sidewalk
Solicitation number
IFB-124472
Issued by
James City County, Virginia

About this file

This is Addendum Number 2 to Invitation for Bids 04-4101-27 issued by the City of Williamsburg, Virginia Public Works & Utilities Department for the African American Heritage Trail Nassau Street Sidewalk project funded through HUD Grant B-23-CP-VA-1478. The project consists of installation of a brick sidewalk, concrete stairs, CG-12 handicap ramps, and miscellaneous work along public rights of way on Nassau Street within the City of Williamsburg. The addendum revises the contract completion timeline and extends the bid opening date to August 11, 2026, from the originally scheduled July 27, 2026. Bid documents are available for download from the City of Williamsburg website at http://www.williamsburgva.gov, with printed versions also available at City offices. No pre-bid conference is included with this IFB.

The addendum modifies the contract time limit from 60 calendar days to 120 calendar days from Notice to Proceed, addressing bidder concerns regarding insufficient time to complete the specialized work required for this project. The time extension revisions were implemented in response to questions raised by prospective bidders regarding the complexity of the work and the need for adequate completion schedules. All other terms and conditions of the original IFB remain unchanged. The addendum clarifies that bid documents are publicly available and confirms that no pre-bid meeting will be conducted for this solicitation.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Public Works & Utilities Department

CITY OF WILLIAMSBURG

CITY OF WILLIAMSBURG

INVITATION FOR BIDS (IFB) 04-4101-27

African American Heritage Trail;

Nassau Street Sidewalk

HUD Grant B-23-CP-VA-1478

ADDENDUM NUMBER 2 DATE: July 22, 2027

This addendum is posted to provide revisions to the IFB and clarify issues in the bid documents.

Please contact Mr. Jamie Clark, at (757) 220-6140 if you have a question regarding this

Addendum.

BID DOCUMENT

REVISE: I. Notice of Advertisement, page Bid-1, change ‘All work shall be completed within 60 calendar days from Notice to Proceed.’, to All work shall be completed within 120 calendar days from Notice To Proceed.

REVISE: II. BID FORM, page Bid-3, Contract time limit, change 60 days to 120 days.

DRAWINGS

No changes to this section of the Bid Documents.

This Addendum is a part of the Invitation for Bids (IFB) and Contract Documents.

ALL OTHER TERMS AND CONDITIONS REMAIN THE SAME

END OF ADDENDUM

ADDENDUM NUMBER 2 INVITATION FOR BIDS 04-4101-27

CLARIFICATIONS

1. Bid documents are available for download from Purchasing on the City of Williamsburg website at http://www.williamsburgva.gov. Printed versions are also available at the City offices under the terms mentioned in the advertisement.

2. A pre-bid conference is not included with this IFB.

3. Clarifications are intended to address questions and comments submitted by perspective bidders and those discussed at the pre-bid meeting. Questions and answers are as follows:

1. I just noticed that the bid date is July 27th. Is that correct? That only allows seven business days to turn around three proposals - site visits, sub/supplier solicitations and receipt, estimate preparation and review, bid package prep and review.

The bid opening date for IFB 02-4101-27, IFB 03-4101-27, and IFB 04-4101-27 has been revised from July 27, 2026 to August 11, 2026.

2. Due to the complexity and specialties involved in these bids, we do not feel that there is sufficient time to get the pricing needed in the short bid time of July 27. Would the City consider additional time to prepare the bids?

The bid opening date for IFB 02-4101-27, IFB 03-4101-27, and IFB 04-4101-27 are revised from July 27, 2026 to August 11, 2026.

3. Due to the complexity and specialties required in the work for these projects, we do not feel that 60 days is sufficient to complete these projects. Would the City consider adding more time for the completion of these projects?

The contract time for IFB 02-4101-27, IFB 03-4101-27, and IFB 04-4101-27 are revised.

IFB 02-4101-27 is changed to ‘Tree removal, clearing & grubbing, survey stakeout, earthwork, erosion and sediment control, concrete steps with handrails, brick pavers at both existing sidewalk connections, guardrail, aggregate base and asphalt pavement shall be completed in 60 calendar days. All other work to be completed 90 calendar days after the initial 60 calendar days’; IFB 03-4101-27 is changed from 60 calendar days to

150 calendar days; IFB 04-4101-27 is changed from 60 calendar days to 120 calendar days.

http://www.williamsburgva.gov/

File details come from the government source that posted it. Updated .