This pre-solicitation announcement from the U.S. Army Corps of Engineers Europe District provides details for an upcoming design-build contract to renovate a fire station in Skuodas, Lithuania. The project location, estimated contract value of $500,000 to $1,000,000, and anticipated one to two year performance period are specified. Interested offerors are encouraged to complete a questionnaire with company information. The announcement instructs offerors to monitor the website for a formal solicitation to be issued within 30 days and register with SAM.gov to be eligible for award, providing links on how to obtain an NCAGE code and UEI number for registration.
View the file
Other files
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
US Army Corps of Engineers
Europe District
APO AE 09049
li12
Statement of Work
Project Number:
Project No.: 67162
Fiscal Year: 2022
Renovate Fire Station
Skuodas, Lithuania
Prepared by:
Design Section
Engineering Branch
04NOV2022
01 10 10 Statement of Work Renovate Fire Station
7-Nov-22 Page 2 of 50
SECTION 01 10 10
STATEMENT OF WORK
SECTION TABLE OF CONTENTS:
1 GENERAL
2 CIVIL AND GEOTECHNICAL (Not applicable)
3 ARCHITECTURAL
4 STRUCTURAL
5 ELECTRICAL & COMMUNICATIONS
6 MECHANICAL & PLUMBING
ATTACHMENTS
Attachment # 1 Location Map
Attachment # 2 Conceptual Floor Plan
Attachment # 3 Existing Elevations
Attachment # 4 Structural Calculations Guideline
Attachment # 5 Dedication Plaque
1.0 GENERAL
1.1 PROJECT DESCRIPTION
The Request for Proposal (RFP) provides parameters for a design-build project for renovation of a fire station facility in Skuodas, Lithuania; Latitude
56°16'21.6"N, Longitude 21°31'44.7"E (Refer to the attached Location Map.)
The fire station was originally built in the 1960s. It is single-story solid masonry/concrete structure with unused attic. The building features original piping and utilities. The building was renovated in 1994. During the renovation, the brick façade was extended upward to create a multi-gabled style roof system.
The new roof framing sits on top of the original low slope roof. The roofing material is asbestos tiles on a wood lathe frame. The exterior walls do not have insulation. The garage does not have a mechanical ventilation system. The 1994 renovation raised the floor in the garage area, reducing the floor-to-ceiling clear space.
The project includes the following general items of work, detailed requirements are contained elsewhere in this Statement of Work:
a. Replace roof, roof gutters and downspouts and insulate attic
b. Full renovation of bathrooms, admin, living, and dining areas
c. Full renovation of heating, water, and sewage systems
d. Full renovation of electrical and telecommunications distribution system.
e. Provide new mechanical ventilation system
f. Provide new vehicle exhaust system
g. Renovate and lower garage floor and remove/fill-in existing revision pit
h. Provide new exterior thermal insulation. Replace exterior windowsills
1.2 GENERAL REQUIREMENTS
The Contractor must deliver fully functional, turnkey type facilities (without mobile furniture) as described in this document. The work includes - but is not limited to - design, demolition, fabrication, delivery, installation, construction, and site work.
The facility in this project must be complete and usable to meet codes and technical and functional requirements per this Statement of Work (SOW). The proposal price must include all design, calculations, approvals, certificates, fees, labor, material, equipment, direct overhead, indirect overhead, general and
7-Nov-22 Page 3 of 50 administrative expenses (G&A) and general conditions to complete this project as described in the SOW.
These design and product requirements are minimum requisites. Compliance with the provisions of this section by subcontractors is the responsibility of the
Contractor.
1.2.1 BASE ITEMS AND OPTIONAL ITEMS
This Statement of Work addresses the technical requirements necessary to complete all work associated with this project. For information and requirements regarding the allocation of pricing between elements of the work, refer to Specification
Section 01 22 00 PRICE AND PAYMENT PROCEDURES. The Schedule of Items identifies the breakdown between the individual base items and optional items for all work identified in this Statement of Work, associated drawings, and attachments. All work as described in these documents is included in either the Base or Optional
Items. Consider all items not specifically identified in the Optional Items as part of the Base Items.
1.3 FUNCTIONAL AREAS
Refer to the attached drawings for a depiction of the required functional areas and spatial adjacencies for the site and new facilities/structures.
1.4 SUBMITTALS
Designer of Record approval is required for submittals with a “DA” designation.
Government approval is required for submittals with a “G” or “GA” designation.
Submittals having an “FIO” designation are for Contractor Quality Control approval. Submit the following to the Contracting Officer (KO) in accordance with
Section 01 33 00 SUBMITTAL PROCEDURES:
SD-01 Preconstruction Submittals
Demolition Plan; G
Sequencing Plan; G
SD-05 Design Data
65% Pre-Final Design; DA/GA
95% Final Design; DA/GA
100% Corrected Final Design; DA/GA
SD-06 Test Reports
Test Results and Reports; FIO
1.4.1 DESIGN SUBMITTALS
Provide a complete design package at each milestone, as described in RFP Section
01 33 16-DESIGN AFTER AWARD. The milestones for this project are indicated above in Section 1.4 SUBMITTALS. The specific requirements of each milestone are described in each discipline-specific section of this Specification.
1.4.2 TEST REPORTS
Provide all test results and reports identified in this SOW to the Government as a submittal in accordance with RFP Section 01 33 00-SUBMITTAL PROCEDURES. Submittals will be considered for information only (FIO) submittals unless specifically
7-Nov-22 Page 4 of 50 identified as a submittal requiring government approval. Coordinate with the KO after award for the specific items to be included in the submittal register.
1.5 MATERIALS AND EQUIPMENT
Materials and products used must be durable, heavy duty, industry standard. The equipment must be the manufacturer’s standard quality and must be compatible with all other equipment and materials within the system or assembly. Equipment and materials must include all connections and accessories necessary to ensure operability and correct installation according to manufacturer’s requirements.
Provide a nameplate secured to each major piece of equipment. Each nameplate must have the manufacturer’s name, address, contact information, type or style, model or serial number, and catalog number. The definition of a “major piece of equipment” is at the discretion of the KO.
1.5.1 LIFE-SPAN
The facility and the installed equipment must be permanent construction with an expected lifespan of more than 25 years.
1.5.2 MAINTAINABILITY
Provide low maintenance materials and systems appropriate for the project climate and location.
1.5.3 OPERABILITY
Systems (including but not limited to architectural, electrical, communications, and mechanical systems) must be simple to operate and easy to maintain.
1.5.4 STANDARDIZATION
Provide standardized materials, products, equipment, and systems to minimize the requirements for replacement parts, storage facilities, and service requirements.
1.6 DESIGN DIMENSIONS
Develop the design using the metric system.
1.7 DESIGN CRITERIA
Project design, site facilities, utility systems and material standards must be in accordance with Host Nation building codes (current versions as of the date of
RFP, unless otherwise indicated). In the absence of Host Nation building codes, use the International Building Code (IBC) and the codes, technical standards, and regulations referenced in this RFP.
While this RFP references various source standards and specifications, all design documents must meet Host Nation codes and requirements. It is the designer's responsibility to demonstrate that the Host Nation standard is equal to the cited standard or specifications being supplanted. Apply the more restrictive standards when conflicts arise between the requirements of this RFP and any referenced or other applicable codes, standards, or regulations. If equivalency cannot be met, use the more stringent requirement and quote both codes verbatim in correspondence to the KO. The designer is responsible to determine the required material and execution standards where specific standards are not indicated.
Provide an electronic copy of the local Host Nation standards and building codes in their original language as related to facility design and construction.
1.8 SPECIAL CONSTRUCTION REQUIREMENTS
1.8.1 DEMOLITION
The Contractor is responsible for all required demolition as indicated in this scope.
7-Nov-22 Page 5 of 50
Submit a Demolition Plan to be tracked via the submittal register indicating all demolition, abatement, and disposal methods.
1.8.1.1 ABATEMENT AND DISPOSAL
All demolished materials, including hazardous materials identified below, must be abated, and disposed of in accordance with local laws, codes, and regulations. The
Contractor is responsible for all required testing before, during and after demolitions as well as for all required compliance with safety standards.
1.8.1.2 LOCATION OF HAZARDOUS MATERIAL
There is asbestos in the roofing materials.
The Contractor is responsible to survey the site and determine if additional hazardous materials exist. If additional hazardous materials are found to exist, immediately notify the KO, and provide the results of the relevant sampling and testing. Provide the hazardous materials report no later than 30 days after Notice to proceed (NTP) for information and approval.
1.8.2 PROTECTION OF WORK AREA
1.8.2.1 DUST AND DEBRIS CONTAINMNET
Seal the project area with construction barriers and dust partitions in order to contain construction dust and debris and maintain a clean environment outside of the work area. In addition to protections within the work area, provide temporary protection for all finishes from the entrance of the facility to each area of work. Patch and repairing any damage caused during construction. Coordinate the locations of barriers with the Government prior to the start of work.
1.8.2.2 PROTECTION OF FURNITURE, FIXTURES, AND EQUIPMENT
Protect all existing furniture, fixtures, and equipment that remain within the work area. Coordinate with the Government for any special protection measures required for sensitive equipment. The Contractor is responsible for repairing or replacing any damage caused during construction. The Contractor must conduct a preconstruction survey of furniture, fixtures, and equipment with a Government representative present. Provide temporary storage for furniture to remain.
1.8.2.3 NOISE AND VIBRATION CONTROL
Employ demolition and construction methods that minimize the production of sound and vibration. Coordinate the schedule of especially loud or disruptive activities with the KO prior to the start of work.
1.8.2.4 PROTECTION OF EGRESS AND LIFE SAFETY
The Contractor must not take actions that hinder existing egress paths or disrupt operation of life safety systems without prior coordination with the KO and all applicable authorities having jurisdiction (AHJ). The Contractor is responsible for supplying signage or other protective measures as required by the KO or AHJ prior to impeding the egress path or life safety system.
1.8.3 SEQUENCING OF CONSTRUCTION WORK
The Contractor must sequence construction to allow the facility to remain occupied during construction. Do not block access to occupied areas during construction.
Utility and communication services must remain functional in all occupied areas.
Some relocation of equipment and/or personnel may be required to comply with this requirement.
The Fire Station must remain fully operational during construction. Submit detailed sequencing Plan – including a construction schedule – to the KO for
7-Nov-22 Page 6 of 50 approval prior to the start of construction activities. Construction on the vehicle garage can only occur during the spring/summer when freezing temperatures and snow are not expected so that the vehicles can be operational if parked outside. The Contractor must inform the KO of any variances in the schedule during construction.
Provide a Sequencing Plan with the 95% Final Design Submittal. The Sequencing Plan must describe the proposed performance of construction operations to comply with the stated sequencing requirements. The Sequencing Plan must include a graphical depiction of the sequencing of each work area and mobilization/staging area. The
Sequencing Plan is in addition to the requirements of RFP Section 01 32 01-PROJECT
SCHEDULE or 01 32 16-SMALL PROJECT PROGRESS SCHEDULES (NOTE: Only one of these specifications applies to this contract, refer to other documents for the section applicable to this project).
END OF SECTION
7-Nov-22 Page 7 of 50
2.0 CIVIL AND GEOTECHNICAL
Not applicable
7-Nov-22 Page 8 of 50
3.0 ARCHITECTURAL
3.1 PROJECT DESCRIPTION
Provide and perform architectural design and construction services to provide a complete, accessible, functional, and usable fire station.
Renovate single-story, solid masonry / concrete building that will serve as fire station.
Remove and replace roof. The existing roof system is asbestos tile on wood frame.
Provide new gutters and downspouts. Insulate the building façade and attic.
Replace existing exterior windowsills. Renovate existing living quarters and admin area with paint and new flooring. Remove interior partition walls in Rooms 1-18 and 1-17. Remove interior partition wall between the garage (G-1) and Room 1-17 to expand the garage. Rooms 1-18, 1-19, and 1-20 will be combined into a kitchen space. Provide new restroom and shower facilities in Room 1-5. Add partition wall in south garage G-3 to create Room 20. Room 20 will be converted into a workout room. Lower the garage floor in G-1 and fill in the mechanic grease pit.
Extensive coordination is required between the architectural work and the work of other disciplines described in this SOW.
3.1.1 DESIGN
Provide a design and construction package that uses the space allocations, functional adjacencies, design details, and features given or referenced in this
RFP. The design must incorporate all referenced codes and regulations. The
Contractor is responsible for creating additional details as required to complete a full design. All details must conform to the requirements of this RFP and are subject to the approval of the KO. A schematic design has been attached for reference. The schematic plans are provided for diagrammatic purposes only and do not necessarily represent an approved floor plan or design. The Contractor is responsible for providing a design that meets all requirements of the User and the codes and criteria referenced in this Statement or Work.
3.1.2 DESIGN SUBMITTALS
Provide all architectural submittals after contract award in accordance with RFP
Section 01 33 16-DESIGN AFTER AWARD and 01 33 00-SUBMITTAL PROCEDURES. Prepare and submit the documents listed below at the submittals indicated.
3.1.2.1 65% DESIGN SUBMISSION
Include the following drawings and reports as applicable to the project:
a. Code Summary – Provide a tabular code compliance summary indicating Host Nation and/or IBC life safety requirements for all new facilities.
b. Life Safety Plans – Provide plans depicting smoke/fire resistance ratings, egress routes, dead-end corridors, exits, and other aspects of life safety pertaining to the design.
c. Demolition Plans – Provide existing floor plans, indicating all demolition required.
d. Floor Plans – Provide all floor plans, indicating room names, areas, and basic dimensions, scale 1:50.
e. Ceiling Plans – Provide reflected ceiling plans for all rooms, indicating ceiling materials and fixtures, scale 1:50.
f. Building Elevations – Provide all building elevations indicating all exterior materials.
g. Roof Plan – Provide a plan of all roof areas, indicating direction of slope and method of drainage.
h. Building Section – Indicate heights of critical building elements.
i. Wall Section - Provide a typical interior and exterior wall section for each building – describe wall materials.
7-Nov-22 Page 9 of 50
j. Interior Elevations – Provide interior elevations of all bathrooms and built-in casework and kitchenettes, indicate critical heights of surfaces and plumbing fixtures, and describe all materials and finishes.
k. Pre-Final Design Analysis – Provide a narrative explaining the design and indicating how the design and materials meet the requirements of this SOW.
l. Pre-Final Specifications – Provide detailed explanations of requirements for all performed work or provide product specific manufacturer information
(brochures, technical information, cut sheets) for all materials and products to be provided/installed.
3.1.2.2 95% DESIGN SUBMISSION
The 95% Submittal provides a complete and final set of contract documents essentially ready for construction by the D/B Contractor. All previous government review comments must have been addressed. Include the following drawings and reports as applicable to the project:
a. All documents from the 65% submittal updated to incorporate 65% review comments.
b. Floor Plans – Provide all floor plans, indicating room names, areas, and dimensions, scale 1:50.
c. Building Elevations – Provide all building elevations indicating all exterior materials.
d. Roof Plan – Provide a plan of all roof areas, indicating direction of slope and method of drainage.
e. Building Section – Indicate heights.
f. Wall Sections – Provide sufficient wall section(s) to indicate all materials and different conditions.
g. Section and Plan Details – Provide details of critical building intersections.
h. Window and Door Schedule – Provide a schedule of all windows and doors, indicating sizes, hardware, and operation.
i. Finish Schedule – Indicate all proposed finishes.
j. Final Design Analysis – Provide a finalized narrative describing all work to be performed on the project and how it meets the functional and code requirements of the project. Provide product specific manufacturer information (brochures, technical information, cut sheets) for all materials and products to be provided/installed.
k. Final Specifications – Provide line items and detailed descriptions of all work to be performed.
3.1.2.3 100% DESIGN SUBMISSION
The 100% Submittal provides a complete and final set of contract documents ready for construction by the D/B Contractor. All previous government review comments must have been addressed. Include all drawings, specifications, and calculations from the 95% Submittal updated to incorporate all previous review comments.
3.2 TECHNICAL CRITERIA AND STANDARDS
Design and construct the project in accordance with the requirements outlined in
Section 1.7 DESIGN CRITERIA.
3.2.1 LIFE SAFETY REQUIREMENTS
The Design must meet all Host Nation and local Fire Suppression System codes and requirements. All new structures must have exits and means of egress that comply with current Host Nation codes and standards. In the absence of Host Nation codes and standards, for individual concerns of Life Safety the Contractor must follow the International Building Code (IBC).
3.2.2 HANDICAPPED ACCESSIBILITY REQUIREMENTS
Handicapped accessibility requirements do not apply to this facility.
7-Nov-22 Page 10 of 50
3.3 GENERAL SCOPE OF WORK
Design the architectural elements of this facility to withstand all site-specific environmental conditions such as wide seasonal temperature swings, local wind, rain, snow, and earthquake conditions. All architectural features must be appropriately braced for anticipated seismic activity. The Contractor may propose alternate building materials to meet the facility’s requirements, but final selection of materials is subject to the approval of the KO. Consider economics not only in the initial acquisition, but also in the future maintenance of the materials, when selecting materials and building systems to be incorporated into the project. When requested, the Contractor must provide documentation demonstrating that a chosen alternative material is life cycle cost effective.
3.4 DETAILED SCOPE OF WORK
The Contractor is responsible for the following specific tasks required for the construction of this facility.
3.4.1 DEMOLITION
Demolition work includes, but is not limited to, the following items:
a. Demolish and remove existing roofing.
b. Demolish and remove existing floor, wall, and ceiling finishes.
c. Demolish and remove sloped concrete floor in garage G-1.
d. Demolish and remove existing interior doors.
e. Demolish and remove existing electrical and lighting systems.
3.4.2 BUILDING SYSTEM AND MATERIALS
The intent of this RFP is to allow the Contractor the maximum flexibility to design and construct this facility in an economical manner without sacrificing good engineering practices, quality materials and systems. The Government requires low or no maintenance finish materials to the greatest extent possible. Provide a design informed by the modular size of selected materials. Building materials as described herein are minimum requirements and may require revision based on code compliance and criteria.
3.4.2.1 FIRE PROTECTION RATINGS OF INTERIOR FINISHES
All interior finishes must conform to Host Nation fire protection standards/requirements.
3.4.2.2 ACOUSTICAL DESIGN
Doors, walls, floors, and ceilings must meet the minimum sound protection per Host
Nation requirements.
3.4.2.3 THERMAL INSULATION
Provide thermal insulation in accordance with Host Nation and local requirements.
3.4.2.4 CORROSION PREVENTION
All exterior materials and finishes must be appropriate for continuous exterior exposure. All materials susceptible to UV degradation must contain UV inhibitors.
Provide corrosion resistant coatings on all materials susceptible to corrosion.
Coatings must be applied in the factory prior to delivery to the maximum extent practicable. Physically separate dissimilar metals with non-conductive hardware.
Do not install aluminum in direct contact with concrete. Treat all wood with preservatives where it is contact with concrete or exposed to the exterior. Cover all exterior wood with metal flashing or exterior grade paint. Do not install wood in contact with soil.
3.4.3 EXTERIOR CONSTRUCTION WORK
Provide the following exterior architectural systems.
7-Nov-22 Page 11 of 50
3.4.3.1 EXTERIOR WALLS
Design and construct new exterior walls in accordance with (IAW) the requirements of this SOW. Refer to Section 4.0 STRUCTURAL. Exterior walls must have smoke/fire resistance ratings as required by Host Nation, and local fire and life safety codes. Provide exterior wall finishes appropriate for the wall structure as required below.
3.4.3.1.1 STEM WALLS
Provide fluid-applied monolithic membrane waterproofing on all concrete and masonry walls below grade. Waterproofing must be low VOC. Apply liquid proof coating with fabric reinforcement corner strips in accordance with manufacturer guidelines. Provide continuous rigid board insulation and drainage membrane. All materials below grade must be appropriate for direct contact with soil.
3.4.3.1.2 EXTERIOR WALL INSULATION FINISH SYSTEM (EIFS)
Install new exterior insulation finish system (EIFS) with new polystyrene thermal insulation, stucco, and paint. Install exterior insulation system consisting of insulation boards, to include mineral lightweight plaster and fiberglass reinforcing net. Insulation boards must have a minimum R-value in accordance with applicable codes and standards. Install EIFS system on the building base. Dowel all boards. Provide all necessary expansion joints, base and corner rails, diagonal fiberglass-reinforcing fabric at the window and door corners, and end flashing at eaves. Use products from a single system, by a single manufacturer, which are certified by the manufacturer to be suitable for the purpose. This also applies to the paint. Apply products in accordance with the manufacturer's instructions. Provide all necessary sealing e.g. at windowsills. Submit a sample of the insulation system along with the manufacturer's catalog data including installation instructions, typical details, and product data for approval.
3.4.3.3 EXTERIOR WINDOWS
3.4.3.3.1 EXTERIOR WINDOWSILLS
Remove existing windowsills. After installation of the new EIFS system install new exterior factory-coated galvanized steel windowsills at all windows. The windowsills must match the color of window frames. Caulk all joints between window frames and building with sealant to provide a watertight installation and proper finish.
3.4.3.4 ROOFING
Roof design and materials must comply with Host Nation requirements.
3.4.3.4.1 ROOF CONSTRUCTION AND ROOF COVERING
Provide new roof structure, roof lathing and new corrugated metal roofing. Provide snow guards on the roof over the entrances and perimeter pavement. Provide a roof slope to match existing roof slope and in accordance with roofing manufacturer installation requirements and proofing certificates. Provide roof-mounted fall protection anchors as required by HN occupational safety requirements. Metal roofing must be factory finished steel or aluminum panel with a minimum thickness of 0.60 mm. Roofing must have concealed fasteners. Provide new vapor barrier and thermal insulation. Roof and wall insulation must be continuous to eliminate thermal breaks. Provide ventilation layer as required to avoid condensation.
Provide all required flashings, fasteners, and sealing materials. Install as required by the manufacturer. Metal roofs must have 20-year warranty. Submit material and color samples for approval. See Structural Section 4.0 for other requirements and information.
3.4.3.4.2 EAVES, OVERHANGS, AND SOFFITS
7-Nov-22 Page 12 of 50
Provide roof overhangs a minimum of 250 mm from the face of exterior walls.
Enclose all eaves and overhangs with factory finished metal soffits.
3.4.3.4.3 ROOF GUTTERS, DOWNSPOUTS AND FLASHING
Provide new pre-finished galvanized steel roof gutters, downspouts, and flashing.
PVC gutters and downspouts are not acceptable. Size gutters and downspouts for roof drainage area and 10-year storm rainfall intensity. Submit gutter and downspout sizing calculations in the Design Analysis. Coordinate storm drainage connections with the requirements of Section 2.0 CIVIL AND GEOTECHNICAL. Submit material and color samples for approval.
3.4.3.4.4 ENTRANCE CANOPIES
Provide exterior canopies over personnel doors serving as building entrances. Roof material at canopies must match building roof material.
3.4.3.4.5 ATTIC THERMAL INSULATION
Provide new vapor barrier and thermal insulation on the top of the attic floor structure. Attic insulation must have a minimum R-value in accordance with applicable codes and standards. Attic and wall insulation must be continuous to eliminate thermal breaks. Insulated attics must be vented.
3.4.3.5 EXTERIOR METAL
All new exterior metal must be finished with an architectural coating. Provide exterior metal elements with a factory applied finish to the greatest extent practicable. For all new metal elements that have not been provided with a factory applied finish, are showing evidence of corrosion, or have failing coatings, clean and paint the metal in the field. Scrape and clean all surfaces to remove rust and dirt before painting. Paint system must be one coat of rust inhibitive primer and two coats of an alkyd-base finish paint. Submit paint samples and colors for review and approval.
3.4.4 INTERIOR CONSTRUCTION WORK
Provide the following interior architectural systems.
3.4.4.1 INTERIOR WALLS
Provide new interior partition walls IAW functional requirements. Provide penetration openings (for example for ventilation, piping, and cables) as required by other sections and drawings of this RFP. All interior walls must be full height between floor and roof/ceiling structure.
3.4.4.1.1 INTERIOR CONCRETE/MASONRY WALLS
Provide new masonry or concrete walls as required. Unless specified otherwise, provide two-layers of interior plaster and new paint on all new masonry walls and existing walls without plaster in normally occupied areas. Install plaster IAW manufacturer's guidelines. Refer to Section 4.0 STRUCTURAL for additional requirements for masonry and concrete construction.
3.4.4.1.2 METAL FRAMED PARTITION WALLS
Provide new light gauge metal framed partition walls as required. Provide slotted deflection tracks at the top of all metal framed partition walls. Unless specified otherwise, provide new gypsum wall board and paint on all metal framed partition walls. Provide cavity insulation and/or multiple layers of gypsum wall board as necessary to meet required acoustic and/or fire resistance ratings IAW manufacturer's guidelines. Provide gypsum board with a minimum thickness of 12,5
mm. Install gypsum board to provide a flat, smooth, and seamless finished surface suitable to receive paint or tile, as appropriate. Provide all necessary trim and edge beads. Provide moisture resistant gypsum board in all areas to receive tile and in all toilet rooms, janitor closets, and kitchens. Provide fire resistance
7-Nov-22 Page 13 of 50 rated gypsum board where required. All fire resistance rated gypsum wall board must be labeled by an approved independent testing laboratory and installed per testing laboratory instructions.
3.4.4.2 INTERIOR WALL FINISHES
Provide new interior wall finishes as described below. Submit data sheets, color, and pattern of all wall finishes for review and approval.
3.4.4.2.1 INTERIOR PAINT
Paint all interior walls with a minimum of two coats of latex enamel paint over compatible primer. Paint must be lead free, water resistive and open to vapor diffusion. All paint must be low VOC and washable after drying.
3.4.4.2.2 CERAMIC WALL TILE
Provide glazed ceramic wall tiles from floor to ceiling in all toilet and bathrooms. Protect all walls in toilet and bathrooms with elastomeric waterproofing membrane half meter high above floors. Provide ceramic wall tiles on windowsills in all rooms / areas to receive ceramic wall tiles. Provide a glazed ceramic wall tile backsplash (from top of counter to underside of upper cabinetry) at all kitchens. Install tiles according to manufacturer’s instructions with appropriate grout-filled joints.
3.4.4.3 CEILINGS
Provide new ceilings as described below. Install ceilings to provide a clear room height in accordance with US, HN, and local building codes, but not less than 2.5 m above finished floor surface in any room. Do not use combustible materials for ceiling construction. Submit data sheets, color, and pattern of all ceiling finishes for review and approval.
3.4.4.3.1 GYPSUM BOARD CEILINGS
Provide suspended gypsum board ceilings with primer and paint in living quarters and admin area. Gypsum board ceilings must be level and flat and appear seamless once finished. Provide all necessary trim and edge beads. Coordinate location of light fixtures and mechanical grilles. Provide moisture resistant gypsum board in all toilet rooms, janitor closets, and kitchens. Provide multiple layers of gypsum board as necessary to meet required acoustic and/or fire resistance ratings IAW manufacturer's guidelines. Provide fire resistance rated gypsum board where required. All fire resistance rated gypsum board must be labeled by an approved independent testing laboratory and installed per testing laboratory instructions.
3.4.4.3.3 EXPOSED CONCRETE CEILINGS
Paint all exposed concrete ceilings. Provide a minimum of two coats of latex enamel paint over compatible primer.
3.4.4.4 FLOOR SLABS
Provide floor slabs in accordance with the requirements of Section 4.0 STRUCTURAL and the following.
3.4.4.4.1 HORIZONTAL WATERPROOFING AGAINST MOISTURE FROM OUTSIDE
Apply waterproofing on all new floor slabs in the building. Apply liquid proof coating with fabric reinforcement corner strips in accordance with manufacturer guidelines. Apply on floors before installing new screed. Provide photographic documentation to the KO showing the application of the waterproofing material.
3.4.4.4.2 SCREED AND FLOOR SLABS
Provide thermal insulation and floating cement screed in all rooms / areas.
3.4.4.5 FLOOR FINISHES
7-Nov-22 Page 14 of 50
Provide new interior floor finishes as described below. Submit data sheets, color, and pattern of all floor finishes for review and approval.
3.4.4.5.1 CERAMIC TILE FLOORING
Provide new non-slip ceramic tile flooring (minimum DIN 51130 Group B, R11) and baseboards in kitchen, bathrooms, and all living and admin areas. Protect ceramic tile flooring in wet rooms/areas with elastomeric waterproofing membrane on the concrete slabs and turn up half meter high above floor. Tiles wet rooms/areas must have a minimum slip resistance of Group B/R11. Tiles must be size 30x30 cm with joints of 3mm width. Fill joints with water resistive grout. Do NOT fill joints between wall and floor with grout, but with permanent elastic silicone. Color of grout and silicone must match. Install proofing layer suited for the application.
Install ceramic tile baseboards in all rooms that receive ceramic tile flooring but not ceramic wall tile.
3.4.4.5.2 NON-SLIP RESILIENT FLOORING
Provide new non-slip rubber flooring and baseboards in workout room 20. Weld sheets at seams. Flooring must be heavy duty suitable for workout areas with free-weights. Color and pattern must be consistent through the entire thickness of the flooring sheet.
3.4.4.5.3 CONCRETE FLOOR SEALER
Provide low VOC, clear epoxy concrete sealer on all garages concrete floors.
Concrete sealer must be appropriate for high-traffic areas and have high oil and chemical resistance. Apply epoxy concrete sealer in accordance with manufacturer instructions. Test concrete for appropriate moisture content prior to application.
3.4.4.5.4 INTERIOR ENTRANCE GRATING
Provide interior entrance gratings at all main entrance doors. Entrance gratings must be recessed, heavy duty type designed for easy removal for maintenance and cleaning. Provide manufacturer’s standard entrance grating system made from corrosion resistant metals with slip resistant surface. Provide all accessories including cast-in-place frames, supports, and fasteners. Recess slab as required so that walking surface of entrance grating is flush with the finish floor of the building interior.
3.4.4.6 INTERIOR DOORS
Provide new single wooden doors and steel frames. All hardware must meet the fire rating assemblies for the doors and frames. Provide standard door 45mm thickness.
Provide moisture resistant doors and door frames for all bathrooms and kitchens.
Paint all interior doors and frames using one coat primer and two coats of a finish paint. Submit color for review and approval.
3.4.4.6.1 DOOR HARDWARE
All hardware must be heavy-duty and have a brushed chrome finish. Install all hardware in accordance with the manufacturer’s instructions. All doors into toilet and bathrooms must have solid kick-plates on both sides.
Each door must have the following additional hardware as a minimum:
a. Three hinges on each leaf.
b. One floor or wall mounted doorstopper, as appropriate.
c. Lever latch handles.
d. Fully mortised lockset compatible with existing keying system.
e. Fully adjustable hydraulic door closer.
f. Door coordinator on all door pairs.
g. Panic push bar in compliance with Host Nation criteria on each leaf, as required.
h. Acoustic gasketing, as required.
7-Nov-22 Page 15 of 50
All doors must have a mortise lockset. All locksets must be keyed to one master key system. Provide panic hardware and smoke tight fire rated doors in egress routes as required by the Life Safety Code.
3.4.4.7 INTERIOR WINDOW ACCESSORIES
Provide the following accessories on all windows.
3.4.4.7.1 INTERIOR WINDOWSILLS
Provide laminated interior windowsills at all windows except walls with ceramic tiles.
3.4.4.7.2 WINDOW COVERINGS
Provide a surface mounted curtain rod over all windows in admin and living areas.
Curtain rod must be steel or aluminum and be adequately sized to span the window without sagging once curtains have been installed.
3.4.4.8 BATHROOM AND TOILET ACCESSORIES
Provide bathroom and toilet accessories as described below. All bathroom and toilet accessories must be made from corrosion resistant materials and have corrosion resistant, concealed fasteners. All bathroom and toilet accessories made from the same material must be finished to match. For toilet and plumbing fixtures, see Section 6.0 MECHANICAL. Submit data sheets and color/finish for all bathroom and toilet accessories for review and approval.
3.4.4.8.1 TOILET ROOM MIRRORS
Provide mirrors of 6 mm minimum thickness over each sink. Size must be approximately 450 x 800 mm (width x height). Securely fasten mirrors to the wall using mechanical fasteners through a steel frame. Do not hang or hook mirrors.
3.4.4.8.2 TOILET ROOM SHELVES
Provide one commercial grade, heavy-duty stainless-steel shelf below each toilet room mirror and in each shower. Toilet room shelves must be wall mounted with mechanical fasteners.
3.4.4.8.3 SOAP HOLDER
Provide one metal soap holder for each sink and shower. Soap holder must be surface mounted with mechanical fasteners.
3.4.4.8.4 TOILET PARTITIONS
Provide solid polymer toilet and urinal partitions as required. Partition panels must be a minimum of 1.83 meters tall and sit a maximum of 0.30 meters above the finished floor. Provide all accessories, bracing, and fasteners required for fully functional partitions. Fittings and fasteners must be stainless steel. Wall and floor mount partitions as required for a structurally sound system. Provide one stainless steel double garment hook on the inside of each door. Toilet partitions must be compatible with all toilet accessories provided.
3.4.4.8.5 TOILET TISSUE DISPENSER
Provide one, two-roll metal toilet tissue dispenser at each toilet. Toilet tissue dispenser must be surface mounted with horizontal dispensing.
3.4.4.8.6 PAPER TOWEL DISPENSER
Provide two metal paper towel dispensers with capacity of 450 C-fold paper hand towels in each toilet room. Paper towel dispensers must be surface mounted with horizontal dispensing.
7-Nov-22 Page 16 of 50
3.4.4.8.7 SANITARY NAPKIN RECEPTACLE
Provide one metal sanitary napkin receptacle at each toilet in all women’s toilet rooms. Receptacles must be designed for surface mounting. Sanitary napkin receptacle must be capable of accepting reusable liners. Mount within reaching distance for a person seated on the toilet.
3.4.4.8.8 GARMENT HOOKS
Provide heavy duty, commercial grade, stainless steel double-hooks. Unless indicated otherwise, mount garment hooks on the inside of each toilet cubicle door at a minimum.
3.4.4.8.9 WASTE RECEPTACLE
Provide steel waste receptacles in each toilet and bathroom. Receptacles must be designed for surface mounting or free standing, painted, with reusable liner.
Capacity must be not less than 20 Liters.
3.4.4.8.10 SHOWER CURTAIN RODS
Provide stainless steel shower curtain rods at each shower. Shower curtain rods must be wall mounted with concealed mechanical fasteners. Mount shower curtain rods 2.0 m above shower floor.
3.4.4.9 MISCELLANEOUS ACCESSORIES
Provide the following miscellaneous accessories in sizes and quantities as described below. Ensure all mounting surfaces have the appropriate structure for the weight and expected use of each accessory.
3.4.4.9.1 FIRE EXTINGUISHERS
Provide fire extinguishers in accordance with Host Nation code. Install fire extinguishers on wall-mounted brackets as required by HN code. Label cabinets in the local language.
3.4.4.9.2 MOP RACKS
Provide stainless steel mop and broom racks in each Janitor Closet with a minimum of four (4) spring loaded cam holders each. Mop racks must be wall mounted with concealed mechanical fasteners.
3.4.4.9.3 CORNER GUARDS
Provide surface mounted resilient corner guards on all outside corners in all corridors. Corner guards must have a minimum height of 1500 mm.
3.4.4.10 CASEWORK
Provide the following casework. Provide samples of all materials and colors for approval.
3.4.4.10.1 BUILT-IN KITCHEN
Provide built-in kitchens with L-shape, approximately 4.8 + 2.0 meters. Coordinate with other engineering disciplines to provide utilities for all required equipment. At a minimum, each kitchen must include the following:
a. Built-in base cabinets with drawers and adjustable shelves.
b. Countertops.
c. Built-in upper cabinets with adjustable shelves.
d. Self-rimming stainless-steel sink with drainboard.
e. One (1) microwave oven (30-liter capacity).
f. One (1) oven (60-liter capacity).
g. Four (4) cooking plates.
h. One (1) dishwasher (600 mm wide).
i. One (1) refrigerator (230-liter refrigerator capacity + 70 liter freezer capacity).
7-Nov-22 Page 17 of 50
j. Kitchen hood.
3.4.4.10.2 BASE CABINETS
Provide base cabinets constructed from laminate-clad medium density fiberboard
(MDF). All built-in cabinet materials must be formaldehyde-free and resistant to chemicals (no negative change of color). Configure base cabinets with one drawer over each door. Base cabinets must be a minimum of 600 mm deep. Except in base cabinets under sinks, provide two shelves in all base cabinets. Install false fronts in lieu of drawers at base cabinets under sinks. Construct all base cabinets with a toe base. Attach drawers to telescoping rails with ball bearing slides and silent stops that allow full drawer depth to be pulled from base cabinets. Provide doors with concealed hinges. Provide drawer and door pulls constructed form a corrosion resistant metal. All pulls must be a minimum of 300 mm long. Provide filler panels as required. Anchor base cabinets to floor and wall.
3.4.4.10.3 COUNTERTOPS
Provide countertops constructed from laminate-clad medium density fiberboard
(MDF). Countertops must be minimum 40mm thick. Provide minimum 100 mm x 15 mm back and side splashes on all countertops adjacent to walls. Countertops must have a 20 mm overhang. Coordinate openings in countertops for sinks, refer to Section 6.0
MECHANICAL. Coordinate height of base cabinetry with thickness of countertops to provide 900 mm finished height at countertop.
3.4.4.10.4 UPPER CABINETS
Provide upper cabinets to match base cabinets. Provide double-door upper cabinets with opposing doors. Upper cabinets must be as wide as base cabinets. Upper cabinets must be minimum 800 mm tall and mounted to provide a minimum 455 mm clearance above counter. All hardware on upper cabinets must match base cabinets.
Provide each upper cabinet with two adjustable shelves. Anchor upper cabinets to walls.
3.4.4.11 EXPOSED PIPES
Paint all exposed ferrous piping. Paint system must be one coat of rust inhibitive primer and two coats of finish for all pipes that are not painted. Pipes that are already painted must be cleaned and painted with adequate coats to provide uniformity with newly painted surfaces. Finish coat paint must be an alkyd base paint. Submit data sheets and colors for all paints review and approval.
3.4.5 SIGNAGE
Provide all signage in accordance with Host Nation standards.
3.4.5.1 INTERIOR SIGNAGE
Provide industry standard aluminum or second surface painted acrylic signs with applied graphics. All interior signs must be of the same material and construction type, with a coordinated text and graphical appearance.
3.4.5.1.1 INTERIOR ROOM SIGNAGE
Provide interior room identification signage for each room. For room signs on offices, provide two slots for paper inserts to allow the User to readily change information such as room name and employee name. Where applicable, provide corresponding international icons/symbols on room signs (for example: toilet rooms and stairs). Surface mount signage with concealed mechanical fasteners adjacent to room entry doors.
3.4.5.2 EXTERIOR SIGNAGE
Provide exterior signage as described below. Construct all exterior signs from corrosion resistant materials appropriate for continuous exposure to the elements.
7-Nov-22 Page 18 of 50
3.4.5.2.1 EXTERIOR DEDICATION PLAQUE
Provide a dedication plaque approximately 600 mm wide x 450 mm high fabricated from powder coated aluminum with permanent printed 18 mm high, “Arial“ font letters as indicated below. Adhesive applied images or text are not acceptable.
Provide the emblem of the United States European Command between two flag emblems, one flag of the United States of America and one of the Republic of Lithuania.
Plaque location and mounting height to be directed by the KO.
The exterior dedication plaque must have text similar to the following in both
English and the Host Nation language: “The Renovation of the Skuodas Fire Station was accomplished as a partnership between the people of the United States of
America and the people of the Republic of Lithuania, with support from the United
States European Command and the Office of Defense Cooperation, U.S. Embassy
Lithuania.” Provide the year of project completion below the text. Coordinate the final dedication plaque verbiage and graphics with the KO prior to procuring the sign.
See attached dedication plaque template for reference.
3.4.6 FINAL CLEAN-UP
Clean all areas impacted by the work under this project. This includes all rooms where renovation work was completed and all circulation paths (corridors, vestibules, etc.) leading to work areas from building entrances. Follow the cleaning instructions provided by the manufacturers for all building material and equipment. Follow the application instructions provided by all cleaning agent manufacturers. Provide all devices and tools required for the performance of the work to include all necessary additional scaffolding and ladders. Remove all temporary protective coatings left in place during construction. Liquid cleaners must not contain any volatile organic content (VOC).
7-Nov-22 Page 19 of 50
4.0 STRUCTURAL
4.1 GENERAL
The Contractor must provide and perform structural engineering design and construction services as required to provide a complete, accessible, functional and usable project.
The primary structural effort of this project includes
a. The repair of the roof system, replacement of the roof covering, and insulating the attic.
b. The addition/removal of doors through load bearing walls and necessary structural supports (i.e. lintels) according to attachment 2.
c. The removal/filling-in of the revision pit and removal of the top layer of concrete in garage to provide a level floor that withstands the load of the fire trucks.
d. The Contractor must inspect, survey, evaluate, and design the existing facility for the planned renovation/conversion usage. The Contractor is responsible for conducting and documenting all existing material investigations and testing as required for a code complaint design.
e. The Contractor must perform structural investigation, non-destructive and destructive tests, material/ core sampling, as deemed necessary to obtain relevant structural information that cannot be verified from the available documentation. Destructive testing must be approved by the KO prior to commencement of this work. Destructive testing must not cause failure, local or global instability of the existing structural system.
f. The Contractor is responsible to verify, test, and evaluate the structural capacity of the existing materials of the relevant structural elements to accommodate the new loads and planned renovation/conversion work. Where the existing structural is damaged, deteriorated, or lacks sufficient structural strength to resist new loads, the Contractor must; identify, repair, and strengthen or replace these elements of the existing structural system.
g. Other elements must include but are not limited to foundations, superstructure (i.e. walls, columns and beams), roof framing, lateral load stability and diaphragm design, framing and connection of any architectural features, and support of mechanical and electrical equipment.
The Contractor must have as part of his design team a licensed structural engineer per Host Nations standards. If work is being performed in a country that does not have licensed structural engineers, then engineering degrees along with extensive structural design experience can be submitted to the KO for qualification verification and approval. The structural engineer’s licensure or qualifications must be submitted to the KO in the design quality control plan prior to the start of design. The Contractor’s structural engineer must be responsible for the design of any part of the building structural systems.
The structural design of the renovation and repair works of existing facility, foundation, superstructure, and any other structural aspects must be in accordance with the design criteria listed in this document. The superstructure of the project building and the foundation must be constructed from locally available materials.
4.2 APPLICABLE DESIGN CRITERIA
All Design, Safety in Construction, Materials, and Performance of Construction
Services must be in accordance with current local or national Host Nation codes and standards. In absence of Host Nation codes, use 2018 International Building
Code and ASCE 7-16 for structural calculations. In case of conflicting requirements between the various elements, the more stringent criteria must govern.
7-Nov-22 Page 20 of 50
Any material or construction installed by the Contractor as part of this contract that does not meet the requirements of this RFP or does not meet the applicable codes and standards must be removed and replaced at the Contractor’s expense.
Structural design methods and allowable stresses or load factors for the various structural materials must be in accordance with paragraph 1.7 of this document and the following codes below.
EUROCODES AND NATIONAL ANNEXES
4.3 SUBMITTALS
4.3.1 DESIGN SUBMITTALS
The Contractor must provide the structural submittals after contract award in accordance with RFP Section 01 33 00-SUBMITTAL PROCEDURES. In addition to General
Section 1.4 SUBMITTALS of this document the following documents must be submitted.
4.3.1.1 DRAWINGS & SPECIFICATIONS
The following structural detail drawings must be provided by the Contractor as required but must conform to the requirements of this SOW and are subject to the approval of the KO. Construction drawings must include:
65% Design Submittal
a. Preliminary plan that shows where structural repairs and rehabilitation work may be necessary to the existing roof framing system that will be required to support the planned replacement and insulation. The documentation must have a plan and procedures for executing these repair work.
b. Preliminary floor plans which provide information of the main structural system of the construction giving general information about dimensions of main elements such as columns, beams, bearing walls, etc. (min. scale 1:50)
c. Preliminary foundation plans which include for all…