Identity Dominance System (IDS) Repair & MX Support Statement of Work (SOW)
C.1 BACKGROUND
The Naval Surface Warfare Center Dahlgren Division (NSWCDD), Intelligent Automation Division (H60) has a requirement for continued support of the technology refresh for the Identity Dominance System (IDS) program. The IDS program is an Acquisition Category (ACAT) IV-T program of record (POR) currently in sustainment managed by Naval Sea Systems Command (NAVSEA) PMS 408 and sponsored by OPNAV N96C4. The IDS program provides a means to collect and process identity information in the conduct of maritime and expeditionary operations. There are two key aspects of this capability: 1) enable forces to rapidly establish and verify the identity information of unknown individuals encountered during operations and 2) improve force capacity to update, manage, and share trusted information on such individuals. The fundamental purpose of the IDS program is to provide and sustain a materiel solution with both hardware and software components for a multi-modal biometric capability which collects, matches, stores, and shares biometric data of individuals. The current configuration of the IDS Handheld Collection System includes the handheld collection device, the support kit containing additional batteries, cleaning supplies, etc., software/firmware, and training materials/manuals. IDS shall adhere to applicable technical standards and policies to include the Department of Defense (DoD) Electronic Biometric Transmission Specification (EBTS), the Privacy Act of 1974 (5 U.S.C. § 552a), cybersecurity and information assurance policy, and network accreditation requirements.
The primary focus of this contract is the maintenance and repair of the IDS Handheld Collection System and the procurement of additional IDS Handheld Collection Systems.
C.2 SCOPE
The purpose of this Statement of Work (SOW) is to continue the efforts to refresh and support IDS technology through its intended life cycle under the current POR. At a minimum, the Contractor shall be responsible for the hardware components of the IDS Handheld Collection System including required drivers, firmware, operating system, and native power management associated with the hardware platform. The Contractor shall kit, package, and deliver IDS hardware in accordance with (IAW) Government-approved design(s) per individual Delivery Orders. The Contractor shall deliver end products to the Government representatives as directed in individual Delivery Orders. Government-developed software will be loaded onto final configuration production hardware units and delivered to the end operators by the Government for the IDS Program. Any software developed by the Government will be Government-owned and the Contractor shall have no rights to it. The Contractor shall provide repair and maintenance support for the hardware components of all delivered systems.
C.2.1 APPLICABLE DOCUMENTS
Specific versions of standards, handbooks, and applicable interface documentation will be articulated in individual Delivery Orders for the respective deliverables. Copies of Government specifications, standards, handbooks and guidance data may be obtained from ASSIST website managed by the Defense Logistics Agency (DLA) Document Services available at https://assist.dla.mil/online/start/.
Otherwise, documents will be available from the links provided in individual Delivery Orders or provided as Government Furnished Information (GFI).
Drawings shall be IAW American National Standards Institute (ANSI) / American Society of Mechanical Engineers (ASME) applicable standards and practices. Any specific tailoring guidance will be provided in individual Delivery Orders.
C.3 REQUIREMENTS
C.3.1 Project Management Activities (Firm Fixed Price (FFP))
C.3.1.1 The Contractor shall be responsible for overseeing the production, quality assurance, quality control, and engineering processes as defined by Contractor management plans. Work shall be conducted IAW this SOW and the specifics provided in individual Delivery Orders.
C.3.1.2 The Contractor shall organize, coordinate, and control all activities, including those assigned to subcontractors, to ensure the correct and timely delivery of all supplies and services.
C.3.1.3 The Contractor shall identify the individuals with whom the Government will interface in order to coordinate the management and technical activities.
C.3.2 Design, Development, and Testing (Firm Fixed Price (FFP))
C.3.2.1 IAW individual Delivery Orders, the Contractor shall update the design of the IDS Handheld Collection System and all requisite firmware and necessary Support Kit items. Reasons for design updates are to accommodate a modernized computing platform, a re-design of the current main circuit board, or changes in major Commercial Off the Shelf (COTS) hardware configuration items. As a part of this task, the Contractor shall develop and test components. (CDRLs A001, A002, A00F)
C.3.2.2 The Contractor shall work with the Government engineering team and the Government software development team throughout the period of this contract as detailed in individual Delivery Orders. This shall include provision of prototype devices for updates identified in C.3.2.1.
C.3.2.3 The Contractor shall include and provide all requisite Software Development Kits (SDK), firmware, and libraries for proper function of the IDS Handheld Collection Device. The Government will be responsible for integration of Government-developed, Government-owned software applications onto the device.
C.3.2.4 The Contractor shall control the configuration and quality of hardware and firmware components and systems delivered to the Government. The Contractor shall utilize quality control measures and quality assurance measures as part of a Quality Management System (QMS) to ensure the quality of all hardware and production processes including inspection and test per a Contractor Quality Assurance Plan (QAP). (CDRLs A003, A005, A006)
C.3.2.5 The Contractor shall provide technical support to the Government to evaluate issues occurring during testing, fielding, and operation of delivered IDS devices and prototypes. Support shall be onsite or via telephone as determined by the Government during normal business hours.
C.3.2.6 The Contractor shall minimize the use of hazardous materials (HAZMAT) to the highest extent possible and take supply chain risk into account when making design choices.
C.3.2.7 In design and production of systems, the Contractor shall strictly adhere to Federal Occupational Safety and Health Agency (OSHA) Regulations, Environmental Safety and Occupational Health (ESOH) requirements in Department of Defense Directive (DoDD) 5000.01 and in Department of Defense Instruction (DoDI) 5000.02, US Navy Battery Safety policies and programs, Environmental Protection Agency (EPA) Regulations, and all applicable state and local laws, regulations, and policies.
C.3.2.8 The Contractor shall provide a complete Level 3 Technical Data Package for the latest IDS Handheld Collection System configuration (CDRL A00G).
C.3.3 Production of Hardware Devices (Firm Fixed Price (FFP))
C.3.3.1 The Contractor shall produce and deliver IDS Handheld Collection Systems and hardware components IAW individual Delivery Orders.
C.3.3.2 The Contractor shall deliver final baselined configuration multi-modal integrated biometric hand-held hardware devices produced via a proven production process.
C.3.3.3 The Contractor shall assemble and deliver to the Government necessary equipment in addition to the additional or updated handheld hardware devices. This may include COTS computing devices, storage media, peripheral biometric sensors, cameras, connectors, ancillary equipment, and supplies.
C.3.3.4 The Contractor shall test units prior to delivery to the Government to ensure that all systems from the production period conform to all of the requirements of this contract and individual Delivery Orders. The Contractor shall test IAW a production acceptance test (PAT) plan included as a part of the Contractor's Quality Assurance Plan (QAP). The Contractor shall provide results to the Government. For each item that fails during the PAT, the Contractor shall provide a failure analysis report. (CDRLs A003, A004, A005)
C.3.3.5 The Contractor shall maintain the baseline and information for all non-consumable parts and systems delivered to the Government. The Contractor shall provide information for traceability and configuration status accounting (CSA). (CDRLs A006, A008)
C.3.4 Life Cycle Sustainment and Support (Firm Fixed Price (FFP))
C.3.4.1 The Contractor shall support the Government in overseeing the technical maintenance of the IDS Handheld Collection System including the update of instruction manuals and training aides. (CDRLs A00H)
C.3.4.2 The Contractor shall provide a warranty for the hand-held hardware device to cover defects discovered within 1 year of delivery not including damage caused by the Government. The Contractor shall repair or replace the defective item under warranty coverage at the Contractor’s expense.
C.3.4.3 The Contractor shall participate in integrated logistics and maintenance planning in coordination with the Government throughout the period of this contract. (CDRLs A009, A00A, A004)
C.3.4.4 The Government will maintain IDS Handheld Collection Systems under a three level concept:
Contractor repair, ISEA level repair, and Operational level (O-level) repair. The Government is responsible for ISEA level and O-level repair. The Contractor shall be responsible for Contractor repair level under C.3.5 of this SOW.
C.3.4.5 O-Level and ISEA level repair actions will be limited to those components identified by the Contractor in the Provisioning Parts List (PPL). The Government performing O-level repair and replace actions shall not nullify existing warranties. (CDRL A00B)
C.3.4.6 The Contractor shall furnish for delivery to the Government spare and repair parts as set forth in the PPL. Failure by the Contractor to specify spare part determinations on the PPL for individual items does not preclude the Government from requiring the Contractor to update the PPL with additional components. The Government may issue Delivery Orders for spare and replacement parts throughout the life of the contract. (CRDL A00B)
C.3.4.7 The Contractor shall communicate Diminishing Manufacturing Sources and Material Shortages (DMSMS) issues and anticipated issues to the Government (CDRL A009). To support logistics, supply chain, and DMSMS management, the Contractor shall provide a Bill of Materials (BOM) for hardware delivered under this contract. (A00C)
C.3.5 Repair (Cost Plus Fixed Fee (CPFF))
C.3.5.1 The Contractor shall have a mechanism in place to collect, analyze, and report on problems and failures and shall implement an effective cause and corrective action system. Failure data shall be isolated to the lowest replaceable unit (LRU) assembly or component. The Contractor shall provide a Failure Summary Analysis Report for each system repaired or replaced under warranty and non-warranty repairs. (CDRLs A009, A004)
C.3.5.2 Warranty Repairs - The Contractor shall receive, inspect, test, and perform failure analysis and isolate each hardware device as necessary to determine the specific work required to restore it to a serviceable condition. The Contractor shall perform and report the results of a screening-level failure analysis to determine whether the repair falls under warranty within ten (10) calendar days after receipt of the failed device(s). Disassembly of the hardware device shall be limited to the minimum extent possible. Repair turnaround time shall not exceed fourteen (14) calendar days after receipt of determination of whether the repair falls under warranty. All failures returned to the Contractor for repair will have a Return Material Authorization (RMA) number assigned by the Contractor. The Contractor shall ship all repaired hardware devices to the Government for acceptance at the Contractor’s expense. (CDRL A00D)
C.3.5.3 Non-Warranty Repairs - The Contractor shall receive, inspect, test, and perform failure analysis and isolate each hardware device as necessary to determine the specific work required to restore it to a serviceable condition. Upon approval by the Government, the Contractor shall repair the hardware that does not exceed fifty-percent (50%) of the replacement cost to the latest approved configuration. The Contractor shall perform failure analysis and submit a cost estimate to the Government within ten (10) calendar days after receipt of the failed device(s) and prior to commencement of work for any non-warranty repairs. The Contractor shall not proceed with repairs until approval by the Government.
Disassembly of the hardware device shall be limited to the minimum extent possible. If a unit has failed beyond economical repair, the Government may choose to replace the unit at its discretion. All failures returned to the Contractor for repair will have a Return Material Authorization (RMA) number assigned by the Contractor. The Contractor shall ship all repaired hardware devices to the Government for acceptance. All non-warranty repairs performed on the hardware device by the Contractor shall be warranted for a minimum of 120 calendar days. This does not exclude any existing warranty remaining.
(CDRL A00E)
C.3.6 Integration Support (Cost Plus Fixed Fee (CPFF))
C.3.6.1 The Contractor shall work with the Government engineering team and the Government software development team throughout the period of this contract to integrate Government-developed software onto hardware devices.
C.4 Travel
The Contractor shall be required to travel in performance of this contract. The numbers of trips and types of personnel traveling shall be limited to the minimum required to accomplish work requirements and shall be coordinated with the COR. Travel to the following locations is anticipated: Washington DC metropolitan area including Washington DC; Dahlgren, Virginia; and Norfolk, VA and surrounding area.
Specific travel requirements will be specified in individual Delivery Orders.
C.5 GOVERNMENT FURNISHED EQUIPMENT, INFORMATION, AND MATERIALS
C.5.1 Government Furnished Property
(a) GFP may be issued under this contract. GFP is anticipated to include IDS units for repair and maintenance.
(b) The Contractor shall maintain and report the inventory of GFP (CDRL A007) issued under this contract.
C.5.3 Government Furnished Information
(a) The Government will provide all GFI listed in this SOW upon award of the contract. Additional GFI, if required by the individual tasking, will be provided to the Contractor for usage.
C.6 SECURITY
C.6.1 Work performed under this contract shall be Unclassified. Personnel providing direct support to this effort will not be required to have a DoD clearance at time of award. Much of the IDS program information is considered Controlled Unclassified Information (CUI). This is information that although unclassified is subject to access or distribution limitations in accordance with statute or regulation.
Included is information exempt from mandatory release to the public under the Freedom of Information Act, or information that is subject to export control. The Contractor shall be appropriately trained and equipped to handle CUI. Controlled Unclassified Information (CUI) to include Personally Identifiable Information (PII) generated and/or provided under this contract shall be safeguarded and marked as specified in DoD 5400.7-R Chapters 3 and 4.
C.6.2 Portable Electronic Devices (PEDs)
C.6.2.1 Non-Government and/or personally owned portable electronic devices (PEDs) are prohibited in all NSWCDD buildings with the exception of personally owned cell phones which are authorized for use in spaces up to and including Controlled Access Areas. The Contractor shall ensure the onsite personnel remain compliant with this PED policy. NSWCDD instruction defines PEDs as the following: any electronic device designed to be easily transported, with the capability to store, record, receive or transmit text, images, video, or audio data in any format via any transmission medium. PED’s include, but are not limited to, pagers, laptops, radios, compact discs and cassette players/recorders. In addition, this includes removable storage media such as flash memory, memory sticks, multimedia cards and secure digital cards, micro-drive modules, ZIP drives, ZIP disks, CD-RWs, DVD-RWs, MP3 players, iPADs, digital picture frames, electronic book readers, kindle, nook, cameras, external hard dish drives, and floppy diskettes.
C.6.2.2 Personal Wearable Fitness Devices (PWFDs) marketed primarily as fitness or sleep devices are allowed in all Navy spaces where collateral non-Sensitive Compartmented Information (SCI), classified information is processed, stored, or discussed up to and including secret. User must ensure PWFD is compliant with all requirements in NAVADMIN 216/15, Cyber Hygiene Authorization to use Personal Wearable Fitness Devices (e.g., FitBit, Jawbone UP, etc.) in Navy Spaces, dated 14 September 2015 and register PWFD in the NSWCDD Fitness Device Tracker.
C.6.2.3 Personnel requiring the use of Medical Portable Electronic Devices (MPEDS) must submit Form NSWCDD 5239/1 for SCIF authorization to the SCIF authorizations to the Special Security Officer (SSO).
For SAFF, authorizations follow the guidance provided by the Government Special Access Program Security Officer (GSSO). Authorizations for use in SAPFs that are co-utilized within NSWCDD SCIFS require coordination between both the GSSO and SSO. For authorizations to use MPED in Collateral Classified spaces, submit form to the Special Programs Branch, Code 1053.
C.6.2.4 PED’s belonging to an external organization shall not be connected to NSWCDD networks or infrastructure without prior approval from the NSWCDD Information Assurance and Compliance Branch.
This approval will be granted using the TARIS form and action tracker process.
C.6.2.5 Personally owned hardware or software shall not be connected or introduced to any NSWCDD hardware, network or information system infrastructure.
C.6.2.6 Navy-issued peripheral:
C.6.2.6.1 Government procured headsets with or without microphones must be wired, use either a 3.5 millimeter (mm) audio jack or universal serial bus (USB) port, cannot contain active-noise cancelling functionality and may be used on systems and may be used on systems of classification up to and including collateral Top Secret. The headsets are considered unclassified when unplugged, and must be unplugged when not in use within classified spaces or when classified discussions are taking place in unclassified spaces.
C.6.2.6.2 Government procured Bluetooth earbuds and headsets that do not require a USB dongle or any other physical connection to enable wireless connectivity are allowed for use on Government issued tablets, phones, and personal devices in telework environments or unclassified general office space where no classified discussion are occurring.
C.6.2.6.3 Web cameras may only be used on systems at the classification level of the space. For example, in a collateral SECRET open storage area an external web camera may be commented to the SECRET workstation only. No camera pass is required for these devices.
C.6.2.6.4 Government provided printers and/or scanners are authorized in a telework environment.
Users must ensure that any paper or media containing CUI or unclassified information not authorized for public release is safeguarded by locking in a drawer, cabinet or room. CUI and unclassified information not approved for public release must be returned to the worksite for destruction.
C.6.2.6.5 Government issued peripherals may be used on personal devices.
C.6.2.6.6 While connected to any Navy network, whether on site or while in a telework environment, the use of headsets with microphones and web cameras are restricted to official Government duties.
C.6.3 Operations Security (OPSEC)
Contractor personnel shall follow OPSEC concepts and principles in the conduct of this requirement to protect critical information, personnel, facilities, equipment, and operations from compromise. All Contractors (including Sub-contractors) shall supplement their current security practices by requiring any personnel involved in executing this contract to complete Government-sponsored and administered Operations Security (OPSEC) training. In addition, all Contractors should be aware of the Critical Information and Indicators List (CIIL) for the organization they are supporting as well as the OPSEC plan for NSWCDD. These OPSEC requirements will be in effect throughout the life of the procurement from award through the conclusion of services at the end of the period of performance (PoP) or other procurement termination. The Contractor must immediately notify the Government upon the discovery of any nonconformance with the OPSEC Plan.
C.6.4 Privacy Program Training
Privacy Program Training. Privacy training is mandatory for all NSWCDD personnel (military, civilian, and Contractor) and must be completed annually. The Total Workforce Management System (TWMS) is the official database for workforce training and is the preferred tool for taking and recording privacy act training. The Contractor is responsible for ensuring individual annual privacy training requirements are met.
C.7 ON-SITE ENVIRONMENTAL AWARENESS
C.7.1 The Contractor shall strictly adhere to all Federal, State and local laws and regulations, Executive Orders, and Department of Defense and Navy policies.
C.7.2 The Contractor shall ensure that each Contractor employee who has been or will be issued a Common Access Card (CAC) completes the NSWCDD Environmental Awareness Training (EAT) within 30 days of commencing contract performance and annually thereafter as directed by their training coordinator or their COR.
C.7.3 The Contractor shall ensure that each Contractor employee not required to complete the training described above (i.e., those who do not have and will not be issued a CAC) reads the NSWCDD Environmental Policy Statement within 30 days of commencing contract performance. This document will be available from the COR, however, the policy is also provided on the publicly-available NSWCDD website:
https://wwwdd.nmci.navy.mil/program/Safety_and_Environmental_Office/Environmental/Environment al.html
C.7.4 Within 30 days of commencing contract performance, the Contractor shall certify by e-mail to their COR that the requirements captured above have been met. The e-mail shall include each employee name and work site and shall indicate which requirement each employee has satisfied.
C.7.5 Contractor copies of the records generated by the actions described above will be maintained and disposed of by the Contractor in accordance with Secretary of Navy Instruction (SECNAVINST) 5210.8D.
C.8 ON-SITE SAFETY REQUIREMENTS
C.8.1 The Contractor shall strictly adhere to Federal Occupational Safety and Health Agency (OSHA) Regulations, Environmental Protection Agency (EPA) Regulations, NSWCDDINST 5100.1 Occupational Safety and Health Instruction (current revision), and all applicable state and local requirements.
C.8.2 The Contractor shall ensure that each Contractor employee reads the document entitled, "Occupational Safety and Health (OSH) Policy Statement" within 30 days of commencing performance at NSWCDD. This document is available at: https://navsea.navy.deps.mil/sites/wc-nswcdd/operations/InfrastructureDiv/SafetyEnvironmental/SitePages/Safety.aspx.
C.8.3 The Contractor shall provide each Contractor employee with the training required to do his/her job safely and in compliance with applicable regulations. The Contractor shall document and provide, upon request, qualifications, certifications, and licenses as required. Contractors conducting lead or asbestos abatement activities shall also provide a written abatement plan to the Safety & Environmental Branches for review and approval.
C.8.4 The Contractor shall provide each Contractor employee with the personal protective equipment required to do their job safely and in compliance with all applicable regulations.
C.8.5 Contractors working with ionizing radiation (radioactive material or machine sources) must comply with NAVSEA S0420-AA-RAD-010 (latest revision)[provided upon request]. Prior to bringing radioactive materials or machine sources on base, the Contractor must notify the Command Radiation Safety Officer in the Safety Branch.
C.8.6 Contractors shall not procure hazardous material (HAZMAT) on behalf of NSWCDD without following the approved HAZMAT procurement process in ERP. For emergency HAZMAT purchases only, the Contractor shall alert the Safety & Environmental Branches and request a waiver to procure outside the HAZMAT procurement process. For emergency purchases, the Contractor shall submit an Authorized Use List Addition form and the Safety Data Sheet to the Safety & Environmental Branches for approval.
Once the HAZMAT arrives onsite, the Contractor shall alert the Environmental Branch so that it can be barcoded and added to the inventory.
C.8.7 HAZMAT owned by the Contractor and brought into NSWCDD work spaces for temporary use shall be reviewed and approved by the Safety & Environmental Branches prior to use. The Contractor shall submit the Safety Data Sheet that must be routed through the Government supervisor responsible for the specific work area. This HAZMAT must clearly be marked that it is Contractor owned and shall not be stored in NSWCDD spaces.
C.8.8 Applicable Contractors shall submit Total Case Incident Rate (TCIR) and Days Away, Restricted and Transfer (DART) rates for the past three years upon request by the Safety Branch. A Contractor meets the definition of applicable if its employees worked 1,000 hours or more in any calendar quarter onsite and where oversight is not directly provided in day to day activities by the command.
C.8.9 The Contractor shall report all work-related injuries/illnesses that occurred while working at NSWCDD, or an off-site location (including shipboard), to the Safety Branch.
C.9 INFORMATION SECURITY AND COMPUTER SYSTEM USAGE
In accordance with U.S. Navy policy, any personnel, including the Contractor, who utilizes DOD owned systems, shall assume responsibility for adherence to restrictions regarding internet and e-mail usage.
Navy policy prohibits racist, sexist, threatening, pornographic, personal business, subversive or politically partisan communications. All personnel, including the Contractor, are accountable and must act accordingly. DOD computer systems are monitored to ensure that the use is authorized, to facilitate protection against unauthorized access, and to verify security procedures, survivability and operational security. During monitoring, information may be examined, recorded, copied, and used for authorized purposes. All information, including personal information, placed on or sent over a DOD system may be monitored. Use of a DOD system constitutes consent to monitoring. Unauthorized use may result in criminal prosecution. Evidence of unauthorized use collected during monitoring may be used as a basis for recommended administrative, criminal or adverse action.
C.10 USE OF INFORMATION SYSTEM (IS) RESOURCES
Contractor Provision of IS Resources Except in special circumstances explicitly detailed elsewhere in this document, the Contractor shall provide all IS resources needed in the performance of this contract. This includes, but is not limited to computers, software, networks, certificates, and network addresses.
C.10.1 CONTRACTOR USE OF NSWCDD IS RESOURCES
(a) In the event that the Contractor is required to have access to NSWCDD IS resources, the login name used for access shall conform to the NMCI login naming convention. If the Contractor requires access to applications/systems that utilize client certificates for authentication, the Contractor is responsible for obtaining requisite certificates from a DOD or External Certificate Authority
(b) If this contract requires that the Contractor be granted access and use of NSWCDD IS resources (at any site), the IS shall be accredited for Contractor use in accordance with procedures specified by the Information Assurance Office.
(c) Connections between NSWCDD and Contractor Facilities If there is a requirement (specifically delineated elsewhere in this contract) for interconnection (e.g., link level or Virtual Private Network (VPN)) between any facilities and/or ISs owned or operated by the Contractor and ISs owned or operated by NSWCDD, such interconnection shall take place only after approval from the Information Assurance Office. All such connections as well as the ISs connected thereto will be accredited in accordance with DOD policy (DODI 5200.40) by the cognizant Designated Approving Authority (DAA) and comply with the requirements of CJCSI 6211.02B regarding Memorandums of Agreement. All such connections will be made outside the appropriate NSWCDD firewall.
C.11 SENSITIVE, PROPRIETARY, AND PERSONAL INFORMATION
Work under this contract may require that personnel have access to Privacy Information. Contractor personnel shall adhere to the Privacy Act, Title 5 of the U.S. Code. Section 552a and applicable agency rules and regulations. Access to and preparation of sensitive information subject to privacy Act and Business Sensitive safeguarding and destruction may be required in the execution of tasking associated with this contract. Administratively sensitive information/data must not be shared outside of the specific work areas. All personnel with access to privacy act data in support of this contract must sign a privacy act certification.
C.12 CONTRACTOR IDENTIFICATION
The Contractor shall be required to obtain identification badges from the Government for all Contractor personnel requiring regular access to Government property. The identification badge shall be visible at all times while employees are on Government property. The Contractor shall furnish all requested information required to facilitate issuance of identification badges and shall conform to applicable regulations concerning the use and possession of the badges. The Contractor shall ensure that all identification badges issued to Contractor employees are returned to the appropriate Security Office within forty-eight (48) hours following completion of the contract, relocation or termination of an employee, and upon request by the Contracting Officer.
All Contractor personnel shall identify their company affiliation when answering or making telephone calls and sending email and when attending meetings where Government personnel or representatives from other Contractors are present.
C.13 CONTROL OF CONTRACTOR PERSONNEL
The Contractor shall comply with the requirements of NAVSEA and NSWCDD instructions regarding performance in Government facilities. All persons engaged in work while on Government property shall be subject to search of their persons (no bodily search) and vehicles at any time by the Government, and shall report any known or suspected security violations to the appropriate Security Department.
Assignment, transfer, and reassignment of Contractor personnel shall be at the discretion of the Contractor. However, when the Government directs, the Contractor shall remove from contract performance any person who endangers life, property, or national security through improper conduct.
All Contractor personnel engaged in work while on Government property shall be subject to all applicable DoD and Navy Standards of Conduct.
C.14 CONTRACT PERSONNEL ADMINISTRATION
When on-site in Government office spaces, laboratories, test facilities, or ship assets, Contractor employees shall be clearly identified as a Contractor (e.g. utilizing badge identifications and sign identifications in office spaces). In addition, Contractor employees shall identify themselves as Contractor personnel when answering telephones and sending emails. Contractor personnel cannot lead/manage/supervise Government personnel. Contractor program /project managers shall be clearly identified and known as such by Government employees. As circumstances permit, frequent (at least monthly) meetings are conducted between the COR and the Contractor organization program manager/project manager.
C.15 TERMINATION OF EMPLOYEES WITH BASE ACCESS
(a) The Contractor shall ensure that all employees who have a DoD Common Access Card (CAC), turn in the CAC immediately upon termination of their employment under this contract. The above requirement shall be made a part of the standard employee facility clearance procedures for all separated personnel. The Contractor shall advise Command Physical Security of all changes in their personnel requiring DoD base access.
(b) For involuntarily separated personnel and those separated under adverse circumstances, the Contractor shall notify Command Physical Security in advance of the date, time, and location where the Command representative retrieve the DoD CAC prior to the employee departing the Contractor’s facility.
In the event the employee is separated in his or her absence, the Contractor shall immediately notify Command Physical Security of the separation and make arrangements between the former employee and Command Physical Security for the return of the CAC.
C.16 NON-PERSONAL SERVICES/INHERENTLY GOVERNMENT FUNCTIONS
(a) The Government will neither supervise Contractor employees nor control the method by which the Contractor performs the required tasks. The Government will not direct the hiring, dismissal or reassignment of Contractor personnel. Under no circumstances shall the Government assign tasks to, or prepare work schedules for, individual Contractor employees. It shall be the responsibility of the Contractor to manage its employees and to guard against any actions that are of the nature of personal services or give the perception that personal services are being provided. If the Contractor feels that any actions constitute, or are perceived to constitute personal services, it shall be the Contractor's responsibility to notify the Contracting Officer immediately in accordance with FAR 52.243-7.
(b) Inherently-Governmental functions are not within the scope of this contract. Decisions relative to programs supported by the Contractor shall be the sole responsibility of the Government. The Contractor may be required to attend technical meetings for the Government; however, they are not, under any circumstances, authorized to represent the Government or give the appearance that they are doing so.
C.17 DIGITAL DELIVERY OF DATA
(a) Delivery by the Contractor to the Government of certain technical data and other information is now frequently required to be made in digital form rather than in hardcopy form. The method of delivery of such data and/or other information (i.e., in electronic, digital, paper hardcopy, or other form) shall not be deemed to affect in any way either the identity of the information (i.e., as “technical data” or “computer software”) or the Government’s and the Contractor’s respective rights therein.
(b) Whenever technical data and/or computer software deliverables required by this contract are to be delivered in digital form, any authorized, required, or permitted markings relating to the Government’s rights in and to such technical data and/or computer software must also be digitally included as part of the deliverable and on or in the same medium used to deliver the technical data and/or software. Such markings must be clearly associated with the corresponding technical data and/or computer software to which the markings relate and must be included in such a way that the marking(s) appear in human-readable form when the technical data and/or software is accessed and/or used. Such markings must also be applied in conspicuous human- readable form on a visible portion of any physical medium used to effect delivery of the technical data and/or computer software. Nothing in this paragraph shall replace or relieve the Contractor’s obligations with respect to requirements for marking technical data and/or computer software that are imposed by other applicable clauses such as, where applicable and without limitation, DFARS 252.227-7013 and/or DFARS 252.227-7014.
(c) Digital delivery means (such as but not limited to Internet tools, websites, shared networks, and the like) sometimes require, as a condition for access to and/or use of the means, an agreement by a user to certain terms, agreements, or other restrictions such as but not limited to “Terms of Use,” licenses, or other restrictions intended to be applicable to the information being delivered via the digital delivery means. The Contractor expressly acknowledges that, with respect to deliverables made according to this contract, no such terms, agreements, or other restrictions shall be applicable to or enforceable with respect to such deliverables unless such terms, agreements, or other restrictions expressly have been accepted in writing by the Procuring Contracting Officer; otherwise, the Government’s rights in and to such deliverables shall be governed exclusively by the terms of this contract.
File details come from the government source that posted it. Updated .