IDL Event 1307 RFQ Package.pdf

PDF 3 MB Posted

Attached to
CXT Cascadian Vault Toilets, or Equivalent with Installation
Solicitation number
1307
Issued by
Ada County, Idaho

About this file

This Request for Quote (RFQ) package is issued by an Idaho government entity to solicit quotes for CXT Cascadian Vault Toilets, or equivalent products, with installation services. The RFQ package references an attached Schedule A and Project Description that outline the specific requirements and scope of work. The solicitation establishes a June 16, 2026 due date for quote submissions. The RFQ package documentation includes supporting materials necessary for vendors to develop competitive responses, though specific details regarding quantities, site visit requirements, bidders' conferences, and contract term information are not detailed within the referenced file materials.

Pricing terms, set-asides, incumbent contractor status, funding sources, and other financial or administrative requirements are not specified within the available file summary. Vendors interested in pursuing this opportunity should request the complete solicitation package, including Schedule A and the Project Description, to obtain comprehensive information regarding pricing expectations, any applicable small business or other preferences, and the full scope of work including installation requirements and performance standards.

View the file

Other files

File Type Posted
IDL Standard Terms and Conditions.pdf PDF
IDL Event 1307 RFQ Package_Amd 2.pdf PDF
RFQ 1307 - Addendum 1 - Q&A.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATE OF IDAHO

DEPARTMENT OF LANDS

CXT VAULT TOILETS, or EQUIVALENT

INCLUDES INSTALLATION

REQUEST FOR QUOTE NO. 1307

DUE BEFORE 5:00:00 P.M. MT on June 9, 2026

REQUEST FOR QUOTE

AND

INSTRUCTIONS

Quotes will be received by the Idaho Department of Lands for the following:

CXT VAULT TOILETS, or EQUIVALENT

INCLUDES INSTALLATION

BOWEN CABIN

LUTHY CORRAL TRAILHEAD

DELIVERY LOCATIONS:

Idaho Department of Lands’ separate locations are on Endowment land in the Kelly Canyon area.

Exact cite locations and any further directions needed will be provided upon a pre-work meeting with the Contracting Officer’s Representative (COR). Links to both areas are provided in Schedule A below.

INSTRUCTIONS:

The purpose of this Request for Quote (RFQ) package is to solicit quotes for CXT Cascadian Vault Toilets, or Equivalent, as outlined in the attached Schedule A and Project Description.

All price quotes must be entered on the attached Schedule A. The signed Schedule A MUST be submitted with your response. The submitting Vendor agrees that its Quotation shall be good and may not be withdrawn for a period of ninety (90) days after the scheduled closing date, unless otherwise identified in the Solicitation. No Quotation will be accepted if marked "price prevailing at time of delivery,” “estimated prices,” “actual costs to be billed,” or similar phrases.

After the date and time of closing, no price change will be allowed, unless otherwise stated in the Solicitation. The right is reserved to accept a quote on each item separately, or as a whole.

IDL may award Purchase Order(s) in its best interest to the qualified Supplier submitting the lowest responsible and responsive quote, either by line item or in whole. The TOTAL PRICE by line item or in whole will be the basis for award. The Quotation must be in U.S. Dollars.

Idaho Department of Lands reserves the right to enter negotiations in accordance with IDL Procurement Policy #455.

QUOTES DEADLINE AND ELECTRONIC DELIVERY REQUIREMENTS:

Quotes must be submitted through the State’s eProcurement system IPRO, Powered by LUMA (IPRO). Do not fax or e-mail your Quote. Quotes must be received before 5:00:00 P.M. MT, on June 9, 2026. IDL is not responsible for delayed delivery of electronically submitted quotes. Late Quotes will not be accepted.

QUESTIONS:

Questions pertaining to this RFQ must be submitted in writing by email to quinn.shea@idl.idaho.gov . The deadline for receiving questions is 11:59:59 P.M., on 6/1/2026.

Responses to all questions received will be posted as an addendum in IPRO. Verbal questions will not be accepted.

mailto:quinn.shea@idl.idaho.gov

SCHEDULE A

STATE OF IDAHO

DEPARTMENT OF LANDS IPRO RFQ Number: 1307

REQUEST FOR QUOTE

THIS IS NOT AN ORDER

INSTRUCTIONS:

• Responders must use this form in submitting a quote

• All quotes over $50,000.00 require a Public Works License

• Delivery: FOB Destination; Idaho Department of Lands’ separate locations

QUAN. UNIT ARTICLES UNIT PRICE TOTAL PRICE

1 LS

Single Vault Toilet, CXT Cascadian Vault Toilet, or Equivalent, per Project Description: Bowen Cabin Area; Coordinates: 12T 451432.10m 4838562.72m (Google Maps link)

Includes: Vault Toilet; Installation (including but not limited to materials, excavation, backfill and cleanup); Transportation (fixed rate); Idaho State PO Drawing and any required Permits.

1 LS

Single Vault Toilet, CXT Cascadian Vault Toilet, or Equivalent, per Project Description: Kelly Canyon IDL Block. Luthy Corral Trailhead Area; Coordinates: 12T 450310.42m 4836314.40m (Google Maps link)

Includes: Vault Toilet; Installation (including but not limited to materials, excavation, backfill and cleanup); Transportation (fixed rate); Idaho State PO Drawing and any required Permits.

Action Due Date Request for Quote Responses Due Before: 5:00:00 P.M. MT, 6/9/2026 Delivery Requested by: 8/31/2026

SUBMISSION DELIVERY:

Complete this Schedule A and upload to Supplier Attachments, in IPRO.

We have stated hereon the prices at which we will furnish and at destination named above, the articles or services as specified. Delivery will be made as specified above.

Firm ______________________________________________

Street _____________________________________________

City State Zip Code ________

Phone Fax __________________

Email ____________________________________________

Signed by _________________________________________

Printed Name ______________________________________

Title ______________________________________________

Date __________________ https://www.google.com/maps/place/43%C2%B041'56.6%22N+111%C2%B036'13.0%22W/@43.6990594,-111.606186,629m/data=!3m2!1e3!4b1!4m4!3m3!8m2!3d43.6990556!4d-111.6036111?entry=ttu&g_ep=EgoyMDI2MDUxNy4wIKXMDSoASAFQAw%3D%3D https://www.google.com/maps/place/43%C2%B041'56.6%22N+111%C2%B036'13.0%22W/@43.6990594,-111.606186,629m/data=!3m2!1e3!4b1!4m4!3m3!8m2!3d43.6990556!4d-111.6036111?entry=ttu&g_ep=EgoyMDI2MDUxNy4wIKXMDSoASAFQAw%3D%3D https://www.google.com/maps/place/43%C2%B040'41.6%22N+111%C2%B036'59.0%22W/@43.6782232,-111.6170326,157m/data=!3m2!1e3!4b1!4m4!3m3!8m2!3d43.6782222!4d-111.6163889?entry=ttu&g_ep=EgoyMDI2MDUxNy4wIKXMDSoASAFQAw%3D%3D https://www.google.com/maps/place/43%C2%B040'41.6%22N+111%C2%B036'59.0%22W/@43.6782232,-111.6170326,157m/data=!3m2!1e3!4b1!4m4!3m3!8m2!3d43.6782222!4d-111.6163889?entry=ttu&g_ep=EgoyMDI2MDUxNy4wIKXMDSoASAFQAw%3D%3D

PROJECT DESCRIPTION

RFQ 1307

PROJECT NAME:

CXT Cascadian Vault Toilets, or Equivalent, with Installation

PROJECT NUMBER:

RFQ 1307

PROJECT COMPLETION DATE:

August 31, 2026

PROJECT LOCATIONS:

Kelly Canyon IDL Block, Bowen Cabin Area and Luthy Corral Trailhead (See Attached map). Locations are marked with a Blue House Waypoint. Google Maps links are located in Schedule A.

WORK TO BE PERFORMED:

The Contractor must provide, deliver, and install, in each location, one (1) pre-engineered vault toilet CXT Cascadian Vault Toilet or Equivalent, single user, waterless restroom. This will include but not be limited to:

• Site prep – Excavate the area, compact the soil, and install the vault toilet, according to manufacturer’s recommendations.

• Backfilling (including materials)

• Building Setup, Leveling

• Ventilation – sweet smelling technology

• ADA Compliance – toilet, toilet riser, grab bars

EQUIPMENT REQUIREMENTS:

The Contractor must furnish all equipment necessary to complete the project.

PERMIT, LICENSING REQUIREMENTS:

It is the Contractor’s sole responsibility to attain all necessary permits and licenses to complete this project. Contractor must not proceed with work until all permits required are confirmed with the COR. It is the Contractor responsibility to ensure that all required permits are identified.

PROJECT ADMINISTRATION:

IDL’s Contracting Officer Representative (COR) will be provided upon award.

PROJECT PERIOD AND SCHEDULE:

Contract work may commence after the Contractor receives a Notice to Proceed and has had a prework conference with the COR. All work must be completed by August 31, 2026, in compliance with all Contract terms, clauses, and associated special provisions (if applicable).

INSPECTION AND ACCEPTANCE:

Upon completion, the COR will inspect the buildings and once approved, the Contractor may submit invoices for payment.

PAYMENT:

Invoices must be sent to Invoicing@idl.idaho.gov. Invoices that are not sent to this address may be delayed in processing and payment. Invoices must include the Contract Number and a unique invoice number to prevent delays in processing.

Payment will be made to the Contractor upon satisfactory completion of fieldwork at the rates set forth in Schedule A. Invoices must be itemized per the attached Schedule A; payment will be made after receipt of the contractor’s itemized invoice for satisfactorily completed work. Invoices shall be submitted no more than monthly and will include a description of services completed during the period being invoiced. Per Idaho Code 67-2302 (2) IDL has up to 60 days from receipt of an invoice for processing and payment.

SPECIFICATIONS:

The Contractor must provide, deliver, and install one (1) CXT Cascadian Vault Toilet, or equivalent, in two (2) separate location in the same general vicinity near Kelly Canyon, ID (See Schedule A for delivery/installation location).

The Vault Toilets must be ADA compliant, equipped with toilet risers and grab bars.

Outside walls should be a simulated distressed wood texture and the roof should be simulated shake, or an equivalent texture with the same functionality.

If offering an Equivalent product, IDL, at its sole discretion, may accept minor deviations to the following measurements:

mailto:Invoicing@idl.idaho.gov

VAULT MEASUREMENTS

• Weight: 17,400 lb.

• Width: 6’ 6”

• Length: 14’ 7½”

• Height: 4’ 4”

BUILDING MEASUREMENTS

• Weight: 28,600 lb.

• Width: 8’ 6”

• Length: 15’ 2 3/4”

• Height: 11’ 6”

INSTALATION

• Placement The floor of the building and the top of the vaults should be the high spot of the site chosen. Finished floor elevation should be 4- 6” above natural grade measured at the front entrance of the floor. Both the floor and the top of the vault should be above the surrounding ground level with the pathway sloped up to meet the entryway. Ideally, the back of the building should be slightly higher to allow water to freely drain out of the toilet rooms.

• Excavation, Backfill and Compaction The hole dug to accommodate the vaults must be large enough to be workable and to allow the floor of the building to fit on the vaults when placed, but small enough to avoid excessive backfill after placement (use industry best practices in your judgement). Compact the natural ground at the bottom of the vault excavation with a minimum of three passes with a whacker-type mechanical compactor or equivalent.

Install aggregate bedding material for building support. Compact aggregate course with two passes with a whacker-type mechanical tamper or equivalent. Install leveling course of sand so there will be no high spots in the middle of the vault bottom. Set vault in place. Ideally, the containment area end of the vault should be slightly higher; ¼” per foot of run to allow the building to sit higher. Ensure vault is level, side to side. Backfill around the structure. Use excavated material for backfill, rocks larger than 6” in maximum dimension shall not be placed within 6” of the exterior vault walls.

Fill, adjacent to the building entry will have excavated material placed in 8” loose lifts and compacted with a minimum of two (2) passes with a whacker-type mechanical compactor or equivalent. After the vault is placed in the hole and backfilled, place butyl tape around the entire top surface of the vault.

Make sure that the area is free of debris.

• Setting and Assembling the Building Set bottom building section onto vault lining up the back corners of the building section with the back corners of the vault (the vault section with ABS liner). Place rebar (included) into the holes provided on the top of the walls of the bottom section, then squeeze epoxy (included) into each hole. Lift top section of building, squeeze epoxy into the holes provided in the bottom of this section, line up the holes with the rebar on the bottom section of building and set.

• Doors Place door frame into door opening. Ensure that door frame is centered within opening. Make sure frame is plumb.

Attach door to hinges. Depending on what hand the door frame is, you might need to remove hinge plate from door and rotate it 180° and return to door.

Ensure that door swings freely within the frame. If door binds, use shims underneath hinges to correct the problem.

Attach deadbolt and privacy latch handle per manufacturer’s instructions.

Adjust door sweep so that it lightly brushes the ground. Caulk around door frame with appropriate caulk for application per manufacturer standards.

MISCELLANEOUS

• Southern exposure for the vent stack is ideal, as this allows for heating of the vent stack. Heating of the vent stack aids in the venting of the building.

Whenever possible, the placement of the building should be chosen with this in mind.

• Aggregate bedding material provides a solid base for the vault.

• Sand is preferable for use in leveling the bottom of the hole excavated for the vault, as it is easier to level.

• Use of softeners when lifting the building is critical to prevent spalling to the roof of the building, if nylon leads are not available.

• When lining up the vault and the floor of the building, lining up the rear corners of the vault (the containment portion) and floor (by the clean-out and vent stack) is the easiest and best way to set the building.

• Important: Check the seal of the containment portion of the vault by getting into the vault through the clean-out cover in the back of the building after building placement. There should be no light leaking through, with the exception of the riser and vent stack holes.

• Use caulk to seal around the riser and vent stack where it joins the floor and roof panels. When sealing the vent stack, be sure to put a bead of caulk in the floor vent hole, insert vent stack, then caulk around vent stack.

• Prior to use, it is recommended you place water in a sufficient amount as to cover the entire bottom of the vault containment area to assist in keeping waste material fluid, making it easier to pump out when needed.

IDL Event 1307 Maps and Directions

The attached map shows the toilet locations identified as a blue house waypoint. The road to get to the locations are colored Magenta for Luthy Corral and Magenta and Purple (the Spur) to get to Bowen Cabin. If more assistance is needed finding these locations, reach out to the East Supervisory area and or Todd Wernex to help guide you there.

On highway 26 coming from Idaho Falls, you will need to turn left just before the Chevron on North 130th East and head toward Ririe. On the way toward both of the locations there will be a 4.6 mile section of gravel road that will turn to pavement and then back to gravel for the final approaches.

• Luthy Corrals Toilet is off the Lyons Creek Road, it is 17.4 miles from Highway 26. Follow the Magenta colored section to get there. The toilet will be installed and then they will back track to the purple spur to get to Bowen Cabin.

Directions to Luthy Corrals off the Browns Creek Road is 17.3 miles. The Spur off of the S6200 E road is noted in purple.

• Bowen Cabin toilet. From Luthy Corrals you will need to back track to the S6200 E road and turn Right on the Browns Creek Road. Travel East on the Browns Creek Road for 3.1 miles.

Directions to the Bowen Cabin Spur is 3.1 mi off the S6200 E road, down the Browns Creek Road.

RFQ 1307- - Vaulted Toilets
SCHEDULE A
INSTRUCTIONS:
SUBMISSION DELIVERY:
Form - Project Description
Updated Map with directions
kelly map
2026 Vault toilet location Luthy and Bowen Map
IDL RFQ 1307Maps and Directions