ID08190024_RFP_47QFRA19R0004_-_Attachment_1_-_Performance_Work_Statement_FINAL.pdf

PDF 203 KB Posted

Attached to
MV-22 Aircraft Maintenance
Solicitation number
ID08190024
Issued by

About this file

Attachment One

View the file

Other files

File Type Posted
ID08190024_RFP_47QFRA19R0004_Amendment_02_RFP_Questions_&_Answers_-_RFP_47QFRA19R0004.xlsx XLSX spreadsheet
ID08190024_RFP_47QFRA19R0004_Amendment_2_-_Attachment_1_-_Performance_Work_Statement_FINAL.pdf PDF
ID08190024_RFP_47QFRA19R0004_Amendment_2_-_Attachment_2_-_Price_Schedule.xlsx XLSX spreadsheet
ID08190024_RFP_47QFRA19R0004_Amendment_02__Solicitation.pdf PDF
Amendment_02_SF30_-_RFP_47QFRA19R0004.pdf PDF
Amendment_01_RFP_Questions_&_Answers_-_RFP_47QFRA19R0004.xlsx.xlsx XLSX spreadsheet
Amendment_01_SF30_-_RFP_47QFRA19R0004.pdf PDF
ID08190024_RFP_47QFRA19R0004_-_Attachment_3_-_WD_2015-4389_(Rev_12).pdf PDF
ID08190024_RFP_47QFRA19R0004_-_Attachment_5_-_RFP_Questions_and_Answers.xlsx XLSX spreadsheet
ID08190024_RFP_47QFRA19R0004_Solicitation.pdf PDF
ID08190024_RFP_47QFRA19R0004_-_Attachment_6_-_Past_Performance_Data_Sheet.docx DOCX document
ID08190024_RFP_47QFRA19R0004_-_Attachment_2_-_Price_Schedule.xlsx XLSX spreadsheet
ID08190024_RFP_47QFRA19R0004_-_Attachment_4_-_DD_Form_254.pdf PDF
ID08190024_RFP_47QFRA19R0004_-_Attachment_2_-_Price_Schedule.xlsx XLSX spreadsheet
ID08190024_RFP_47QFRA19R0004_Solicitation.docx DOCX document
ID08190024_RFP_47QFRA19R0004_-_Attachment_1_-_Performance_Work_Statement.docx DOCX document
ID08190024_RFP_47QFRA19R0004_-_Attachment_3_-_WD_2015-4389_(Rev_10).pdf PDF
ID08190023_RFP_47QFRA19R0003_-_Attachment_1_-_Performance_Work_Statement.docx DOCX document
ID08190023_RFP_47QFRA19R0003_-_Attachment_3_-_WD_2015-4389_(Rev_10).pdf PDF
ID08190023_RFP_47QFRA19R0003_-_Attachment_5_-_Past_Performance_Data_Sheet.docx DOCX document
ID08190023_RFP_47QFRA19R0003_Solicitation.docx DOCX document
ID08190023_RFP_47QFRA19R0003_-_Attachment_2_-_Price_Schedule.xlsx XLSX spreadsheet
ID08190023_RFP_47QFRA19R0003_-_Attachment_4_-_RFP_Questions_and_Answers.xlsx XLSX spreadsheet
Show all 23

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Performance Work Statement

MV-22 Aircraft Maintenance Services

Project ID08190024

1.0 INTRODUCTION

1.1 The purpose of this non-personal services contract is to provide Contractor Maintenance Support

(CMS) for the six Tactical Aircraft (TACAIR) Squadrons of Marine Aircraft Group 26 (MAG). MAG 26 is a United States Marine Corps aviation unit based at Marine Corps Air Station (MCAS) New River, North Carolina, that is composed of six TACAIR Marine Medium Tilt rotor Squadrons (VMM’s), one

Fleet Replacement Squadron (FRS) and one Marine Aviation Logistics Squadron (MALS). Operationally, MAG 26 falls under the command of the 2nd Marine Aircraft Wing (2D MAW) and II Marine

Expeditionary Force (II MEF). MAG 26’s increasing operational demand in support of worldwide deployments as well as force restructuring requirements has depleted the MAG’s level of government maintenance personnel qualifications.

1.2 Under this non-personal services contract, the contractor personnel rendering the services are not subject, either by the contract’s terms or by the manner of its administration, to the supervision and control usually prevailing in relationships between the Government and its employees.

2.0 DESCRIPTION OF SUPPLIES/SERVICES

2.1 The contractor shall perform organizational level maintenance on MV-22 aircraft onboard Marine

Corps Air Station (MCAS) New River, North Carolina (NC). The maintenance services provided by the contractor shall be within the skill classifications identified in this Performance Work Statement.

3.0 SCOPE

3.1 Contractor Maintenance Support: Contractor will perform Organizational Level (O-Level) scheduled and unscheduled maintenance to include documentation, troubleshooting, inspections, corrosion prevention/treatment, servicing, lubricating, adjusting and the removal and replacement of aeronautical components.

3.2 The Contractor shall participate in periodic quality assurance (QA) audits and periodic monitoring.

Additionally, the Contractor shall participate in periodic Government Aviation Maintenance Management

Team (AMMT) inspections, Aviation Logistics Management Assist Team (ALMAT) inspections, Maintenance Program Assist (MPA) visits, training assist visits (pre-MPA), Material Condition

Inspections (MCIs), and Naval Safety Center surveys.

4.0 CONTRACTOR FURNISHED

4.1 The contractor shall provide all labor, supervision, and technical support required to provide training and perform scheduled/unscheduled MV-22 maintenance. All maintenance to be performed by the contractor shall be performed by technicians thoroughly trained and knowledgeable in operation and maintenance of the systems specified in the individual skill classifications as listed in paragraph 9.2.8. All qualifications/certifications listed in paragraph 9.2.8 must be currently held, previously held and/or fully attainable by CMS personnel assigned to production work centers as prescribed in the notes. All qualifications/certifications will be documented and maintained using the Advanced Skills Management database.

4.2 Minimum Insurance Requirements The Contractor shall acquire and thereafter maintain the following minimum insurance during performance of this contract. The Contractor agrees to insert the substance of this clause including this paragraph, in all subcontracts hereunder.

WORKER’S COMPENSATION AND EMPLOYER’S LIABILITY INSURANCE:

(a) Compliance with applicable worker’s compensation and occupational disease statutes.

(b) Employer’s liability coverage in the minimum amount of $500,000.

GENERAL LIABILITY INSURANCE: Bodily injury in the minimum amount of $500,000 per occurrence shall be required on the comprehensive form of the policy. There shall be no exclusionary clauses added to this contract for any asbestos related work that would void the required General Liability insurance.

AUTO LIABILITY INSURANCE: Bodily injury liability and property damage liability covering operation of all automobiles used in connection with performance of task orders. Minimum limits are $200,000 per person and

$500,000 per occurrence for bodily injury and $20,000 per occurrence for property damage.

CERTIFICATE OF INSURANCE: Prior to the commencement of work hereunder, the Contractor shall furnish to the Contracting Officer, a certificate or written statement of the above required insurance. The policies evidencing requirement insurance shall contain an endorsement to the effect that cancellation or any material change in the policies adversely affecting the interests of the Government in such insurance shall not be effective for such periods as may be prescribed by the laws of the state in which task orders are to be performed and in no event less than thirty (30) days after written notice thereof to the contracting officer.

The General Liability policy(ies) shall name "The United States of America, acting by and through the General

Services Administration," as an additional insured with respect to operations performed under this contract. Should such insurance be canceled, the Contracting Officer shall be given at least 30 days’ notice prior to the effective date of cancellation.

The Contractor agrees to insert the substance of this section, including this subparagraph, in all subcontracts hereunder.

5.0 APPLICABLE DOCUMENTS

5.1 The contractor shall perform all work in accordance with the most current version of Commander

Naval Air Forces Instruction (COMNAVAIRFORINST) 4790, also referred to as the Naval Aviation

Maintenance Program (NAMP), and applicable MV-22 maintenance instruction manuals, Marine Corps

Order (MCO) 8023.3B, Technical Directives (TDs), squadron Standard Operating Procedures (SOPs), and such other instructions as may be applicable in the support of these tasks.

6.0 CMS WORK SPECIFICATIONS

6.1 The personnel complement shall include an adequate mixture of the following labor categories;

airframe mechanics, flight-line mechanics, and electrical/avionics mechanics. The complement mixture shall be balanced in a manner to adequately support 46,080 man hours of O-Level scheduled and unscheduled maintenance to include documentation, troubleshooting, inspections, corrosion prevention/treatment, servicing, lubricating, adjusting and the removal and replacement of aeronautical components. Additional guidance and minimum qualifications are provided in Appendix 1. These CMS personnel shall augment government maintenance personnel at the O-Level.

6.2 The contractor shall perform the tasks prescribed in the Performance Work Statement. The

Contracting Officer’s Representative (COR) ensures compliance with the PWS, but does not supervise contractor personnel. Contractor personnel are employees of the contractor and fall under their administrative control and supervision.

6.3 The government’s estimated labor category mixture for CMS is:

-(8) Flight-line Mechanics

-(8) Airframe Mechanics

-(8) Electrical/Avionics Mechanics

6.4 The contractor shall report all interim Intermediate Level (I-Level) and Depot Level (D-Level) repair requirements found during inspection/corrective action, to the designated squadron Maintenance Material

Control Officer (MMCO).

6.5 All work performed shall be in accordance with the NAMP and existing local processes and procedures. All maintenance/inspections performed by the contractor shall be documented via

Maintenance Action Form (MAF). Contractor personnel shall acquire appropriate Special Maintenance

Qualifications (SMQ) to initiate MAF and complete maintenance action within Squadron Naval Aviation

Logistics Command/Management Information System (NALCOMIS).

6.6 The CMS team members shall be qualified to examine, inspect, investigate, repair, and provide recommendations to the local Maintenance Control and/or government agency as required. CMS personnel will be highly qualified and technically competent in their assigned skill category, meeting the minimum qualifications identified in paragraph Appendix 1.

6.7 Selected contractor personnel shall qualify as Collateral Duty Inspector (CDI) or Collateral Duty

Quality Assurance Representative (CDQAR) in accordance with the NAMP. All maintenance will be performed and inspected in accordance with the NAMP.

6.8 The electrical/avionics mechanics shall possess at minimum a SECRET clearance due to their access to cryptographic equipment/components and/or spaces in which they are handled.

7.0 WORK HOURS

7.1 The standard work week for federal employees is 40 hours per week. The standard 40 hour week is defined as five (5) days a week, eight (8) hours a day. The contractor is advised that deviation from this standard workweek may affect access to buildings, materials and or government employees.

The following is a list of holidays observed by the Government:

Name of Holiday Time of Observance

New Year’s Day 1 January

Martin Luther King Jr. Day Third Monday in January

President’s Day Third Monday in February

Memorial Day Last Monday in May

Independence Day 4 July

Labor Day First Monday in September

Columbus Day Second Monday in October

Veteran’s Day 11 November

Thanksgiving Day Fourth Thursday in November

Christmas Day 25 December

7.2 Current shifts of government employees are as follows, which includes a 1-hour lunch break:

1. Monday-Friday 0700-1600 (1st shift)

2. Monday-Friday 1600-0100 (2nd shift)

7.3 The COR will develop a work schedule that supports the Government’s maintenance work schedule and priorities. The expectation is that all contractor staff will work 1 st shift; however, unique situations may require contractor staff to work 2 nd shift with the approval of the CO.

7.4 The contractor may be required to provide maintenance services in support of natural disasters and other unique situations (e.g., extended hours, stranded aircraft rescue, national security support, etc.). The

Government will make every effort to provide at least 24-hour advance notice of emergent requirements.

The contractor is required to provide COR and CO an estimation of the number of hours and total estimated cost required to perform requested support IAW contract negotiated labor rates. In coordination with the COR, the CO will approve based on the requested supported hours. The Contractor and COR shall be responsible for tracking and reconciling expended hours. The Contractor shall notify the COR and CO in writing whenever it has reason to believe that the costs it expects to incur under the Labor

Hour Contract Line Item (CLIN) will exceed 75 percent of the total amount so far allotted to the CLIN by the Government.

8.0 ADMINISTRATIVE INFORMATION

8.1 The contractor is responsible for maintaining the required minimum number of employees (see

Appendix 2). The contractor alone shall approve and administer leave and holidays for its employees. The contractor will be responsible for tasking its employees in accordance with the work required. The COR will provide the Team Leader with all tasks the contractor will be responsible for completing and the contractor will decide how that work is assigned to its employees. The contractor will perform all supervision, evaluation and disciplinary functions for its employees.

8.2 Due to the urgent and continuous nature of this requirement, the government requires the contractor to maintain the proposed workforce at 100% manning. As such, the contractor is expected to develop a manning plan to fill any planned or unplanned vacancies on an expedited basis. Any vacancies that occur in the contractor’s proposed manning should be filled within 14 calendar days.

9.0 QUALIFICATION REQUIREMENTS OF CONTRACTOR’S EMPLOYEES

9.1 The contractor shall identify a member of their support team as the Team Leader. The team leader shall be responsible for all contractor activity and for overall supervision of the contract performance associated with the CMS efforts.

9.2 CMS Personnel:

9.2.1 Shall possess extensive maintenance, modification, and repair experience on V-22 aircraft, or possess equivalent industry experience such as Airframe and Power Plant (A&P) or Federal

Communication Commission (FCC) license or greater. See 9.2.8 for specific qualifications and certifications.

9.2.2 Must possess the ability to work independently, without technical guidance, to perform all tasks outlined in the Interactive Electronic Maintenance Manual (IETM), and the technical proficiency to qualify as CDI or CDQAR.

9.2.3 Will be familiar with all publications relevant to the maintenance of the MV-22 appropriate to the assignment and have a thorough practical and theoretical knowledge of the equipment/systems.

9.2.4 Will possess knowledge of the learning process and how to transfer technical knowledge to less qualified personnel, including the ability to express thought in both oral and written communications.

9.2.5 Shall possess a thorough understanding or become familiar and proficient with NALCOMIS

OOMA automated maintenance documentation system within 90 days of employment.

9.2.6 Shall be U.S. citizens to ensure access to flight line work spaces and critical information systems.

9.2.7 Will not have Aircraft Confined Space Program responsibilities or work on aeronautical equipment fuel cells and tanks in accordance with NAVAIR 01-1A-35.

10. SAFETY

10.1 The contractor shall comply with all applicable and local safety regulations and policies governing work performed on USMC aircraft. The Contractor shall ensure personnel are equipped with proper work attire to include safety boots, eye protection, and other Personal Protection Equipment (PPE) determined to be necessary. Coveralls shall be clearly marked to identify personnel.

11. GOVERNMENT RESPONSIBILITIES

11.1 The Government will:

11.1.1 Provide workspace/hangar facilities for the servicing of aircraft and a secure space for storing contractor's common tools.

11.1.2 Provide office space for the CTS team and CMS personnel. The office shall include desks, chairs, filing cabinets, telephones, and access to computers as necessary to include Navy/Marine Corps Intranet

(NMCI) accounts.

11.1.3 Provide all technical manuals.

11.1.4 Provide all common hand tools, special Individual Material Readiness List (IMRL) tools, Ground

Support Equipment (GSE), ground handling equipment, precision measuring equipment (micrometers, torque wrenches, etc.), and special/common tools required to perform the aircraft maintenance tasks for the contractor’s usage as needed. Ownership and maintenance of these items will remain with the

Government.

11.1.5 Provide Defense Secure Network (DSN) and local MCAS New River phone service.

11.1.6 Provide all materials, consumable parts, and repairable parts needed to perform scheduled/unscheduled aircraft maintenance tasks.

11.1.7 Provide access to supply databases as required.

11.1.8 Provide existing squadron Pre-Expended Bins (PEBs) for use by the contractor maintenance personnel. All usage will be decremented via NALCOMIS. PEB additions may be made with the concurrence of the COR and MALS Aviation Supply Officer.

11.1.9 Provide liaison for squadron concerns, including Engineering Investigations (EIs), hazardous material reports, and quality deficiency reporting.

11.1.10 Be responsible for Quality Assurance (QA) and Collateral Duty Inspections (CDI) of all work accomplished by any member of the CTS/CMS team. In the absence of a qualified CMS CDIs or

CDQARs, final responsibility for ALL completed work remains with the USMC.

11.1.11 Upon arrival, change of personnel, and at an annual minimum, CTS/CMS personnel are to be briefed on local policies, safety rules, and regulations.

11.1.12 Provide emergency medical care when injuries occur on the worksite: Defined as medical care that is necessary to be performed until the individual can be transported to civilian medical facilities without endangering life. Closing lacerations and tending to unconscious personnel are examples of emergency medical care.

11.1.13 Provide all necessary personnel passes, identification badges, and vehicle permits required for access to work.

11.1.14 For the services described herein, the COR shall be responsible for ensuring services are received and properly performed in accordance with this Performance Work Statement.

12. TRAVEL

12.1 Work performed within a 50-mile radius of MCAS New River will be considered local travel, and will not be reimbursed by the government. Travel outside a 50 mile radius must be pre-approved in writing by the CO and shall be in accordance with the Joint Federal Travel Regulations.

13. Contracting Officer Representative (COR) will be provided via separate correspondence.

14.0 BASE ACCESS.

14.1 Marine Corps Installations East - Marine Corps Base Camp Lejeune and Marine Corps Air Station

New River have implemented the RAPIDGate program intended to enhance installation access control.

In order to gain access to Marine Corps Base (MCB), Camp Lejeune and/or Marine Corps Air Station

(MCAS), New River, non-Federal Government and non-DoD issued ID cardholders require identity proofing and vetting to determine fitness and eligibility for access. Specifically, a check of records through the National Crime Information Center (NCIC) Interstate Identification Index (III) is the installation's minimum background check for access to MCB, Camp Lejeune and/or MCAS, New River for non-Common Access Card holders, to include entrance of visitors.

14.2 MCB, Camp Lejeune and MCAS, New River applies the following non-Federal Government cardholder criteria to determine the authorized type of access control credentials:

a. Contractors: RAPIDGate or 30-Day Pass followed by 4-DayPass*

b. Sub-Contractors: RAPIDGate or 30-Day Pass followed by 4-Day Pass*

c. Vendors: RAPIDGate or 30-Day Pass followed by 4-Day Pass*

d. Suppliers: RAPIDGate or 30-Day Pass followed by 4-Day Pass*

e. Service Providers: RAPIDGate or 30-Day Pass followed by 4-Day Pass*

f. Delivery Personnel: RAPIDGate or 30-Day Pass followed by 4-Day Pass*

g. Public-Private Venture (PPV) Housing and Installation Volunteers: Local Population Credential

(The following are examples of Installation Volunteers: (Red Cross, Community College Instructors and

Students, Commissary Baggers, Naval Hospital Volunteers, Family Readiness Volunteers, Wounded

Warrior Volunteers, and any other organization approved by the Commanding General, Marine Corps

Installation East-Marine Corps Base Camp Lejeune and Commanding Officer, MCAS, New River)

14.3 Contractor Common Access Card (CAC) Eligibility: Contractor personnel authorized CAC’s are exempt from RAPIDGate enrollment.

14.4 Contractor personnel who are ineligible for a CAC will be required to either obtain a 30-Day pass followed by a 4-Day pass* or enroll in the RAPIDGate Program. RAPIDGate is a voluntary program due to associated costs. For further information concerning contractor access, please contact the Contractor

Vetting Office at 910-450-5978 or visit Marine Corps Base Camp Lejeune

(http://www.lejeune.marines.mil/) or MCAS New River (http://www.newriver.marines.mil/) websites.

For information concerning enrolling in RAPIDGate please visit their website at www.rapidgate.com.

The Government will not be responsible for any access delays. Delays that may result from inadequate planning are contractor responsibility. Any and all costs associated with RAPIDGate are the sole responsibility of the contractor.

* Contractors will be issued a one-time pass for 30 days. Upon expiration of the 30 day pass, they will only be issued a 4 day pass every 4 days thereafter, for the duration of the contract.

14.5 For all other locations, the vendor must contact the installation security management office for the installation they are trying to access for access rules and restrictions.

15. CONTRACTOR'S UNAUTHORIZED WORK PERFORMANCE. The Contractor shall not perform work that deviates from contract requirements and specifications. If the Contractor deviates from contract requirements and specifications without approval of the CONTRACT ADMINISTRATOR and/or the

CONTRACTING OFFICER, such deviation shall be at the risk of the Contractor and any cost related thereto shall be borne by the Contractor.

16. LEVEL OF EFFORT REQUIREMENTS SUMMARY.

The performance standards are stated in the summary below.

Objective Standard AQL Inspector Inspection Type and

Frequency

Maintain

Required

Staffing Levels

In accordance with paragraph

6.0 (CMS) and

8.2 of the PWS.

100%

COR Ongoing Observation

Maintain

Qualified

Personnel

In accordance with paragraph

9.0 of the

PWS and

Appendixes 1 and 2.

100% COR Ongoing Observation

Maintenance

Work and

Documentation

In accordance with paragraph

6.5 of the PWS.

100% COR 100% Inspection http://www.lejeune.marines.mil/ http://www.newriver.marines.mil/ http://www.rapidgate.com/

Safety Abide by all applicable safety regulations including those detailed in

CNAFINST and

OSHA

instructions. In accordance with paragraph 10.1 of the PWS.

100% COR Observation

Random Monitoring

Appendix 1: Required Qualifications and Certifications

ALL

CMS

100%

NOTE

(1)

ALL

CMS

75%

MIN

NOTE

(2)

ALL

CMS

50%

MIN

AIRFRAMES

75% MIN

AVIONICS

75% MIN

FLIGHT

LINE

75% MIN

NOTE (2)

Auxiliary Power Unit (APU) X

Blade Fold Wing Stow (BFWS) X

Brake Rider X

Egress Certified X

Tow Qualified

X

A/M42-2A Light Cart X

A/S32A-45 Tow Tractor X

BT-400-46 Pre-Heater (or legacy equivalent)

Flight Line Utility Vehicles (aka Mighty

Mites)

A/M32A-108 Mobile Electric Power Plant

(MEPP)

X X

ACU-20/M Air Compressor

00850-100-1 Portable Hydraulic Power

Supply (PHPS)

1428AS100 Portable Nitrogen Cart

A/M26U-4B Nitrogen Cart

A/M27T-6 Hydraulic Cart

Hydraulic Contamination, Air Frames (AF)

Tire and Wheel, Air Frames (AF)

NC-10 A/B/C Mobile Electric Power Plant

(MEPP)

X X

65A102-J1 Corrosion Cart

Fuel Surveillance, Flight Line (FL)

NOTE (1): Applies to the 3 CMS production work centers only (Airframes, Avionics, and Flight Line).

This qualification will be attained within 90 days from employment.

NOTE (2): This qualification will be attained within 120 days from employment.

Appendix 2: Required Contractor Employee Complement

Note that contractor staffing levels shall be maintained in accordance with this enclosure.

Contracted Maintenance Support (CMS). The Government’s estimated labor category mix is 24 maintainers:

CATEGORY

WORKERS

CDI CDQAR

MIN YRS

AVIATION

MAINT

EXPERIENCE

MIN YRS V-

22 MAINT

EXPERIENCE

FLIGHT LINE 8(2) 4 4 4 2

AVIONICS 8(1) (2) 4 4 4 2

AIRFRAMES 8(2) 4 4 4 2

Note (1): Electrical/Avionics mechanics shall possess at minimum a SECRET clearance due to their access to cryptographic equipment/components and/or spaces in which they are handled.

Note (2): 75% of CMS personnel will currently have MATMEP Level III / T &R level 3000 (applicable systems) or greater. Remaining 25% of personnel (to include previous acquired, but not current

MATMEP Level III / T&R employees) will attain MATMEP III/T&R level 3000 (Applicable systems) within 90 days of employment.