ID07170015_DRAFT_PWS_01242017.docx

DOCX document 192 KB Posted

Attached to
C4ISR SYSTEMS PROTOTYPING, INTEGRATION & TESTING SUPPORT
Solicitation number
ID07170015
Issued by

About this file

ID07170015 Draft Performance Work Statement

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PERFORMANCE WORK STATEMENT (PWS)

C4ISR SYSTEMS PROTOTYPING, INTEGRATION & TESTING SUPPORT

U.S. ARMY CERDEC CP&I PROTOTYPING, INTEGRATION AND TESTING DIVISION

24 January 2017

PART 1

GENERAL INFORMATION

1. GENERAL: This is a non-personal services contract to provide Command, Control, Communications, Computers, Intelligence, Surveillance and Reconnaissance (C4ISR) Systems Prototyping, Integration, and Testing Support for Military Aerospace Equipment and Military Weapons. The Government shall not exercise any supervision or control over the contract service providers performing the services herein. Such contract service providers shall be accountable solely to the Contractor who, in turn is responsible to the Government.

1.1 Description of Services/Introduction: The Contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to perform C4ISR Systems Prototyping, Integration, and Testing Support as defined in this Performance Work Statement. The Contractor shall perform to the standards in this contract.

1.2 Background. The Prototyping, Integration and Testing Division (PI&TD) of the Command, Power and Integration Directorate (CP&ID), U.S. Army Communications-Electronics Research Development and Engineering Center (CERDEC), within the U.S. Army Research, Development and Engineering Command (RDECOM), supports a variety of tri-service Military and Aerospace Equipment and Military Weapons programs. PI&TD provides expertise in all aspects of prototype systems integration, including engineering design, material procurement, fabrication, systems assembly and installation, environmental testing, logistics, fielding, and follow-on support. PI&TD provides full support for integrating C4ISR systems into Military and Aerospace Equipment and Military Weapons including current systems and evaluation exercises for future systems.

1.3 Objectives: The individual Military Equipment C4ISR integration and systems prototyping and prototype systems integration projects executed by the PI&TD are highly variable, being dependent upon the emerging needs of the Warfighter. PI&TD provides support to several Military Program Management Offices including RDECOM, Warfighter Information Network Tactical (WIN-T), Mission Command, Radars, DCGS-A, Special Operations Command, and United States Marine Corp (USMC). PI&TD also provides support for integration evaluation exercises including Network Integration Evaluation (NIE) in Ft Bliss and C4ISR Ground Activity Events in Ft Dix. This effort will provide the PI&TD with the contractual support required to perform and support the integration of C4ISR operational prototype systems onto Military Weapon platforms. The contractor shall provide the necessary personnel and essential materials to aid PI&TD associated projects. The contractor will be required to provide qualified personnel and a fully-functioning web based material tracking system for project materials and other direct cost (ODC) procurement that provides the ability to initiate, monitor, track, review and approve purchase orders via a web-based system. The contractor shall provide support for the design, development and fabrication of C4ISR systems, sub-systems, components, installation kits, and systems-of-systems for integration into ground-based, vehicular, shelter, airborne, watercraft, soldier and dismounted platforms, both tactical and non-tactical, and into fixed and re-locatable sites.

1.4 Scope: The individual project requirements of each effort will include activities required to support a variety of projects involving C4ISR prototyping, integration, testing, delivery and follow-on support, to include the following support elements (specific task descriptions provided in Part 5):

1. Engineering Support

1. CAD/CAM Design / 3D Modeling / Drafting Support

1. Prototype Technology Research and Development

1. Rapid Prototyping and Technology Insertion

1. Fabrication Support

1. Systems Integration Support

1. Warehouse and Inventory Management

1. Web Based Material Tracking System

1. Integrated Logistics Support

1. Environmental Test Support

1. Quality Management / Assurance Support

1. Project and Operations Support

1. Laboratory / Facility Operations and Maintenance

1.5 General Information

1.5.1 Quality Control: The Contractor shall develop and maintain an effective quality control program to ensure services are performed in accordance with this PWS. The Contractor shall develop and implement procedures to identify, prevent, correct, and ensure non-recurrence of defective services. The Contractor’s quality control program provides assurance that the work complies with the requirement of the contract. In addition, all efforts described herein shall be performed under the auspices of the PI&TD’s ISO-9001 quality management system. Quality Assurance (QA) efforts shall verify that the products and services delivered by the PI&TD meet customer requirements, and that the project execution is performed in compliance with the quality management system.

1.5.1.1 Quality Control Plan: The Contractor shall submit a Quality Control Plan (QCP) with the proposal for evaluation. If changes are made after contract award, the Contractor shall submit a comprehensive written QCP with changes to the KO within 5 working days after changes are made. The QCP shall reflect the quality approach of the vendor as it applies to the key areas of the offeror’s approach to the PWS.

1.5.1.2 Quality Assurance: The Government will evaluate the Contractor’s performance under this contract in accordance with the Quality Assurance Surveillance Plan. This plan is primarily focused on what the Government must do to ensure that the Contractor has performed in accordance with the performance standards. It defines how the performance standards will be applied, the frequency of surveillance, and the minimum acceptable defect rate(s). The Contractor will be evaluated in the areas of Engineering Support and Prototype Research, Development, and Technology Insertion (paras 5.1, 5.3, 5.4), CAD/CAM Support (para 5.2), Fabrication Support/Integration Support (para 5.5, 5.6), material procurement/Inventory (para 5.7, 5.8), Qualified Personnel (based on technical competence of personnel and meeting requirements of exhibit 4), cost/performance/schedule requirements. The Government will be performing inspections, reviewing deliverables, monitoring the web based reporting systems, conducting in process reviews, and observation.

1.5.1.3 The Contractor shall purchase materials per the ISO-9001 registered PI&TD Quality Management System. The Government will provide the Contractor with the Approved Supplier List for purchasing materials. Processes are in place to qualify vendors who do not already appear on the Approved Supplier List. Processes are also in place to disqualify vendors who fail to meet designated quality standards. The Contractor shall coordinate with the Quality Management Representative designated by the PI&TD in these regards.

1.5.2 Hours of Operation: The Contractor is responsible for providing services 8 hours per day, 40 hours per week Monday thru Friday except Federal holidays or when the Government facility is closed due to local or national emergencies, administrative closings, or similar Government directed facility closings. However, operations at government facilities may take place under an Alternative Work Schedule / Compressed Work Schedule. The workdays must include the core hours of 0900 to 1500. At government request, contractor employees may be required to work extended hours. The Contractor Program Manager shall submit request for extended hours to the COR. The COR shall process this request for concurrence and then forward to the KO for approval.

1.5.2.1 Period of Performance: The period of performance of this effort shall be five years consisting of one 12-month base year, followed by four 12-month option periods.

1.5.3 Place of Performance: The work to be performed under this contract will be performed at U.S. Army CERDEC, with locations at/around Aberdeen Proving Ground MD, but may also be performed at the Contractor’s facilities, and may also be performed at other government and commercial CONUS/OCONUS locations as directed by the Government.

1.5.4 Transition Phase In / Phase Out Period: To minimize any decrease in productivity and to prevent possible negative impacts on additional services, the Contractor shall submit a Transition Phase In/Phase Out Plan with the proposal for evaluation.

1.5.4.1 Phase In. The contractor shall submit as a part of their proposal, a Phase-In Plan that clearly demonstrates a reasonable, realistic approach for assuming full contractual responsibility without disruption or degradation of performance within the first 60 days of the transition period. The contractor shall have the key personnel (see para 1.5.8) on board at Aberdeen Proving Ground MD during the 60 day phase in period. The Plan will identify risks and the appropriate mitigation strategies. The Plan will propose a transition schedule and staffing plan that is realistic, achievable and affordable and identify trained and qualified resources on hand and available to begin work on the effort.

1.5.4.2 Phase Out: The Contractor shall submit as a part of their proposal, a Phase-Out Plan that clearly demonstrates a reasonable, realistic approach for relinquishing full contractual responsibility without disruption or degradation of performance during the last 60 days of contract performance. The Plan will identify risks and the appropriate mitigation strategies.

1.5.5 Security Requirements: The contractor shall have a facility clearance at the SECRET level with No safeguarding capability. All personnel working this effort will be required to maintain a SECRET clearance unless specifically waived. The contractor will have access to COMSEC and For Official Use Only (FOUO) information. Administrative duties performed by the contractor will not require a secret clearance but will still require an investigation for IT sensitive duties.

The contractor will have access to classified information ONLY at another contractor’s facility or Government site. The contractor will have access to classified information outside of the U.S. The contractor will be authorized use of the Defense Technical Information services (DTIC). IT Sensitive duties may be required.

1.5.5.1 Critical Program Information (CPI) is defined as information/technologies resident in a particular system or program which if divulged to unauthorized persons, would likely result in the reduction of a critical U.S. military technological advantage. In as much, CPI may be identified by the Government during a contracted effort and if identified must be protected by the contractor in accordance with guidance outlined in an Interim Program Protection Plan (IPPP) or Program Protection Plan (PPP), written in collaboration with the contractor. The aforementioned IPPP or PPP will establish policy and procedures for the protection of CPI.

1.5.5.2 AT Level I training. This standard language is for contractor employees with an area of performance within an Army controlled installation, facility or area. All contractor employees, to include subcontractor employees, requiring access Army installations, facilities and controlled access areas shall complete AT Level I awareness training within 30 calendar days after contract start date or effective date of incorporation of this requirement into the contract, whichever is applicable. The contractor shall submit certificates of completion for each affected contractor employee and subcontractor employee, to the COR or to the contracting officer, if a COR is not assigned, within 30 calendar days after completion of training by all employees and subcontractor personnel. AT level I awareness training is available at the following website: http://jko.jten.mil

1.5.5.3 Access and general protection/security policy and procedures. This standard language is for contractor employees with an area of performance within Army controlled installation, facility, or area. Contractor and all associated sub-contractors employees shall provide all information required for background checks to meet installation access requirements to be accomplished by installation Provost Marshal Office, Director of Emergency Services or Security Office. Contractor workforce must comply with all personal identity verification requirements (FAR clause 52.204-9, Personal Identity Verification of Contractor Personnel) as directed by DOD, HQDA and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any individual facility or installation change, the Government may require changes in contractor security matters or processes.

For contractors requiring Common Access Card (CAC). Before CAC issuance, the contractor employee requires, at a minimum, a favorably adjudicated National Agency Check with Inquiries (NACI) or an equivalent or higher investigation in accordance with Army Directive 2014-05. The contractor employee will be issued a CAC only if duties involve one of the following: (1) Both physical access to a DoD facility and access, via logon, to DoD networks on-site or remotely; (2) Remote access, via logon, to a DoD network using DoD-approved remote access procedures; or (3) Physical access to multiple DoD facilities or multiple non-DoD Federally controlled facilities on behalf of the DoD on a recurring basis for a period of 6 months or more. At the discretion of the sponsoring activity, an initial CAC may be issued based on a favorable review of the FBI fingerprint check and a successfully scheduled NACI at the Office of Personnel Management.

1.5.5.4 AT Awareness Training for Contractor Personnel Traveling Overseas: This standard language text required US based contractor employees and associated sub-contractor employees to make available and to receive government provided area of responsibility (AOR) specific AT awareness training. Specific AOR training content is directed by the combatant commander with the unit ATO being the local point of contact.

1.5.5.5 iWATCH Training: This standard language is for contractor employees with an area of performance within an Army controlled installation, facility or area. The contractor and all associated sub-contractors shall brief all employees on the local iWATCH program (training standards provided by the requiring activity ATO). This local developed training will be used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the COR. This training shall be completed within 30 calendar days of contract award and within 30 calendar days of new employees commencing performance with the results reported to the COR NLT 30 calendar days after contract award.

1.5.5.6 Army Training Certification Tracking System (ATCTS) registration for contractor employees who require access to government information systems. All contractor employees with access to a government info system must be registered in the ATCTS (Army Training Certification Tracking System) at commencement of services, and must successfully complete the DOD Information Assurance Awareness prior to access to the IS and then annually thereafter.

1.5.5.7 For contracts that require OPSEC Training. Per AR 530-1 Operations Security, the contractor employees must complete Level I OPSEC Awareness training. New employees must be trained within 30 calendar days of their reporting for duty and annually thereafter.

1.5.5.8 For information assurance (IA)/information technology (IT) training. All contractor employees and associated sub-contractor employees must complete the DoD IA awareness training before issuance of network access and annually thereafter. All contractor employees working IA/IT functions must comply with DoD and Army training requirements in DoDD 8570.01, DoD 8570.01-M and AR 25-2 within six months of appointment to IA/IT functions.

1.5.5.9 For information assurance (IA)/information technology (IT) certification. Per DoD 8570.01-M , DFARS 252.239.7001 and AR 25-2, the contractor employees supporting IA/IT functions shall be appropriately certified upon contract award. The baseline certification as stipulated in DoD 8570.01-M must be completed upon contract award.

1.5.5.10 For Contract Requiring Performance or Delivery in a Foreign Country, DFARS Clause 252.225-7043, Antiterrorism/Force Protection for Defense Contractors Outside the US . The clause shall be used in solicitations and contracts that require performance or delivery in a foreign country. This clause applies to both contingencies and non-contingency support. The key AT requirement is for non-local national contractor personnel to comply with theater clearance requirements and allows the combatant commander to exercise oversight to ensure the contractor’s compliance with combatant commander and subordinate task force commander policies and directives.

1.5.5.11 For contracts that require handling or access to classified information. Contractor shall comply with FAR 52.204-2, Security Requirements. This clause involves access to information classified “Confidential,” “Secret,” or “Top Secret” and requires contractors to comply with— (1) The Security Agreement (DD Form 441), including the National Industrial Security Program Operating Manual (DoD 5220.22-M); (2) any revisions to DOD 5220.22-M, notice of which has been furnished to the contractor.

1.5.5.12 Threat Awareness Reporting Program. For all contractors with security clearances. Per AR 381-12 Threat Awareness and Reporting Program (TARP), contractor employees must receive annual TARP training by a CI agent or other trainer as specified in 2-4b.

1.5.6. Safety: The contractor is responsible for ensuring all employees maintain required training certifications.

1.5.6.1 Government facilitated training requirements includes but is not limited to the areas of Operational Security, Antiterrorism/Force Protection, Information Assurance and Hazardous Waste Handling, The government will provide the class schedules or websites to the contractor as soon as available.

1.5.6.2 The contractor shall ensure that employees designated to operate industrial trucks, forklifts, pallet jacks, and other material handling equipment (MHE) are properly trained and certified as stipulated in OSHA 29 CFR 1910.

1.5.6.3 The contractor shall ensure that construction activities meet the requirements of OSHA 29 CFR 1926.

1.5.6.3 The contractor shall ensure that accident prevention and accident reporting procedures meet requirements of FAR 52.236-13.

1.5.7 Post Award Conference/Periodic Progress Meetings: The Contractor shall attend the post award conference convened by the contracting activity or contract administration office in accordance with Federal Acquisition Regulation Subpart 42.5, which shall be scheduled within 30 days of contract award. The KO, COR, and other Government personnel, as appropriate, may meet periodically with the Contractor to review the Contractor's performance. At these meetings the contracting officer will apprise the Contractor of how the Government views the Contractor's performance and the Contractor will apprise the Government of problems, if any, being experienced. Appropriate action shall be taken to resolve outstanding issues. These meetings shall be at no additional cost to the Government.

1.5.8 Key Personnel: The following personnel has been designated as Key Personnel.

1.5.8.1 Program Manager (Senior/Lead): Must meet requirements as listed in Technical Exhibit 4. In addition, the Program Manager (PM) shall be responsible for the performance of the work and of the employees. The PM shall have full authority to act for the Contractor on all contract matters relating to daily operation of this contract.

1.5.9 Identification of Contractor Employees: All contract personnel attending meetings, answering Government telephones, and working in other situations where their Contractor status is not obvious to third parties are required to identify themselves as such to avoid creating an impression in the minds of members of the public that they are Government officials. They must also ensure that all documents or reports produced by Contractors are suitably marked as Contractor products or that Contractor participation is appropriately disclosed. APG C4ISR Campus Badges shall be required and authorized only for those employees required to be on site at the Government Facility at least 3 days per week. As applicable, the Contractor shall be responsible for obtaining the CAC and/or Campus Badge for their employees by making the request through the COR.

1.5.10 Contractor Travel: The Contractor shall be required to travel to various locations in order to complete tasks associated with this effort at CONUS / OCONUS locations as directed by the Government. Possible CONUS locations include, but are not limited to, Joint Base McGuire-Dix-Lakehurst NJ, Ft. Bragg NC, Joint Base Lewis-McChord WA, Ft Hood TX, Ft Bliss TX, White Sands Missile Range (WSMR) NM, and Camp Roberts CA. Possible OCONUS locations include, but are not limited to, Iraq, Afghanistan, Kuwait, Japan, Germany, France, Italy, England, Korea, Australia, Guam, Alaska, and Hawaii. For OCONUS travel, the contractor may be required to work on U.S. Military Bases/compounds and/or other locations as required; travel outside of these U.S. Military Bases/compounds may be required; travel between work sites may be required; the Government will not provide transportation between work sites or between work and lodging sites. The Contractor will be authorized travel expenses consistent with the provisions of FAR 31.205-46 Travel Costs and the limitation of funds specified in this contract. The government may require contractor employees to work extended hours while on travel. Travel Authorization Requests and extended work hour requests shall be made to the COR in advance of the travel start date. The COR shall process this request for concurrence and then forward to the KO for approval. Approval must be received prior to commencement of travel by the Contractor.

1.5.10.1 OCONUS Travel: For traveling to OCONUS sites, the Contractor shall make all travel/security clearance/passport/country clearance submittal arrangements for their employees. Any contractor going OCONUS TDY on behalf of the government is still obligated to complete all mandatory training prior to travel. The Contractor is responsible for country clearances, theater clearances, entering travel data into APACS (Aircraft and Personnel Automated Clearance System), and entering data into the SPOT (Synchronized Pre-deployment Operational Tracker) database. The SPOT-generated LOA shows to anyone in theater that the contractor is on official Government business/travel.

For OCONUS travel, Contractor personnel shall complete the following training:

- ISOPREP (Isolated Personnel Report) form
- SERE 100.1 Personnel Recovery
- Anti-Terrorism/Force Protection

Other training which may be required for specific Countries:

- Pre-Deployment Health Assessment
- Medical and Dental requirements and forms
- Counter Insurgency (COIN)
- Other training and briefings as necessary to be identified at the time of travel
- Attendance at CONUS Replacement Center (CRC) in Ft Bliss, TX

The contractor will be notified of any new or changing requirements for travel.

1.5.10.2 Specific for Germany: The Contractor shall complete all arrangements necessary for travel to Germany. For less than 90 days per year, the Contractor may use the “FAX Back” email method. “FAX Back” is required by German Law and is an agreement between the Contractor and the German government. For more than 90 days per year, the Contractor shall apply for TESA through the DoD Contractor Personnel Office. More information is available on http://www.eur.army.mil/g1/content/CPD/docper.html

1.5.10.3 Specific for Camp Arifjan Kuwait: For entry onto Camp Arifjan, the Contractor will be required to complete and submit ASG-KU PMO Form 190-16.01. This form and other instructions will be provided to the contractor when the travel is requested.

1.5.10.4 Additional information on OCONUS travel can be found at https://www.fcg.pentagon.mil/fcg.cfm and at CRC website https://www.bliss.army.mil/CRC/index.html

1.5.10.5 SOFA REPUBLIC OF KOREA (ROK)

Invited Contractor (IC) and Technical Representative (TR) status shall be governed by the U.S.-ROK Status of Forces Agreement (SOFA) as implemented by United States Forces Korea (USFK) Reg 700-19, which can be found under the "publications" tab on the US Forces Korea homepage http://www.usfk.mil

(a) Definitions. As used in this clause-

"U.S. - ROK Status of Forces Agreement" (SOFA) means the Mutual Defense Treaty between the Republic of Korea and the U.S. of America, Regarding Facilities and Areas and the Status of U.S. Armed Forces in the Republic of Korea, as amended

"Combatant Commander" means the commander of a unified or specified combatant command established in accordance with 10 U.S.C. 161. In Korea, the Combatant Commander is the Commander, United States Pacific Command.

"United States Forces Korea" (USFK) means the subordinate unified command through which US forces would be sent to the Combined Forces Command fighting components.

"Commander, United States Forces Korea" (COMUSK) means the commander of all U.S. forces present in Korea. In the Republic of Korea, COMUSK also serves as Commander, Combined Forces Command (CDR CFC) and Commander, United Nations Command (CDR UNC).

"USFK, Assistant Chief of Staff, Acquisition Management" (USFK/FKAQ) means the principal staff office to USFK for all acquisition matters and administrator of the U.S.-ROK SOFA as applied to US and Third Country contractors under the Invited Contractor (IC) and Technical Representative (TR) Program (USFK Reg 700-19).

"Responsible Officer (RO)" means a senior DOD employee (such as a military E5 and above or civilian GS-7 and above), appointed by the USFK Sponsoring Agency (SA), who is directly responsible for determining and administering appropriate logistics support for IC/TRs during contract performance in the ROK.

(b) IC or TR status under the SOFA is subject to the written approval of USFK, Assistant Chief of Staff, Acquisition Management (FKAQ), Unit #15289, APO AP 96205-5289.

(c) The contracting officer will coordinate with HQ USFK/FKAQ, IAW FAR 25.8, and USFK Reg 700-19. FKAQ will determine the appropriate contractor status under the SOFA and notify the contracting officer of that determination.

(d) Subject to the above determination, the contractor, including its employees, may be accorded such privileges and exemptions under conditions and limitations as specified in the SOFA and USFK Reg 700-19. These privileges and exemptions may be furnished during the performance period of the contract, subject to their availability and continued SOFA status. Logistics support privileges are provided on an as-available basis to properly authorized individuals. Some logistics support may be issued as Government Furnished Property or transferred on a reimbursable basis.

(e) The contractor warrants and shall ensure that collectively, and individually, its officials and employees performing under this contract will not perform any contract, service, or other business activity in the ROK, except under U.S. Government contracts and that performance is IAW the SOFA.

(f) The contractor’s direct employment of any Korean-National labor for performance of this contract shall be governed by ROK labor law and USFK regulation(s) pertaining to the direct employment and personnel administration of Korean National personnel.

(g) The authorities of the ROK have the right to exercise jurisdiction over invited contractors and technical representatives, including contractor officials and employees, for offenses committed in the ROK and punishable by the laws of the ROK. In recognition of the role of such persons in the defense of the ROK, they will be subject to the provisions of Article XXII, SOFA, related Agreed Minutes and Understandings. In those cases in which the authorities of the ROK decide not to exercise jurisdiction, they shall notify the U.S. military authorities as soon as possible. Upon such notification, the military authorities will have the right to exercise jurisdiction as is conferred by the laws of the U.S.

(h) Invited contractors and technical representatives agree to cooperate fully with the USFK Sponsoring Agency (SA) and Responsible Officer (RO) on all matters pertaining to logistics support and theater training requirements. Contractors will provide the assigned SA prompt and accurate reports of changes in employee status as required by USFK Reg 700-19.

(i) Theater Specific Training. Training Requirements for IC/TR personnel shall be conducted in accordance with USFK Reg 350-2 Theater Specific Required Training for all Arriving Personnel and Units Assigned to, Rotating to, or in Temporary Duty Status to USFK. IC/TR personnel shall comply with requirements of USFK Reg 350-2.

(j) Except for contractor air crews flying Air Mobility Command missions, all U.S. contractors performing work on USAF classified contracts will report to the nearest Security Forces Information Security Section for the geographical area where the contract is to be performed to receive information concerning local security requirements.

(k) Invited Contractor and Technical Representative status may be withdrawn by USFK/FKAQ upon:

(1) Completion or termination of the contract.

(2) Determination that the contractor or its employees are engaged in business activities in the ROK other than those pertaining to U.S. armed forces.

(3) Determination that the contractor or its employees are engaged in practices in contravention to Korean law or USFK regulations.

(l) It is agreed that the withdrawal of invited contractor or technical representative status, or the withdrawal of, or failure to provide any of the privileges associated therewith by the U.S. and USFK, shall not constitute grounds for excusable delay by the contractor in the performance of the contract and will not justify or excuse the contractor defaulting in the performance of this contract. Furthermore, it is agreed that withdrawal of SOFA status for reasons outlined in USFK Reg 700-19, Section II, paragraph 6 shall not serve as a basis for the contractor filing any claims against the U.S. or USFK. Under no circumstance shall the withdrawal of SOFA Status or privileges be considered or construed as a breach of contract by the U.S. Government.

(m) Support.

(1) Unless the terms and conditions of this contract place the responsibility with another party, the COMUSK will develop a security plan to provide protection, through military means, of Contractor personnel engaged in the theater of operations when sufficient or legitimate civilian authority does not exist.

(2)(i) All Contractor personnel engaged in the theater of operations are authorized resuscitative care, stabilization, hospitalization at level III military treatment facilities, and assistance with patient movement in emergencies where loss of life, limb, or eyesight could occur. Hospitalization will be limited to stabilization and short-term medical treatment with an emphasis on return to duty or placement in the patient movement system.

(ii) When the Government provides medical or emergency dental treatment or transportation of Contractor personnel to a selected civilian facility, the Contractor shall ensure that the Government is reimbursed for any costs associated with such treatment or transportation.

(iii) Medical or dental care beyond this standard is not authorized unless specified elsewhere in this contract.

(3) Unless specified elsewhere in this contract, the Contractor is responsible for all other support required for its personnel engaged in the theater of operations under this contract.

(n) Compliance with laws and regulations. The Contractor shall comply with, and shall ensure that its personnel supporting U.S Armed Forces in the Republic of Korea as specified in paragraph (b)(1) of this clause are familiar with and comply with, all applicable—

(1) United States, host country, and third country national laws;

(2) Treaties and international agreements;

(3) United States regulations, directives, instructions, policies, and procedures; and

(4) Orders, directives, and instructions issued by the COMUSK relating to force protection, security, health, safety, or relations and interaction with local nationals. Included in this list are force protection advisories, health advisories, area (i.e. “off-limits”), prostitution and human trafficking and curfew restrictions.

(o) Vehicle or equipment licenses. IAW USFK Regulation 190-1, Contractor personnel shall possess the required licenses to operate all vehicles or equipment necessary to perform the contract in the theater of operations. All contractor employees/dependents must have either a Korean driver’s license or a valid international driver’s license to legally drive on Korean roads.

(p) Evacuation.

(1) If the COMUSK orders a non-mandatory or mandatory evacuation of some or all personnel, the Government will provide assistance, to the extent available, to United States and third country national contractor personnel.

(2) Non-combatant Evacuation Operations (NEO).

(i) The contractor shall designate a representative to provide contractor personnel and dependents information to the servicing NEO warden as required by direction of the Responsible Officer.

(ii) If contract period of performance in the Republic of Korea is greater than six months, non-emergency essential contractor personnel and all IC/TR dependents shall participate in at least one USFK sponsored NEO exercise per year.

(q) Next of kin notification and personnel recovery.

(1) The Contractor shall be responsible for notification of the employee-designated next of kin in the event an employee dies, requires evacuation due to an injury, or is missing, captured, or abducted.

(2) In the case of missing, captured, or abducted contractor personnel, the Government will assist in personnel recovery actions in accordance with DOD Directive 2310.2, Personnel Recovery.

(3) IC/TR personnel shall accomplish Personnel Recovery/Survival, Evasion, Resistance and Escape (PR/SERE) training in accordance with USFK Reg 525-40, Personnel Recovery

Procedures and USFK Reg 350-2 Theater Specific Required Training for all Arriving Personnel and Units Assigned to, Rotating to, or in Temporary Duty Status to USFK.

(r) Mortuary affairs. Mortuary affairs for contractor personnel who die while providing support in the theater of operations to U.S. Armed Forces will be handled in accordance with DOD Directive 1300.22, Mortuary Affairs Policy and Army Regulation 638-2, Care and Disposition of Remains and Disposition of Personal Effects.

(s) USFK Responsible Officer (RO). The USFK appointed RO will ensure all IC/TR personnel complete all applicable training as outlined in this clause.

1.5.10.6 Trip reports CONUS and OCONUS DI-ADMIN-81505 CDRL C001: The Contractor shall submit a trip report within 5 working days after completion of travel. Trip report shall include purpose of travel, dates, locations, general discussion, and follow-on action items.

1.5.11 Organizational Conflict of Interest: Contractor and sub-Contractor personnel performing work under this contract may receive, have access to or participate in the development of proprietary or source selection information (e.g., cost or pricing information, budget information or analyses, specifications or work statements, etc.) or perform evaluation services which may create a current or subsequent Organizational Conflict of Interests (OCI) as defined in FAR Subpart 9.5. The Contractor shall notify the KO immediately whenever it becomes aware that such access or participation may result in any actual or potential OCI and shall promptly submit a plan to the KO to avoid or mitigate any such OCI. The Contractor’s mitigation plan will be determined to be acceptable solely at the discretion of the KO and in the event the KO unilaterally determines that any such OCI cannot be satisfactorily avoided or mitigated, the KO may affect other remedies as deemed necessary, including prohibiting the Contractor from participation in subsequent contracted requirements which may be affected by the OCI.

PART 2

DEFINITIONS & ACRONYMS

2. DEFINITIONS AND ACRONYMS:

2.1. Definitions:

2.1.1. Contractor. A supplier or vendor awarded a contract to provide specific supplies or service to the Government. The term used in this contract refers to the prime.

2.1.2. Contracting Officer (KO). A person with authority to enter into, administer, and or terminate contracts, and make related determinations and findings on behalf of the Government. Note: The only individual who can legally bind the Government.

2.1.3. Contracting Officer's Representative (COR). An employee of the U.S. Government appointed by the contracting officer to administer the contract. Such appointment shall be in writing and shall state the scope of authority and limitations. This individual has authority to provide technical direction to the Contractor as long as that direction is within the scope of the contract, does not constitute a change, and has no funding implications. This individual does NOT have authority to change the terms and conditions of the contract.

2.1.4. Defective Service. A service output that does not meet the standard of performance associated with the Performance Work Statement.

2.1.5. Deliverable. Anything that can be physically delivered, but may include non-manufactured things such as meeting minutes or reports.

2.1.6. Key Personnel. Contractor personnel that are evaluated in a source selection process and that may be required to be used in the performance of a contract by the Key Personnel listed in the PWS. When key personnel are used as an evaluation factor in best value procurement, an offer can be rejected if it does not have a firm commitment from the persons that are listed in the proposal.

2.1.7. Physical Security. Actions that prevent the loss or damage of Government property.

2.1.8. Quality Assurance. The Government procedures to verify that services being performed by the Contractor are performed according to acceptable standards.

2.1.9. Quality Assurance Surveillance Plan (QASP). An organized written document specifying the surveillance methodology to be used for surveillance of Contractor performance.

2.1.10. Quality Control. All necessary measures taken by the Contractor to assure that the quality of an end product or service shall meet contract requirements.

2.1.11. Subcontractor. One that enters into a contract with a prime Contractor. The Government does not have privity of contract with the subContractor.

2.1.12. Work Day. The number of hours per day the Contractor provides services in accordance with the contract.

2.1.12. Work Week. Monday through Friday, unless specified otherwise.

2.2. ACRONYMS:

AFARSArmy Federal Acquisition Regulation Supplement
APGAberdeen Proving Ground
ARArmy Regulation
ASMEThe American Society of Mechanical Engineers
AWS / CWSAlternative Work Schedule / Compressed Work Schedule
BFOCBayonet Fiber Optic Connector (BFOC)
BNCBayonet Neill–Concelman connector
BOMBill Of Materiel
C4ISRCommand, Control, Communications, Computers, Intelligence, Surveillance and Reconnaissance
CADComputer Aided Design
CAMComputer Aided Manufacturing
CARCChemical Agent Resistant Coating
CCEContracting Center of Excellence
CCIControlled Cryptographic Item
CERDECU.S. Army Communications-Electronics Research Development and Engineering Center
CFRCode of Federal Regulations
CNCComputer Numeric Controlled
COMSECCommunications Security
CONUSContinental United States (excludes Alaska and Hawaii)
CORContracting Officer Representative
COTSCommercial-Off-the-Shelf
CP&IDCommand, Power and Integration Directorate
CPUCentral Processing Unit
CSCapability Set
DADepartment of the Army
DBD Subminiature connectors per DIN 41625
DD250Department of Defense Form 250 (Receiving Report)
DD254Department of Defense Contract Security Requirement List
DFARSDefense Federal Acquisition Regulation Supplement
DIACAPDefense Information Assurance Certification and Accreditation Process
DINDeutsches Institut für Normung (German Institute for Standardization)
DMDCDefense Manpower Data Center
DODDepartment of Defense
EDMEngineering Data Management
EMIElectromagnetic Interference
EMPElectromagnetic Pulse
FARFederal Acquisition Regulation
FDDIFiber Distributed Data Interface
GFEGovernment Furnished Equipment
GNECGlobal Network Enterprise Construct
GOTSGovernment-off-the-Shelf
HDHigh Density connector
HEMPHigh-Altitude Electromagnetic Pulse
HIPAAHealth Insurance Portability and Accountability Act of 1996
HVACHeating, Ventilation and Air Conditioning
IDIdentification
IETMInteractive Electronic Technical Manual
ILSPIntegrated Logistics Support Plans
INFOSECInformation Security
ISOThe International Organization for Standardization
ITInformation Technology
ITARInternational Traffic in Arms Regulations
KOContracting Officer
LEDLight Emitting Diode
LPLesson Plan
MEFU.S. Marine Corps Expeditionary Force
MHEMaterial Handling Equipment
MRPManufacturing Resource Planning
MSMicrosoft Corporation
MSMilitary Specification
NIENetwork Integration Exercise
NSNNational Stock Number
OCIOrganizational Conflict of Interest
OCONUSOutside Continental United States (includes Alaska and Hawaii)
ODCOther Direct Costs
OEMOriginal Equipment Manufacturer
OSHAOccupational Safety and Health Administration
PDMProduct Data Management
PI&TDPrototyping, Integration and Testing Division
PIPOPhase In/Phase Out
POPurchase Order
POCPoint of Contact
POIProgram of Instruction
PRSPerformance Requirements Summary
PTCParametric Technologies Corporation
PWSPerformance Work Statement
QAQuality Assurance
QAPQuality Assurance Program
QASPQuality Assurance Surveillance Plan
QCQuality Control
QCPQuality Control Program
QMQuality management
RDECOMU.S. Army Research, Development and Engineering Command
RFRadio Frequency
RFIRadio Frequency Interference
RFQRequest For Quotation
RHNRegional Hub Node
RJRegistered Jack interface
RPRapid Prototyping
RPSTLRepair Parts and Special Tools List
SCSubscriber Connector / Square Connector / Standard Connector (fiber optic connector)
SMASubMiniature version A connector
STStraight Tip (fiber optic connector) also known as a “Bayonet Fiber Optic Connector” (BFOC)
SWAP-LSize, Weight and Power, Location
TACOMU.S. Army Tank-Automotive and Armaments Command
TETechnical Exhibit
T-FOCATactical Fiber Optic Connector Assembly, also T-FOCA II
TMTechnical Manual
TOTechnical Order
USBUniversal Serial Bus
WIN-TWarfighter Information Network – Tactical

PART 3

GOVERNMENT FURNISHED PROPERTY AND EQUIPMENT

3. GOVERNMENT FURNISHED ITEMS:

3.1. Facilities and Equipment: The Government will provide the Design, Fabrication, Integration, Test, and Inventory Control Facilities and Equipment located at Aberdeen Proving Ground, Building 3200, for those efforts to be performed on site at that facility. Contractors will have use of government owned cubicles, landline phones, computer equipment, workbenches and tools as is deemed necessary by the Government to complete the assignments within Bldg. 3200.

PART 4

CONTRACTOR FURNISHED ITEMS AND SERVICES

4. CONTRACTOR FURNISHED ITEMS AND RESPONSIBILITIES:

4.1 General: The contractor shall provide all supplies, equipment, facilities and services required to perform work within the contractor owned facilities.

4.2 Secret Facility Clearance: The Contractor shall possess and maintain a SECRET facility clearance from the Defense Security Service. The Contractor’s employees, performing work in support of this contract shall have been granted a SECRET security clearance from the Defense Industrial Security Clearance Office. The DD 254 is provided as an attachment to the contract.

PART 5

SPECIFIC TASKS

5. SPECIFIC TASKS: The contractor shall support the CP&ID PI&TD’s C4ISR prototyping, integration and test efforts in a variety of technical areas during the execution of its various current and planned tri-service Military Systems prototyping and prototype systems integration programs. By their very nature, the individual prototype project requirements and duration of each project vary and are undefined until the system proponent identifies a need or requirement that may include engineering, three dimensional (3D) modeling/computer aided design, virtual prototyping, fabrication, computer aided manufacturing, installation, assembly, integration, technology insertion, environmental testing, logistics, material acquisition, or other related activities. Most projects start out with an inexact set of requirements that are refined and adjusted as the effort progresses. The contractor shall be able to respond to these changing needs within a time-constrained and aggressively-scheduled environment that meet delivery timeframes.

5.1. Design and Development Tasks

5.1.1. Mechanical Engineering Design. The contractor shall provide mechanical engineering design support to PI&TD during design and development stage of C4ISR systems, sub-systems, components, installation kits, and systems-of-systems for integration into ground-based, vehicular, shelter, airborne, watercraft, soldier and dismounted platforms, both tactical and non-tactical, and into fixed and re-locatable sites, including the engineering and design required to perform platform modifications required for the purposes of the integrated C4ISR system. Tasks for mechanical design include efforts such as:

· Formulates engineering objectives and project requirements

· Conceptual and layout design

· Integrated system design

· Design of components and mechanisms

· Perform engineering studies and analyses, use of computer aided design tools

· Size, Weight and Power, Location (SWAP-L) analysis

· CAD and 3D modeling

· Finite Element Analysis

· Computational Fluid Dynamics

· Thermal analysis

· Rapid Prototyping (RP)

· Produce technical data / drawing packages

· “Build-to-Print”

· Conceptual level

· Developmental level

· Production level

· Engineering experimentation

· Mechanical test plans

· Design and development of mechanical test fixtures

· Subject Matter Expert engineering consulting services

· Provides engineering source data to logistics processes

· Engineering project management and coordination

· Technical coordination of the systems integration process

· Technical reviews, technical reports, etc

5.1.2. Electrical Engineering Design . The contractor shall provide electrical engineering design support to PI&TD during the design and development of C4ISR systems, sub-systems, components, installation kits, and systems-of-systems for integration into ground-based, vehicular, shelter, airborne, watercraft, soldier and dismounted platforms, both tactical and non-tactical, and into fixed and re-locatable sites, including the engineering and design required to perform platform modifications required for the purposes of the integrated C4ISR system. Electrical design tasks includes efforts such as:

· Formulates engineering objectives and project requirements

· Conceptual and layout design

· Integrated system design

· Design for the electro-magnetic environment

· Mitigation of EMI/RFI interference

· Surge suppression

· EMP/HEMP and lightning strike protection

· Perform engineering design and analyses

· Size, Weight and Power, Location (SWAP-L) analysis

· CAD and 3D modeling

· Electrical power/signal distribution assemblies

· Printed circuit boards

· Data busses

· Power and signal entrance panels

· Power distribution panels

· Signal interface panels

· Produce technical data / drawing packages

· Electrical schematics, wiring diagrams

· “Build-to-Print”

· Conceptual level

· Developmental level

· Production level

· Engineering experimentation

· Electrical test plans

· Design and development of test fixtures for cables and electronics assemblies

· Subject Matter Expert engineering consulting services

· Engineering support, technical input, and consultation to Safety Assessment

· Provides engineering source data to logistics processes

· Engineering project management and coordination

· Technical coordination of the systems integration process

· Technical reviews, technical reports, etc.

5.1.3. Systems Engineering Design. The contractor shall provide systems engineering design support to PI&TD for the planning, research, design, execution and coordination for efforts including C4ISR systems concept analysis and development, prototype development, platform systems integration efforts, and project management functions. Tasks includes efforts such as:

· Customer requirements analysis and development

· Research / trade studies / analysis of alternatives

· Engineering design and analysis

· Conceptual Design efforts

· interface definition

· new design and development efforts

· evaluation of proposed design solutions

· Commercial-off-the-Shelf / Government-off-the-Shelf (COTS/GOTS) technology evaluation and implementation

· interoperability

· integration analysis

· functional analysis

· reliability, availability, maintainability, and logistical supportability assessments

· define and optimize system and subsystem operations

· life cycle costs

· mission effectiveness

· study, recommend and implement remedies for design / performance deficiencies

· quick reaction studies

· Technical documentation preparation, review and evaluation

· Configuration management

· Engineering change proposals, drawings, and plans

· Design validation and verification

· Customer acceptance

· Delivery / fielding

· Post deployment / field support

· Project management

· Project planning and implementation

· Technical solution implementation

· Design reviews

5.1.4. Hardware / Software / Network design Support.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .