Scope_of_Work_for_Solicitation_IBM15R0006.pdf
PDF 10 KB Posted
- Attached to
- Solicitation for Supply and Delivery of Chlorine Tabs and Granular Chlorine-Nogales, Arizona
- Solicitation number
- IBM15R0006
About this file
Scope of Work for Solicitation IBM15R0006
View the file
Other files
| File | Type | Posted |
|---|---|---|
| IBM15R0006_A001_Amendment_1.pdf | ||
| IBM15R0006_Solicitation.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
UNITED STATES INTERNATIONAL BOUNDARY AND WATER COMMISSION
(USIBWC)
NOGALES INTERNATIONAL WASTEWATER TREATMENT PLANT (NIWTP)
SCOPE OF WORK
FOR
CHLORINE TABS AND GRANULAR
I. BACKROUND
The US International Boundary and Water Commission (USIBWC) operates and maintains the Nogales International Wastewater Treatment Plant (NIWTP) in Rio Rico, Arizona. The NIWTP currently treats approximately 17 million gallons per day of raw sewage entering from Nogales, Mexico and Nogales, Arizona. The NIWTP consists of a Biological Nutrient Removal (BNR), filtering and UV disinfection.
The Nogales International Wastewater Treatment Plant (NIWTP) utilizes Chlorine tablets to assist in disinfection of cross border fugitive flows and Chlorine granules in disinfection of sand filters. The lack of chlorine tablets and granules has the potential to create excessive levels of organic pollutants which may lead to violations of the plant’s permit to operate and to create health hazards to the public.
II. LOCATION
The USIBWC NIWTP is located in Rio Rico, Santa Cruz County, just north of Nogales, Arizona. The treatment plant is situated between the Santa Cruz River that is to the east and Arizona Highway 19 to the west. There is a railroad track between the highway and the treatment plant.
III. SCOPE OF WORK
The contractor shall deliver 68% of calcium hypochlorite 3 inch diameter (nominal) chlorine tablets and granular chlorine to be ordered by delivery orders.
Product failing to meet the calcium hypochlorite content will be rejected and the return shipping cost shall be borne by the contractor.
The contractor shall deliver their product to the plant site within operating hours as scheduled. All delivery orders are FOB Destination.
Estimated orders of chlorine tablets to be 884 buckets/drums per year and 105 buckets/drums of granular chlorine per year. The estimated orders will be made throughout the fiscal year.
The contractor shall be responsible for all shipping, delivery, and/or transportation costs of the chlorine tabs and the chlorine granular.
IV. ORDERING PERIOD
The Contractor shall complete the requirements under this scope of work within the time frames listed below:
BASE YEAR for Line Items 001 and 002 – October 1, 2015 through September 30, 2016.
OPTION YEAR ONE for Line Items 003 and 004 – October 1, 2016 through September 30, 2017
OPTION YEAR TWO for Line Items 005 and 006 – October 1, 2017 through September 30, 2018
OPTION YEAR THREE for Line Items 007 and 008 – October 1, 2018 through September 30, 2019
OPTION YEAR FOUR for Line Items 009 and 010 – October 1, 2019 through September 30, 2020
V. DELIVERY ADDRESS
IBWC, Nogales Waste Water Treatment Plant 865 Rio Rico Industrial Park, Rio Rico, AZ 85648.
VI. ACCESS TO SITE:
NIWWTP is a restricted Facility; and access for delivery shall be in accordance with existing USIBWC procedures. All delivery vehicles must be escorted by a USIBWC employee into the facility. All coordination for delivery will be through the USIBWC Contracting Officer’s Representative (COR).
VII. DELIVERY HOURS
Delivery of all supplies shall be FOB destination
Delivery shall be made within 14 calendar days after receipt of a delivery order.
Delivery hours shall be from 7:30 am to 3:00 pm (MST), Monday to Friday except for Federal holidays.
File details come from the government source that posted it. Updated .