This Invitation to Bid (ITB 27-PW01) is issued by the City of Milton Public Works Department in Milton, Georgia, for building demolition services at One, Two, and Three Verizon Place. The project involves the complete demolition of three office buildings: 1 Verizon Place (144,219 square feet), 2 Verizon Place (144,389 square feet), and 3 Verizon Place (144,718 square feet), located at the northeast corner of Morris Road and Deerfield Parkway. The City reserves the right to exclude one or more buildings from the demolition scope before contract award. Electronically submitted sealed bids are due no later than 2:00 p.m. EST on November 12, 2026, via BidNet Direct at www.miltonga.gov. A highly recommended pre-bid meeting is scheduled for 9:00 a.m. on November 4, 2026, at Building Two, where contractors will have access to all floors and rooms in each building. The deadline for written questions is 5:00 p.m. on November 5, 2026, with answers posted by approximately November 6, 2026. Tentative contract award is on or about December 7, 2026. The selected contractor must commence work within ten calendar days of receiving the Notice to Proceed, with a project completion timeframe to be determined prior to issuance of that notice. Inclement weather days will not count against the available calendar days for completion.

Bids shall be submitted on a unit price basis for demolition and associated erosion control work, including supplemental pricing for potential unknowns. All work must comply with Georgia Department of Transportation Standard Specifications and Special Provisions. A bid bond equal to five percent of the base bid is required with each proposal. The successful bidder must furnish Performance and Payment Bonds in amounts equal to 100 percent of the base bid price, issued by corporate sureties on the Treasury Department's current Circular 570 list. Contractor must obtain and maintain comprehensive general liability insurance with limits of $1,000,000 per occurrence and $2,000,000 umbrella coverage, comprehensive automobile liability of $1,000,000 combined single limit, and workers' compensation and employers' liability coverage as required by Georgia with $1,000,000 per accident limits. The City must be named as an additional insured on all policies except workers' compensation. The contractor or a proposed subcontractor must possess a current and valid Asbestos Abatement License from the State of Georgia and have a minimum of three years of verifiable experience in asbestos removal and disposal. The contractor shall serve as Primary Permittee for NPDES compliance and is responsible for filing the Notice of Intent and associated fees. Erosion control and tree-save fencing will be installed along buffer areas with an estimated 10 percent allowance included in the demolition bid for each building. The contractor must identify its proposed demolition method in the bid schedule and provide a completion timeline excluding weather-related delays.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ITB 27-PW01 1 | P a g e

Bid Number:

ITB 27-PW01

Project Name Building Demolitions at One, Two, and Three Verizon Place

Due Date and Time: November 12, 2026, by 2:00 p.m.

EST

*Link for virtual bid opening will be posted as a “Communication” under this solicitation listing on the City’s procurement portal, BidNet Direct.

Number of Pages: 106

ISSUING DEPARTMENT INFORMATION

Issue Date:

October 15, 2026

City of Milton Public Works Department 2006 Heritage Walk Milton, GA 30004

Phone: 678-242-2500

Website: www.miltonga.gov

INSTRUCTIONS TO BIDDERS

Electronic Submittal: **Bids must be submitted electronically via Milton’s BidNet procurement portal/platform at www.miltonga.gov If you have not registered as a vendor via BidNet we encourage you to register. There is no cost to join, and you will be notified of any potential bid opportunities with the City of Milton as well as other agencies who are part of the Georgia Purchasing Group.

Mark Face of Envelope/Package:

Bid Number: ITB 27-PW01 Name of Company or Firm

Special Instructions:

Deadline for Written Questions November 5, 2026 by 5:00 p.m.

Submit questions online via the BidNet Direct procurement portal at www.miltonga.gov/finance/bids-rfps

BIDDERS MUST COMPLETE THE FOLLOWING

Bidder Name/Address:

Authorized Bidder Signatory:

(Please print name and sign in ink)

Bidder Phone Number: Bidder FAX Number:

Bidder Federal I.D. Number: Bidder E-mail Address:

BIDDERS MUST RETURN THIS COVER SHEET WITH BID RESPONSE

CITY OF MILTON INVITATION TO BID

(THIS IS NOT AN ORDER)

http://www.miltonga.gov/ http://www.miltonga.gov/

ITB 27-PW01 2 | P a g e

Table of Contents

Topic Page

Definitions 3

Invitation to Bid 4

Schedule of Events 5

Bidding Instructions (What must be submitted) 6

Insurance/Bond Requirements 7

Bid Form and Addenda Acknowledgement 11

Bid Bond (3 pages) 13

Qualifications Signature and Certification 16

Corporate Certificate 16

List of Subcontractors 17

Contractor Affidavit and Agreement (eVerify) 18

Disclosure Form 19

Project Specifications 20

Bid Submittal Form (4 pages) 30

General Conditions 34

EPD Air Quality Rules 39

Sample Contract Agreement 40

ITB 27-PW01 3 | P a g e

DEFINITIONS

COMPW: City of Milton Public Works Department

CY: Cubic Yard

GDOT: Georgia Department of Transportation

ENGINEER: The City of Milton Director of Public Works or a duly authorized representative.

ADA: Americans with Disabilities Act

EA: Each

GAL: Gallon

LF: Linear Feet

LM: Linear Mile

LS: Lump Sum

SY: Square Yard

TN: Ton

MUTCD: Manual on Uniform Traffic Control Devices

OSHA: Occupational Safety and Health Administration

FHWA: Federal Highway Administration

AASHTO: American Association of State Highway and Transportation Officials

FOB: Free on Board

ITB 27-PW01 4 | P a g e

Invitation to Bid ITB 27-PW01, Building Demolitions at One, Two, and Three Verizon Place

The City of Milton is accepting electronically submitted sealed bids from qualified firms for the Public Works Department in conformance with Title 32, Chapter 4, Article 4, Part 2 of the Official Code of Georgia Annotated. All work will be done in accordance with Georgia Department of Transportation’s (GDOT) Standard Drawings, Standard Specifications (current edition), and Pay Items Index as standards and specifications for the construction and completion of the work required. All bidders must comply with all general and special requirements of the bid information and instructions enclosed herein.

Electronically submitted sealed bids will be received no later than 2:00 PM Local Time on November 12, 2026. Electronic bids shall be submitted online via BidNet Direct, the City’s procurement portal, at www.miltonga.gov/finance/bids-rfps . Bids received after the above time will not be accepted.

At approximately 2:30 P.M. Local Time on the day bids are received the bids will be publicly opened and the bidder’s name and total bid amount will be read aloud at: City of Milton City Hall, 2006 Heritage Walk, Milton, GA 30004. *Link for the virtual bid opening will be posted as a “Communication” under this solicitation listing on the City’s procurement portal, BidNet Direct.

Pre-Bid Meeting on November 4, 2026. All contractors attending must be present and signed in by 9:00 am at Building Two and will be led by representatives of the City and Owner. Contractors will be able to access all floors and rooms in each building. Once the entire group has completed the first building we will move to Building One and then Building Three. No questions will be accepted at this event, Contractors must submit questions via Bid-Net Direct, the City’s procurement portal.

Questions must also be submitted online in the same manner listed above for bids. Deadline for questions is November 5, 2026, at 5:00 p.m. Official answers to questions and potential changes to the ITB (Addendums) will be posted at the same web locations as the ITB on or about November 6, 2026. Any other form of interpretation, correction, or change to this ITB will not be binding upon the City. It is the bidder’s responsibility to check the websites for potential updates. Please refer to Bid (ITB 22-PW01) and bid name (Building Demolitions at One, Two, and Three Verizon Place) when requesting information.

The City of Milton reserves the right to reject any or all bids and to waive technicalities and informalities, and to make award in the best interest of the City of Milton.

The selected contractor must be able to start work within ten (10) calendar days after the “Notice to Proceed” is issued. The time of completion for the project is to be determined prior to the issuance of the “Notice to Proceed.” If weather affects the required completion schedule, The City and selected contractor will negotiate a new completion date. Section

108.08 of the State of Georgia Department of Transportation Standard Specifications Construction of Transportation Systems (current edition) shall be applied.

http://www.miltonga.gov/finance/bids-rfps

ITB 27-PW01 5 | P a g e

SCHEDULE OF EVENTS

FOR REFERENCE ONLY - DO NOT SUBMIT WITH BID RESPONSE

EVENT DATE

ITB Issue Date October 15, 2026

Highly Recommended Pre-Bid Meeting at 9:00 a.m. on November 4, 2026

Deadline for Receipt of Written Questions 5:00 PM on November 5, 2026

Posting of Written Answers by City to Websites on or about November 6, 2026

ITB DUE No Later than 2:00 P.M. on November 12, 2026

Tentative Contract Award (on/about) December 7, 2026

Notice to Proceed (on/about) To be coordinated with the Contractor

NOTE: PLEASE CHECK THE CITY WEBSITE (http://www.miltonga.gov) FOR ADDENDA

AND SCHEDULE UPDATES.

http://www./

ITB 27-PW01 6 | P a g e

BIDDING INSTRUCTIONS

FAILURE TO RETURN THE FOLLOWING BID DOCUMENTS COULD RESULT IN THE BID

BEING DEEMED NON-RESPONSIVE AND BEING REJECTED:

Item Description Page(s) 1 Filled out and Signed Invitation to Bid (Cover Sheet) 1 2 Bid Form and Addenda Acknowledgement (2 pages) 11-12 3 Bid Bond (3 pages) 13-15 4 Qualifications Signature and Certification 16 5 List of Subcontractors 17 6 Contractor Affidavit and Agreement (eVerify) 18 7 Disclosure Form 19 8 Bid Submittal Form (4 pages) 30-33

INFORMATION AND INSTRUCTIONS

The purpose of this solicitation is to enter a unit price “purchasing contract” with one firm to be the primary supplier of Building Demolitions at One, Two, and Three Verizon Place, ITB 27-PW01.

No specification expressed or implied shall be construed as any type of restrictive specification that would limit competition.

Unless clearly shown as “no substitute” or any words to that effect, any items in these contract documents which have been identified, described or referenced by a brand name or trade name are for reference only. Such identification is intended to be descriptive but not restrictive and is to indicate the general quality and characteristics of products that may be offered. Each bid item for which an equivalent item is proposed must be individually identified on the bid sheet with the following information: brand name, model or manufacturer’s number or identification regularly used in the trade. Photographs, specifications and cut sheets shall be provided of the proposed alternative. The City shall be the sole judge of the suitability of the proposed alternative and may consider function, design, materials, construction, workmanship, finishes, operating features, overall quality, local service facilities, warranty terms and service or other relevant features.

The City reserves the right to cancel the contract at any time, without cause, with 30 days’ written notice.

ITB 27-PW01 7 | P a g e

Title to any supplies, materials, equipment or other personal property shall remain the Contractors’ until fully paid for by the City.

All items to be bid FOB, Milton, Georgia. No sales taxes are to be charged.

Any damage to any building or traffic control device, or equipment incurred during the course of work shall be repaired at the Contractor’s expense to the complete satisfaction of the City of Milton with no additional expense to the City.

EVALUATION

The City intends to evaluate the ITB on the lowest, responsible and responsive bidder.

Bids may be found nonresponsive at any time during the evaluation or contract process, if any of the required information is not provided; the submitted price is found to be inadequate; or the proposal is not within the specifications described and required in the ITB. If a bid is found to be non-responsive or non-qualified, it will not be considered further.

INSURANCE REQUIREMENTS

Within ten (10) days of Notice of Award, and at all times that this Contract is in force, the Contractor shall obtain, maintain and furnish the City Certificates of Insurance from licensed companies doing business in the State of Georgia with an A.M. Best Rating A-6 or higher and acceptable to the City. Insurance requirements are provided below and included in the CONTRACT AGREEMENT (Section 7.K).

(1) Requirements: The Contractor shall have and maintain in full force and effect for the duration of this Agreement, insurance insuring against claims for injuries to persons or damages to property which may arise from or in connection with the performance of the Work by the Contractor, its agents, representatives, employees or subcontractors. All policies shall be subject to approval by the City Attorney as to form and content. These requirements are subject to amendment or waiver if so approved in writing by the City.

(2) Minimum Limits of Insurance: Contractor shall maintain the following insurance policies with limits no less than:

(a) Comprehensive General Liability of $1,000,000 (one million dollars) limit per single occurrence, $2,000,000 (two million dollars) umbrella, including coverage for bodily and personal injury, sickness, disease or death, injury to or destruction of property, including loss of use resulting therefrom, vandalism, property loss and theft.

ITB 27-PW01 8 | P a g e

(b) Comprehensive Automobile Liability (owned, non-owned, hired) of

$1,000,000 (one million dollars) combined single limit per occurrence for bodily and personal injury, sickness, disease or death, injury to or destruction of property, including loss of use resulting therefrom.

(c) Workers' Compensation limits as required by the State of Georgia and Employers Liability limits of $1,000,000 (one million dollars) per accident.

(3) Deductibles and Self-Insured Retentions: Any deductibles or self-insured retentions must be declared to and approved by the City in writing.

(4) Other Insurance Provisions: The policy is to contain, or be endorsed to contain, the following provisions:

(a) General Liability and Automobile Liability Coverage.

(i) The City and City Parties are to be covered as insureds. The coverage shall contain no special limitations on the scope of protection afforded to the City or City Parties.

(ii) The Contractor’s insurance coverage shall be primary noncontributing insurance as respects to any other insurance or self-insurance available to the City or City Parties. Any insurance or self-insurance maintained by the City or City Parties shall be in excess of the Contractor’s insurance and shall not contribute with it.

(iii) Any failure to comply with reporting provisions of the policies shall not affect coverage provided to the City or City Parties.

(iv) Coverage shall state that the Contractor’s insurance shall apply separately to each insured against whom claim is made or suit is brought, except with respect to the limits of the insurer's liability.

(v) Coverage shall be provided on a “pay on behalf” basis, with defense costs payable in addition to policy limits. There shall be no cross-liability exclusion.

(vi) The insurer agrees to waive all rights of subrogation against the City and City Parties for losses arising from Work performed by the Contractor for the City for General Liability coverage only.

(b) Workers' Compensation Coverage: The insurer providing Workers’ Compensation Coverage will agree to waive all rights of subrogation against the City and City Parties for losses arising from Work performed by the Contractor for the City.

ITB 27-PW01 9 | P a g e

(c) All Coverages:

(i) Each insurance policy required by this clause shall be endorsed to state that coverage shall not be suspended, voided, canceled, reduced in coverage or in limits except after thirty (30) days prior written notice by certified mail, return receipt requested, has been given to the City.

(ii) Policies shall have concurrent starting and ending dates.

(5) Acceptability of Insurers: Insurance is to be placed with insurers authorized to do business in the State of Georgia and with an A.M. Bests' rating of no less than A:VI.

(6) Verification of Coverage: Contractor shall furnish the City with certificates of insurance and endorsements to the policies evidencing coverage required by this clause prior to the start of Work. The certificate of insurance and endorsements shall be on a form utilized by Contractor’s insurer in its normal course of business and shall be received and approved by the City within ten

(10) days of the Notice of Award. The City reserves the right to require complete, certified copies of all required insurance policies, at any time. The Contractor shall provide proof that any expiring coverage has been renewed or replaced at least two (2) weeks prior to the expiration of the coverage.

(7) Subcontractors: Contractor shall include all subcontractors as insureds under its policies or shall furnish separate certificates and endorsements for each subcontractor. All coverage for subcontractors shall be subject to all of the requirements stated in this Agreement, including but not limited to naming the Parties as additional insureds.

(8) Claims-Made Policies: Contractor shall extend any claims-made insurance policy for at least six (6) years after termination or final payment under the Agreement, whichever is later.

(9) City as Additional Insured and Loss Payee: The City shall be named as an additional insured and loss payee on all policies required by this Agreement, except the City need not be named as an additional insured and loss payee on any Workers’ Compensation policy.

ITB 27-PW01 10 | P a g e

BONDING REQUIREMENTS

Each bid must be accompanied with a BID BOND (bond only: certified checks or other forms are not acceptable) in an amount equal to five percent (5%) of the base bid, payable to the City of Milton. Said bid bond guarantees the bidder will enter into a contract to construct the project strictly within the terms and conditions stated in this bid and in the bidding and contract documents, should the construction contract be awarded.

The Successful Bidder shall be required to furnish PAYMENT AND PERFORMANCE BONDS for the faithful performance on the contract and a bond to secure payment of all claims for materials furnished and/or labor performed in performance of the project, both in amounts equal to one hundred percent (100%) of the base bid price.

Bonds shall be issued by a corporate surety appearing on the Treasury Department’s most current list (Circular 570 as amended) and be authorized to do business in the State of Georgia. Bonds shall be on the forms provided by the City and subject to the review and approval of the City Attorney.

Date of Bond must not be prior to date of Contract. If Contractor is a Partnership, all partners shall execute Bond.

OATH

Prior to commencing the Work, the successful bidder shall execute a written oath as required by O.C.G.A. §§ 32-4-122 and 36-91-21(e).

COST OF PREPARING A BID

The costs for developing and delivering responses to this ITB and any subsequent presentations of the proposal as requested by the City are entirely the responsibility of the bidder. The City is not liable for any expense incurred by the bidder in the preparation and presentation of their proposal. All materials submitted in response to this ITB become the property of the City of Milton.

ITB 27-PW01 11 | P a g e

[BIDDERS MUST RETURN THIS FORM WITH BID RESPONSE]

BID FORM and ADDENDA ACKNOWLEDGEMENT

TO: PURCHASING OFFICE

CITY OF MILTON

MILTON, GEORGIA 30004

Ladies and Gentlemen:

In compliance with your Invitation to Bid, the undersigned, hereinafter termed the Bidder, proposes to enter into a Contract with the City of Milton, Georgia, to provide the necessary machinery, tools, apparatus, other means of construction, and all materials and labor specified in the Contract Documents or as necessary to complete the Work in the manner therein specified within the time specified, as therein set forth, for:

Bid Number ITB 27-PW01 Building Demolitions at One, Two, and Three Verizon Place

The Bidder has carefully examined and fully understands the Contract, Specifications, and other documents hereto attached, has made a personal examination of the Site of the proposed Work, has satisfied himself as to the actual conditions and requirements of the Work, and hereby proposes and agrees that if his bid is accepted, he will contract with the City of Milton in full conformance with the Contract Documents.

Unless otherwise directed, all work performed shall be in accordance with the Georgia Department of Transportation Standard Specifications, Construction of Transportation Systems (current edition).

It is the intent of this Bid to include all items of construction, and all Work called for in the Specifications, or otherwise a part of the Contract Documents.

In accordance with the foregoing, the undersigned proposes to furnish and construct the items listed in the attached Bid schedule for the unit prices stated.

The Bidder agrees that the cost of any work performed, materials furnished, services provided, or expenses incurred, which are not specifically delineated in the Contract Documents, but which are incidental to the scope, intent, and completion of the Contract, shall be deemed to have been included in the prices bid.

The Bidder further proposes and agrees hereby to promptly commence the Work with adequate forces within ten (10) calendar days from the Notice to Proceed, and to complete all Work as scheduled.

ITB 27-PW01 12 | P a g e

If weather affects the required completion schedule, the City and selected Bidder will negotiate a new completion date.

Attached hereto is an executed Bid Bond in the amount of __________________ Dollars ($ (Five Percent of Amount Bid).

If this bid shall be accepted by the City of Milton and the undersigned shall fail to execute a satisfactory contract in the form of said proposed Contract, and give satisfactory Performance and Payment Bonds, or furnish satisfactory proof of carriage of the insurance required within ten days from the date of Notice of Award of the Contract, then the City of Milton may, at its option, determine that the undersigned abandoned the Contract and there upon this bid shall be null and void, and the sum stipulated in the attached Bid Bond shall be forfeited to the City of Milton as liquidated damages.

Bidder acknowledges receipt of the following addenda:

Addendum No. Date viewed

Bidder further declares that the full name and resident address of Bidder’s Principal is as follows:

Signed, sealed, and dated this _______ day of _____________, 20_____

Bidder _______________________ (Seal) Company Name

Bidder Mailing Address:

Signature: ________________________________________

Print Name: ______________________________________

Title: _____________________________________________

ITB 27-PW01 13 | P a g e

[BIDDERS MUST RETURN THESE SHEETS WITH BID RESPONSE]

BID BOND

BIDDER (Name and Address):

SURETY (Name and Address of Principal Place of Business):

OWNER (hereinafter referred to as the “City” (Name and Address):

City of Milton, Georgia ATTN: Purchasing Office 2006 Heritage Walk Milton, Georgia 30004

BID

BID DUE DATE:

PROJECT (Brief Description Including Location):

BOND

BOND NUMBER:

DATE (Not later that Bid due date):

PENAL SUM: _______________________________________________________________________

(Words) (Figures)

IN WITNESS WHEREOF, Surety and Bidder, intending to be legally bound hereby to the City, subject to the terms printed below or on the reverse side hereof, do each cause this Bid Bond to be duly executed on its behalf by its authorized officer, agent or representative.

BIDDER SURETY

(Seal) (Seal) Bidder’s Name and Corporate Seal Surety’s Name and Corporate Seal

By: By: ___________________________ Signature and Title: Signature and Title:

(Attach Power of Attorney)

Attest: Attest:_________________________ Signature and Title: Signature and Title:

ITB 27-PW01 14 | P a g e

Note: (1) Above addresses are to be used for giving any notice required by the terms of this Bid Bond.

(2) Any singular reference to Bidder, Surety, the City or any other party shall be considered plural where applicable.

1. Bidder and Surety, jointly and severally, bind themselves, their heirs, executors, administrators, successors and assigns to pay to the City upon Default of Bidder the penal sum set forth on the face of this Bond.

2. Default of Bidder shall occur upon the failure of Bidder to deliver within the time required by the Bidding Documents (or any extension of that time agreed to in writing by the City) the executed Agreement required by the Bidding Documents and any performance and payment Bonds required by the Bidding Documents.

3. This obligation shall be null and void if:

3.1 The City accepts Bidder’s Bid and Bidder delivers within the time required by the Bidding Documents (or any extension of that time agreed to in writing by the City) the executed Agreement required by the Bidding Documents and any performance and payment Bonds required by the Bidding Documents;

or

3.2 All Bids are rejected by the City; or

3.3 The City fails to issue a Notice of Award to Bidder within the time specified in the Bidding Documents (or any extension of that time agreed to in writing by Bidder and, if applicable, consented to by Surety when required by paragraph 5 hereof).

4. Payment under this Bond will be due and payable upon Default by Bidder within 30 calendar days after receipt by Bidder and Surety of a written Notice of Default from the City, which Notice will be given with reasonable promptness and will identify this Bond and the Project and include a statement of the amount due.

5. Surety waives notice of, as well as any and all defenses based on or arising out of, any time extension to issue a Notice of Award agreed to in writing by the City and Bidder, provided that the total time, including extensions, for issuing a Notice of Award shall not in the aggregate exceed 120 days from Bid due date without Surety’s written consent.

6. No suit or action shall be commenced under this Bond either prior to 30 calendar days after the Notice of Default required in paragraph 4 above is received by Bidder and Surety or later than one year after Bid due date.

7. Any suit or action under this Bond shall be commenced only in a court of competent jurisdiction located in the State of Georgia.

8. Notices required hereunder shall be in writing and sent to Bidder and Surety at their respective addresses shown on the face of this Bond. Such notices may be sent by personal delivery, commercial courier or by United States Registered or Certified Mail, return receipt requested, postage pre-paid, and shall be deemed to be effective upon receipt by the party concerned.

ITB 27-PW01 15 | P a g e

9. Surety shall cause to be attached to this Bond a current and effective Power of Attorney evidencing the authority of the officer, agent or representative who executed this Bond on behalf of Surety to execute, seal and deliver such Bond and bind the Surety thereby.

10. This Bond is intended to conform to all applicable statutory requirements. Any applicable requirement of any applicable statute that has been omitted from this Bond shall be deemed to be included herein as if set forth at length. If any provision of this Bond conflicts with any applicable statute, then the provision of said statute shall govern and the remainder of this Bond that is not in conflict therewith shall continue in full force and effect.

11. The term “Bid” as used herein includes a Bid, offer or proposal, as applicable under the particular circumstances.

12. The terms of this Bid Bond shall be governed by the laws of the State of Georgia.

ITB 27-PW01 16 | P a g e

QUALIFICATIONS SIGNATURE AND CERTIFICATION

I certify that this offer is made without prior understanding, agreement, or connection with any corporation, firm, or person submitting a proposal for the same materials, supplies, equipment, or services and is in all respects fair and without collusion or fraud. I understand collusive bidding is a violation of State and Federal Law and can result in fines, prison sentences, and civil damage awards. I agree to abide by all conditions of the proposal and certify that I am authorized to sign this proposal for the proposer. I further certify that the provisions of the Official Code of Georgia Annotated, including but not limited to Title 32, Chapter 4, Article 4, Part 2 and Sections 45-10-20 et seq. have not been violated and will not be violated in any respect.

Authorized Signature______________________________Date_______________________

Print/Type Name______________________________________________________________

Print/Type Company Name Here_______________________________________________

CORPORATE CERTIFICATE

I, ___________________________________, certify that I am the Secretary of the Corporation named as Contractor in the foregoing bid; that _______________________________________ who signed said bid in behalf of the Contractor, was then (title)_________________________ of said Corporation; that said bid was duly signed for and in behalf of said Corporation by authority of its Board of Directors, and is within the scope of its corporate powers; that said Corporation is organized under the laws of the State of _________________________________.

This ________________ day of ________________, 20______

______________________________________(Seal) (Signature)

ITB 27-PW01 17 | P a g e

LIST OF SUBCONTRACTORS

I do _________, do not _______, propose to subcontract some of the work on this project. I propose to Subcontract work to the following subcontractors:

Company Name:___________________________________________________

ITB 27-PW01 18 | P a g e

CONTRACTOR AFFIDAVIT AND AGREEMENT

STATE OF GEORGIA

CITY OF MILTON

By executing this affidavit, the undersigned contractor verifies its compliance with O.C.G.A. § 13-10- 91, stating affirmatively that the individual, firm, or corporation which is engaged in the physical performance of services on behalf of the City of Milton has registered with, is authorized to use and uses the federal work authorization program commonly known as E-Verify, or any subsequent replacement program, in accordance with the applicable provisions and deadlines established in O.C.G.A. § 13-10-91. Furthermore, the undersigned contractor will continue to use the federal work authorization program throughout the contract period and the undersigned contractor will contract for the physical performance of services in satisfaction of such contract only with subcontractors who present an affidavit to the contractor with the information required by O.C.G.A. § 13-10-91(b).

Contractor hereby attests that its federal work authorization user identification number and date of authorization are as follows:

I hereby declare under penalty of perjury that eVerify Number

Date of Authorization

Name of Contractor

Building Demolitions at One, Two, and Three Verizon Place Name of Project

City of Milton, Georgia Name of Public Employer the foregoing is true and correct.

Executed on ____________________, 20____ in ________________________(city), ______(state).

Signature of Authorized Officer or Agent

Printed Name and Title of Authorized Officer or Agent

SUBSCRIBED AND SWORN BEFORE ME ON

THIS THE ______ DAY OF ______________,20___.

NOTARY PUBLIC

[NOTARY SEAL]

My Commission Expires:

ITB 27-PW01 19 | P a g e

DISCLOSURE FORM

This form is for disclosure of campaign contributions and family member relations with City of Milton officials/employees.

Please complete this form and return as part of your bid package when it is submitted.

Name of Bidder __________________________________________________

Name and the official position of the Milton Official to whom the campaign contribution was made (Please use a separate form for each official to whom a contribution has been made in the past two (2) years.)

List the dollar amount/value and description of each campaign contribution made over the past two (2) years by the Applicant/Opponent to the named Milton Official.

Amount/Value Description

Please list any family member that is currently (or has been employed within the last 9 months) by the City of Milton and your relation:

ITB 27-PW01 20 | P a g e

Pre-Bid Meeting on November 4, 2026. All contractors attending must be present and signed in by 9:00 a.m. at Building Two and will be led by representatives of the City and Owner. Contractors will be able to access all floors and rooms in each building. Once the entire group has completed the first building we will move to Building One and then Building Three. No questions will be accepted at this event, Contractors must submit questions via Bid-Net Direct, the City’s procurement portal.

PROJECT SCOPE AND LOCATIONS

Demolition services for three (3) office buildings as shown numbered below.

Contractor will follow all City, State, and Federal demolition guidelines and ordinances, and laws. The property, known as One, Two, and Three Verizon Place, is located on the northeast corner of Morris Road and Deerfield Parkway, 34°05'36.9"N 84°16'13.7"W.

1 Verizon Place - 3 story structure measuring 144,219. SF 2 Verizon Place- 3 story structure measuring 144,389. SF 3 Verizon Place- 3 story structure measuring 144,718. SF

ITB 27-PW01 21 | P a g e

Demo and Site plan link:

https://www.miltonga.gov/home/showdocument?id=10441&t=639275057149582936

PROJECT DESCRIPTION

The awarded contractor will be responsible for demolishing and removal of the structures. This includes the buildings, identified retaining walls, and other items called out in this bid document. Erosion control and tree-save fence will be installed along the entire undisturbed buffer for the creeks below grade of the work zone. Estimated quantities will be called out for known items and there will also be an E&SC allowance in the bid. The City is requesting pricing for demolition of all three buildings on the site. The City reserves the right to exclude one or more buildings from the demolition scope and will make that determination before entering into a contract with the lowest responsive and responsible bidder.

SPECIAL PROVISIONS

1. A previously completed Environmental Site Assessment (ESA) was provided for informational purposes only and is available at:

https://www.miltonga.gov/home/showdocument?id=10439&t=63927503600 8549587 .

The City is obtaining an updated Phase I ESA, which will be provided before contract award. The bid includes an allowance for removal of items identified in the City’s assessment. If removal services are needed, the City and the selected Contractor will negotiate the scope and cost of those services. The City, at its sole discretion, may authorize use of the allowance or procure the services through a separate contract.

2. Bidders shall identify their proposed demolition method on the bid schedule.

3. The Contractor, or a proposed subcontractor for the project, must also have current and valid Asbestos Abatement License from the State of Georgia along with the bid and a minimum of three (3) years of verifiable experience (Contractor and/or Sub-Contractor) in asbestos removal and disposal.

4. If needed: Removal and disposal of all ACM shall be in accordance with the

Department of Environmental Quality, the Environmental Protection Agency (EPA), Georgia Environmental Protection Division (EPD), and Occupational Safety and Health Administration (OSHA) guidelines and current laws of the State of Georgia, City of Milton, and all governing Federal regulations.

https://www.cityofmiltonga.us/Home/ShowDocument?id=4447 https://www.miltonga.gov/home/showdocument?id=10441&t=639275057149582936 https://www.miltonga.gov/home/showdocument?id=10439&t=639275036008549587 https://www.miltonga.gov/home/showdocument?id=10439&t=639275036008549587

ITB 27-PW01 22 | P a g e

5. If needed: the Contractor, or his foreman, shall be responsible for asbestos removal/disposal operations involved with asbestos removal/disposal operations and shall be certified by the Georgia Asbestos Licensing and Certification Unit before performing any asbestos removal or disposal work.

Chapter 52-1 of the rules of the Asbestos Licensing Board shall apply.

6. If needed: Copies of any environmental permits, hazardous materials disposal certificates, or manifests shall be sent to the Engineer or the Inspector over the project. Please ensure that all applicable documents are forwarded to the department on an ongoing basis. Work performed under this contract shall conform to EPA, EPD, and OSHA requirements. Site clean-up shall also conform to applicable State of Georgia and City of Milton laws, ordinances and codes.

7. The Contractor shall comply with the plans and specifications provided.

8. The Erosion control layout and quantities are estimated quantities. The tree-save and double row of type C silt fence will be laid out with the City Engineer and the Contractor prior to installation. Contractor will be paid by actual quantity used. There are supplemental bid items also called out in the bid as well as an erosion and sediment control allowance.

9. In addition to other standard specifications referenced herein, the bid package includes:

a. Construction Drawings.

b. Special Provision 163 – Miscellaneous Erosion Control Items.

c. Special Provision 165 - Maintenance of Temporary Erosion and

Sedimentation Control Devices.

d. Special Provision 171 – Silt Fence.

e. Special Provision 700 – Grassing

DEMOLITION

The Contractor shall establish a regulated work area, demark the demolition areas. Create a safety Zone 80’ from the building and restrict access to the demolition area. Contractor shall remove and properly dispose of all CFC containing refrigerants / coolants and listed universal waste within the building.

The subject buildings shall be demolished via standard mechanical means or alternate methods proposed by the Contractor. All C& D waste material shall be removed from the site to a permitted landfill.

ITB 27-PW01 23 | P a g e

The Contractor will supply industry standard equipment, dumpsters, and dump trucks to complete this work. Contractor’s staff shall consist of professional experienced equipment operators and supply qualified and experienced ground staff, spotters, removal drivers.

The Contractor will be responsible for removal and proper disposal of the following items, if present in the building(s) prior to demolition of a building.

Universal Waste

• Fluorescent lamps (mercury)

• HID lamps

• Thermostats (mercury bulbs)

• Exit signs (tritium)

• Batteries (UPS, emergency lights, tenant equipment)

• Smoke detectors

Hazardous Materials

• PCB ballasts

• PCB transformers

• Freon in chillers/RTUs/split systems

• Oils in elevators or compressors

• Housekeeping chemicals / stored materials

Solar Panels Solar panels are planned to be removed by Seller. If not, the Contractor will remove and dispose of in accordance with all local, state, and federal regulations. This work would be paid for using the demolition allowance called out in the bid document.

HAZARDOUS MATERIALS

The City excludes the testing, handling, and disposal of hazardous materials from this proposal. If asbestos, UST tanks, PCB transformers, batteries, or mercury-filled lighting are suspected, these items will be subject to separate testing and disposal costs. This work would be paid for using the demolition allowance called out in the bid document.

SILENCE OF SPECIFICATIONS:

The apparent silence of these specifications and any supplemental specifications as to any details, or the omission from it of a detailed description concerning any point, shall be regarded as meaning that only the best commercial practices are to prevail and that only materials of first quality and correct type, size and design are to be used. All workmanship is to be first quality. All interpretations of this specification shall be made upon the basis of this statement, with City interpretation to prevail.

ITB 27-PW01 24 | P a g e

PROSECUTION AND PROGRESS

Demolition shall begin no later than ten (10) calendar days following the Notice to Proceed. The Contractor will mobilize with sufficient forces such that all construction identified as part of this contract shall be substantially completed within the calendar days indicated on the Bid Schedule. Inclement weather days will not count against the available calendar days. With the size of this demolition project the City would allow the qualified low bidder the ability to pull off the site if needed. This would be coordinated with the Public Works Manager prior to pulling off. Stipulations to that would be the Contractor cannot leave in the middle of demolishing a building. Once the building is demolished and removed and the site has been safed up and work approved by the City, the Contractor may pull off if needed for an agreed upon timeframe.

Normal workday for this project shall be 9:00 am to 7:00 pm and the normal workweek shall be Monday through Friday. Normal working hours for roadway activities is 9:00 am to 4:00 pm. The City will consider extended workdays or workweeks upon written request by the Contractor on a case-by-case basis. No work will be allowed on City recognized holidays.

The work will require bidder to provide all labor, administrative forces, equipment, materials and other incidental items to complete all required work. The City shall perform a Final Inspection upon completion of all work. The Contractor will be allowed to participate in the Final Inspection. All repairs shall be completed by the Contractor at his expense prior to issuance of Final Acceptance. Except to the extent limited by law, 5% retainage will be held from the total amount due the Contractor until Final Acceptance of work is issued by the City.

The Contractor shall provide all materials, labor, and equipment necessary to perform the work without delay unto completion.

PERMITS AND LICENSES

The Contractor shall procure all permits and licenses, pay all charges, taxes and fees, and give all notices necessary and incidental to the due and lawful prosecution of the work.

The Contractor shall obtain a building demolition permit from the City and provide all required documentation to obtain the permit but will not be charged the permit fee and shall not include that fee in the base bid. The Contractor is responsible for obtaining all required inspections.

RODENT ERADICATION

Pre-demolition, the selected contractor shall diligently eradicate all rodents and vermin before demolition and provide a rodent letter from a certified exterminator.

ITB 27-PW01 25 | P a g e

UTILITIES

The City will work with the local utility servicing these structures terminate these services.

necessary to the completion of the work. Contractor shall call in locates with GA811. The contractor will follow Fulton County Sewers specifications for demolition of structures with Sanitary Sewers and Grease Traps.

Notification: Notify the Fulton County Department of Public Works at least two days in advance before disconnecting or interrupting any public sewer or water service.

Lateral Capping & Sealing: Disconnected sewer services (laterals) must be cleanly cut, plugged, and sealed per Fulton County standards to prevent groundwater infiltration, soil entry, or sewer gases escaping.

Easement Protection: No heavy machinery, grading, or storage of demolition debris is permitted over recorded sanitary sewer easements without prior county approval.

Inspection & Standards: All repair, capping, or reconnection work must follow Fulton County Standard Details (100–800 Series), using approved materials like PVC (ASTM D3034 SDR35) or ductile iron where required.

PROTECTION AND RESTORATION OF PROPERTY AND LANDSCAPE

The Contractor shall be responsible for the preservation of all public and private property, crops, fishponds, trees, monuments, highway signs and markers, fences, grassed and sodded areas, etc. along and adjacent to the highway, road or street, and shall use every precaution necessary to prevent damage or injury thereto, unless the removal, alteration, or destruction of such property is provided for under the contract. No stone or asphalt chunks shall be left in the right-of-way and screened topsoil shall be placed in all disturbed areas before grassing. Contractor is responsible for ensuring that all permanent grassing shall match the existing grassing.

When or where any direct or indirect damage or injury is done to public or private property by or on account of any act, omission, neglect or misconduct in the execution of the work, or in consequence of the non-execution thereof by the contractor, he shall restore, at his/her own expense, such property to a condition similar or equal to that existing before such damage or injury was done, by repairing, rebuilding or otherwise restoring as may be directed, or she/he shall make good such damage or injury in an acceptable manner. The Contractor shall correct all disturbed areas before retainage will be released.

TEMPORARY TRAFFIC CONTROL

The Contractor shall, at all times, conduct his work as to assure the least possible obstruction of traffic. The safety and convenience of the general public and the residents along the roadway and the protection of persons and property shall be provided for by the contractor as specified in the State of Georgia, Department of Transportation Standard Specifications Sections 104.05, 107.09 and 150.

https://www.fultoncountyga.gov/inside-fulton-county/fulton-county-departments/public-works https://www.fultoncountyga.gov/property-and-vehicles/water/view-construction-standard-details https://www.fultoncountyga.gov/property-and-vehicles/water/view-construction-standard-details

ITB 27-PW01 26 | P a g e

Traffic whose origin and destination is within the limits of the project, shall be provided ingress and egress at all times unless otherwise specified by the City. The ingress and egress include entrances and exits VIA driveways at various properties, and access to the intersecting roads and streets. The Contractor shall maintain sufficient personnel and equipment (including flaggers and traffic control signing) on the project at all times, particularly during inclement weather, to ensure that ingress and egress are safely provided when and where needed.

The Contractor shall provide access to emergency vehicles and/or emergency personnel through or around the construction area. Any pavement damaged by such an occurrence will be repaired by the Contractor at no additional cost to the City.

The Contractor shall furnish, install and maintain all necessary and required barricades, signs and other traffic control devices in accordance with the latest MUTCD and GDOT specifications, and take all necessary precautions for the protection of the workers and safety of the public.

All existing signs, markers and other traffic control devices removed or damaged during construction operations will be reinstalled or replaced by the end of the workday at the Contractor’s expense. At no time will Contractor remove regulatory signing which may cause a hazard to the public. The Contractor shall provide three (3) variable message boards to be placed at the direction of the City. The message boards will warn approaching traffic to be aware trucks will be entering the road.

SAFETY REQUIREMENTS

The Contractor shall be responsible for the entire site and the construction of the same and provide all the necessary protections as required by laws or ordinances governing such conditions and as required by the Owner or Designer. He/she shall be responsible for any damage to the Owner's property or that of others on the job, by himself/herself, his/her personnel or his/her subcontractors, and shall make good such damages. He/she shall be responsible for and pay for any claims against the Owner arising from such damages.

The Contractor shall provide all necessary safety measures for the protection of all persons on the work. Contractor shall clearly mark or post signs warning of hazards existing and shall barricade excavations and similar hazards. He/she shall protect against damage or injury resulting from falling materials and he/she shall maintain all protective devices and signs throughout the progress of the work.

EROSION CONTROL

It is the responsibility of the Contractor to follow all Federal, State and Local erosion and sediment control laws and specifications. This includes meeting all NPDES guidelines. The contractor shall serve as the Primary Permittee for this project and is responsible for filing the NOI and all necessary fees associated with it.

ITB 27-PW01 27 | P a g e

Erosion and Sediment Control measures shall be installed and maintained by the Contractor throughout the duration of the project. Contractor is responsible for the removal and disposal, off project site, of all installed temporary erosion and sediment control measures when affected areas have been restored to a level where vegetative coverings will minimize erosion. The cost for this will be considered incidental to the project and included in the overall bid.

CLEANUP

All restoration and clean-up work shall be performed daily. The cleanup will be strictly monitored with the close proximity of state waters on the site. Operations shall be suspended if the contractor fails to accomplish restoration and clean-up within an acceptable period of time.

SAFETY

Beginning with mobilization and ending with acceptance of work, the Contractor shall be responsible for providing a clean and safe work environment at the project site. The Contractor shall comply with all OSHA regulations as they pertain to this project.

This project shall follow Georgia Department of Transportation Specifications. The most current GDOT Specifications and shelf Special Provisions apply to all work performed under this contract.

Georgia Asbestos Rules

The Contractor will follow these or the most current guidelines for asbestos abatement if it is determined that there is asbestos or any other hazardous waste it found upon the completion of the City’s Environmental Site Assessment.

The Environmental Protection Division enforces several Rules which govern Georgia's asbestos abatement, licensing and disposal industry. The Rules, in their entirety, can be found at epd.georgia.gov/rules-and-laws; however, select requirements are outlined below:

Rules for Air Quality Control Chapter 391-3-1 incorporates and adopts the National Emission Standards for Hazardous Air Pollutants (NESHAP), Asbestos Revision by reference; Final Rule;

Effective November 20, 1990. The following excerpt provides the authority for regulating asbestos emission standards and work practices in Georgia:

Rule 391-3-1-.02(9)(b)7. Emission Standard for Asbestos (Including Work Practices):

40 CFR Part 61 (NESHAP), Subpart M (asbestos), as amended July 20, 2004, is hereby incorporated and adopted by reference.

Applicability: All owners and operators when buildings are public, commercial, industrial; two or more single family residences; a single family residence that is part https://epd.georgia.gov/rules-and-laws http://rules.sos.state.ga.us/cgi-bin/page.cgi?g=GEORGIA_DEPARTMENT_OF_NATURAL_RESOURCES/ENVIRONMENTAL_PROTECTION/AIR_QUALITY_CONTROL/index.html

ITB 27-PW01 28 | P a g e of a public, commercial, or industrial project; or a multifamily structure with five or more units.

Basic Requirements: Accredited Asbestos Inspectors must perform thorough inspections for friable and non-friable asbestos-containing materials (ACM); notify EPD and remove all ACM that is friable or will become friable that is found at or above the trigger quantities; wet, package, and label the ACM before removal and keep wet until at disposal site; generate Waste Shipment Record; and notify EPD prior to demolition.

Rules for Asbestos Removal and Encapsulation Chapter 391-3-14 delineates the requirements for licensing asbestos abatement contractors, fees for abatement projects, project supervisor training requirements, licensing reciprocity, exemptions and enforcement. The following summary provides the authority for regulating asbestos abatement work:

Applicability: All contractors removing or disturbing more than 10 square or 10 linear feet of friable ACM in any type of building or structure.

Basic Requirements: All project supervisors and workers must be trained in approved asbestos training courses; the contractor must have a Georgia Asbestos Contractor License; contractor must submit a completed Project Notification to EPD before removing or disturbing more than the trigger quantities of friable ACM and pay the associated fee; and before and during work must wet and keep wet any ACMs that are or will become friable.