This document contains a Quality Assurance Surveillance Plan (QASP) and related attachments for an annual online subscription to technical codes and standards. The QASP outlines methods for monitoring contractor performance including checklists, schedules, and procedures for addressing non-conforming performance. Key requirements include the contractor providing online access to codes and standards for engineers at the Department of Public Works at West Point, updating access as standards are revised, and providing periodic usage reports. The government will conduct surveillance using methods like random sampling, periodic inspections, and customer feedback to ensure the contractor meets performance standards specified in the PWS. The QASP defines non-conformance levels and procedures for issuing discrepancy reports, and requires the contractor have a quality control plan. Completed surveillance documents will be uploaded to the CORT system.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| PRS.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Quality Assurance Surveillance Plan
For;
Annual Subscription for Technical Standards & Codes.
CONTRACT # TBD
POP: 1 May 2022- 30 April 2023 + 4 Option years
Ms. Kym Aviles Mr. John Michael Duncombe Contracting Officer Contracting Officer’s Representative Mission & Installation Contracting Command United States Army Garrison, West Point, TABLE OF CONTENTS
Subject Page Number
1. Overview
2. Description of Services
3. Roles and Responsibilities
4. Contract Quality Requirements
5. Government Surveillance
6. Non-Conforming Performance
7. Deduct Plan
8. Data Analysis
9. Acceptance of Services
10. COR Status Report
11. Contractor Manpower Reporting Application (CMRA)
12. Contractor Performance Assessment Reporting System (CPARS)
13. Combating Trafficking In Persons
14. COR/Quality Assurance Surveillance Files
15. QASP Changes
1. Overview.
1.1. Purpose. This Quality Assurance Surveillance Plan (QASP) is a Government developed document used to ensure that the Government receives quality services, and pays only for conforming services actually provided. The objective of this FFP contract is to provide The Contractor shall perform to the standards specified in the PWS.
The Engineering Services Division (ESD) of the Department of Public Works (DPW) at the US Army Garrison, West Point, N.Y. has a need for an annual on line subscription providing access to numerous technical codes and standards that we use for the execution of our Engineering and Construction projects. Hard copies have been purchased in the past however they become out of date as soon as a new revision is issued. The vendor is required to provide an annual subscription for on line access to all engineers within DPW, as well as others on West Point (Cadets, Faculty, etc.) including the Reference Librarian. Vendor is also required provide access to updated codes and standards when they are revised by the issuing entity. Access shall be provided for at least one simultaneous user for each individual code/standard. The ability to print hard copies shall also be provided. Additionally, vendor shall provide periodic usage reports showing the amount of usage by code/standard.
This Quality Assurance Surveillance Plan (QASP) identifies the methods and procedures the Government will use to ensure it receives the services to the desired standard, as identified in the
PWS.
1.2. Intent. The intent of this QASP is to:
1) Ensure Contractor performance meets or exceeds contract terms, conditions and specifications
2) Hold the Contractor accountable for quality control
3) Encourage the Contractor to take appropriate steps to control and improve quality
4) Ensure all sections of FAR 46 are applied as required and applicable
Accordingly, the Government will perform surveillance on the contract in accordance with this QASP, but reserves the right to monitor the contract in any manner necessary, at any time necessary, and at all places necessary to ensure that the services rendered conform to contract requirements. The Government also reserves the right to perform quality assurance at the Subcontractor level, and at the contractor's place of business. Sub-contract service providers shall be accountable to the Contractor who, in turn is responsible to the Government. Resolution of non-conforming services discovered at the Subcontractor level will be addressed with the prime Contractor. The Government will not exercise any supervisory controls over the contract service providers performing the services herein.
2. Description of Services.
2.1. Scope of Work. The contractor shall The Engineering Services Division (ESD) of the Department of Public Works (DPW) at the US Army Garrison, West Point, N.Y. has a need for an annual on line subscription providing access to numerous technical codes and standards that we use for the execution of our Engineering and Construction projects. Hard copies have been purchased in the past however they become out of date as soon as a new revision is issued. The vendor is required to provide an annual subscription for on line access to all engineers within DPW, as well as others on West Point (Cadets, Faculty, etc.) including the Reference Librarian.
Vendor is also required provide access to updated codes and standards when they are revised by the issuing entity. Access shall be provided for at least one simultaneous user for each individual code/standard. The ability to print hard copies shall also be provided. Additionally, vendor shall provide periodic usage reports showing the amount of usage by code/standard. The required codes/standards are as follows:
ACI 301, 318
ASCE 7
ASME B31.1
AWS D1.1
ICC-IBC
NFPA 70, 70E, 72, 90A, 101, 110
ASTM Section 4
ASTM Volumes 01.01, 01.03, 01.04, 01.05, 08.03, 08.04, 10.01, 10.02, 10.03
ASHRAE
ICC NY State Building Codes
SMACNA
CFR/US Federal Construction Regulations
AISC
2.2. Type of Contract. This will be a FFP contract.
3. Roles and Responsibilities. The following provides a synopsis for the roles and their respective authority during the performance of the contract:
3.1. Government.
3.1.1. Contracting Officer (KO). The KO is the only person authorized to direct changes in any of the requirements under this contract. In the event the Contractor effects any such change at the direction of any person other than the KO, the change will be considered to have been made without authority, and solely at the risk of the Contractor. No changes in, or deviation from the terms and conditions shall be affected, without a written modification to the contract, executed by the KO authorizing such changes.
3.1.2. Contracting Officer’s Representative (COR). The COR will monitor all technical and performance aspects of the contract, and assist the (KO) in contract administration. The COR is authorized to perform the following functions:
• Assure that the Contractor performs the technical requirements of the contract
• Perform inspections necessary in connection with contract performance
• Maintain written and oral communications with the Contractor concerning technical and performance aspects of the contract
• Issue written interpretations of technical requirements, including Government drawings, designs, and specifications
• Monitor Contractor's performance and documents and notifies both the Contracting
Officer and Contractor of all deficiencies
• Coordinate availability of Government furnished property
• Provide site entry of Contractor personnel351099
ACC and MICC do not use other acronyms to refer to and describe a COR. Terms such as the “COTR, “Onsite COR”, “TM”, etc. will not be used. Some personnel may be assigned as Alternate CORs, but other than a statement to that effect and what actions the KO expects that ACOR to take in the absence of the primary COR, there is no difference between a COR an Alternate COR, or other government surveillance personnel assigned to conduct contract oversight. Throughout the remainder of this QASP, The term “COR’ will be used to refer to all government surveillance personnel assigned to monitor the contractor’s performance on this contract.
A letter of designation issued to the COR, a copy of which is sent to the Contractor, states the responsibilities and limitations of the COR, especially with regard to changes in cost, price, or delivery dates. The COR is not authorized to change any of the terms and conditions of the resulting order.
The Contracting Officer shall use the DoD Contracting Officer Representative Tracking (CORT) Tool to electronically track COR nominations, appointments, terminations, and training certifications for each COR appointed to conduct oversight on this contract. The COR will upload their surveillance documents, such as Monthly Status Reports (MSR), COR trip reports, correspondence with the contractor, and other miscellaneous documents into the CORT Tool within their online CORT Profile for this contract. The CORT Tool is available within the WAWF suite of tools at: https://wawf.eb.mil/.
3.1.2.1 Alternate Contracting Officer’s Representative (ACOR). The Alternate COR is an employee of the U.S. Government provided by the Requiring Activities (RA) and appointed by the Contracting Officer to provide additional surveillance personnel in monitoring and documenting the contractor’s performance. These alternate surveillance support personnel may serve as on-site representatives of the COR in performance of actual contract surveillance, if they meet all COR training and experience requirements and are appointed by the contracting officer https://wawf.eb.mil/ as Alternate CORs (ACOR) in the DPAP CORT Tool. This term will apply to other government surveillance personnel as defined in Army Regulation 70-13, paragraph 2-2 g.
3.1.3. Contract Administrator. NA
3.1.4. Property Administrator. NA
3.2. Contractor.
3.2.1. Contract Manager. NA
3.2.2. Program Manager. NA
3.2.3. Quality Manager. The Contractor responsible for promoting quality achievement and performance improvement throughout the organization. Develops, implements, communicates and maintains a quality plan to bring the Contractor’s Quality Systems and Policies into compliance with quality system requirements. Directs the activities of contractor quality personnel to measure key quality characteristics of services delivered and processes from inception to completion. Establishes the standards of service for customers expected by the Requiring Activity
For quick access, the contact information for the performance of this QASP is provided:
Table 1; Key Positions for Contract Administration Government Personnel:
Title Name Phone e-mail Contracting Officer Kymberly
Aviles 845-938-5861 Kymberly.y.aviles.civ@army.mil
COR/ACOR John Michael
Duncombe
845-938-7653 John.m.duncombe.civ@army.mil
Contract Administrator
Property Administrator
Contractor Personnel:
Title Name Phone e-mail
Project Manager
Quality Manager
4. Contract Quality Requirements.
4.1. Contractor’s Quality Control Plan/Program (QCP). The Government will evaluate the adequacy of the Contractor’s Quality Control Plan (QCP) performance under this contract in accordance with this QASP.
The Contractor’s quality control program is the means by which he assures himself that all work complies with the requirement of the contract PWS. It is essential that Government Surveillance Personnel understand that Quality Control (QC) is the responsibility of the contractor, and not the government.
As such, the government will focus their efforts on validating if the contractor is maintaining an adequate quality control inspection systems that ensures the contractor maintains evidence that services provided conform to contract quality requirements. The Contractor shall provide inspection data to the Government on request for validation.
The Contractor’s QCP shall include a process that can identify, prevent, and ensure non-recurrence of defective services.
4.2. Government Quality Assurance. This QASP describes what the Government will do to ensure that the Contractor has performed in accordance with the performance standards within the PWS.
This QASP describes:
• How the performance standards will be applied:
o The Performance Standard for each requirement in the PWS will be applied as prescribed in the PWS. Ensure that each Performance requirement within the PWS includes a Measurable performance standard in terms of quality, timeliness, or quantity.
o Ensure the method of assessing contractor performance against performance standards is included in this QASP o Ensure each Performance Requirement includes an acceptable quality limit (AQL).
AQL is the worst tolerable performance that is still considered acceptable.
For example; if “the contractor shall provide personnel support within 2 hours”, the AQL may be:
+ or - (+/-) 15 min. See attachment 3, Surveillance Requirements Summary (SRS).
• Which performance elements will be surveilled (Surveillance Checklist, attachment 5) o All performance activities will be surveilled through-out the Period of Performance, using a risk based approach to selecting Checklist items from Attachment 1, List of Contractor Requirements. The selected items will be populated on the Monthly Checklist and placed on the Surveillance Schedule for each period surveilled.
• When the surveillance will be scheduled (Surveillance Schedule, attachment 4) o A sample of Checklist items will be selected from Attachment 1, List of Contractor
Requirements. These selected items for each month will be placed on the Surveillance Checklist and scheduled surveillance on the Monthly Schedule. Surveillance may be scheduled on a daily, weekly or monthly frequency. However, each contractor requirement must be audited for compliance prior to invoice payment being made.
• The Acceptable Quality Limit (AQL) o The AQL will be determined by the Requiring Activity, i.e., the COR, and referenced in attachment 3, QASP Surveillance Item Requirements for each Performance requirement.
• The nature of Government contract quality assurance actions that includes the number of observations made and the number and type of defects (defect rate) o Personnel conducting contractor performance surveillance will use attachment 5, Surveillance Checklist to answer the Performance question asked, and provide comments in the area provided on the checklist. The comments and metrics from the Checklist will be included on each MSR submitted during the Period of Performance.
5. Government Surveillance.
5.1. Methods of Surveillance. The following Methods of Surveillance may be utilized in monitoring the Contractors’ performance:
NOTE: The PRS is a stand-alone document that illustrates to the contractor the few, most salient items the government wishes the contractor to be aware of. The PRS is contained in the contract PWS. The performance items selected for the PRS combined with the SRS will total all items from the List of Contractor Requirements. This QASP shall not be provided to the contractor.
• 100% Inspection will be reserved for the highest risk areas where consequence of failure may affect life or limb, or there is likelihood of mission failure
• Random Sampling Will be used when a service is performed on a frequent basis and a statistically valid sample can be selected for audit. This is most appropriate method for frequently recurring tasks
• Periodic Inspection Will be used when planned sampling of a service is at a specific predetermined date and time. This is most appropriate for tasks that occur infrequently, yet on a scheduled basis
• Customer Feedback. Not a primary method of surveillance, but a tool to support other methods of surveillance and a good indicator of areas where surveillance should be conducted or intensified.
The DA Form 5477, Customer Complaint Record, Attachment 7, will be placed at convenient locations for the end user of these services, and made available to document/record all complaints. The COR will collect the Customer Complaints each surveillance cycle and investigate for validity ASAP.
The following procedures will be followed when a complaint is received.
• The COR/ACOR will investigate to determine the validity of the complaint
• If the complaint is determined to be invalid, the COR will inform the person who submitted the complaint of the reason(s) as soon as practical
• For validated complaints that are true contractual non-conformances, the procedures in paragraph 6 below will be applied
5.2. Surveillance Schedule. A Surveillance Schedule (Attachment 4) will be created each month utilizing the DA 5475, COR Surveillance Schedule, or locally generated equivalent. The schedule is “FOR OFFICIAL USE ONLY” and is not releasable to anyone other than authorized Government personnel. Each Month’s Surveillance Schedule will be completed at the beginning of each month during the Period of Performance (PoP) to schedule the upcoming month surveillance activity. Completed Surveillance Schedules will be uploaded separately in the Miscellaneous Documents Section of the CORs’ CORT file.
5.3. Surveillance Checklists. A Surveillance Checklist (Attachment 5) will be created each month utilizing the DA 5476, COR Surveillance Checklist, or locally generated equivalent. The Checklist is “FOR OFFICIAL USE ONLY” and is not releasable to anyone other than authorized Government personnel. Each Month’s Surveillance Checklist will be completed with the Surveillance Schedule. Completed Surveillance Checklist will be uploaded separately in the Miscellaneous Documents Section of the CORs’ CORT file.
Surveillance checklist items will be selected from both the PRS and the SRS to ensure all items identified in the List of Contractor Requirements are monitored during the POP.
5.4. Surveillance Documentation. Each months’ Completed Surveillance Documentation must be uploaded separately in the Miscellaneous Documents Section of the COR’s online CORT file.
6. Non-Conforming Performance. A Non-conformance occurs when the Contractor fails to meet the terms, conditions and/or specifications of the Contract/Task Order. All instances of non-conformance must be documented by the COR. The COR will provide the details of the non-conformance using the Contract Discrepancy Report (CDR), DA Form 5479, Attachment 5, to the KO and the MICC QAS. The KO will notify the Contractor of each nonconformance occurrence, unless the KO has authorized the COR to submit directly to the contractor, and copy the COR. Resolution of any non-conformance discovered at the Subcontractor level will be addressed with the prime Contractor.
Non-conformances are classified as either: Level I (Minor); Level II (Major); or Level III (Critical).
6.1. Level I (Minor). Level I non-conformance is not likely to materially reduce the usability of services for their intended purpose or is a departure from established standards having little bearing on completing the contract requirement. Minor non-conformances can usually be corrected on the spot and can be issued to the Contractor through either a verbal or written CDR.
However, the Government is required to document verbal Level I CDRs. The COR may issue verbal Level I CDRs directly to the appropriate level of Contractor management. The COR will notify the KO as soon as practical when a verbal Level I CDR is issued and document them in their Monthly Reports. If the non-conformance cannot be corrected on the spot, the Contractor shall be given a suspense date to correct the deficiency. The KO will issue and sign written Level I CDRs, Attachment 5.
6.2. Level II (Major). Level II non-conformance is likely to result in failure of the services to meet contract requirements. Also, repeated discrepancies, a large number of documented Level I CDRs and trends indicating failure of the Contractor’s quality control program can be classified as Level II CDRs. The KO issues all Level II CDRs in writing, Attachment 5. The COR will notify the KO as soon as practical when a major non-conformance is identified.
6.3. Level III (Critical). Level III non-conformances result in hazardous or unsafe conditions due to the manner in which the services are performed; prevent or impact a vital agency mission as a result of performance; or are for repeated or uncorrected Level II CDRs. The Contracting Office Director or Deputy Director issues written Level III CDRs. The COR is responsible for notifying the KO immediately upon discovery of a critical non-conformance.
6.4. Documenting CDRs. The COR will provide the details of the non-conformance using the Contract Discrepancy Report, DA Form 5479, Attachment 6 to both the KO and the MICC QAS.
6.5. Tracking and Resolving CDRs. All CDRs, verbal and written, regardless of issuer will be included in the COR’s Monthly Report. The QAS and KO shall track CDRs to ensure the Contractor identifies and takes appropriate corrective action to the root cause and the specific non-conformance is corrected within the required timeline. The KO will make a final written determination of the Government’s remedies if the non-conformance is not corrected by the Contractor after receiving notice and a reasonable opportunity to correct the work IAW MICC Desk Book.
7. Deduct Plan. This acquisition does not include a Deduct Plan.
8. Data Analysis. Data Analysis will be performed to identify trends in cost, schedule and/or performance risks. The results of Data Analysis will be documented in COR Monthly Status Reports (MSR) and may be used to make adjustments to surveillance schedules and/or checklist items to increase or decrease surveillance, based on performance trends. Negative trends noted using Government data/observations could result in issuing the Contractor a Contract Discrepancy Report. Trends noted using Contractor data will not result in a CDR unless the Contractor has not addressed the negative trend. QASP changes based on Data Analysis will be coordinated with the Contracting Officer for approval.
9. Acceptance of Services. When all services have been deemed acceptable and there is documented, objective, quality evidence to support acceptable performance, the COR will accept the services provided and authorize payment to the Contractor. Acceptance and payment will be made by approving the Contractor’s Receiving Reports in Wide Area Workflow at https://wawf.eb.mil/ as an iRAPT Inspector, and/or Acceptor.
10. COR Status Report. COR Status Reports, or Monthly Status Reports (MSR) will be submitted on a monthly basis to the Contracting Officer via the CORT Tool. MSR reports must be uploaded into the CORT Tool, using the “Smart Form” Monthly Surveillance Report. MSR reports will be due NLT the 10th day of the month following the month of surveillance. COR https://wawf.eb.mil/
Status Reports will provide a synopsis of the Contractors performance for the inclusive dates of the report. The synopsis must contain a summary of surveillances performed, Customer Feedback if any, CDRs if any, an analysis of the Contractors performance, recommended adjustments to surveillance schedules, and any other pertinent contract information IAW FAR 46.104, and the COR Appointment Letter. Completed Surveillance Checklists and CDRs, if any, will be referenced in the MSR for that month and uploaded separately in the Miscellaneous Documents Section of the CORs’ Online CORT file for this contract. See para 4.2.
11. Contractor Manpower Reporting Application (CMRA). Reporting Labor Hours. The Office of the Assistant Secretary of the Army (Manpower & Reserve Affairs) operates and maintains a secure Army data collection site where the Contractor shall report all Contractor manpower (including subcontractor manpower) required for performance of this contract. The Contractor shall completely fill in all the information in the format using the following web address: https://cmra.army.mil.
The required information includes the following:
a. Contracting Officer (KO), Contracting Officer’s Representative (COR) name;
b. Contract number, including task and delivery order number;
c. Beginning and ending dates covered by reporting period;
d. Contractor's name, address, phone number, e-mail address, identity of Contractor employee entering data;
e. Estimated direct labor hours (including sub-Contractors);
f. Estimated direct labor dollars paid this reporting period (including sub-Contractors);
g. Total payments (including sub-Contractors);
h. Predominant Federal Service Code (FSC) reflecting services provided by Contractor (and separate predominant FSC for each sub-Contractor if different);
i. Estimated data collection cost;
j. Organizational title associated with the Unit Identification Code (UIC) for the Army Requiring Activity (the Army Requiring Activity is responsible for providing the Contractor with its UIC for the purposes of reporting this information);
k. Locations where Contractor and sub-Contractors perform the work (specified by zip code in the United States and nearest city, country, when in an overseas location, using standardized nomenclature provided on website);
l. Presence of deployment or contingency contract language; and Number of Contractor and sub- Contractor employees deployed in theater this reporting period (by country).
While inputs may be reported any time during the FY, The COR shall ensure the contractor submits all data shall no later than October 31 of each calendar year. The COR shall verify that the Contactor has complied with the required contractor manpower reporting annually and document the results in the CORs’ Online CORT File, CMRA section. Contracting officers shall ensure that the requirement to report contractor manpower is included in all contracts, task/delivery orders and modifications.
12. Contractor Performance Assessment Reporting System (CPARS). Documented surveillance data (COR Status Reports, Completed Surveillance Checklists, Customer Feedback and CDRs, if any) will be used to support CPARS ratings. CPARS will be completed in accordance with AFARS, Subpart 5142.15 – Contractor Performance Information.
https://cmra.army.mil/
13. Combating Trafficking In Persons (CTIP). In accordance with PGI 222.17 and FAR 52.222-50, the KO will be notified immediately of any information from any source that alleges a Contractor employee, subcontractor and/or subcontractor employee has engaged in conduct that violates the United States Government “zero” tolerance policy regarding trafficking in persons.
14. COR/Quality Assurance Surveillance Files. The official COR/Quality Assurance Surveillance File will be maintained in the on-line CORT Tool, IAW DoDI 5000.72, and
DFARS PFI 201.602-2.
15. QASP Changes. This QASP is a living document and, as such, may be changed as needed based on Data Analysis (trends), contract modifications by the KO, etc. The COR will send any recommended changes to the Contracting Officer for approval and the Contracting Officer must approve all changes.
COR’S Signature Block
Contracting Officer’s Signature Block
Attachments:
1. List of Contractor Requirements
2. Performance Requirements Summary (PRS)
3. Surveillance Requirements Summary (SRS)
4. Surveillance Schedule, DA Form 5475
5. Surveillance Checklist(s)
6. Contract Discrepancy Report, DA Form 5479
7. Customer Complaint Record, DA Form 5477
Attachment 1 List of Contractor Requirements
Paragraph Number
List of Contractor Requirements {Search PWS for all 'Contractor Shall" Copy and paste those requirements in this section below. Select a random number of these requirement each surveillance period for checklists items.}
1.2
Contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to perform the marketing consultation services, as outlined and defined in Section 5 “Specific Tasks” of this Performance Work Statement (PWS) – excluding those items specified as government furnished property and services.
List of Contractor Requirements.xlsx
Attachment 2
Performance Requirements Summary (PRS)
PERFORMANCE REQUIREMENTS SUMMARY (PRS)
PERFORMANCE REQUIREMENTS SUMMARY (PRS)
ON LINE SUBSCRIPTION ACCESSING TECHNICAL CODES & STANDARDS
Performance Objective
Performance Standard
Acceptable Quality Level
(AQL)
Incentive/ Disincentive
ANNUAL SUBSCRIPTION
for Standards & Codes
Service to be performed as per the SOW.
100% Failure to meet requirement may require the contractor to provide the service at no additional cost to the Government, however the non-conformance is still documented.
Attachment 3
Surveillance Requirements Summary (SRS) {Generated from the List of Contractor Requirements (Attachment 1)}
Attachment 4
Surveillance Schedule, DA Form 5475
The COR will develop a monthly schedule for conducting surveillance. You can use this form.
The date you are going to conduct surveillance would go in the far left column. You would list the PWS, paragraph number for the task you are going to surveil on the top line.
DA FORM 5475
Attachment 5
Surveillance Checklist(s)
DA 5476 Surv Checklist.pdf
The COR may use either the Surveillance Checklist template in Attachment 1 or the DA5476.
COR SURVEILLANCE CHECKLIST Template
COR Inspection Checklist & Data Report (Fixed Firm Price Contract) Period Of Performance:
Contractor: From:
Contract Number: To:
Service Provided: Meeting Contract
Requirements? COR Name:
Date: YES No
Comments:
Comments:
Comments:
Comments:
Comments:
Comments summary, to include, positive trends, negative trends, concerns, customer comments, and any additional COR comments:
To populate the checklist, select items from the “Contractor Shall Items” tab and convert the requirement to a question: “Did the contractor…" Each "Yes" can be graded as a 1, and each NO graded as a 0, for example.
From this, the COR may generate a quantifiable performance rating using numbers.
Attachment 6
Contract Discrepancy Report, DA Form 5479
DA FORM 5479
Attachment 7
Customer Complaint Record, DA Form 5477
DA FORM 5477
| PERFORMANCE REQUIREMENTS SUMMARY (PRS) |
| ON LINE SUBSCRIPTION ACCESSING TECHNICAL CODES & STANDARDS |