I24-I69-Audubon-Penny Pkwys WLS February 2026.pdf
PDF 145 KB Posted
- Attached to
- RoW Mow Trim and Litter Removal 1-24/I-69
- Solicitation number
- RFB 605 2600000381 1
- Issued by
- Hickman County, Kentucky
About this file
This is a Scope of Work document for a mowing and litter removal maintenance project conducted by the Kentucky Department of Transportation (KDOT) in District 2, covering Interstate 24, Interstate 69, Audubon Parkway, and Pennyrile Parkway. The project encompasses maintenance services across multiple counties including Christian, Trigg, Hopkins, Webster, Henderson, and Daviess. The work involves mowing of 3,649 acres across 188.565 miles of roadway and shoulder areas, with litter removal and centerline control maintenance required. The project is divided into 21 distinct segments across various routes, including interstates (I-24 and I-69), state parkways (Audubon and Pennyrile), and secondary highways (US 41, US 41A, US 68, US 68B, KY 136, KY 425, KY 788, KY 1682, and KY 2171). Each segment specifies project length in miles, mowing acreage, number of mowing cycles (predominantly three cycles annually), litter removal cycles (primarily five cycles annually), and specific geographic endpoints marked by mileposts.
The contract requires completion of each mowing cycle within a maximum of 20 working days. The document indicates that batwing mowers may be utilized on designated routes, and certain segments include additional work such as the mowing of two retention basins on US 41A. Work location sheets and project limits are provided as reference materials for contractors. The project is scheduled for February 2026 completion, with maintenance activities to be performed across the entire District 2 region. No specific pricing information, bid dates, award dates, or contract term details are included in this scope of work document.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Litter Project Type 3 Number Removal Number
Route Project Length Mowing of Cntrln of Number System County Number Begin End (Miles) Acres Cycles Miles Cycles
I-24* Interstate Christian FE01 024 0024 Trigg Co. Line Tennessee State Line 23.543 639 3 24 5
069-093 (MP 69.830) (MP 93.373)
I-69* Interstate Hopkins FE01 054 0069 I-69 Ramp EB 9004 Webster Co. Line 21.119 417 3 21.1 5
105-126 (MP 105.720) (MP 126.839)
I-69* Interstate Webster FE01 117 0069 Hopkins Co. Line Henderson Co. Line 10.302 157 3 10.3 5
126-137 (MP 126.839) (MP 137.141)
I-69* Interstate Henderson FE01 051 0069 Webster Co. Line US 41 Overpass 10.949 154 3 10.9 5
137-148 (MP 137.141) (MP 148.090)
Pennyrile MP Christian FE01 024 9004 I-24 Interchange Hopkins Co. Line 28.095 577 3 28.1 5 Pkwy* 000-028 (MP 0.000) (MP 28.095)
Pennyrile MP Hopkins FE01 054 9004 Christian Co. Line WK9001 over EB9004 6.161 67 3 6.2 5 Pkwy* 028-034 (MP 28.095) (MP 34.256)
Audubon MP Henderson FE01 051 9005 Pennyrile Parkway Daviess Co. Line 15.883 313 3 15.9 5 Pkwy* 000-016 (MP 0.000) (MP 15.883)
Audubon MP Daviess FE01 030 9005 Henderson Co. Line Wendell Ford Expresswy 7.551 199 3 7.5 5 Pkwy* 015-024 (MP 15.883) (MP 23.434)
US 41* MP Henderson FE01 051 0041 KY 2084 US 60 Overpass 5.233 191 3 5.2 5
010-016 (MP 10.750) (MP 15.983)
KY 136* MP Henderson FE01 051 0136 0.316 Mi. W. of US60 KY 425 Bypass 0.316 19 3 0.3 5
019-020 (MP 19.232) (MP 19.548)
Litter Project Type 3 Number Removal Number
Route Project Length Mowing of Cntrln of Number System County Number Begin End (Miles) Acres Cycles Miles Cycles
KY 425 MP Henderson FE01 051 0425 US 60 US 41/KY 2084 4.747 137 3 4.7 5 Bypass* 000-004 (MP 0.000) (MP 4.747)
KY 2171* MP Hopkins FE01 054 2171 US 41 Penntrile Parkway 3.474 66 3 3.4 5
001-005 (MP 0.000) (MP 3.474)
US 41* MP Christian FE01 024 0041 Salubria Springs Rd Pennyrile Parkway 6.365 42 3 6 3
004-011 (MP 4.025) (MP 10.390)
US 41A*^ MP Christian FE01 024 041A Tennessee State Line Pennyrile Parkway 13.243 137 3 13.2 3
000-014 (MP 0.000) (MP 13.243)
US 68* MP Christian FE01 024 0068 Trigg Co. Line KY 1682 7.137 125 3 7.1 3
000-008 (MP 0.000) (MP 7.137)
US 68* MP Christian FE01 024 0068 US 68B Todd Co. Line 6.994 153 3 7 3
014-022 (MP 14.120) (MP 21.114)
US 68B* MP Christian FE01 024 068B US 68 US 68 11.026 166 3 11 3
000-012 (MP 0.000) (MP 11.026)
KY 788* MP Christian FE01 024 0788 Fort Campbell Base US 41A 1.111 10 3 1.1 3
000-001 (MP 0.000) (MP 1.111)
KY 1682* MP Christian FE01 024 1682 US 68 Concord Lane 5.316 80 3 5.8 3
000-005 (MP 0.000) (MP 5.316)
Litter Project Type 3 Number Removal Number
Route Project Length Mowing of Cntrln of Number System County Number Begin End (Miles) Acres Cycles Miles Cycles
Grand Total 188.565 3,649 188.8
Limits of Project Mowing Work Location Sheet
* A batwing mower may be used on this route(s).
^ There are 2 retention basins to be mowed with this route.
Mowing Work Location Sheet Limits of Project
Maximum time to complete a cycle: 20 working days.
I-24/I-69/Audubon/Pennyrile Parkways District 2
I-24/I-69/Audubon/Pennyrile Parkways District 2 Mowing Work Location Sheet
Limits of Project
I-24/I-69/Audubon/Pennyrile Parkways District 2
Sheet1
File details come from the government source that posted it. Updated .