I. 2_Working SOW.pdf
PDF 345 KB Posted
- Solicitation number
- N66604-22-R-G200
About this file
This statement of work and related solicitation describe a requirements contract for outboard cable spares, repairs, and technical analysis services in support of the AN/WSQ-9 acoustic system. The Naval Undersea Warfare Center Division Newport intends to award a single firm-fixed price, indefinite-delivery/indefinite-quantity contract for a period of five years. Services include first article testing and delivery of pulse power and fiber optic cables, assessment and repair of failed in-service cables, and technical analysis services such as identifying substitute components and cable improvement recommendations. The solicitation will be released on or about June 1st, 2022, with responses due on a date specified in the RFP. Evaluation criteria will consider technical capability, past performance, small business participation, and price. The North American Industry Classification code is 334511 and the small business size standard is 1,250 employees.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOW Template ver. 2.4 – JULY 2019
PR # 1300867735
STATEMENT OF WORK
(SOW)
Outboard Cable Spares, Repairs, and Technical Analysis
PR No. 1300867735
1.0 Background
NAVSEA Systems Command (PMS 415) is Naval Undersea Warfare Center (NUWCDIVNPT) Code
8541’s sponsor for the AN/WSQ-9 system. Code 8541 conducts research, development, test and evaluation (RDT&E) for new and existing technologies in the subject area of Undersea Defensive
Systems. The fleet relies on these innovative defensive systems to be able to safely complete its missions.
1.1 Places of Performance: Contractor’s facility
1.2 Authorized Users: Code 8541
1.3 Sponsors: Program Executive Office Submarines (PEO-SUB) and Submarine Defensive
Warfare Systems Program Office (PMS415).
1.4 Types of Funding: Operations and Maintenance, Navy (O&M,N) and Research, Development, Test, and Evaluation, Navy(RDT&E,N)
2.0 Scope
The contractor shall provide repair services and technical analysis. The contractor shall manufacture outboard cable assemblies associated with the AN/WSQ-9 program. The contractor shall perform First Article Tests (FAT) and deliver assemblies.
The AN/WSQ-9 system has a total of four (4) acoustic outboard sensors, two (2) located forward on a submarine and two (2) located aft, that interface with inboard electronics. The cable interface from outboard sensors are run through ballast tanks and mate to Electric Hull Fittings (EFHs). For a sensor to operate, one (1) steady state, one (1) fiber optic, and one (1) pulse power cable are needed. Each submarine platform has four (4) of each cable type for a total of twelve (12) cables. Various lengthens of outboard cable are required, ranging from 150 ft. to 250 ft. for forward and aft sections.
Applicable Documents
The contractor shall perform the tasking required in Section 4.0 in accordance with the below
Applicable Documents.
NUMBER TITLE TASK
NUMBER
3.1 Navy Issuances
3.1 DWG. NO. 8580072: AN/WSQ-9 Pulse Power
Outboard Cable Assembly, Rev F
ALL
3.2 DWG. NO. 8580077: AN/WSQ-9 Fiber Optic
Outboard Cable Assembly, Rev D
ALL
3.3 DWG. NO. 8580080: AN/WSQ-9 Steady State
Outboard Cable Assembly, Rev D
4.2, 4.3
4.0 Technical Requirements
The contractor shall perform the tasks in section 4.0 in accordance with (IAW) Task or delivery orders, Applicable Documents (ADs) (Section 3.0) and using Government Furnished Information
(Section 6.0) for production of and services related to AN/WSQ-9 outboard cable assemblies.
IAW ADs 3.1 – 3.3, the contractor shall submit a Quality Assurance Program Plan (QAPP) to the Government for review. The contractor shall provide proof of the following certifications:
NAVSEA S930-AM-PRO20/MLDG and MIL-STD-2042B, as part of the QAPP.
DELIVERABLES: The Contractor shall deliver a QAPP in accordance with [DI-QCIC-81794]
IAW CDRL A001.
4.1 Outboard First Article Testing (FAT)
IAW ADs 3.1 & 3.2, the contractor shall fabricate, test, and deliver pulse power and fiber optic
FAT cables. The contractor shall give the Government notice ten (10) working days prior to cable fabrications and FAT tests. Following Government review and approval of the FAT cables, the contractor shall provide the FAT cables with accompanied Quality Conformance Test
Reports and Certificate of Conformance verifying that the hardware and materials conform to approved drawings, standards, and specifications.
The Government will provide, as Government Furnished Material (GFM), one length of 53711-
8580076 and one length of 53711-8580071 bulk cable to manufacture the Fiber Optic and Pulse
Power Outboard Cable Assemblies (Part # 53711-8580077-1 and Part # 53711-8580071-1) for the required FAT testing.
DELIVERABLES: The contractor shall deliver FAT cables with Quality Conformance Test
Reports and Certificate of Conformance [DI-NDTI-80809B] IAW CDRL A002.
4.2 Outboard Cable Assembly Repair
IAW applicable documents 3.1 – 3.3, and using GFI 6.1, the contractor shall assess failed in-service cables, provided as Government Furnished Property (GFP), and provide a repair feasibility assessment report. The assessment shall include technical feasibility of the repair and a cost for the repair. Upon approval, the contractor shall perform repairs, all necessary conformance tests, set up a time for a Government Source Inspection (GSI), and provide
Certificates of Conformance for all repaired cables.
DELIVERABLES: The Contractor shall deliver: Individual Repair Feasibility Assessment
Report [DI-PSSS-80386A] IAW CDRL A003 and Quality Conformance Test Reports and
Certificate of Conformance [DI-NDTI-80809B] IAW CDRL A002
4.3 Outboard Cable Assembly Technical Analysis
IAW applicable Documents 3.1 – 3.3, the contractor shall provide technical analysis services for
AN/WSQ-9 outboard cables assemblies. The contractor shall provide services ranging from identifying substitute cable components, identifying potential alternate suppliers for sole source components, performing root cause analysis and troubleshooting, and providing cable improvement recommendations. The contractor shall provide a technical report documenting the results of studies and/or analyses performed.
DELIVERABLES: The Contractor shall deliver a Technical Report [DI-MISC-80508B] IAW
CDRL A004.
5.0 Progress Reports
The Contractor shall prepare a Contractor’s Status Report that indicates the progress of work, status of the program(s), and existing or potential problem areas for all assigned tasks. The
Contractor shall submit the Contract Status Report for the same timeframe as each invoice submitted in the Wide Area Workflow (WAWF) Module of the Procurement Integrated
Enterprise Environment (PIEE). CDRL A005 – DI-MGMT-81991.
6.0 Government Furnished Information
The following Government Furnished Information (GFI) will be made available under this contract/order TBD.
Number Title Task Number
6.1 Government Furnished Property List 4.1 and 4.3
7.0 Quality Surveillance and Performance Standards
The Government will conduct quality surveillance via various methods including formal and informal meetings, review of technical reports, review of monthly progress reports, and review of deliverables. Contractor performance will be evaluated in the areas of technical quality, cost control, schedule/timeliness, management, utilization of small business, and regulatory compliance as follows:
Technical Quality: The Government will evaluate technical quality using the criteria defined in the Performance Requirements Summary Table (PRST), Attachment X;
Schedule/Timeliness: The Government will evaluate the contractor’s ability to meet negotiated milestones and delivery schedules;
Management: The Government will evaluate the contractor’s ability to integrate and coordinate all activities needed to execute the contract/task order;
Utilization of Small Business: The Government will evaluate the contractor’s compliance with the Small Business Subcontracting Plan and any small business subcontracting goals contained in the contract/task order;
Regulatory Compliance: The Government will evaluate the contractor’s compliance with the terms and conditions of the contract/task order relating to applicable regulations and codes.
File details come from the government source that posted it. Updated .