I. 18_SSJ Redacted.pdf

PDF 263 KB Posted

Attached to
MSO46 O-Scope Federal contract opportunity
Solicitation number
N66604-20-Q-8551
Issued by
Department of the Navy Naval Sea Systems Command

View the file

Other files for this federal contract opportunity

Other files attached to MSO46 O-Scope, newest first.
File Type Posted
N6660420Q8551.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

v1.5_JANUARY2020

SOLE SOURCE JUSTIFICATION

Tektronix’s MSO46 O-Scope

DESCRIPTION OF REQUIREMENT:

The Naval Undersea Warfare Center Division Newport (NUWCDIVNPT) firmware and software for all H variants. The test system has hardware that can support a myriad of test requirements for electrical signals from DC to roughly 1GHz bandwidth, and at resolutions that allow significant dynamic range for low-level signal measurement.

The anticipated delivery date is 5-weeks after dated of award, and the anticipated value is

SOLE SOURCE JUSTIFICATION:

Tektronix Inc has been selected as the sole source vendor for this purchase to be compatible with existing items/systems already being used throughout the torpedo enterprise. The Tektronix requirements and aligns with the test capabilities of

It also allows to leverage instant capabilities of Commercial off the Shelf (COTS)

Tests and Measurement hardware and software. It will provide the fastest path to mission operability by allowing to concentrate on application of already proven measurement technologies, instead of having to design, build and verify test systems prior to integrating and applying them to or test needs.

RESELLERS:

N/A v1.5_JANUARY2020

Requiring Department:

Based on the above, I recommend this acquisition be conducted on a Sole Source basis. I certify the technical data which form the basis of this justification are complete and accurate.

APPROVAL:

Contracting Officer:

Based on the above, I have determined that the circumstances of the contract action deem only one source reasonably available. I certify that this justification is accurate and complete to the best of my knowledge and belief.

File details come from the government source that posted it. Updated .