About this file
This is a Bid Bond (Proposal Guarantee) document issued by the State of Iowa, Department of Agriculture and Land Stewardship, Division of Soil Conservation and Water Quality for Bid No. 26-13, related to the Nutrient Reduction Wetland Project (Project ID: Wor982210D) located in Section 10, Township 99 North, Range 22 West, Worth County, Iowa. The project involves construction of East and West wetland systems designed to treat water from an existing ditch using a solar panel-powered pump. Work scope includes selective clearing, excavation and grading, installation of tile and outlet structures, pump installation, riprap placement, and seeding. The project entails approximately 7,500 cubic yards of earthwork, 700 linear feet of pipe installation, 129 tons of riprap, installation of five modified concrete structures (two SW-512 intake, three SW-513 outlet, and two SW-401/402 lift stations), three solar pump systems, and 2.5 acres of seeding. Construction must be completed by September 1, 2027, with seeding completed by December 15, 2027, following specified seeding dates.
The bid bond requires submission of a sealed proposal and guarantees that the successful bidder will enter into a contract and furnish a performance bond within fourteen days of award approval. The penal sum of the bond is to be determined by the bidder. The estimated construction cost range for this project is $225,000 to $325,000. The bond obligates both the principal and surety to forfeit the penal sum if the proposal is accepted and the contractor fails to execute the contract or provide the required performance bond within the specified timeframe. This contract will be awarded to the lowest responsive bidder meeting all requirements.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| F - Geotechnical Report.pdf | ||
| C -Specifications.pdf | ||
| B - Bid Book.pdf | ||
| E - H&H Report.pdf | ||
| D - Plans.pdf | ||
| H - Doc CC Proposal - Acknowledgment - Affidavit.pdf | ||
| A - Notice to Bidders.pdf | ||
| G - Schedule of Prices.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Wor982210D Nutrient Reduction Wetland Project DOCUMENT EE Bid No. 26-13 PROPOSAL GUARANTEE (BID BOND)
EE-1
State of Iowa Iowa Department of Agriculture and Land Stewardship
DIVISION OF SOIL CONSERVATION AND WATER QUALITY
KNOW ALL PERSONS BY THESE PRESENTS:
That we, of as PRINCIPAL, and of as SURETY(S), are hereby held and firmly bound unto the State of Iowa in the penal sum of
______ /100 Dollars ($ . ) for the payment, whereof, the said PRINCIPAL and SURETY(S) bind themselves, their heirs, executors, administrators, successors and assigns, jointly and severally, firmly by these presents.
The conditions of this obligation are such that whereas the PRINCIPAL is herewith submitting to the Iowa Department of Agriculture and Land Stewardship, Division of Soil Conservation and Water Quality, hereinafter called the DIVISION its sealed contract for the following:
Nutrient Reduction Wetland Project Section 10, Township 99 North, Range 22 West, Worth County, Iowa Project ID: Wor982210D Bid No. 26-13
NOW THEREFORE,
the conditions of this obligation are such that, if said proposal is rejected by the DIVISION, or if said proposal is accepted by the DIVISION and the PRINCIPAL shall enter into a contract in the form specified by the DIVISION in accordance with the terms of the Proposal and Schedule of Prices (Document CC) and shall furnish a bond for the faithful performance of said contract in the form specified by the DIVISION, this obligation shall be null and void. Otherwise, it shall remain in full force and effect.
In the event that the said proposal is accepted by the DIVISION and the PRINCIPAL fails to enter into the contract as defined herein or fails to furnish the performance bond as noted above, within fourteen (14) days of the approval of the award, the PRINCIPAL and SURETY(S) agree to forfeit to the DIVISION the penal sum herein mentioned, it being understood that the liability of the SURETY(S) shall in no event exceed the penal sum or this obligation.
IN WITNESS WHEREOF,
the above bounden parties have executed this instrument under their several seals this day of , 20_______, the name and corporate seal of each party being hereto affixed and these presents duly signed by its undersigned representative pursuant to authority of its governing body.
PRINCIPAL SURETY
By By
Print Name:
If a partnership, all partners must sign.
END OF DOCUMENT EE