I-75 I-275 WLS Type 3 January 2026.pdf

PDF 92 KB Posted

Attached to
RoW Mow Trim and Litter Removal I-75 and I-275
Solicitation number
RFB 605 2600000346 1
Issued by
Boone County, Kentucky

About this file

This is a Mowing Work Location Sheet for a maintenance contract involving the Kentucky Transportation Cabinet and local jurisdictions including Boone, Kenton, and Campbell counties in the Northern Kentucky region. The document specifies mowing and litter removal services for Interstate 75, Interstate 275, Interstate 471, Kentucky routes 9, 17, 237, and US Route 27. The scope includes mowing of centerline and shoulder areas totaling 66.592 miles with 1,120 acres requiring five mowing cycles annually, plus litter removal along specified routes requiring seven cycles annually across 66.6 miles. Additional work includes mowing of detention basins totaling 1.023 acres requiring two cycles annually. The project encompasses multiple route segments with defined mile point locations and lengths, with a grand total of 67.615 acres to be maintained. The contractor must complete each mowing cycle within a maximum of 15 working days.

The work location sheet indicates that batwing mowers are permitted for use on designated routes, suggesting flexibility in equipment selection. The document provides detailed specifications for each route segment including project numbers, county locations, specific from-to mile points, acreage, required cycle frequency, and litter removal cycles. No pricing information, set-asides, bid due dates, award dates, or contract term information is included in this work location sheet, as it functions as a technical specification document outlining the geographic scope and maintenance requirements rather than the procurement terms and conditions.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MOWING WORK LOCATION SHEET

Litter Type 3 Number Removal Number

Route Project Project Mowing of Cntrln. of Number System County Number FROM TO Length Acres Cycles Miles Cycles

I-75* MP Boone FE01 008-0075 0.9 Mile North of the Kenton County Line 9.712 270 5 9.7 7 173-184 I-71 Under-Pass (MP 183.312)

(MP 173.600)

I-75* MP Kenton FE01 059-0075 Boone Co. Ln. 2,600 Feet South of 6.711 132 5 6.7 7 183-191 (MP 183.312) KY 1120 (12th Street)

(MP 190.023)

I-275* MP Campbell FE01 019-0275 Ohio River Kenton County Line 3.778 96 5 3.8 7

073-078 (MP 73.777) (MP 77.555)

I-275* MP Kenton FE01 059-0275 Campbell County Line I-75 6.225 109 5 6.2 7

077-084 (MP 77.555) (MP 83.780)

I-275* MP Kenton FE01 059-0275 I-75 Boone County Line 1.582 9 5 1.6 7

000-002 (MP 0.000) (MP 1.582)

I-275* MP Boone FE01 008-0275 Kenton County Line Indiana State Line 12.313 202 5 12.3 7

001-014 (MP 1.582) (MP 13.895)

I-471* MP Campbell FE01 019-0471 I-275 Ohio River 4.828 57 5 4.8 7

001-006 (MP 1.000) (MP 5.828)

KY 9* MP Campbell FE01 019-0009 Rocky View Drive I-275 4.803 83 5 4.8 7

(AA) 013-018 (MP 13.175) (MP 17.978)

KY 237* MP Boone FE01 008-0237 Wright Blvd I-275 0.448 2 5 0.5 7

004-010 (MP 8.771) (MP 9.219)

KY 17* MP Kenton FE01 059-0017 KY 16 I-275 8.997 82 5 9 7

009-019 (MP 9.516) (MP 18.513

US 27* MP Campbell FE01 019-0027 Nagel Road Constable Drive 7.195 78 5 7.2 7

001-010 (MP 1.988) (MP 9.183)

Subtotal MP 66.592 1120 66.6

* A Batwing Mower will be allowed on this route(s)

Mowing of Detention Basins:

I-75* MP Kenton FE01 059 0075 2000' North of KY 1072 2600' South of KY 1120 1.023 6 2 0

183 191 (MP 189.0) (MP 190.023)

Subtotal Detention Basins 1.023 6 0

Grand Total 67.615 1126 66.6

* A Batwing Mower will be allowed on this route(s)

Maximum time to complete a cycle: 15 working days.