This document is a Request for Bids for a concrete patching project on I-75 bridge approaches at the CSX Railroad in Saginaw County, Michigan. The project involves concrete pavement repairs, including matching the existing 10-inch and 9-inch concrete depths, on the northbound and southbound I-75 lanes and shoulders. The work is to be completed between April 23, 2024 and May 23, 2024. Traffic control and maintaining traffic flow are required during construction, with approved signing to reduce speeds to 45 mph where workers are present. The project is funded by MDOT Maintenance and will be awarded to the lowest qualified bidder.
The bid includes pay items for mobilization, pavement removal, aggregate base, various concrete joint types, epoxy-anchored lane ties, concrete pavement repair, pavement marking removal and application, and temporary traffic control devices. No overpayments or extras will be permitted, and the contractor must ensure all material, labor, and mobilization costs are included in their lump sum bid. MDOT reserves the right to reject any bid deemed unqualified and may request a site plan review meeting with the low bidder prior to award.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| PMC Template_I75 Bridge Approaches.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
JN:
DRAWING SHEET
I-75
TITLE
73171
TSC: DATE:DESIGN UNIT: 3/5/23 BCTSC BAY CITY
FILE:I-75 TITLE SHEET.DGN
BRIDGE APPROACHES AT CSX RAILROAD
I-75
TITLE SHEET
NO SCALE
Michigan Department of Transportation
SECT
CS:
MICHIGAN DEPARTMENT OF TRANSPORTATION
SAGINAW COUNTY
BIRCH RUN TOWNSHIP
ROUTE: I-75
SAGINAW CO.
RUNNEL DR.
SILVE
R
CR
E E
K
C S
X
R
R
VIENNA TWP.
T10N,R6E
BURT RD
BIRCH RUN RD
WILLARD RD
E L
M S R
D
M A
P L E R
D
S B
E Y
E R R
D
N C
L
IO
R
D
D
IX
IE
H
W Y
W E
IR
R
D
BIRCH RUN TWP
GENESSEE CO.
WILLARD RD
BIRCH RUN
MAIN ST.
N
I-75
LOCATION
PROJECT
MDOT Maintenance Project Log
Job Location:
I-75 Bridge Approaches at CSX Railroad (1.7 miles south of M-83 (Birch Run Road), Birch Run Township, Saginaw County.
Job length: 0.40
Project Schedule:
Work may begin immediately after receiving approval from MDOT. Work to be completed between April 23, 2024, to May 23, 2024. Notice must be provided to Dan Senske at 989-233-1053 a minimum of three (3) calendar days prior to beginning work.
Description of work:
The work shall consist of concrete pavement repairs.
Northbound Lanes 1, 2, and northbound right shoulder shall be completed before work on Lanes 3 and 4. See plan drawing in proposal for Lane number designation.
The outside shoulder and first travel lane for both NB & SB I-75 is 10 inches thick and the inside 3 travel lanes and shoulder is 9 inches thick.
The pavement repair section will consist of matching the existing left in place concrete depth up to 10”.
For areas where existing concrete exceeds 10” in depth, additional aggregate base should be placed and compacted prior to placing concrete. The final repair shall be flush with the existing road surface and will match the existing cross slope.
A preconstruction meeting will be required. Concrete patches shall be laid out by Engineer.
Maintaining Traffic:
Contractor is allowed to do both northbound and southbound work at same time.
Contractor shall use approved traffic signing as approved by engineer to reduce traffic speed from 70 mph to 45 mph (where workers present) in the construction influence area.
Pay item “_Filling Shld Corrugations with Micro-Surface”, shall also include removal of material at completion of project.
Traffic control devices and equipment will be supplied and laid out by the contractor and should be maintained per typical 208–FW-2LC-(L)–MOD (included in this proposal) for lane shifts. Typical for right lanes closures and shift shall mirror typical
208–FW-2LC-(L)–MOD.
Work on Saturdays and Sundays will be at the Engineers discretion and require preapproval.
Once work is initiated that includes any lane restrictions, that work shall be continuous until completed. A lack of work activity (which does not include concrete cure time) for more than two calendar days will require the removal and replacement of lane restriction, at the Contractor's expense.
Daily maintenance of traffic control items will not be paid for separately but will be included in the lump sum price for the project.
The Contractor shall not create any unsafe conditions within the Construction Influence Area (CIA) that form a hazard for motorists. Extra caution should be used when delineating the work zone overnight to protect the roadway users.
This project is a Maintenance funded project, which means that there will be absolutely no overpayment or extras. All material, labor and mobilization shall be included in the bid.
MDOT will have the low bid reviewed and approved for funding. MDOT reserves the right to reject any bid that appears to be unqualified. Before award, MDOT may request a site plan review meeting with the low bid contractor.
General Notes
SPECIFICATIONS FOR CONSTRUCTION
The improvements covered by these plans shall be done in accordance with the MDOT 2020 Standard Specifications for Construction.
UNDERGROUND UTILITIES / MISS DIG
For the protection of underground utilities and in conformance with Public Act 174 of 2013, the Contractor shall contact MISS DIG System, Inc. by phone at 811 or 800-482- 7171 or via the web at either elocate.missdig.org for single address or rte.missdig.org, a minimum of 3 business days prior to excavating, excluding weekends and holidays.
STATIONING
Stationing on this project was taken from Right-of-Way plans and from measurements made in the field. The stationing is not necessarily accurate.
AGGREGATE BASE
Aggregate bases shall use aggregate 21AA, unless otherwise specified. Required aggregate base shall be included in the bid price for the lump sum bid.
CONCRETE
The type of concrete to be used on this project for the pavement repairs is Type P-NC. It is the contractor’s responsibility to ensure strength requirements are met prior to opening to traffic.
RECREATIONAL PROPERTIES
The Contractor shall not park any vehicles or store any equipment on public recreational property. Access to the recreational properties must also be maintained at all times.
Notes Applying to Standard Plans
Where the following items are called for on the plans, they are to be constructed according to the Standard Plan or Special Detail given below opposite each item unless otherwise indicated.
Transverse Pavement Joints ...................................................................... R-39-K Load Transfer Assemblies for Transverse Joints ......................................... R-40-I Longitudinal Pavement Joints ..................................................................... R-41-H Typical Joint Layouts for Concrete Pavement ............................................. R-42-F Location of Transverse Joints in Plain Concrete Pavement ........................ R-43-J Concrete Pavement Repair ....................................................................... R-44-G
Estimated Quantities:
Pay Item
Quantity
Unit
Price/Unit
Cost
Mobilization 1 Ls _________ __________________
Pavt, Rem 1450 Syd _________ __________________
Aggregate Base 70 Ton _________ __________________
Joint, Contraction, Cp 983 Ft _________ __________________
Joint, Contraction, C3p 77 Ft _________ __________________
Joint, Contraction, Crg 1399 Ft _________ __________________
Lane Tie, Epoxy Anchored 1760 Ea _________ __________________
Pavt Repr, Nonreinf Conc, 10 inch 1997 Syd _________ __________________
Pavt Repr, Rem 547 Syd _________ __________________
Saw Cut, Intermediate 2630 Ft _________ __________________
Pavt Mrkg, Longit, 6 inch or Less Width, Rem 9950 Ft _________ __________________
Pavt Mrkg, Wet Reflective Polyurea, 6 inch, White 9900 Ft _________ __________________
Pavt Mrkg, Wet Reflective Polyurea, 6 inch, Yellow 50 Ft _________ __________________
_ Filling Shld Corrugations with Micro-Surface 3300 Ft _________ __________________
Barricade, Type III, High Intensity, Lighted, Furn 8 Ea _________ __________________
Barricade, Type III, High Intensity, Lighted, Oper 8 Ea _________ __________________
Channelizing Device, 42 in, Furn 400 Ea _________ __________________
Channelizing Device, 42 in, Oper 400 Ea _________ __________________
Lighted Arrow, Type C, Furn 4 Ea _________ __________________
Lighted Arrow, Type C, Oper 4 Ea _________ __________________
Sign, Portable, Changeable Message, Furn 4 Ea _________ __________________
Sign, Portable, Changeable Message, Oper 4 Ea _________ __________________
Sign, Type B, Temp, Prismatic, Furn 1350 Sft _________ __________________
Sign, Type B, Temp, Prismatic, Oper 1350 Sft _________ __________________
Pavt Mrkg, Wet Reflective, Type R, Tape, 6 inch, White, Temp 25000 Ft _________ __________________
Pavt Mrkg, Wet Reflective, Type R, Tape, 6 inch, Yellow, Temp 100 Ft _________ __________________
Total Cost __________________
Federal ID # _________________________
Signature____________________________ Date
20RC812(A730)
MICHIGAN
DEPARTMENT OF TRANSPORTATION
SPECIAL PROVISION
FOR
FILLING SHOULDER CORRUGATIONS WITH MICRO-SURFACE FOR TRAFFIC
SHIFTS
CFS:TGH 1 of 1 APPR:CRB:KPK:08-10-22
a. Description. This work consists of filling existing shoulder corrugations with micro-surface at locations shown on the plans and as directed by the Engineer.
b. Materials. Furnish a micro-surface mix in accordance with subsection 504.02 of the Standard Specifications for Construction.
c. Construction. Place a single application of micro-surface on the shoulder corrugations using equipment and methods in accordance with subsection 504.03 of the Standard Specifications for Construction. Ensure the width and rate of the application is sufficient to fill the shoulder corrugations level to the adjacent surface.
d. Measurement and Payment. The completed work, as described, will be measured and paid for at the contract unit price using the following pay item:
Pay Item Pay Unit
Filling Shld Corrugations with Micro-Surface .............................................................. Foot
Filling Shld Corrugations with Micro-Surface will be measured along the outside edge of each shoulder where shoulder corrugations are filled. No adjustment will be made for areas where the shoulder corrugations vary in width or spacing between corrugations.
CS:
JN:
TSC:
DATE:
DESIGN UNIT:
DRAWING SHEET
CONST
73171
3/4/2024
BCTSC
BAY CITY
1.7 MILES SOUTH OF M-83 (BIRCH RUN ROAD)
CONCRETE PATCHES
I-75 BRIDGE APPROACHES AT CSX RAILROAD
NO SCALE
Michigan Department of Transportation
SECT
DESCRIPTIONAUTH
DATENO.
FINAL ROW PLAN REVISIONS SUBMITTAL DATE:
FILE:
DESCRIPTIONAUTH
DATENO.
M A
T C
H L
IN
E
M A
T C
H L
IN
E
B rid g e E x p a n s io n J o in t
518' LONG BY 12' WIDE
±16+76 to ±16+81
LANE 1
518' LONG BY 12' WIDE
±16+76 to ±16+81
LANE 2
shoulder shoulder lane 1 - 12' wide lane 2 - 12' wide lane 4 - 12' wide lane 3 - 12' wide
CP JOINTS
33' LONG BY 5'
EACH 6' WIDE BY 8' LONG
15 LOCATIONS
RIGHT SHOULDER NORTHBOUND
±STA 1677+00 TO ±1681+00
100' LONG BY 9'
STA ±16+69 TO ±16+70
B rid g e E x p a n s io n J o in t
B rid g e E x p a n s io n J o in t
B rid g e E x p a n s io n J o in t shoulder shoulder lane 5 - 12' wide lane 6 - 12' wide lane 8 - 12' wide lane 7 - 12' wide shoulder shoulder lane 1 - 12' wide lane 2 - 12' wide lane 4 - 12' wide lane 3 - 12' wide shoulder shoulder lane 5 - 12' wide lane 6 - 12' wide lane 8 - 12' wide lane 7 - 12' wide
7 4' 9 4'
4'
4'
10 10
6 4' 6
6 4'
4'
4' 20 4'
4'
4'
7 4' 9 4'
4' 4' 4' 4' 4' 14 94'4' 4' 6 13
N
FILE:
Michigan Department of Transportation
MARCH 2024
ON A 4-LANE FREEWAY
OR DIVIDED ROADWAY
WITH A 2 LANE SHIFT
LEFT 2-LANE CLOSURE DATE:
SHEET:
NOT TO SCALE
MAINTAINING TRAFFIC TYPICAL
NO:
SHIFT MOD
208-FW-2LC-(L)
S H
O U
L D
E R
ROAD WORK
END
G20-2
LIMIT
SPEED
R2-1
W O
R K
A R
E A
V A
R
IE
S
LIMIT
SPEED
R2-1
LIMIT
SPEED
R2-1
D
S H
O U
L D
E R
BEGINS
ZONE
WORK
R5-18c
D D
ROAD
WORK
AHEAD
W20-1
INJURE /
KILL A
WORKER
7500$
15 YEARS
R5-18b
W3-5b
ZONE
AHEAD
REDUCED
SPEED
W4-2L
LIMIT
SPEED
R2-1
ROAD WORK
END
G20-2
ROAD
WORK
AHEAD
W20-1
W4-2L
BEGINS
ZONE
WORK
R5-18c
W3-5b
ZONE
AHEAD
REDUCED
SPEED
INJURE /
KILL A
WORKER
7500$
15 YEARS
R5-18b
D B
D
D L
L
L
W4-2L W4-2L
L
D
L
D
WHERE
WORKERS
PRESENT
R2-1a
KEY
F
T
DIVIDED ROADWAYS AND 2D ON FREEWAYS
PLACE SIGNS AT A SPACING OF D ON
R2-1a OPTIONAL
PLACE SIGN AS INDICATED IN NOTE S2
PLACE SIGN AS INDICATED IN NOTE S5
REFLECTS EXISTING SPEED LIMIT
TRAFFIC FLOW
LIGHTED ARROW PANEL
CHANNELIZING DEVICES
L 1/3
DEVICES:
SIGNING:
GENERAL:
TCD1, TCD2, TCD6
S1, S2, S3, S5, S6, S8
G1, G2, G3, G4
STANDARD NOTES
(SEE 102-GEN-NOTES)
CLOSED
AHEAD
LEFT LANES
W20-5aL3
LIMIT
SPEED
R2-1
WHERE
WORKERS
PRESENT
R2-1a
W1-6R
W1-4BR
D
F T
W1-4BR
W1-4BL W1-4BL
CLOSED
AHEAD
LEFT LANES
W20-5aL3
| I-75 TITLE SHEET |
| propsal of I75 over RR bridge |
| UNDERGROUND UTILITIES / MISS DIG |
| STATIONING |
| AGGREGATE BASE |
| CONCRETE |
| The type of concrete to be used on this project for the pavement repairs is Type P-NC. It is the contractor’s responsibility to ensure strength requirements are met prior to opening to traffic. |
| RECREATIONAL PROPERTIES |
| The Contractor shall not park any vehicles or store any equipment on public recreational property. Access to the recreational properties must also be maintained at all times. |
| Filling Shoulder Corrugations with Micro-Surface for Traffic Shifts-20RC812(A730) |
| I75 bridge over railroad |
| TRAFFIC CONTROL MODIFIED 208-FW-3LC-(L) |
File details come from the government source that posted it. Updated .