I-29 Grade Raise Prequalification Questionnaire 28Oct20.xlsx
XLSX spreadsheet 21 KB Posted
- Attached to
- I-29 Grade Raise and Borrow Ditch Crossing
- Solicitation number
- W912ES21B0001
About this file
This document outlines a prequalification of sources announcement for the Interstate Highway 29 Grade Raise and Borrow Ditch Crossing project. Interested firms must demonstrate experience completing at least one interstate highway construction project and one interstate highway bridge project each over $10 million within the last five years. Firms must also have a single bonding capability of at least $75 million and acknowledge compliance with FAR 52.219-8 regarding utilization of small businesses. Responses are due by November 30th and should include a completed questionnaire signed by a principal, up to 20 pages describing relevant project experience and management approach, and a letter confirming bonding capacity. Firms meeting the standards will be included on a prequalified sources list to receive an invitation to bid on the project, which involves raising a 5.6 mile section of I-29 in North Dakota out of the 500-year flood elevation.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
I-29 PreQual
| St. Paul District ~ U.S. Army Corps of Engineers (USACE) | |
| Prequalification of Sources List Establishment Questionnaire | |
| FMM Area Flood Risk Management Project - Interstate Highway 29 Grade Raise and Borrow Ditch Crossing | |
| Submit to toni.w.wasgatt@usace.army.mil and kenneth.j.eshom@usace.army.mil | |
| no later than 12:00pm (Noon) Central on Monday, 30 November 2020 |
Section 1: General
1. Company Name:
2. Company Point of Contact:
3. POC email:
4. Company Address:
5. DUNS Number:
6. CAGE Number:
7. Please select all of the following categories that apply to your firm:
Small Business Woman Owned Small Business Large business
8(a) Service Disabled Owned Small Business HUBZone
Corporation Partnership Individual
If Corporation, what State?
| Section 2: Capability & Experience | |
| Please answer by selecting Yes or No from the drop down list in the gray box. |
| 1. | Bonding Capability: |
| (In accordance with the Prequalification of Sources List Announcement on beta.SAM.gov, your firm will be required to provide a surety letter confirming this bonding capability.) |
Does your firm have a single contract bonding capability of at least $75 million?
2. Has your firm completed an Interstate Highway Construction Project with a contract price of at least $10 million in the last 5 years?
2a. Contract #:
2b. Name of Project:
2c. Project Location:
2d. Project Value:
| 2e. | Project Reference: | |
| (Name, email, & Phone #) |
2f. Brief Project Description:
| 2g. | Project Completion Date: |
| Past Performance Rating of Satisfactory or above on horizontal construction projects submitted in response to this announcement. |
3. Has your firm completed an Interstate Highway Bridge Construction Project with a contract price of at least $10 million in the last 5 years? Note may be the same project as identified in 2. above.
3a. Contract #:
3b. Name of Project:
3c. Project Location:
3d. Project Value:
| 3e. | Project Reference: | |
| (Name, email, & Phone #) |
3f. Brief Project Description:
3g. Project Completion Date:
4. Can your firm successfully comply with the provisions of FAR 52.219-8, Utilization of Small Business Concerns?
5. Implementation Approach: Please prepare a Narrative (20 pages or less) describing how your firm has successfully performed at least one (1) Interstate Highway construction project and at least one (1) Interstate Highway bridge construction project, both involving short construction seasons and fluctuating temperatures ranging from freezing to extreme heat. The same project may be used to demonstrate both Interstate Highway construction and Interstate Highway bridge construction, and the firm may use the project(s) described in questions 2 and 3 above. No more than four (4) projects total shall be described.
5a. Previous Related Project Experience: The firm shall describe Interstate Highway construction and Interstate Highway bridge construction projects completed within short construction seasons that experienced fluctuating temperatures from freezing to extreme heat.
| Standards of Acceptability: | |
| 1. | The standard is met when the firm demonstrates the construction of an Interstate Highway construction project and an Interstate Highway bridge construction project. |
2. The standard is met when the firm demonstrates the Interstate Highway construction project and Interstate Highway bridge construction projects were performed in a geographic area that experienced fluctuating temperatures from freezing to extreme heat within a short construction season.
5b. Management Team: The firm shall describe the management team that will be utilized to support this Interstate Highway construction and Interstate Highway bridge build construction project. The firm shall include information about the construction team members addressed under Standards of Acceptability, their technical competencies and experience.
| Standards of Acceptability: | |
| 1. | The standard is met when the firm demonstrates the Project Manager for the I-29 Grade Raise project has a technical degree and at least 10 years experience working on Interstate Highway construction and Interstate Highway bridge build construction projects. |
2. The standard is met when the firm demonstrates the Construction Superintendent for the I-29 Grade Raise project has at least 10 years experience working on Interstate Highway construction and Interstate Highway bridge build construction projects.
3. The standard is met when the firm demonstrates the Quality Control Manager for the I-29 Grade Raise project is a graduate engineer, graduate architect, or a graduate of construction management with at least 10 years experience working on Interstate Highway construction and Interstate Highway bridge build construction projects, or a Quality Control Manager without a college degree and a minimum of 15 years of experience working on Interstate Highway construction and Interstate Highway bridge build construction projects.
4. The standard is met when the firm demonstrates the Site Safety and Health Officer (SSHO) for the I-29 Grade Raise project is OSHA trained and has at least 5 years experience working on Interstate Highway construction and Interstate Highway bridge build construction projects.
| 6. | The following statement shall be signed by a principal of your firm: |
| "I certify that the answers which are provided in in response to this Prequalification of Sources Announcement are accurate and complete to the best of my knowledge and belief." |
5a. Name:
5b. Position:
5c. Signature:
Information provided in this document will not be disclosed outside the Government's Project Delivery Team and will be kept strictly confidential.
| Yes |
| No |
&P of &N
File details come from the government source that posted it. Updated .