Hylton Portals Closure Project24_Final_Signed.pdf
PDF 2 MB Posted
- Attached to
- Hyltons Portal
- Solicitation number
- 63767
- Issued by
- Washington County, Winchester City, Virginia
About this file
This document is related to the Hylton Portals Closure Project for the Commonwealth of Virginia, which involves the permanent closure of multiple, inundated mine portals and the revegetation of all disturbed areas on the project site located off SR 753 near Wise, Virginia. The work includes the removal of a hazardous water body and modifications to the drainage pattern to ensure adequate positive drainage in conjunction with existing drainage structures and downstream areas. The project is located in Wise County, Virginia.
The document provides detailed specifications and drawings for the project, including general notes, site plans, erosion and sediment control measures, and various construction details for the portal closures, culverts, and drainage features. Pricing terms, set-asides, funding requirements and sources, and other contractual information are not included in this document.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
o
2593.5
2598.5
SCALE:1"=2000'
100002000
PROJECT LOCATION MAP
1 Cover Sheet
DESCRIPTION
INDEX OF SHEETS
WISE, VA QUADRANGLE
December 23, 2023
2 Location Map 3 Site Plan & ESC
N
Virginia
Virginia
Maryland
NorthTennessee
Kentucky
West
Carolina
Wise County
GENERAL NOTES
1. Before performing any excavation, contact Miss Utility, (800) 810-7197, to confirm the location of any below ground utility lines in the work area.
2. Before starting the work, contact the Agency for proper clearance and be governed by the Agency's instructions.
3. The contractor is responsible for scheduling, expediting, directing, inspecting and coordinating the work so as to complete the work in the time agreed upon.
4. Work in close cooperation with the Agency and others engaged in the project so that the work will be completed in an orderly manner.
5. Provide temporary supports as may be required during construction to ensure the stability of the proposed excavation.
CLOSURE PROJECT
MINED LAND REPURPOSING
ABANDONED MINED LAND SECTION
WISE, VA
4 Details
HYLTON PORTALS
PROJECT LOCATION
Project
37°00' 04'' N 82° 31' 51''W
2598.5 of3 4
Sheet Number:
/2
3/
D at e:
M R
C
Pl an
V ie w : P
R O
PO
SE
D D es ig ne d:
D ra w n:
M R
C H
YL
TO
N P
O R
TA
LS
P R
O
JE
C T
W
IS
E C
O U
N
TY
, V
IR
G
IN
IA
Sc al e:
1"
0'
R ev is io ns
N
Legend
2595 Contour
SCALE:1"=30'
3015030
Shed
Access Existing Drainpipe
Bi g
St on e G ap , V irg in ia (2
) 5
-8
Proposed 18" CMPs Driveway
Limit of Disturbance
TWO Proposed 18" Ø HDPE Pipes
RL2
EXISTING DITCH
(to be armored)
GL1
RL1
CEDAR CROFT ROAD
Wet Seal Pipe Discharge Ditch@ Portals
Josey driveway
Josey driveway
SUMP
1. STONE USED SHALL BE VDOT GABION STONE.
2. ALL STONE SHALL BE PLACED A MINIMUM OF 4'
ABOVE THE ROOF OF THE MINE.
3. DRAIN PIPE SHALL BE 6" SDR11 (TYP.)
4. FLANGES SHALL BE MECHANICALLY-FUSED
4' (approximate) ground
Mine Entry
1' MIN 4' MIN
20'
FILTER FABRIC
3. BACKFILL AND
COMPACT THE
EXCAVATED SOIL.
1. SET POSTS 5' APART AND
EXCAVATE A 4" X 4" TRENCH
UPSLOPE ALONG THE LINE OF POSTS.
2. ATTACH THE FILTER FABRIC
TO THE POSTS AND EXTEND IT
INTO THE TRENCH.
Silt Fence N.T.S.
1. EROSION CONTROL BLANKET SHALL BE USED IN THE
GRASS LINED DITCH TO FACILITATE VEGETATIVE GROWTH.
2. EROSION CONTROL BLANKET SHALL BE ENKAMAT 7020W
OR EQUIVALENT.
3. SEE DITCH SCHEDULE FOR GENERAL DIMENSIONS.
3-5
Grassed Lined Ditch N.T.S.
Top Width
VDOT #57 Stone
SECTION VIEW
1. Pipe shall have 1.5' cover minimum.
2. All pipe is to be placed on a >1% grade minimum
3. All Solid HDPE Pipe shall be ADS N-12 Pipe or SDR11
Typical Culvert N.T.S.
Compacted Backfill
1' MIN
4"
MIN
1.5'
MIN
Gabion Portal Closure N.T.S.
GRASS LINED
DITCH
6" SDR 11 (FUSED BOLT FLANGES)
6" Varmint Guard
0.5' MIN
6"-VARMINT GUARD
PROFILE VIEW
1. Pipe shall have grated cover to allow discharge and prevent varmint entry.
2. All pipe discharge is to be placed within ditch.
3. All Solid HDPE Pipe shall be 6-INCH SDR11
4. Flanges shall be mechanically-fused.
Pipe End Treatment
N.T.S.
Wet Seal Pipe from closed portal
A
PROPER PLACEMENT OF STRAW BALE BARRIER IN DRAINAGE WAY
Note: Embed hay bales a minimum of 4 inches.
Prevent Piping Compacted Soil to
Straw Bale Staked and Entrenched
Runoff Sediment Laden
Filtered Runoff or Twine Binding Wire
Points A should be higher than point B
B
A
STRAW BALE DETAIL
NOT TO SCALE
Straw Bales-Barrier N.T.S.
6" SDR 11
GL1 = Grassed Lined Ditch cover above opening
(FUSED BOLT FLANGES)
HDPE N-12
(Mild Gradual Slopes) of4 4
Sheet Number:
/2
3/
D at e:
H
FW
M
IS
C . D
ET
AI
LS
S
H
EE
T D es ig ne d:
R ev ie w ed
M R
C H
YL
TO
N P
O R
TA
LS
P R
O
JE
C T
W
IS
E C
O U
N
TY
, V
IR
G
IN
IA
Sc al e:
AS
S
H O
W N
R ev is io ns
N
Bi g
St on e G ap , V irg in ia (2
) 5
-8
File details come from the government source that posted it. Updated .