This solicitation requests quotes for a Hydraulic Systems and Equipment Laboratory Upgrade. The United States Coast Guard Training Center Yorktown seeks to procure three double-sided hydraulic training simulators from the sole-source contractor Fluid Power Training Institute. The simulators must include components like pumps, valves, cylinders, displays, and plumbing to provide basic and advanced hydraulic troubleshooting training with electro-hydraulic diagnostic capabilities. Quotes are due by September 9, 2022, and the period of performance is five months from award. The Coast Guard intends to evaluate quotes based on price alone and award a firm-fixed-price contract to the responsive, responsible offeror with the lowest price.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Combined Synopsis Solicitation Hydraulic Lab.docx | DOCX document | |
| Attachment 2_Pricing.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PR # 63100PR220055713
STATEMENT OF WORK
STATEMENT OF WORK (SOW)
FOR
MK06 Hydraulic Systems and Equipment Laboratory Trainer Upgrade
1.0 GENERAL
1.1 Background
MK-06 Hydraulic Systems and Equipment course is the United States Coast Guard’s premier hydraulic training “C” School for Machinery Technicians (MK) and Electrician’s Mates (EM). The course is designed to aid technicians in troubleshooting, grooming, and safely operating hydraulic systems located on almost all Coast Guard platforms. The course has been in operation since the early 90’s and all training equipment is original to the course, and still in use to this day. The current Hydraulic Trainers/equipment (Vickers Sperry) are outdated, no longer supported by the manufacturer, and the parts required to conduct repairs of failed parts are obsolete. A Job Task Analysis for MK-06 was conducted in 2019 and results identified that with the current modernization of the Coast Guards fleet and the advancement of technology concerning hydraulics and electro-hydraulics, a new Curriculum Outline with update Performance Objectives was needed to meet the Needs of the Service. The current Hydraulic Trainers are not capable of meeting the new Performance Objectives outlined in the new Curriculum Outline. In response, the MK Auxiliary Sub-Group conducted market research to find new hydraulic trainers that are relevant to today’s hydraulic technology with the opportunity to expand as technology within the hydraulic industry continues to advance that would meet the new Curriculum Outline Performance Objectives
1.2 Scope
Vendor shall Provide delivery of (03) Double-Sided Hydraulic Training Simulators with the capabilities of basic and advanced troubleshooting skills. With Electro-Hydraulic Diagnostic capabilities. All components for both sides shall be independent from one another and shall be pre-assembled at the vendor’s factory to include:
Axial Piston Pump
Electric motor
10 Micron Filter
(6) Directional Control Valves of various types Adjustable Sequence Valve
Adjustable Pilot and Direct Operating Pressure Relief Vlave Adjustable Pressure Reducing Valve
Adjustable Flow Control Valve Adjustable Pressure-Compensated Flow Control valve
Adjustable Counterbalance Valve
Adjustable Needle Valve
Check Valve
Pilot Operated Check Valve
Two cylinders – one single-rod double acting and one double-rod double acting Bi-directional hydraulic motor
Pressure Gages
(48) Plumbing Tees
(108) Flexible hoses and with leak-free quick disconnects
The trainers will be delivered on a plug-and-play state and be fully operational.
The trainers shall have variable load cycle capabilities, pressure and leak testing, safe pressure relief system, and real time/real world fault code insertion. Trainers shall also have digital displays for pressure, temperature, and motor speed (RPMs)
1.3 OBJECTIVE
An upgraded hydraulic troubleshooting training aid with electro-hydraulic troubleshooting capabilities will positively impact the Coast Guard by modernizing our hydraulic trainers and allow both Machinery Technicians and Electricians Mates to be able to troubleshoot and repair components and systems they will encounter in the fleet. The overall goal of this procurement is to upgrade the current outdated, no longer supported trainers to new electro-hydraulic trainers that closely resembles what Coast Guard assets have for their hydraulic systems and components. Investing in an upgraded MK06 course to train our organic workforce to understand, troubleshoot and repair these complex systems is essential to ensure the acquisition, operation and maintence of our current cutters and shore based assets and also maintaining our current legacy hydraulic systems.
1.4 APPLICABLE DOCUMENTS
Curriculum Outline for Class “C” Hydraulic Systems and Equipment Course
Course Code 230670 Meets requirements for curriculum outline TPO 5.1:
Fluid Power Training Institute: MF102-H-TS Electro-Hydraulic Training System spec sheet Does not meet requirements:
Amatrol 950-HT1 Hydraulic Trainer – Does not provide basic manually operated DCV’s Parker Motion and Control Trainer – Does not provide advanced hydraulic troubleshooting Fluid Power Training Module – Does not provide advanced hydraulic troubleshooting
2.0 SPECIFIC REQUIREMENTS/TASKS
2.1 TASK ONE. Delivery
Vendor shall provide (3) double-sided and complete functioning Hydraulic Training and Troubleshooting Systems. Trainers must be free of defect upon delivery and acceptance, including testing and verification of the unit’s operational capabilities.
2.2 TASK TWO. Training
The manufacturer shall provide training materials, manuals, and supporting documentation to the MK06 Instructors before acceptance to:
Commanding Officer
Coast Guard Training Center Yorktown
1 U. S. Coast Guard Training Center
Yorktown, VA 23690
Attn: MKC Reggie Wellemeyer Martin Hall 757-856-2133
3.0 CONTRACTOR PERSONNEL
Not Applicable
3.1 QUALIFIED PERSONNEL
The vendor shall provide qualified technician as per warranty requirements specified in purchasing documentation.
3.2 CONTINUITY OF SUPPORT
The vendor shall ensure that the contractually required level of support for this requirement (warranty) is maintained at all times.
4.0 OTHER APPLICABLE CONDITIONS
Not Applicable
4.1 SECURITY
Per TCYINST 5530.3 (series), all personnel entering TRACEN Yorktown Virginia are subject to NCIC background checks. Those found to have felony convictions, outstanding warrants of any type, and registered sexual offenders will be denied access by security. The Commanding Officer reserves the right to refuse entry based on other criminal charges, convictions and concerns. Background checks will be entered into an automated database accessible only by the security watch supervisors indicating the date the checks were accomplished, the individuals name, address and date of birth, and the company they are employed by when submitting and access list. Background checks will be re-accomplished at least yearly if the individual still requires access. TRACEN Yorktown, VA meets and exceeds requirements set forth in Directive-Type Memorandum (DTM) 14-005 (Access to FBI Natinal Crime Information Center (NCIC) files).
4.2 Period of Performance
The period of performance for this contract shall not exceed 05 months from the date of award.
4.3 PLACE OF PERFORMANCE
The primary place of performance will be the Elbert Hall RM 107 Hydraulic Lab:
Commanding Officer
Coast Guard Training Center Yorktown
1 U. S. Coast Guard Training Center
Yorktown, VA 23690
POC: MKC Reggie Wellemeyer MK Schoolhouse Auxiliary Sub-Group Supervisor
Martin Hall 757-856-2133
4.4 HOURS OF OPERATION
Not Applicable
4.5 Travel
Not Applicable
4.6 POST AWARD CONFERENCE
The Contractor shall attend a Post Award Conference with the Contracting Officer and the COR no later than 02 business days after the date of award. The purpose of the Post Award Conference, which will be chaired by the Contracting Officer, is to discuss technical and contracting objectives of this contract and review the Contractor's draft project plan. The Post Award Conference will be held via teleconference.
4.7 PROJECT PLAN
The Vendor shall provide a draft Project Plan at the Post Award Conference for Government review and comment. The plan, at a minimum, shall include: (a) list of work to be performed;(b) project schedule; (c) description of intended results; (d) role of key personnel, if applicable and (e) how quality of service (project) will be maintained throughout life of contract. The Vendor shall provide a final Project Plan to the COR not later than 2 business days after the Post Award Conference.
4.8 BUSINESS CONTINUITY PLAN
Not applicalbe
4.9 PROGRESS REPORTS
The Project Manager shall provide a bi-weekly progress report to the Contracting Officer and COR via electronic mail. This report shall include a summary of all Contractor work performed, including a breakdown of labor hours by labor category, all direct costs by line item, an assessment of technical progress, schedule status, any travel conducted and any Contractor concerns or recommendations for the previous reporting period.
4.10 PROGRESS MEETINGS
The Contractor shall be available to meet with the COR upon request to present deliverables, dicuss progress, exchange information and resove emergent technical problems and issues. These meeting shall take place via teleconference.
4.11 GENERAL REPORT REQUIREMENTS
The Contractor shall provide all written reports in electronic format with read/write capability using applications that are compatible with DHS workstations (Windows XP and Microsoft Office Applications).
4.12 INTELLECTUAL PROPERTY
Not applicable
4.13 PROTECTION OF INFORMATION
Not applicable
4.14 SECTION 508 COMPLIANCE
Not applicable
5.0 GOVERNMENT FURNISHED RESOURCES
The Government will not furnish any resources to the Contractor in support of this contract.
6.0 CONTRACTOR FURNISHED PROPERTY
The Contractor shall furnish all facilities, materials, equipment and services necessary to fulfill the requirements of this contract, except for the Government Furnished Resources specified in SOW 2.0 and SOW 5.0.
7.0 GOVERNMENT ACCEPTANCE PERIOD
The COR will review deliverables prior to acceptance and provide the contractor with an e-mail that provides documented reasons for non-acceptance. If the deliverable is acceptable, the COR will send an e-mail to the Vendor notifying it that the deliverable has been accepted.
7.1 The COR will have the right to reject or require correction of any deficiencies found in the deliverables that are contrary to the information contained in the Contractor’s accepted proposal. In the event of a rejected deliverable, the Contractor will be notified in writing by the COR of the specific reasons for rejection. The Contractor may have an opportunity to correct the rejected deliverable and return it per delivery instructions.
7.2 The COR will have 02 business days to review deliverables and make comments. The Vendor shall have 05 business days to make corrections and redeliver.
7.3 All other review times and schedules for deliverables shall be agreed upon by the parties based on the final approved Project Plan. The Contractor shall be responsible for timely delivery to Government personnel in the agreed upon review chain, at each stage of the review. The Contractor shall work with personnel reviewing the deliverables to assure that the established schedule is maintained.
8.0 DELIVERABLES
The Vendor shall consider items in BOLD as having mandatory due dates. Items in italics are deliverables or events that must be reviewed and/or approved by the COR prior to proceeding to next deliverable or event in this SOW.
| ITEM |
| SOW REFERENCE |
| DELIVERABLE / EVENT |
| DUE BY |
| DISTRIBUTION |
| 1 |
| 4.6 |
| Post Award Conference |
| Two (2) business days after award date |
| COR, Contracting Officer |
| 2 |
| 4.7 |
| Project Plan |
| Two (2) business days after award date |
| COR, Contracting Officer |
| 3 |
| 4.9 |
| Progress Reports |
| Bi Weekly from date of award |
| COR, Contracting Officer |
| 4 |
| 4.10 |
| Progress Meeting |
| When requested by the COR |
| COR, Contracting Officer |
| 5 |
| 4.2 |
| Delivery of Training Aid |
| 5 months from award date |
| COR, Contracting Officer |
LAST UPDATED: 05/17/2022
PAGE 2/6