Hwy 70 Stormwater Pipe Repair Drawings IFB 05-12-2025.pdf
PDF 7 MB Posted
- Solicitation number
- 294-29405152025A
- Issued by
- Hiddenite CDP, North Carolina
About this file
These are the civil engineering drawings for the Highway 70 Stormwater Pipe Repair project for the City of Havelock, North Carolina, prepared by Hazen and Sawyer engineering firm in May 2025. The project involves repairing a 24-inch storm drain outfall buried approximately nine feet below the surface, which currently carries stormwater runoff from Highway 70. The proposed work includes connecting the existing pipe outfall to a new junction box and a 24-inch outflow pipe that will carry water westward and terminate at an existing embankment slope, with riprap to be installed along the slope to dissipate outflows.
The project documents indicate this is an Invitation for Bid (IFB) issued on May 12, 2025, with Hazen contract number 20250972 and Hazen project number 30906-214. The drawings provide detailed civil engineering specifications, including site plans, storm drain profiles, standard details, and NCDOT-specific construction details. Key specifications include requirements for site preparation, utility coordination, excavation, erosion control, and environmental protection, with a focus on minimizing disturbance to the 30' and 50' riparian buffers and wetland areas adjacent to the project site.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Highway 70 Stormwater Pipe Repair.pdf | ||
| Hwy 70 Stormwater Pipe Repair Project Manual IFB 05-12-2025.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PL
O
T D
AT
E:
5/
/2
3:
P
M B
Y:
S
KA
N
E Fi le : O
:\3
\3
-2
\C
AD
_B
IM
\G
EN
ER
AL
\G
S av ed b y S
KA
N E S av e da te
: 5/
/2
3:
P
M
CITY OF HAVELOCK
HAVELOCK, NORTH CAROLINA
HIGHWAY 70 STORMWATER PIPE REPAIR
HAZEN AND SAWYER
4011 WESTCHASE BOULEVARD, SUITE 500
RALEIGH, NORTH CAROLINA 27607
LICENSE NO. : C-0381
I I I I I I I I I I I I I I I I I I I I I I I I I I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I I I
I I I I I
I
II
I I
I
B
ELLTO
W N
R D
EA
ST
P R O
N G
S
LO
C U
M C
R
EE
K
CAPS
BRANCH
CU
N N
IN
G H
AM
B
LV
D
WOODHAVEN DR
FONTANA BLVD
SLO
CUM
CREEK
CUN
N
IN
G H
AM
B
LV
D
TALLPINE RD
JAYCEE ST
MANTEO DR
MIDDLE SCHOOL LN
M
AIN
ST
RO
O
SE
VE
LT
BL
VD
SERVICE RD
PA
R K
LN
MIMOSA DR
JACKSON DR
TR
A D
ER
A
V E
OAK DR
PO
PLA
R R
D
W
ILD
W O
O D
R D
FO
R
ES
T V
IEW
D R
PIN
E D
A
LE R
D
101 101
PROJECT LOCATION
ISSUED FOR BID
HAZEN NO.: 30906-214
HAZEN CONTRACT NO.: 20250972
MAY 2025
DRAWING INDEX
DRAWING NUMBER DRAWING TITLE
GENERAL
G1 COVER SHEET
G2 GENERAL NOTES, LEGEND, AND ABBREVIATIONS
CIVIL
C1 STORM PLAN AND PROFILE
CD1 STANDARD DETAILS
CD2 NCDOT DETAILS
T. GRAY
S. KANE
G2
GENERAL NOTES, LEGEND, AND ABBREVIATIONS
B. PRICE
PL
O
T D
AT
E:
/1
2/
:2
PM
B Y:
S
KA
N E
Fi le
: O :\3
\3
-2
\C
AD
_B
IM
\G
EN
ER
AL
\G
Sa ve d by S
KA
N
E Sa ve d at e:
/1
2/
0:
A M
ISSUED FOR BID
HAZEN AND SAWYER
4011 WESTCHASE BOULEVARD, SUITE 500
RALEIGH, NORTH CAROLINA 27607
LICENSE NO.: C-0381
HIGHWAY 70
STORMWATER PIPE REPAIR
CITY OF HAVELOCK
HAVELOCK, NORTH CAROLINA 30906-214
20250972
MAY 2025T. GRAY
IF THIS BAR DOES NOT
MEASURE 1" THEN DRAWING IS
NOT TO FULL SCALE
CHECKED BY:
DRAWN BY:
DESIGNED BY:
PROJECT
ENGINEER:
REV ISSUED FOR DATE BY
0 1"1/2"
CONTRACT NO.:
HAZEN NO.:
DATE:
DRAWING
NUMBER:
1 ISSUED FOR BID 05/2025 TMG
PROGRAM: C3D 2024 PLOT STYLE: HS-FWS.ctb
GAS
W WATER LINE
SANITARY SEWER
STORM DRAIN
NATURAL GAS
OHE OVERHEAD ELECTRIC
15 MAJOR CONTOUR
13 MINOR CONTOUR
X
S
FH
W
GM
FIRE HYDRANT
WATER VALVE
GAS VALVE
UTILITY POLE
ABBREVIATIONS
FENCE
ABANDON/DEMOLITION
BUILDING
EASEMENT
RIPRAP
ASPHALT
CONCRETE
PROPERTY LINE
LEGEND
RAILROADI I I I I I I I
GUY WIRE
TREELINE
ROAD SIGN
CONTROL POINT
LIGHT POLE
CATCH BASIN
EXISTING
SANITARY SEWER MANHOLE
100YR 100-YEAR FLOODPLAIN
FLOODWAY
STORM DRAIN MANHOLE
STORM DRAIN PIPE
CENTERLINE
PROPOSED
LIMIT OF DISTURBANCELOD
SILT FENCE
TPF
SF
RIPRAP
30' BUFFER
50' BUFFER
STREAM EDGE
ASPHALT
ABC AGGREGATE BASE COURSE
APPROX APPROXIMATE
BLDG BUILDING
BM BENCH MARK
BOC BACK OF CURB
BOT BOTTOM
C&G CURB AND GUTTER
CATV CABLE TELEVISION
CB CATCH BASIN
CL CENTER LINE
CMP CORRUGATED METAL PIPE
CONC CONCRETE
CP CONCRETE PIPE
DB DEED BOOK
DET DETAIL
DIA DIAMETER
DIM DIMENSION
DIP DUCTILE IRON PIPE
DWG DRAWING
E EAST / EASTING
EL / ELEV ELEVATION
EOP EDGE OF PAVEMENT
EX /EXIST EXISTING
FH FIRE HYDRANT
FT FEET
HDPE HIGH DENSITY POLYETHYLENE PIPE
G GAS / GAS LINE
H/HORZ HORIZONTAL
HWY HIGHWAY
ID INSIDE DIAMETER
IN INCH
INV INVERT
JB JUNCTION BOX
LOD LIMIT OF DISTURBANCE
LF LINEAR FEET
MAX MAXIMUM
MH MANHOLE
MIN MINIMUM
MISC MISCELLANEOUS
N NORTH / NORTHING
NE NORTHEAST
NTS NOT TO SCALE
NW NORTHWEST
OD OUTSIDE DIAMETER
OHE OVERHEAD ELECTRIC
PG PAGE
PP POWER POLE
PROP PROPOSED
PVC POLYVINYL CHLORIDE
PVMT PAVEMENT
QTY QUANTITY
RCP REINFORCED CONCRETE PIPE
RD ROAD
REM REMOVE
RR RAILROAD
RT RIGHT
R/W RIGHT OF WAY
SD STORM DRAIN
SQ FT SQUARE FEET
SF SILT FENCE
S SOUTH
SS SANITARY SEWER
ST STREET
STA STATION
STD STANDARD
SE SOUTHEAST
SW SOUTHWEST
TBM TEMPORARY BENCHMARK
TC TOP OF CURB
TECH TECHNICAL
TEL TELEPHONE
TEMP TEMPORARY
TON TOP OF NUT
TOS TOP OF SLAB
TOW TOP OF WALL
TPF TREE PROTECTION FENCE
TYP TYPICAL
UG UNDERGROUND
UGT UNDERGROUND TELEPHONE
UTIL UTILITY
V/VERT VERTICAL
W WEST
W/ WITH
W/O WITHOUT
WH WIRE HEIGHT
WL WATERLINE
WV WATER VALVE
YD YARD
YR YEAR
FLOODWAYFLOODWAY
50'
30'
WETLAND EDGEWL
PROJECT DESCRIPTION
1. A 24-INCH STORM DRAIN OUTFALL WHICH CARRIES STORMWATER RUNOFF FROM
HIGHWAY 70 WAS RECENTLY DISCOVERED BURIED APPROXIMATELY NINE FEET
BELOW THE SURFACE OF THE PROJECT SITE. THE PROPOSED PROJECT SEEKS TO
CONNECT THE EXISTING PIPE OUTFALL TO A JUNCTION BOX AND A 24-INCH
OUTFLOW PIPE WHICH CARRIES THE FLOW WESTWARD AND TERMINATES AT THE
EXISTING EMBANKMENT SLOPE. RIPRAP IS TO BE INSTALLED DOWN THE
EMBANKMENT SLOPE AND AT THE BASE OF THE SLOPE TO DISSIPATE OUTFLOWS.
GENERAL NOTES
1. THE NOTES CONTAINED HEREIN ARE INTENDED TO SUPPLEMENT TECHNICAL
SPECIFICATIONS. IN NO CASE SHALL THESE NOTES VOID ANY PART, SECTION OR
REQUIREMENT OUTLINED IN THE TECHNICAL SPECIFICATIONS CONTAINED IN THE
CONTRACT DOCUMENTS. IF CONFLICTS OCCUR BETWEEN THE TECHNICAL
SPECIFICATIONS AND THE NOTES CONTAINED HEREIN, THE TECHNICAL
SPECIFICATIONS SHALL SUPERSEDE.
2. CONTRACTOR IS SOLELY RESPONSIBLE FOR SITE SAFETY ASSOCIATED WITH THE
WORK UNDER THIS PROJECT AND FOR COMPLIANCE WITH ALL FEDERAL, STATE
AND LOCAL HEALTH AND SAFETY LAWS, CODES, REGULATIONS, AND ORDINANCES
INCLUDING, BUT NOT LIMITED TO, THOSE CURRENTLY MANDATED BY THE
OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION (OSHA).
SURVEY
1. SITE SURVEY BY COOPER AND ASSOCIATES SURVEYORS, PA, COLLECTED MARCH
2022.
2. HORIZONTAL CONTROL IS BASED ON NC STATE PLANE GRID NORTH, NAD83 (2011)
AS DETERMINED BY GPS.
3. ELEVATIONS SHOWN ARE REFERENCED TO NAVD 88 DATUM.
4. BENCHMARKS, CONTROL POINTS, ETC., IF PRESENT, ARE SHOWN ON DRAWING C1.
SITE PREPARATION
1. LIMITS OF DISTURBANCE SHALL BE AS INDICATED ON THE CONTRACT DRAWINGS.
ANY CHANGES TO THE LOD BY CONTRACTOR SHALL REQUIRE PRIOR APPROVAL
FROM ENGINEER.
2. CONTRACTOR SHALL LIMIT CLEARING AND GRUBBING TO ONLY THOSE AREAS
ABSOLUTELY NECESSARY FOR CONSTRUCTION.
UTILITIES
1. EXISTING UTILITY AND STRUCTURE LOCATIONS, WHERE SHOWN ON THE
DRAWINGS, SHALL BE CONSIDERED APPROXIMATE. NOT ALL LOCATIONS OR
STRUCTURES AFFECTING THE WORK MAY BE SHOWN. CONTRACTOR IS
RESPONSIBLE FOR DESIGNATING AND LOCATING EXISTING UTILITIES AND
STRUCTURES BEFORE BEGINNING WORK.
2. EXISTING UTILITIES ARE SHOWN IN LOCATIONS AT THE TIME OF SURVEY. UTILITIES
MAY HAVE BEEN RELOCATED OR NEWLY CONSTRUCTED AFTER THE DATE OF
SURVEY. CONTRACTOR SHALL VERIFY LOCATIONS AND COORDINATE WITH UTILITY
OWNERS.
3. WHERE OVERHEAD POWER LINES ARE PRESENT, CONTRACTOR MUST CONTACT
THE UTILITY PRIOR TO THE COMMENCEMENT OF CONSTRUCTION TO DETERMINE
THE MINIMUM REQUIRED EQUIPMENT CLEARANCE (MEC) DISTANCE BASED UPON
LINE STRENGTH.
4. FOLLOWING UTILITY DESIGNATION, CONTRACTOR SHALL EXCAVATE AT EACH
UTILITY THAT MAY BE IN-CONFLICT WITH CONSTRUCTION TO VERIFY LOCATIONS
(HORIZONTALLY AND VERTICALLY). CONTRACTOR SHALL ALLOW ENGINEER
OPPORTUNITY TO ADJUST DESIGN TO AVOID CONFLICTS IF PRESENT.
5. IN THE EVENT OF DAMAGE TO EXISTING UTILITIES, CONTRACTOR SHALL STOP
WORK IMMEDIATELY, TAKE NECESSARY PRECAUTIONS TO PREVENT INJURY OR
FURTHER DAMAGE, AND NOTIFY PROPER AUTHORITIES. CONTRACTOR SHALL BE
RESPONSIBLE FOR RESTORING/REPAIRING ALL EXISTING STRUCTURES, CONDUITS,
OR OTHER UTILITIES DAMAGED BY CONTRACTOR'S OPERATIONS AT NO COST TO
OWNER.
6. CONTRACTOR SHALL COORDINATE WITH UTILITY OWNERS FOR TEMPORARY
SUPPORT AND / OR RELOCATION OF UTILITIES THAT CONFLICT WITH
CONSTRUCTION, INCLUDING BUT NOT LIMITED TO: SUBSURFACE UTILITY LINES,
OVERHEAD UTILITY LINES, UTILITY POLES, AND GUY WIRES.
7. CONTRACTOR SHALL PROTECT UTILITIES FROM DAMAGE. CONTRACTOR SHALL
HOLD OWNER AND ENGINEER HARMLESS FOR ANY THIRD-PARTY INCONVENIENCE
CREATED BY WORK OF HIS OR HER OWN FORCES OR THAT OF THE CONTRACTOR'S
AGENTS. DAMAGES INCURRED SHALL BE CONTRACTORS FINANCIAL
RESPONSIBILITY.
8. CONTRACTOR SHALL RECORD AND PROVIDE TO ENGINEER THE LOCATION OF ALL
UTILITIES CROSSED AND THE NEW LOCATION AND DEPTH OF ALL RELOCATED
AND/OR ADJUSTED UTILITIES.
EXCAVATION AND BORROW
1. CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR THE DESIGN, INSTALLATION,
AND MAINTENANCE OF ALL EXCAVATION SUPPORT ON THE PROJECT. ALL
EXCAVATION SUPPORT SHALL BE DESIGNED BY A PROFESSIONAL ENGINEER
REGISTERED IN THE STATE OF NORTH CAROLINA. ALL EXCAVATION SUPPORT
DESIGN DOCUMENTS SHALL BE PROVIDED TO ENGINEER FOR REVIEW AT LEAST 15
DAYS BEFORE IMPLEMENTATION. CONTRACTOR SHALL USE ADEQUATE SHORING
METHODS TO ENSURE:
A. COMPLIANCE WITH OSHA REGULATIONS.
B. PROTECTION OF EXISTING PAVEMENT AND ROAD SHOULDERS,
STRUCTURES AND UTILITIES.
C. CONSTRUCTION ACTIVITIES ARE CONFINED TO CITY OF HAVELOCK
PROPERTY AS INDICATED
2. ALL HOLES, TRENCHES, AND OTHER HAZARDOUS AREAS SHALL BE ADEQUATELY
PROTECTED BY BARRICADES, LIGHTS OR OTHER PROTECTIVE DEVICES.
3. CONTRACTOR SHALL PROVIDE MEASURES TO SECURE SITE AND EXCAVATION
FROM GENERAL PUBLIC; COMPLY WITH OSHA REGULATIONS. JOB SITE SAFETY IS
THE EXCLUSIVE AND SOLE RESPONSIBILITY OF CONTRACTOR. OPEN EXCAVATION
SHALL BE FILLED OR COVERED AT THE END OF EACH DAY'S WORK AND SHALL NOT
BE LEFT UNATTENDED OR OPEN OVERNIGHT.
4. ALL EXCAVATED MATERIALS THAT ARE NOT REQUIRED OR ARE UNSUITABLE FOR
USE IN THE PROJECT SHALL BE CONSIDERED WASTE AND SHALL BE DISPOSED OF
OFFSITE.
5. CONTRACTOR SHALL BE RESPONSIBLE FOR ALL BORROW MATERIAL REQUIRED TO
CONSTRUCT THE PROJECT.
PROPERTY PROTECTION
1. CONTRACTOR SHALL BE RESPONSIBLE FOR THE REMOVAL AND REPLACEMENT TO
ORIGINAL OR BETTER CONDITION OF ALL EXISTING PAVEMENTS, DRIVEWAYS,
FENCES, AND MISCELLANEOUS ITEMS WHERE DAMAGED BY CONSTRUCTION
ACTIVITIES OR REQUIRED TO COMPLETE THE CONSTRUCTION.
2. CONTRACTOR SHALL MAKE EVERY EFFORT TO SAVE AND MAINTAIN ALL PROPERTY
IRONS, MONUMENTS, OTHER PERMANENT POINTS AND LINES OF REFERENCE AND
CONSTRUCTION STAKES. A NORTH CAROLINA REGISTERED LAND SURVEYOR, AT
CONTRACTOR'S EXPENSE, SHALL REPLACE PROPERTY IRONS, MONUMENTS, AND
OTHER PERMANENT POINTS OF REFERENCE.
SITE MAINTENANCE AND SECURITY
1. CONTRACTOR SHALL MAINTAIN A NEAT AND CLEAN JOB SITE TO INCLUDE STAGING
/ STORAGE AREAS AND PERFORM DUST CONTROL BY WATERING DAILY OR AS
DIRECTED BY OWNER / ENGINEER.
2. CONTRACTOR SHALL PROVIDE SECURITY FENCING, SECURITY GUARD, AND OTHER
MEASURES CONTRACTOR DEEMS NECESSARY TO PROTECT EQUIPMENT AND
MATERIALS STORED ON SITE.
EROSION CONTROL
1. ALL EROSION CONTROL MEASURES SHALL BE IN PLACE BEFORE ANY LAND
DISTURBANCE ACTIVITIES MAY BEGIN.
2. CONTRACTOR SHALL FURNISH AND INSTALL ALL NECESSARY EROSION CONTROL
MEASURES WHETHER OR NOT SHOWN ON THE PLANS TO PROTECT ADJACENT
CREEKS, RIVERS, ROADWAYS, ETC. FROM SILTATION AND EROSION.
3. ALL EROSION CONTROL MEASURES SHALL BE INSPECTED WEEKLY AND WITHIN 24
HOURS OF ANY RAINFALL EVENT THAT PRODUCES 1/2 INCH OR MORE OF RAIN.
REPAIR AND/OR REPLACE AS NECESSARY. SEE SPECIFICATIONS FOR SPECIFIC
MAINTENANCE REQUIREMENTS FOR EACH EROSION AND SEDIMENT CONTROL
MEASURE UTILIZED ON THIS PROJECT.
4. ANY AREAS USED FOR STOCKPILING, CONCRETE WASHOUT, AND
CONSTRUCTION/DEMOLITION WASTE SHALL BE LOCATED WITHIN THE DELINEATED
LIMITS OF DISTURBANCE.
5. EROSION CONTROL MEASURES SHALL BE CLEANED OF ACCUMULATED SEDIMENT
WHEN VOLUME OF MEASURE IS HALF FULL. SEDIMENT SHALL BE REMOVED FROM
BEHIND SILT FENCING WHEN IT BECOMES APPROXIMATELY 0.5 FEET DEEP AT THE
FENCE. THE SEDIMENT FENCE SHALL BE REPAIRED AS NECESSARY TO MAINTAIN
THE BARRIER. REMOVED SEDIMENT SHALL BE DISPOSED OF IN SUCH A MANNER AS
TO PREVENT FURTHER SEDIMENT TRANSPORT. IF NO SUITABLE ON-SITE
LOCATIONS ARE AVAILABLE, ALL REMOVED SEDIMENT WILL BE LEGALLY DISPOSED
OF OFF-SITE AT NO ADDITIONAL COST TO THE OWNER.
6. ALL EXCESS SOIL RESULTING FROM EARTHWORK OPERATIONS SHALL BE
REMOVED FROM SITE BY CONTRACTOR. THIS INCLUDES BUT IS NOT LIMITED TO
ANY SPOIL MATERIAL EXCAVATED FROM TRENCHING, BORINGS AND DRILLING
OPERATIONS. ALL TEMPORARY SOIL STOCKPILE AREAS USED FOR BACKFILL AND
OTHER ACTIVITIES SHALL BE WITHIN THE LOD AS SHOWN ON THE DRAWINGS.
STOCKPILE SIDE SLOPES SHALL BE NO STEEPER THAN 3:1 AND TOP OF STOCKPILE
SHALL BE SLOPED AT A MINIMUM OF 5% TO PROMOTE POSITIVE DRAINAGE. ALL
ONSITE TEMPORARY SOIL STOCKPILES SHALL BE SEEDED WITH TEMPORARY
AND/OR PERMANENT SEEDING MEASURES FOR THE DURATION OF CONSTRUCTION
ACTIVITIES. ALL CONTRACTOR STAGING AND LAYDOWN AREAS, SOIL OR WASTE
STOCKPILE AREAS SHALL HAVE PERIMETER SILT FENCE LOCATED NO CLOSER
THAN 6 FEET FROM TOE OF SLOPE TO ALLOW FOR ACCESS AND MAINTENANCE.
ANY SOILS TAKEN OFF SITE BECOME CONTRACTOR'S RESPONSIBILITY AND
DISPOSAL SHALL COMPLY WITH ALL REQUIRED STATE AND LOCAL REGULATIONS
AND PERMITS.
7. CONTRACTOR SHALL PROVIDE MEANS TO DEWATER THE SITE TO ENSURE WORK IS
PERFORMED IN DRY CONDITIONS. DISCHARGES FROM DEWATERING ACTIVITIES
SHALL BE CLEAN OF SEDIMENT AND TURBIDITY, AND SHALL BE DISCHARGED TO AN
ENVIRONMENTALLY ACCEPTABLE LOCATION IN A NON-EROSIVE MANNER THROUGH
AN APPROVED SEDIMENT FILTERING DEVICE IN COMPLIANCE WITH APPLICABLE
REGULATIONS. CONTRACTOR SHALL SUBMIT A DEWATERING PLAN DESIGNED,
SIGNED, AND SEALED BY A PROFESSIONAL ENGINEER REGISTERED IN THE STATE
OF NORTH CAROLINA.
8. ALL EROSION CONTROL MEASURES SHALL REMAIN IN PLACE UNTIL ENTIRE SITE IS
PERMANENTLY STABILIZED WITH VEGETATION AS PER SEEDING SPECIFICATIONS
AND SCHEDULE. ALL TEMPORARY EROSION CONTROL DEVICES ARE TO BE
REMOVED AFTER PERMANENT STABILIZATION HAS BEEN ACHIEVED. RESTORE
AREAS DISTURBED AFTER EROSION CONTROL DEVICE REMOVAL.
SURVEY LIMITS
LOD/TPF
CONCRETE
STABILIZED OUTLET FOR
SILT FENCE
LIMIT OF DISTURBANCE /
TREE PROTECTION FENCE
SS
UNDERGROUND TELEPHONEUGT
STAGING AREA
PERMANENT SOIL
REINFORCEMENT MATTING
2 6
1 23
2 5
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS SS SS
CITY OF HAVELOCK
DB 3809 PG 1397
MONUMENT
DISTURBED
W
W W W W W W
CATV
C
ATV
UG
T
UGT
UGT
UGT
UG
TASPHALT
ASPHALTASPHALT
ASPHALT
ISLANDASPHALT
ISLAND
ASPHALT
ISLAND
OHE
OHE
OHE
OHE
O H
E
OHE OHE OHE OHE OHE OHE
OHE
OHE
OHE
4L W
H=2 8'
1L W
H =2
4'
1L WH=14'
1L WH=24'
12"RCP
CB
TOP/CURB=14.52
INV IN=2.30
INV OUT=2.22
PIPE DIRECTION
(END NOT FOUND)
15"C M
P
18"R C
P
15"±UNK
15"±UNK
15"±UNK
12"±U N
K
4"PVC
CORAL
POST
POST
POST
POST
POST
POST
SSMH G244
RIM=11.76
INV IN=-1.52 (SE)
INV IN=0.44 (NW)
INV OUT=-1.34 (NE)
(STANDING WATER)
CONTROL POINT
MN
N: 418231.01' E:2627493.56'
EL=14.32'
100YR
100YR
0Y
R
100YR
100YR
100YR
100YR
100YR
100YR
100YR
100YR 100YR
100YR
100YR
100YR 100YR 100YR 100YR
100YR
100YR
100YR
100YR
100YR
100YR
FL
OODW
AY
FLOODWAY
FLOODWAY
FLOODWAY FLOODWAY FLOODW
AY
FLO
O
D W
AY
FLO
O
D W
AY
FLOODW
AY
FLOODWAY
FLOODWAY
FLOODWAY
FLOODWAY
FLOODWAY
FLO
O
D W
AY
FLOODW
AYFL
OO
DW
AY
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
A & N.C.S.R.
100' RAILROAD RIGHT-OF-W
AY
PC F PG 181C
SSMH G243
RIM=11.67
INV IN=-1.20 (S)
INV IN=6.59 (W) SERVICE
INV OUT=-1.20 (NW)
(STANDING WATER)
S
SS
SS
S
SS
SS
S
SS
SS
SS
SS
SS
SS
SS
SS
SS SS SS S
SSMH-6 (4'Ø)
RIM: 11.42
INV IN: -1.46 (18" PVC) (SE)
INV IN: -0.58 (10" PVC) (NW)
INV OUT: -1.49 (18" PVC) (NE)
SSMH-7 (4'Ø)
RIM: 13.34
INV IN: -0.99 (18" DIP) (S)
INV OUT: -1.01 (18" PVC) (NW)
SSMH-8
30' 30'
30'
30'
30' 30'
30' 30'
30'
30'
30' 30'
30' 30' 30'
30' 30'
30'
30' 30'
30' 30' 30'
30'
50'
50' 50'
50'
50'
50'
50' 50'
50'
50'
50' 50' 50' 50'
50' 50'
50'
50'
50' 50' 50' 50'
50'
50'
50'
W L
W L
W L
W L
WL
WL WL
W L
W L
WL
WL WL
WL WL
WL WL
24" RCP
(SEE NOTE 1)
LF
4" H
DP
E
LOD/TPF
LOD/TPF
LOD/TPF
LOD/TPF
LO
D/
TP
F
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LODLODLODLODLODLODLODLODLODLODLODLODLO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
SF SF SF SF SF SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
-0 +2
0+
1+
2+
MH-1 (4' DIA)
SEE NOTE 1
SEE NCDOT DETAIL 840.52
RIM: 11.87
INV IN: 2.07 (ASSUMED)
INV OUT: 7.00
EX CB-2
GRATE: 13.80
INV IN: 2.30
INV OUT: 2.22
-2
-2
0+00 1+00 2+00 2+60
APPROX 30 LF 24" RCP
(SEE NOTE 1)
143 LF 24" HDPE @ 0.70%
M H
-1 (4
' D
IA
SE
E N
O
TE
IN
V
IN
: 2
.0
(A
SS
U M
ED
IN
V
O U
T:
.0
(2 4"
H D
PE
SW
ST
A
1+
R
IM
: 1 1.
18" PVC SS
ABANDONED 15" SS
EX
C
B-
IN
V
IN
: 2
.3
(1 8"
R C
P) (N
E)
IN
V O
U T:
.2
(2
4" R
C P)
(S W
ST
A
1+
R
IM
: 1 3.
EXIST GRADE
79 LF 18" RCP @ -0.04%
EX
C
B-
IN
V
O U
T:
.2
(1 8"
R C
P) (S
W
ST
A
2+
R
IM
: 1 3.
PIPE OUTLET SLOPE PROTECTION,
SEE DETAIL 1/CD1
PROP GRADE
ST
A:
-0 +1
3.
EL
EV
: 2 .0
INV ELEV: 6.00
ELEVATE GRADE OVER PIPE TRENCH
WHERE NECESSARY TO MEET A
MINIMUM OF 2' COVER OVER
THE HDPE PIPE
WL WL WL
WL
WL
WL
LOD/TPF
LOD/TPF
LOD/TPF
LOD/TPF
LOD/TPF
LOD/TPF
LOD/TPF
LOD/TPF
LOD/TPF
LOD/TPF
LOD/TPF
LOD/TPF
LOD/TPFLOD/TPFLOD/TPFLOD/TPF
LO
D/
TP
F
LO
D/
TP
F
LO
D/
TP
F
LO
D/
TP
F
LO
D/
TP
F
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
T. GRAY
S. KANE
C1
CIVIL
STORM PLAN AND PROFILEB. PRICE
NOTES:
1. THE OUTFALL LOCATION OF THE EXISTING 24" RCP IS
BURIED AND HAS BEEN APPROXIMATED IN THIS
DRAWING. CONTRACTOR TO LOCATE PIPE END AND
CONNECT TO PROPOSED MH-1. CONTRACTOR SHALL
EXCAVATE AND DETERMINE ELEVATION OF EXISTING
PIPE PRIOR TO CONSTRUCTION OF MH-1.
2. THE EXISTING BURIED 24" PIPE OUTFALL ACTIVELY
DISCHARGES STORMWATER RUNOFF FROM HIGHWAY
70 DURING RAINFALL EVENTS. CONTRACTOR SHALL
PROVIDE MEANS TO DEWATER THE SITE TO ENSURE
WORK IS PERFORMED IN DRY CONDITIONS.
3. CONTRACTOR TO MINIMIZE THE REMOVAL OF AND
DAMAGE TO TREES, BRUSH AND VEGETATION
LOCATED WITHIN THE 30' AND 50' RIPARIAN BUFFER
TO THE MAXIMUM EXTENT PRACTICABLE. NO
ENCROACHMENT OR DISTURBANCE IS ALLOWED
WITHIN ANY DESIGNATED WETLAND AREA.
4. ELEVATION CONTOURS WERE GENERATED FROM NC
QL2 LIDAR.
5. FIELD VERIFY DEPTHS AND LOCATIONS OF ALL
EXISTING BURIED UTILITIES WITHIN AREAS OF
PROPOSED EXCAVATION AND TRENCHING.
6. GRADES, ELEVATIONS, LENGTHS, AND LOCATIONS
SHOWN ON DRAWINGS MAY BE ADJUSTED TO
ACCOMMODATE UNFORESEEN CONDITIONS ONLY AS
DIRECTED BY OWNER OR ENGINEER.
7. DRAINAGE STRUCTURES SHOWN FOR REFERENCE
ONLY AND MAY NOT REPRESENT ACTUAL SIZES,
CONFIGURATIONS, ORIENTATIONS, OR DIMENSIONS.
STRUCTURES SHALL BE IN ACCORDANCE WITH
OWNER, NCDOT, MANUFACTURER, AND
CONTRACTOR'S ENGINEER'S REQUIREMENTS.
8. DEVIATIONS FROM STANDARD STRUCTURES,
WHETHER SHOWN HEREIN OR AS DETERMINED BY
CONTRACTOR, SHALL BE DESIGNED AND SEALED BY A
PROFESSIONAL ENGINEER REGISTERED IN THE STATE
OF NORTH CAROLINA. THE SEALED DESIGN SHALL BE
SUBMITTED TO ENGINEER.
9. ADHERE TO MANUFACTURER'S INSTALLATION
GUIDELINES AND/OR SPECIFICATIONS FOR PRECAST
STRUCTURES. OWNER OR ENGINEER NOT
RESPONSIBLE FOR DAMAGE TO STRUCTURES
ASSOCIATED WITH DEVIATION FROM
MANUFACTURER'S INSTALLATION GUIDELINES AND/OR
SPECIFICATIONS.
10. MINIMUM 2-FT PIPE COVER SHALL BE PROVIDED OVER
THE TOP OF PROPOSED STORM DRAIN PIPES.
11. CONTRACTOR SHALL MAINTAIN CONNECTIVITY OF THE
EXISTING STORM DRAIN SYSTEM AS MUCH AS
PRACTICABLE DURING CONSTRUCTION. NEW PIPE
INSTALLATION SHALL FOLLOW REMOVAL OF EXISTING
PIPE. CONTRACTOR SHALL BE RESPONSIBLE FOR
CONTROL OF STORM SYSTEM FLOWS, INCLUDING USE
OF TEMPORARY BYPASS PUMPING TO ROUTE FLOWS
AROUND WORK AREA.
12. STORM DRAINAGE REPAIRS PERFORMED BY
CONTRACTOR DUE TO CONSTRUCTION DAMAGE, AND
TO JOINTS EXPOSED DURING CONSTRUCTION, SHALL
BE INSPECTED BY OWNER / ENGINEER PRIOR TO
BACKFILLING.
13. INSTALL ROLLED EROSION CONTROL MATTING TO
SLOPES GREATER THAN 2:1 IMMEDIATELY AFTER
SLOPE HAS BEEN PROPERLY GRADED, PREPARED,
FERTILIZED, AND SEEDED.
14. INSTALL PERMANENT SOIL REINFORCEMENT MATTING
AT DOWNSTREAM END OF PIPE OUTLET SLOPE
PROTECTION. PREPARE AND SEED DISTURBED AREAS
WITHIN RIPARIAN ZONE 1 (30' BUFFER) AND RIPARIAN
ZONE 2 (50' BUFFER) WITH SPECIALTY SEED MIX PER
SPECIFICATIONS.
15. RESTORE TOPOGRAPHIC GRADE WHERE DISTURBED.
FOR DISTURBED AREAS, PREPARE SOIL AND APPLY
PERMANENT SEEDING PER SPECIFICATIONS.
SCALE: 1" = 20'
PLAN
VERTICAL SCALE: 1" = 5'
5 5'
HORIZONTAL SCALE: 1" = 20'
20 10 20'
H: V: 1" = 5'1" = 20'
PROFILE
PL
O
T D
AT
E:
/1
2/
:2
S
KA
N E
Fi le
: O :\3
\3
-2
\C
AD
_B
IM
\C
IV
IL
\C
Sa ve d by
S
KA
N E
Sa ve d at e:
/1 4/
1:
A
M
ISSUED FOR BID
HAZEN AND SAWYER
4011 WESTCHASE BOULEVARD, SUITE 500
RALEIGH, NORTH CAROLINA 27607
LICENSE NO.: C-0381
HIGHWAY 70
STORMWATER PIPE REPAIR
CITY OF HAVELOCK
HAVELOCK, NORTH CAROLINA 30906-214
20250972
MAY 2025T. GRAY
IF THIS BAR DOES NOT
MEASURE 1" THEN DRAWING IS
NOT TO FULL SCALE
CHECKED BY:
DRAWN BY:
DESIGNED BY:
PROJECT
ENGINEER:
REV ISSUED FOR DATE BY
0 1"1/2"
CONTRACT NO.:
HAZEN NO.:
DATE:
DRAWING
NUMBER:
1 ISSUED FOR BID 05/2025 TMG
PROGRAM: C3D 2024 PLOT STYLE: HS-FWS.ctb
FLO
W
EAST PR
O
N G
SLO
C
U M
C R
EEK
50' BUFFER, TYP
30' BUFFER, TYP
STREAM EDGE, TYP
WETLAND EDGE, TYP
US HIGHWAY 70
SAW CUT, REMOVE AND
REPLACE PAVEMENT,
SEE DETAIL 2/CD1
APPROX LIMITS OF SURVEY, TYP
SILT FENCE, TYP
SEE DETAIL C-31-0400/CD1
TREE PROTECTION FENCE,
SEE DETAIL C-31-0404/CD1
SCALE: 1" = 5'
INSET
2'
2'
.5
2'
11'
STABILIZED OUTLET
FOR SILT FENCE, TYP
SEE DETAIL C-31-0433/CD1
SEE INSET THIS DWG
PIPE OUTLET SLOPE PROTECTION,
SEE DETAIL 1/CD1
TYPE 2 PERMANENT SOIL
REINFORCEMENT MATTING,
SEE DETAIL 1/CD1
CONTRACTOR
STAGING AREA
-0 +2
CD1
CIVIL
STANDARD DETAILSB. PRICE
PL
O
T D
AT
E:
/1
2/
:2
S
KA
N E
Fi le
: O :\3
\3
-2
\C
AD
_B
IM
\C
IV
IL
\C D
Sa ve d by S
KA
N
E Sa ve d at e:
/1
4/
0:
A M
ISSUED FOR BID
HAZEN AND SAWYER
4011 WESTCHASE BOULEVARD, SUITE 500
RALEIGH, NORTH CAROLINA 27607
LICENSE NO.: C-0381
HIGHWAY 70
STORMWATER PIPE REPAIR
CITY OF HAVELOCK
HAVELOCK, NORTH CAROLINA 30906-214
20250972
MAY 2025T. GRAY
IF THIS BAR DOES NOT
MEASURE 1" THEN DRAWING IS
NOT TO FULL SCALE
CHECKED BY:
DRAWN BY:
DESIGNED BY:
PROJECT
ENGINEER:
REV ISSUED FOR DATE BY
0 1"1/2"
CONTRACT NO.:
HAZEN NO.:
DATE:
DRAWING
NUMBER:
1 ISSUED FOR BID 05/2025 TMG
PROGRAM: C3D 2024 PLOT STYLE: HS-FWS.ctb
DETAIL 2
NTS
PAVEMENT REPAIR
CD1
DETAIL 1
NTS
PIPE OUTLET SLOPE PROTECTION
CD1
FRONT VIEWSIDE VIEW
WARNING SIGN DETAIL
DO NOT ENTER
TREE PROTECTION AREA
TREE PROTECTION AREA
DO NOT ENTER
NOTE: FOR TREE PROTECTION ONLY
NOTES:
1. WARNING SIGNS TO BE MADE OF DURABLE, WEATHERPROOF
MATERIAL.
2. LETTERS TO BE 3" HIGH MINIMUM, CLEARLY LEGIBLE, AND SPACED
AS DETAILED.
3. PLACE A SIGN AT EACH END OF LINEAR TREE PROTECTION AND 50'
ON CENTER THEREAFTER.
4. FOR TREE PROTECTION AREAS LESS THAN 200' IN PERIMETER,
PROVIDE NO LESS THAN ONE SIGN PER PROTECTION AREA.
5. ATTACH SIGNS SECURELY TO FENCE POSTS AND FABRIC.
6. MAINTAIN TREE PROTECTION FENCE THROUGHOUT DURATION OF
PROJECT.
C-31-0404
TREE PROTECTION FENCE
GRADE
2' -2
"3' -0
ORANGE, UV RESISTANT
HIGH-TENSILE STRENGTH
POLY-BARRICADE FABRIC, TYP
3' - 4"
4" 3"
4" 3"
4"
MIN 12 1/2 GAUGE
INTERMEDIATE
WIRES, TYP
PLASTIC OR
WIRE TIES
8'-0" MAX
VARIABLE AS DIRECTED BY THE ENGINEER
MIN 10 GAUGE
LINE WIRES
WARNING SIGN
WOVEN WIRE FABRIC
STEEL POST
C-31-0400
STEEL POST
3' -0
" M
IN
FI
LT
ER
F
AB
R
IC
3'
-0 " M
IN
GRADE LINE
BOTTOM STRAND
TOP STRAND
STAY WIRES
MIN
8"
M
IN
2' -0
M
IN8"
2' -2
" M
IN
8'-0" MAX
GALV WIRE FABRIC
AND SILT FENCE
MATERIAL. BURY TOE
OF MATERIAL FABRIC
A MIN OF 8"
ELEVATION
SILT FENCE
SECTION
SILT FENCE
1. EXTRA STRENGTH SILT FENCE MATERIAL (AS APPROVED BY
ENGINEER) WITH 6'-0" POST SPACING DOES NOT REQUIRE MESH
SUPPORT FENCE.
2. SILT FENCE MATERIAL SHALL BE WIRED DIRECTLY TO POST.
NOTE:
SILT FENCE
TYPE II FILTER
GEOTEXTILE
CLASS I RIPRAP
VARIES 2'
EX SLOPE
2' TYP
EX TOE OF SLOPE
EXISTING GROUND
TYPE 2 PERMANENT SOIL REINFORCEMENT MATTING
INSTALL FLUSH WITH NATURAL GROUND
PIPE OUTLET
1.5" MIN ASPHALT SURFACE COURSE
3" ASPHALT BASE COURSE
6" AGGREGATE BASE COURSE
CONCRETE PAVEMENT REPAIR ASPHALT PAVEMENT REPAIR
4" CONCRETE
6" AGGREGATE
BASE COURSE
24"
EXISTING CONCRETE EXISTING ASPHALT
2'-0"2'-0"OD2'-0"2'-0"
STEEL POST
3'-0" MAX
2' -0
M
IN
GRADE LINE
2' -0
" M
IN
#57 WASHED STONE
C-31-0433
1/2" MESH
HARDWARE CLOTH
ELEVATION
STONE FILTER
SECTION
STONE FILTER
STABILIZED OUTLET FOR SILT FENCE
MIN 1' TUCK
CD2
CIVIL
NCDOT DETAILSB. PRICE
PL
O
T D
AT
E:
/1
2/
:2
S
KA
N E
Fi le
: O :\3
\3
-2
\C
AD
_B
IM
\C
IV
IL
\C D
Sa ve d by S
KA
N
E Sa ve d at e:
/1
4/
0:
A M
ISSUED FOR BID
HAZEN AND SAWYER
4011 WESTCHASE BOULEVARD, SUITE 500
RALEIGH, NORTH CAROLINA 27607
LICENSE NO.: C-0381
HIGHWAY 70
STORMWATER PIPE REPAIR
CITY OF HAVELOCK
HAVELOCK, NORTH CAROLINA 30906-214
20250972
MAY 2025T. GRAY
IF THIS BAR DOES NOT
MEASURE 1" THEN DRAWING IS
NOT TO FULL SCALE
CHECKED BY:
DRAWN BY:
DESIGNED BY:
PROJECT
ENGINEER:
REV ISSUED FOR DATE BY
0 1"1/2"
CONTRACT NO.:
HAZEN NO.:
DATE:
DRAWING
NUMBER:
1 ISSUED FOR BID 05/2025 TMG
PROGRAM: C3D 2024 PLOT STYLE: HS-FWS.ctb
4'
4' 4'
MODIFIED
| Sheets and Views |
| G1 COVER SHEET |
| G2 GENERAL NOTES, LEGEND, AND ABBREVIATIONS |
| C1 STORM PLAN AND PROFILE |
| CD1 STANDARD DETAILS |
| CD2 NCDOT DETAILS |