This document is a set of specifications for the maintenance of the HVAC system for the Pennsylvania Department of Transportation (PennDOT) District 2-3. The work consists of servicing, maintaining, and/or repairing HVAC equipment located at PennDOT District 2-3 Stockpile 01 in Mill Hall, PA, and Interstate 80 Roadside Rest Sites 33 and 34. The contractor must be qualified to perform HVAC work and have at least 5 years of experience in the business. The contractor is required to make Fall and Spring maintenance visits, and respond to site call-outs during regular and premium hours. The bid price must include all travel expenses, labor, overhead, and profit.

The cost of materials, parts, or repair equipment shall be invoiced at the contractor's cost not to exceed 15% of the retail value. No material purchase in excess of $50.00 may be initiated at any one emergency call without written approval from the Equipment Manager. The Department reserves the right to supply materials to be installed by the Contractor when it is deemed to be in the best interest of the Commonwealth. All labor and materials used will be documented on Form OS-501 (Confirmation of Services Form), which will serve as the basis for payment.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Exhibit A Revised September 2012 Exhibit A Revised September 2012 Exhibit A Revised July 11, 2017

SPECIFICATIONS FOR

MAINTENANCE OF HVAC SYSTEM PENNDOT DISTRICT 2-3

Service Level Requirements Section One

DESCRIPTION

A. This work shall consist of servicing, maintaining, and/or repairing HVAC equipment located at PennDOT District 2-3 Stockpile 01, 1054 Ridge Road, Mill Hall, PA; and Interstate 80 Roadside Rest Site 33 (East Bound) and Site 34 (West Bound).

B. Contractor must visit the sites listed above before bidding to be familiar with the type of equipment to be maintained.

C. The HVAC contractor shall be qualified to perform HVAC work and shall have been actively involved in this business for a minimum of five (5) years. All work shall be performed in accordance with all federal, state, and local regulations.

D. The Contractor shall complete his proposed bid as follows:

1. Price for Fall Maintenance Visit. The Fall Maintenance Visit shall be made during the period of November I and 30.

2. Price for Spring Maintenance Visit. The Spring Maintenance Visit shall be made upon notification by the Equipment Manager.

3. Hourly Price for Site Call Out during regular hours (7:00 AM to 5:00 PM, Monday through Friday).

4. Hourly Price for Site Call Out during premium hours (5:00 PM to 7:00 AM, Monday through Friday, and weekends).

E. The bid price shall include all travel expenses, labor (not to exceed Labor and Industry standards), overhead and profit. Award will be based on the combination of the Fall Maintenance Visit cost, the Spring Maintenance Visit cost, Site Call Out during regular hours, and Site Call Out during premium hours. However, the Commonwealth does not guarantee that the Site Call Out during regular or premium hours will be utilized.

Contractor will be required to provide a copy of their Liability Insurance Certificate with PennDOT named on the Certificate during the life of this contract.

The cost of materials, parts, or repair equipment shall be F.O.B. the job site and invoiced at the contractor's cost not to exceed 15% of the retail value. No material purchase in excess of $50.00 may be initiated at any one emergency call without the written approval of the Equipment Manager. When material costs are above $50.00, the Department reserves the right to supply materials to be installed by the Contractor, when it is deemed to be in the best interest of the Commonwealth.

G. All labor and materials used will be documented on Form OS-501 (Confirmation of Services Form). The Contractor's representative, following completion of each work assignment, will sign this report. This report shall serve as basis for payment. Invoices will be submitted to the address shown on the purchase order. A courtesy copy of the invoice will also be submitted to the County Maintenance Office located at 1054 Ridge Road, Mill Hall, PA 17751.

II.SPECIFICATIONS
A.The following equipment shall be serviced during the Fall Maintenance Visit and during the Spring Maintenance Visit within 48 hours’ notification by the Equipment Manager:

Stockpile 01:

Air Handling Unit #1: Heating, Ventilating and Air Conditioning Condensing Unit; servicing the main office area.

Air Handling Unit #2: Heating, Ventilating and Air Conditioning Condensing Unit; servicing the main office conference room area.

Air Handling Unit #3: Heating, Ventilating and Air Conditioning Condensing Unit; servicing the lunch room, radio room, garage office and storeroom area.

Air Handling Unit #4: Heating, Ventilating and Air Conditioning Condensing Unit; servicing the Foreman office and lunch room in Staging Building.

Split System Air Conditioning Unit and Condenser: Servicing the Server/Data Room 125.

Heat Make Up Air Units #1: Servicing main Garage Area.

Heat Make Up Air Units #2: Servicing main Garage Area.

Heat Make Up Air Units #3: Servicing Wash Bay, Carpenter, Sign Rooms and Weld Shop.

Interstate 80 Roadside Rest Site 33 (East Bound) and Site 34 (West Bound):

AAON RQ Series Rooftop Units

B.Equipment shall have all air circulation filters cleaned (if washable) and/or replaced if disposable. Contractor will provide disposable filters within the terms of this contract and include within the bid price of the Fall Maintenance Visit and of the Spring Maintenance Visit.
C.Vendors shall thoroughly review and exercise the heating and cooling of the unit to test for proper operation. All condensing units and coils shall be degreased, washed, and rinsed during the visit. Any part replacement must be reported to the Equipment Manager with cost and time estimate for approval.

D. Contractor must respond within four (4) hour notice on the above listed equipment for Site Call Out Visits during the contract period. The unit requiring repair will be identified by the Equipment Manager or Purchasing Agent on site.

E. Vendor shall be responsible for supplying equipment necessary to access the heating and cooling units installed at a height of 12 feet or less. PennDOT will supply equipment necessary to access the heating and cooling units installed at a height greater than 12 feet.

III.SAFETY REQUIREMENTS
A.All work shall be performed in a safe and orderly manner with a minimum of interference to daily operations. The Contractor shall be aware of the latest Department of Environmental Protection safety regulations when entering confined areas. When working in such areas, all precautions shall be taken as required by these regulations.
IV.NON-COMPLIANCE
A.In the event that any materials furnished by the Contractor are found to be defective, unsuitable or otherwise unacceptable, the materials shall be removed by the Contractor and replaced with acceptable materials and installed anew to the satisfaction and approval of the Equipment Manager at the expense of the Contractor.

Service Level Requirements Section TWO

1. DESCRIPTION

A. This work shall consist of servicing, maintaining, and/or repairing HVAC equipment located at PennDOT District 2-3 Stockpile 01, 1054 Ridge Road, Mill Hall, PA; and Interstate 80 Roadside Rest Site 33 (East Bound) and Site 34 (West Bound).

B. Contractor must visit the sites listed above before bidding to be familiar with the type of equipment to be maintained.

C. The HVAC contractor shall be qualified to perform HVAC work and shall have been actively involved in this business for a minimum of five (5) years. All work shall be performed in accordance with all federal, state, and local regulations.

D. The cost of materials, parts, or repair equipment shall be F.O.B. the job site and invoiced at the contractor's cost not to exceed 15% Of the retail value. No material purchase in excess of $50.00 may be initiated at any one emergency call without the written approval of the Equipment Manager. When material costs are above $50.00, the Department reserves the right to supply materials to be installed by the Contractor, when it is deemed to be in the best interest of the Commonwealth.

E. All labor and materials used will be documented on Form OS-501 (Confirmation of Services Form). The Contractor's representative, following completion of each work assignment, will sign this report. This report shall serve as basis for payment. Invoices will be submitted to the address shown on the purchase order. A courtesy copy of the invoice will also be submitted to the County Maintenance Office located at 1054 Ridge Road, Mill Hall, PA 17751.

II.SPECIFICATIONS
A.The following equipment shall be serviced on an as needed basis and will be inclusive within this contract. Contractor must respond within 4 hours’ notice from Equipment Manager. Any part replacement must be reported to equipment manager with cost and time estimate for approval. Regular and Premium Hourly Bid pricing will be utilized for payment within this section.

Stockpile 01:

Domestic Gas Fired Hot Water Tanks: Room 126, Foreman Building Radiant heat Indirect Gas Fired Unit #1: Carpenter/Sign Shop Radiant Heat Indirect Gas Fired Unit #2: Weld Shop Radiant Heat Indirect Gas Fired Unit #3: Wash Bay Radiant Heat Indirect Gas Fired Unit #4: Main Garage Unit Heater #1: Electric Room Unit Heater #2: Oil Room Unit Heater #3: Brine Building Power Ventilator and Exhaust Fans #1 through #23: Located throughout site as noted on attached Drawings, HVAC200 thru HVAC203 Interstate 80 Roadside Rest Site 33 (East Bound) and Site 34 (West Bound:

Interior Electric Fan Coil Wall Heaters

B.Vendor shall be responsible for supplying equipment necessary to access the heating and cooling units installed at a height of 12 feet or less. PennDOT will supply equipment necessary to access the heating and cooling units installed at a height greater than 12 feet.
III .SAFETY REQUIREMENTS
A.All work shall be performed in a safe and orderly manner with a minimum of interference to daily operations. The Contractor shall be aware of the latest Department of Environmental Protection safety regulations when entering confined areas. When working in such areas, all precautions shall be taken as required by these regulations.
IV.NON-COMPLIANCE
A.In the event that any materials furnished by the Contractor are found to be defective, unsuitable or otherwise unacceptable, the materials shall be removed by the Contractor and replaced with acceptable materials and installed anew to the satisfaction and approval of the Equipment Manager at the expense of the Contractor.

image1.jpg image2.jpg

File details come from the government source that posted it. Updated .