This Scope of Work document for the Commonwealth of Massachusetts defines preventive maintenance services for HVAC equipment, including central HVAC systems, ductless mini-split units, and rooftop package units. The service agreement covers equipment maintenance to maintain peak operating condition, extend service life, minimize downtime, improve energy efficiency, and ensure compliance with manufacturer recommendations and applicable codes. All scheduled preventive maintenance visits shall be coordinated with the client at least five business days in advance and performed during normal business hours (Monday-Friday, 8:00 AM - 5:00 PM), with 24/7 emergency service availability. Technicians must hold current EPA 608 Universal Certification, with lead technicians requiring a minimum of five years of commercial HVAC experience. The maintenance schedule includes monthly filter inspections and replacements, quarterly indoor unit housing cleaning, semi-annual coil cleaning and refrigerant leak inspections, and annual comprehensive inspections of heat exchangers, safety controls, electrical connections, and system performance testing. All work shall comply with OSHA standards, NFPA 70 (NEC), ASHRAE guidelines, and local codes, with technicians required to follow lockout/tagout procedures and wear appropriate personal protective equipment at all times.

Labor for all scheduled preventive maintenance tasks is included in the contract price, along with standard replacement filters (MERV 8 or as specified), condensate drain treatment, belts, contact and coil cleaners, lubricants, and refrigerant leak detection solution. Items quoted separately with client approval include refrigerant (R-410A, R-22, R-32, R-454B, or other) billed per pound, specialty filters (MERV 13+), and replacement components such as capacitors, contactors, motors, compressors, or control boards. Upon completion of each PM visit, technicians shall provide a written service report documenting all tasks performed, equipment readings and measurements, materials and parts used, deficiencies observed, and recommended repairs or replacements, submitted electronically within 48 hours of service completion. The scope excludes ductwork cleaning or replacement, refrigerant system retrofits, electrical service upgrades, building automation system programming, roof repairs, plumbing work beyond condensate drain service, and equipment added to the site after contract execution without written amendment.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PREVENTIVE MAINTENANCE SCOPE OF WORK | HVAC, Mini-Splits & Rooftop Units

SCOPE OF WORK

Preventive Maintenance Services HVAC Systems | Mini-Split Units | Rooftop Package Units

SERVICE AGREEMENT DETAILS

Client / Facility:
___________________________________
Site Address:
___________________________________
Contract Number:
___________________________________
Effective Date:
___________________________________
Contract Term:
___________________________________
Service Provider:
___________________________________
Account Manager:
___________________________________
Emergency Contact:
___________________________________

1. PURPOSE & OVERVIEW

This Scope of Work (SOW) defines the preventive maintenance (PM) services to be performed on all HVAC equipment within the scope of the service agreement. The objective is to maintain equipment in peak operating condition, extend useful service life, minimize unplanned downtime, improve energy efficiency, and ensure compliance with manufacturer recommendations and applicable codes.

This document covers the following equipment categories:

1. Central HVAC Systems (air handlers, fan coil units, split systems)

1. Ductless Mini-Split Systems (single-zone and multi-zone)

1. Rooftop Package Units (heating, cooling, and heat-pump configurations)

2. GENERAL TERMS & CONDITIONS

2.1 Scheduling

All scheduled preventive maintenance visits shall be coordinated with the client at least five (5) business days in advance. PM visits will be performed during normal business hours (Monday–Friday, 8:00 AM – 5:00 PM) unless otherwise specified. Emergency service calls are available 24/7 per the terms of the service agreement.

2.2 Technician Qualifications

All technicians assigned to this contract shall hold current EPA 608 Universal Certification. Technicians performing work on refrigerant systems shall be qualified per applicable federal, state, and local regulations. Lead technicians shall have a minimum of five (5) years of commercial HVAC experience.

2.3 Safety & Compliance

1. All work shall be performed in accordance with OSHA standards, NFPA 70 (NEC), ASHRAE guidelines, and local codes.

1. Technicians will follow lockout/tagout (LOTO) procedures before servicing any electrical components.

1. Personal protective equipment (PPE) will be worn at all times while on site.

1. Refrigerant handling will comply with EPA Section 608 regulations. No venting of refrigerants is permitted.

2.4 Documentation & Reporting

Upon completion of each PM visit, the technician shall provide a written service report documenting: all tasks performed, equipment readings and measurements, materials and parts used, deficiencies observed, and recommended repairs or replacements. Reports will be submitted electronically within 48 hours of service completion.

3. CENTRAL HVAC SYSTEMS — PM CHECKLIST

The following tasks apply to central air handling units (AHUs), fan coil units (FCUs), split systems, and associated components.

3.1 Air Handling Unit / Indoor Coil

✓
Task
Frequency
Initials/Date
☐
Inspect and replace air filters (per MERV rating on record)
Monthly / Quarterly
___________
☐
Clean evaporator coil — inspect for fouling, mold, or corrosion
Semi-Annual
___________
☐
Inspect and clean condensate drain pan and drain lines; flush with biocide treatment
Semi-Annual
___________
☐
Check and tighten all electrical connections; inspect wiring for damage
Annual
___________
☐
Measure and record supply/return air temperatures (delta-T)
Each PM Visit
___________
☐
Lubricate blower motor bearings (where applicable)
Annual
___________
☐
Inspect blower wheel — clean if necessary; check belt tension and wear
Semi-Annual
___________
☐
Verify operation of all safety controls (high limit, freeze stat, smoke detector)
Annual
___________
☐
Inspect insulation on refrigerant suction line — repair if damaged
Annual
___________
☐
Check for unusual noises or vibration; investigate and document
Each PM Visit
___________

3.2 Condensing Unit / Outdoor Section

✓
Task
Frequency
Initials/Date
☐
Clean condenser coils — use approved coil cleaner; rinse thoroughly
Semi-Annual
___________
☐
Inspect condenser fan blades and motor; check amperage draw
Semi-Annual
___________
☐
Clear debris from around unit; ensure 24-inch minimum clearance
Each PM Visit
___________
☐
Check and record refrigerant pressures (suction and discharge)
Each PM Visit
___________
☐
Inspect refrigerant lines for leaks using electronic detector
Semi-Annual
___________
☐
Check compressor oil level (scroll compressors with sight glass)
Annual
___________
☐
Inspect contactor contacts for pitting or burning; replace if worn
Annual
___________
☐
Check capacitors (run and start) — test with capacitor meter
Annual
___________
☐
Verify crankcase heater operation (on applicable equipment)
Annual
___________
☐
Inspect electrical disconnect box and fuses/breakers
Annual
___________

3.3 Heating Components (Gas / Electric / Heat Pump)

✓
Task
Frequency
Initials/Date
☐
Inspect heat exchanger for cracks, corrosion, or deterioration
Annual
___________
☐
Clean and inspect burners; check flame pattern and color
Annual
___________
☐
Check ignition system — hot surface igniter, spark igniter, or pilot
Annual
___________
☐
Inspect and clean flue and vent system; verify proper draft
Annual
___________
☐
Check gas pressure at inlet and manifold; verify proper combustion
Annual
___________
☐
Test and verify operation of all safety limits and rollout switches
Annual
___________
☐
Check electric heating elements and sequencers for continuity
Annual
___________
☐
Measure and record temperature rise across heat exchanger
Annual
___________

3.4 Controls & Thermostat

✓
Task
Frequency
Initials/Date
☐
Test thermostat/BAS setpoints — heating, cooling, and fan modes
Each PM Visit
___________
☐
Check economizer damper operation and linkages
Semi-Annual
___________
☐
Verify demand-controlled ventilation (DCV) sensors if applicable
Annual
___________
☐
Inspect control wiring for loose connections or damage
Annual
___________
☐
Calibrate temperature and humidity sensors where applicable
Annual
___________

4. DUCTLESS MINI-SPLIT SYSTEMS — PM CHECKLIST

The following tasks apply to all ductless mini-split systems including single-zone and multi-zone configurations (indoor air handlers and outdoor compressor/condenser units).

4.1 Indoor Air Handler (Evaporator)

✓
Task
Frequency
Initials/Date
☐
Remove and clean washable air filters — use mild detergent; allow to dry fully
Monthly
___________
☐
Clean evaporator coil fins with appropriate coil cleaner and rinse
Semi-Annual
___________
☐
Clean indoor unit housing — exterior and interior panels
Quarterly
___________
☐
Clean and flush condensate drain tray and drain line; apply biocide
Semi-Annual
___________
☐
Check and clean blower wheel; inspect for mold or biofilm growth
Semi-Annual
___________
☐
Test louvers and swing vanes — verify full range of motion
Each PM Visit
___________
☐
Inspect refrigerant piping connections and insulation at wall penetration
Annual
___________
☐
Check for odors — treat with UV or antimicrobial spray as needed
Semi-Annual
___________
☐
Record supply air temperature and verify unit reaches setpoint
Each PM Visit
___________

4.2 Outdoor Condenser Unit

✓
Task
Frequency
Initials/Date
☐
Clean condenser coil with low-pressure water and coil cleaner
Semi-Annual
___________
☐
Inspect fan blade for cracks or imbalance; check motor amperage
Semi-Annual
___________
☐
Check and record refrigerant pressures — suction and discharge
Semi-Annual
___________
☐
Inspect all refrigerant line connections at unit for leaks
Semi-Annual
___________
☐
Check capacitors and contactors; replace if outside tolerance
Annual
___________
☐
Tighten all electrical connections in control and power panels
Annual
___________
☐
Verify unit mounting bracket is secure; check for rust or corrosion
Annual
___________
☐
Clear debris from unit base pan; check for standing water
Each PM Visit
___________

4.3 Multi-Zone Specific Items

✓
Task
Frequency
Initials/Date
☐
Verify refrigerant charge per manufacturer specs for total connected zones
Annual
___________
☐
Check communication wiring between indoor and outdoor units
Annual
___________
☐
Test simultaneous operation of all zones — verify no conflicts
Annual
___________
☐
Inspect branch selector boxes (VRF/multi-zone systems) if applicable
Annual
___________

5. ROOFTOP PACKAGE UNITS — PM CHECKLIST

The following tasks apply to single-package rooftop units (RTUs) including gas-electric, electric-electric, and heat pump configurations.

5.1 Rooftop Safety & Access

✓
Task
Frequency
Initials/Date
☐
Verify roof hatch, ladder, and walkway pad access is safe prior to work
Each PM Visit
___________
☐
Inspect unit curb and roof penetration for water intrusion or damage
Annual
___________
☐
Check unit leveling — verify condensate will drain properly
Annual
___________
☐
Inspect unit panels and cabinet — repair damaged or missing fasteners
Annual
___________

5.2 Cooling Section

✓
Task
Frequency
Initials/Date
☐
Inspect and replace supply air filters (1", 2", or 4" as applicable)
Monthly / Quarterly
___________
☐
Clean evaporator coil — inspect for frost, fouling, or microbial growth
Semi-Annual
___________
☐
Clean condenser coil — inspect for bent fins (straighten if needed)
Semi-Annual
___________
☐
Check and record refrigerant pressures — suction, discharge, subcooling, superheat
Each PM Visit
___________
☐
Inspect refrigerant circuits for leaks using electronic detector
Semi-Annual
___________
☐
Check condenser fan motors and blades — verify amperage within nameplate
Semi-Annual
___________
☐
Inspect compressors — check amperage draw; compare to nameplate RLA
Each PM Visit
___________
☐
Flush condensate drain pans and drain lines; apply Pan Treat tablets
Semi-Annual
___________
☐
Check and test all cooling safeties (high pressure, low pressure)
Annual
___________

5.3 Heating Section

✓
Task
Frequency
Initials/Date
☐
Inspect heat exchanger for cracks or deterioration — use camera if needed
Annual
___________
☐
Clean and inspect gas burners; check orifices and manifold
Annual
___________
☐
Test ignition system; verify proper light-off and flame verification
Annual
___________
☐
Check and clean flue; inspect flue discharge for obstructions
Annual
___________
☐
Measure inlet gas pressure and manifold pressure — record results
Annual
___________
☐
Verify operation of all heating safeties (high limit, rollout, draft)
Annual
___________
☐
Test electric heating elements (if applicable) — check element continuity
Annual
___________
☐
Measure temperature rise; verify within design range
Annual
___________

5.4 Supply Fan / Blower Section

✓
Task
Frequency
Initials/Date
☐
Inspect belt — check tension, alignment, and wear; adjust or replace
Semi-Annual
___________
☐
Lubricate fan shaft bearings (non-sealed bearings) with correct grease
Semi-Annual
___________
☐
Check blower wheel for debris buildup; clean if needed
Semi-Annual
___________
☐
Measure blower motor amperage; compare to nameplate FLA
Each PM Visit
___________
☐
Check motor mounting bolts and vibration isolators
Annual
___________
☐
Direct-drive units: check motor capacitor and inspect motor windings
Annual
___________

5.5 Controls & Economizer (RTU)

✓
Task
Frequency
Initials/Date
☐
Test economizer damper — full open, full closed, and modulating positions
Semi-Annual
___________
☐
Inspect economizer linkage and actuator; lubricate pivot points
Annual
___________
☐
Check outdoor air and return air temperature/CO2 sensors (DCV)
Annual
___________
☐
Test rooftop unit controller — cycle all stages of heating and cooling
Each PM Visit
___________
☐
Test all low-ambient lockouts and head pressure controls if present
Annual
___________
☐
Verify BAS/DDC integration and setpoint communication if applicable
Annual
___________

6. PERFORMANCE STANDARDS & MEASUREMENTS

At each PM visit, the technician shall record the following system performance data and compare to baseline values established at the start of the contract:

Measurement
Acceptable Range
Action if Out of Range
Supply/Return Delta-T (Cooling)
16°F – 22°F
Check charge, airflow, coil
Supply/Return Delta-T (Heating)
50°F – 80°F
Check heat exchanger, gas pressure
Refrigerant Subcooling
8°F – 14°F
Check charge, condenser, TXV
Refrigerant Superheat
8°F – 18°F
Check charge, TXV, evaporator
Compressor Amp Draw
Within 10% of nameplate RLA
Evaluate compressor health
Blower/Fan Amp Draw
Within nameplate FLA
Check motor, belt, static pressure
Gas Manifold Pressure
Per manufacturer spec (typical 3.5" W.C.)
Adjust regulator / contact gas co.

7. MATERIALS & REPLACEMENT PARTS

Labor for all scheduled PM tasks listed in this SOW is included in the contract price. The following materials are also included:

1. Standard replacement filters (MERV 8 or as specified on equipment schedule)

1. Condensate drain treatment tablets / biocide flush solution

1. Belts (standard replacements — single belt per blower per visit)

1. Contact cleaner, coil cleaner, lubricants, and refrigerant leak detection solution

1. Wire nuts, electrical tape, and minor fasteners

Items NOT included in the base contract price (quoted separately with client approval):

1. Refrigerant (R-410A, R-22, R-32, R-454B, or other) — billed per pound

1. Non-standard or MERV 13+ specialty filters

1. Replacement capacitors, contactors, motors, compressors, or control boards

1. UV lights, IAQ accessories, or air purification systems

1. Any repair work resulting from equipment damage, vandalism, or acts of God

8. RECOMMENDED MAINTENANCE SCHEDULE

Service Type
Monthly
Quarterly
Semi-Annual
Annual
Filter Inspection & Replacement
✓

Coil Cleaning (Evaporator)

Coil Cleaning (Condenser)

Condensate System Service

Refrigerant Pressure Check
✓

Refrigerant Leak Inspection

Electrical Connections Check

Capacitor & Contactor Test

Belt Inspection & Replacement

Bearing Lubrication

Heat Exchanger Inspection

Gas Pressure & Combustion Test

Safety Controls Test

Economizer Damper Service

Full System Performance Test

9. EXCLUSIONS

This Scope of Work does not include the following unless separately authorized in writing:

1. Ductwork cleaning, sealing, or replacement

1. Refrigerant system retrofits or conversions

1. Electrical service upgrades or panel work

1. Building automation system (BAS) programming or software upgrades

1. Roof repairs or structural work related to unit curbs

1. Plumbing repairs beyond condensate drain at the unit

1. Equipment that is beyond economic repair — replacement recommendation will be issued

1. Equipment added to the site after contract execution without a written amendment

10. CONTRACT ACCEPTANCE & SIGNATURES

By signing below, both parties agree to the terms and scope defined in this document.

SERVICE PROVIDER

Authorized Signature

Printed Name & Title

Date

CLIENT / FACILITY REPRESENTATIVE

Authorized Signature

Printed Name & Title

Date

CONFIDENTIAL — FOR INTERNAL USE Page 1

File details come from the government source that posted it. Updated .