Summary
This is a Bid Quote Sheet for preventive maintenance services on HVAC and refrigeration systems at Hutchings Psychiatric Center, a New York State Office of Mental Health (OMH) facility, under contract #OMH01-C202970-3650367. The contractor is required to provide comprehensive preventive maintenance services across multiple buildings (1, 2, 5, 6, 8, 10, 11, 12, 14, 15, 16, 17, and 1229 Glenwood Avenue) covering equipment including air handling units, rooftop units, heat pump systems, split system air conditioning, fans, pumps, heat exchangers, domestic water heaters, expansion tanks, refrigeration units, and ancillary controls. Maintenance frequencies range from annual to quarterly depending on equipment type. The contract has a five-year term with specific provisions addressing ongoing facility renovation projects that will remove existing equipment and install new units, with detailed notes on the timing of contractor responsibility for servicing. Bidders must provide unit costs for all listed preventive maintenance tasks, supplemental services that the facility may request, and time-and-material labor rates for repairs not covered under routine maintenance.
Pricing is submitted on a unit cost basis for each maintenance task across five contract years, with annual costs calculated by multiplying bid units by service frequency and unit cost. A material allowance of $30,000 is provided annually ($150,000 total over five years) with a fixed 10% markup on materials; this allowance covers both routine repairs and emergency services requiring on-site arrival within two hours. Bidders must also provide hourly rates for HVAC technician straight time, overtime, and training labor. The contract includes prevailing wage requirements, M/WBE/SDVOB participation provisions, and mandatory participation in the State Comptroller's Electronic Payment system. All unit costs are binding after bid opening, and only actual services performed may be invoiced. The bid sheet requires completion of all cost fields with no blank entries or the bid will be disqualified.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| C202970 - DRAFT Contract BP 11.18.26.pdf | ||
| C202970 - IFB doc 11.18.26.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
HVAC #C202970
| ATTACHMENT D - BID QUOTE SHEET: HUTCHINGS PSYCHIATRIC CENTER #OMH01-C202970-3650367 |
| Provide Preventive Maintenance Service for the HVAC & Refrigeration Systems and Ancillary Equipment per Appendix D of the Contract. The FACILITY reserves the right to alter the scheduling of the services as necessary. There is no reimbursement for travel time and/or travel expenses including mileage and fuel costs. |
Subcontractors Costing: The prices/rates quoted include all direct and indirect costs of any subcontractors, including those used to meet any stated M/WBE/SDVOB participation goals.
CONTRACT NOTES:
1 - The Facility has several projects in place to remove and replace existing equipment. The exact timeline dates of construction and completion are not available at the time of this contract development. The affected equipment to be removed, and the new equipment to be installed, are included and noted in the Appendix D, Exhibit C - Equipment List for reference. The Contractor will not be responsible for servicing the new equipment until project completion and OMH acceptance. The Contractor may not invoice for equipment once it is removed and for new equipment until project completion and OMH acceptance and once the preventive maintenance service begins.
2- The Facility will perform the Routine PM on some buildings equipment as noted in Appendix D, Exhibit C - Equipment List. The Contractor will provide a unit cost for the PM of the equipment in the event the Facility is no longer able to perform the PM tasks and requests the Contractor provide the PM service for the equipment.
| Directions: 1) Insert the Unit Cost in the Unit Cost ($) column for each preventive maintenance service task listed (unless blocked); 2) The Annual Cost for each Contract Year, which is equal to the Bid Unit x Service Frequency per Year x Unit Cost will be calculated automatically; 3) The Total Amount (Years 1 – 5) for each preventive maintenance service task listed, which is equal to the total sum of the Annual Costs for each Contract Year (1 through 5) will be calculated automatically; 4) The Subtotal Bid for Preventive Maintenance Tasks, which is equal to the sum of the Total Amount (Years 1 – 5) column will be calculated automatically. | |||||
| Failure to follow these directions exactly may result in your bid being disqualified. Please be advised that only actual services performed may be invoiced at the Unit Costs quoted as per Appendix C of the contract. The Unit Cost for each item must be completed for each item listed (unless blocked). Do not leave any areas blank or the bid may be disqualified. Bidders are bound by the Unit Costs provided and cannot be changed after the Bid Opening. | |||||
| Page 1: Preventive Maintenance Services for the HVAC & Refrigeration Systems and Ancillary Equipment | |||||
| Item / Building | Maintenance Task | Bid Unit | Service Freq. per Year | Year 1 | |
| Unit Cost ($) | Year 1 | ||||
| Annual Cost ($) | Year 2 | ||||
| Unit Cost ($) | Year 2 | ||||
| Annual Cost ($) | Year 3 | ||||
| Unit Cost ($) | Year 3 | ||||
| Annual Cost ($) | Year 4 | ||||
| Unit Cost ($) | Year 4 | ||||
| Annual Cost ($) | Year 5 | ||||
| Unit Cost ($) | Year 5 | ||||
| Annual Cost ($) | Total Amount |
(Years 1-5)
| Controls - Pneumatic Air Compressors & Ancillaries / Bldg. 5, 6, 10, 11, 12, 14, 15, 16 & 17 | Semi-Annual PM | 9 | 2 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| Air Handling Units (AHU) / Bldg. 1 & 8 | Quarterly PM | |||||||||||
| (No Pre-Filter Replacement) | 8 | 4 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| Quarterly PM | ||||||||||||
| (Pre-Filter Replacement Only) | 8 | 4 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| Annual PM | ||||||||||||
| (No Final Filter Replacement) | 8 | 1 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| Annual PM | ||||||||||||
| (Final Filter Replacement Only) | 8 | 1 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| Page 1: Subtotal Bid for Preventive Maintenance Tasks ($) | $0.00 | |||||||||||
| Page 2: Preventive Maintenance Services for the HVAC & Refrigeration Systems and Ancillary Equipment | ||||||||||||
| Please refer to the instructions above on Page 1 of the Bid Quote Sheet. The Unit Cost for each item must be completed for each item listed (unless blocked). Do not leave any areas blank or the bid may be disqualified. | ||||||||||||
| Item / Building | Maintenance Task | Bid Unit | Service Freq. per Year | Year 1 | ||||||||
| Unit Cost ($) | Year 1 | |||||||||||
| Annual Cost ($) | Year 2 | |||||||||||
| Unit Cost ($) | Year 2 | |||||||||||
| Annual Cost ($) | Year 3 | |||||||||||
| Unit Cost ($) | Year 3 | |||||||||||
| Annual Cost ($) | Year 4 | |||||||||||
| Unit Cost ($) | Year 4 | |||||||||||
| Annual Cost ($) | Year 5 | |||||||||||
| Unit Cost ($) | Year 5 | |||||||||||
| Annual Cost ($) | Total Amount |
(Years 1-5)
| Roof Top Units (RTU) | ||||||||||||
| (with Direct Expansion (DX) Cooling Coil) / Bldg. 10 | Quarterly PM | |||||||||||
| (No Pre-Filter or Mesh Filter Section Service) | 1 | 4 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| Quarterly PM | ||||||||||||
| (Single Final Filter Section Unit Replacement Only) | 1 | 4 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| Semi-Annual PM | ||||||||||||
| (Spring Seasonal) | 1 | 1 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| Semi-Annual PM | ||||||||||||
| (Fall Seasonal) | 1 | 1 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| Annual PM | ||||||||||||
| (No Final Filter Replacement) | 1 | 1 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| Heat Pump System (Compressor Unit, Coils & Air Handling Unit) / Bldg. 2 | Quarterly PM | |||||||||||
| (No Pre-Filter or Mesh Filter Section Service) | 26 | 4 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| Quarterly PM | ||||||||||||
| (Mesh Filter Section Service Only) | 26 | 4 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| Semi-Annual PM | 26 | 2 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| Annual PM | ||||||||||||
| (No Final Filter Replacement) | 26 | 1 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| Energy Recovery Ventilator / Bldg. 2 | Quarterly PM | 4 | 4 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| Semi-Annual PM | 4 | 2 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| Split System Air Conditioning System / Bldg. 1, 5, 6, 10, 11, 12, 14, 15, 16, 17 & 1229 Glenwood Avenue | Annual PM | 27 | 1 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| Portable Air Conditioning Unit / Bldg. 16 | Annual PM | 1 | 1 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| Variable Air Volume Box / Bldg.1 & 8 | One-Time PM Service | |||||||||||
| (Year 1) | 185 | 1 | $0.00 | $0.00 | ||||||||
| Reheat Coils / Bldg. 5, 6, 11, 12, 14, 15, 16 & 17 | One-Time PM Service | |||||||||||
| (Year 1) | 189 | 1 | $0.00 | $0.00 | ||||||||
| Cabinet Unit Heaters, Fan Coil Units, Unit Heaters / Bldg. 1, 2 & 8 | Semi-Annual PM | 27 | 2 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| Annual PM | 27 | 1 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| Page 2: Subtotal Bid for Preventive Maintenance Tasks ($) | $0.00 | |||||||||||
| Page 3: Preventive Maintenance Services for the HVAC & Refrigeration Systems and Ancillary Equipment | ||||||||||||
| Please refer to the instructions above on Page 1 of the Bid Quote Sheet. The Unit Cost for each item must be completed for each item listed (unless blocked). Do not leave any areas blank or the bid may be disqualified. | ||||||||||||
| Item / Building | Maintenance Task | Bid Unit | Service Freq. per Year | Year 1 | ||||||||
| Unit Cost ($) | Year 1 | |||||||||||
| Annual Cost ($) | Year 2 | |||||||||||
| Unit Cost ($) | Year 2 | |||||||||||
| Annual Cost ($) | Year 3 | |||||||||||
| Unit Cost ($) | Year 3 | |||||||||||
| Annual Cost ($) | Year 4 | |||||||||||
| Unit Cost ($) | Year 4 | |||||||||||
| Annual Cost ($) | Year 5 | |||||||||||
| Unit Cost ($) | Year 5 | |||||||||||
| Annual Cost ($) | Total Amount |
(Years 1-5)
| Variable Frequency Drives / Bldg. 1, 2, 8, 12, 14, 16 & 17 | Annual PM | 38 | 1 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| Fans, Belt-Driven & Direct-Driven / Bldg. 1, 2 & 8 | Semi-Annual PM | 40 | 2 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| Heat Exchangers / Bldg. 1 & 8 | Semi-Annual PM | 2 | 2 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| Shell & Tube - One-Time PM (Year 1) | 1 | 1 | $0.00 | $0.00 | ||||||||
| Plate & Frame - One-Time PM (Year 1) | 1 | 1 | $0.00 | $0.00 | ||||||||
| Domestic Water Heaters - Storage Tank / Bldg. 1 & 8 | Semi-Annual PM | 4 | 2 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| Domestic Water Heaters – Gas-Fired / Bldg. 1, 2, 8 & 1229 Glenwood Avenue | Semi-Annual PM | 7 | 2 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| Domestic Water Heaters (Electric) / Bldg. 6, 15, 16 & 17 | Semi-Annual PM | |||||||||||
| (AFTER PROJECTS TO INSTALL NEW EQUIPMENT) | 4 | 2 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| Pumps, Continuous Operation / Bldg. 1, 2 & 8 | Quarterly PM | |||||||||||
| 14 | 4 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| Pumps, Seasonal Operation / Bldg. 1, 2 & 8 | Semi-Annual PM | 14 | 2 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| Expansion Tanks / Bldg. 1, 2, 5, 6, 8, 10, 12, 15, 16 & 17 | Annual PM | |||||||||||
| (BEFORE PROJECTS TO REMOVE EQUIPMENT) | 21 | 1 | $0.00 | $0.00 | ||||||||
| Expansion Tanks / Bldg. 1, 2, 5, 6, 8, 10, 12, 15, 16 & 17 | Annual PM | |||||||||||
| (AFTER PROJECTS TO INSTALL NEW EQUIPMENT) | 19 | 1 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| Air Separators / Bldg. 1 & 8 | Annual PM | 2 | 1 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| Meter, Insertion, Flow, Hot Water / Bldg. 2 | Bi-Annual PM | |||||||||||
| (Once Every Two (2) Years in Year 2 & 4) | 4 | 1 | $0.00 | $0.00 | $0.00 | |||||||
| Meter, In-Line, Flow, Hot Water / Bldg. 2 | Annual PM | 1 | 1 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| Forced Hot Air Furnace / 1229 Glenwood Ave. | Annual PM | 1 | 1 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| Refrigeration Units and Freezer Units, Walk-In / Bldg. 10 | Semi-Annual PM | 1 | 2 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| Page 3: Subtotal Bid for Preventive Maintenance Tasks ($) | $0.00 | |||||||||||
| Page 4: Supplemental Preventive Maintenance Services for the HVAC & Refrigeration Systems and Ancillary Equipment | ||||||||||||
| Please refer to the instructions above on Page 1 of the Bid Quote Sheet. The Unit Cost for each item must be completed for each item listed (unless blocked). Do not leave any areas blank or the bid may be disqualified. | ||||||||||||
| The Facility will perform the Routine PM on the equipment as noted below and in Appendix D, Exhibit C - Equipment List. The Contractor will provide a unit cost for the PM of the equipment in the event the Facility is no longer able to perform the PM tasks and requests the Contractor provide the PM service for the equipment. | ||||||||||||
| Item / Building | Maintenance Task | Bid Unit | Service Freq. per Year | Year 1 | ||||||||
| Unit Cost ($) | Year 1 | |||||||||||
| Annual Cost ($) | Year 2 | |||||||||||
| Unit Cost ($) | Year 2 | |||||||||||
| Annual Cost ($) | Year 3 | |||||||||||
| Unit Cost ($) | Year 3 | |||||||||||
| Annual Cost ($) | Year 4 | |||||||||||
| Unit Cost ($) | Year 4 | |||||||||||
| Annual Cost ($) | Year 5 | |||||||||||
| Unit Cost ($) | Year 5 | |||||||||||
| Annual Cost ($) | Total Amount |
(Years 1-5) Air Handling Units (AHU) / Bldg. 5, 6, 10, 11, 12, 14, 15, 16 & 17
| (PRIOR TO PROJECTS - REMOVAL OF OLD UNITS) | Quarterly PM | |||
| (No Pre-Filter Replacement) | 17 | 4 | $0.00 | $0.00 |
| Quarterly PM | ||||
| (Pre-Filter Replacement Only) | 5 | 4 | $0.00 | $0.00 |
| Quarterly PM | ||||
| (Single Final Filter Section Unit Replacement Only) | 12 | 4 | $0.00 | $0.00 |
| Annual PM | ||||
| (No Final Filter Replacement) | 17 | 1 | $0.00 | $0.00 |
| Annual PM | ||||
| (Final Filter Replacement Only) | 5 | 1 | $0.00 | $0.00 |
| Air Handling Units (AHU) / Bldg. 5, 6, 10, 11, 12, 14, 15, 16 & 17 |
| (AFTER PROJECTS - NEW UNITS) | Quarterly PM | ||||||
| (No Pre-Filter Replacement) | 17 | 4 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Quarterly PM | |||||||
| (Pre-Filter Replacement Only) | 11 | 4 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Quarterly PM | |||||||
| (Single Final Filter Section Unit Replacement Only) | 6 | 4 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Annual PM | |||||||
| (No Final Filter Replacement) | 17 | 1 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Annual PM | |||||||
| (Final Filter Replacement Only) | 11 | 1 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Make-up Air Handling Unit / Bldg. 11 | Quarterly PM |
(No Pre-Filter Replacement)
| (Mesh Washable Filter) | 1 | 4 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| Annual PM | ||||||||||||
| (No Final Filter Replacement) | 1 | 1 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| Cabinet Unit Heaters, Unit Heaters / Bldg. 10, 11, 12, 14, 15, 16 & 17 | Semi-Annual PM | 46 | 2 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| Annual PM | 46 | 1 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| Fans, Belt-Driven & Direct-Driven / Bldg. 5, 6, 10, 11, 12, 14, 15, 16 & 17 | Semi-Annual PM | |||||||||||
| (BEFORE PROJECTS TO REMOVE EQUIPMENT) | 72 | 2 | $0.00 | $0.00 | ||||||||
| Fans, Belt-Driven & Direct-Driven / Bldg. 5, 6, 10, 11, 12, 14, 15, 16 & 17 | Semi-Annual PM | |||||||||||
| (AFTER PROJECTS TO INSTALL NEW EQUIPMENT) | 75 | 2 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| Page 4: Subtotal Bid for Supplemental Preventive Maintenance Tasks ($) | $0.00 | |||||||||||
| Page 5: Supplemental Preventive Maintenance Services for the HVAC & Refrigeration Systems and Ancillary Equipment | ||||||||||||
| Please refer to the instructions above on Page 1 of the Bid Quote Sheet. The Unit Cost for each item must be completed for each item listed (unless blocked). Do not leave any areas blank or the bid may be disqualified. | ||||||||||||
| The Facility will perform the Routine PM on the equipment as noted below and in Appendix D, Exhibit C - Equipment List. The Contractor will provide a unit cost for the PM of the equipment in the event the Facility is no longer able to perform the PM tasks and requests the Contractor provide the PM service for the equipment. | ||||||||||||
| Item / Building | Maintenance Task | Bid Unit | Service Freq. per Year | Year 1 | ||||||||
| Unit Cost ($) | Year 1 | |||||||||||
| Annual Cost ($) | Year 2 | |||||||||||
| Unit Cost ($) | Year 2 | |||||||||||
| Annual Cost ($) | Year 3 | |||||||||||
| Unit Cost ($) | Year 3 | |||||||||||
| Annual Cost ($) | Year 4 | |||||||||||
| Unit Cost ($) | Year 4 | |||||||||||
| Annual Cost ($) | Year 5 | |||||||||||
| Unit Cost ($) | Year 5 | |||||||||||
| Annual Cost ($) | Total Amount |
(Years 1-5)
| Heat Exchangers / Bldg. 5, 6, 11, 12, 14, 15, 16 & 17 | Semi-Annual PM | ||||||||||||||
| (BEFORE PROJECTS TO REMOVE EQUIPMENT) | 8 | 2 | $0.00 | $0.00 | |||||||||||
| Shell & Tube - One-Time PM (Year 1) | 8 | 1 | $0.00 | $0.00 | |||||||||||
| Heat Exchangers / Bldg. 5, 6, 11, 12 & 14 | Semi-Annual PM | ||||||||||||||
| (AFTER PROJECTS TO INSTALL NEW EQUIPMENT) | 5 | 2 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||||
| Domestic Water Heaters (Electric) / Bldg. 5, 6, 10, 11, 12, 14 & 16 | Semi-Annual PM | ||||||||||||||
| (BEFORE PROJECTS TO REMOVE EQUIPMENT) | 7 | 2 | $0.00 | $0.00 | |||||||||||
| Domestic Water Heaters (Electric) / Bldg. 5, 10, 11, 12 & 14 | Semi-Annual PM | ||||||||||||||
| (AFTER PROJECTS TO INSTALL NEW EQUIPMENT) | 6 | 2 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||||
| Pumps, Continuous Operation / Bldg. 5, 6, 10, 11, 12, 14, 15, 16 & 17 | Quarterly PM | ||||||||||||||
| (BEFORE PROJECTS TO REMOVE EQUIPMENT) | 27 | 4 | $0.00 | $0.00 | |||||||||||
| Pumps, Continuous Operation / Bldg.5, 6, 10, 11, 12, 14, 15, 16 & 17 | Quarterly PM | ||||||||||||||
| (AFTER PROJECTS TO INSTALL NEW EQUIPMENT) | 32 | 4 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||||
| Pumps, Seasonal Operation / Bldg. 5, 6, 10, 11, 12, 14, 15, 16 & 17 | Semi-Annual PM | ||||||||||||||
| (BEFORE PROJECTS TO REMOVE EQUIPMENT) | 33 | 2 | $0.00 | $0.00 | |||||||||||
| Pumps, Seasonal Operation / Bldg. 10, 11, 12 & 14 | Semi-Annual PM | ||||||||||||||
| (AFTER PROJECTS TO INSTALL NEW EQUIPMENT) | 18 | 2 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||||
| Air Separators / Bldg. 5, 6, 10, 12, 15, 16 & 17 | Annual PM | ||||||||||||||
| (BEFORE PROJECTS TO REMOVE EQUIPMENT) | 7 | 1 | $0.00 | $0.00 | |||||||||||
| Air Separators / Bldg. 5, 6, 10, 12, 15, 16 & 17 | Annual PM | ||||||||||||||
| (AFTER PROJECTS TO INSTALL NEW EQUIPMENT) | 8 | 1 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||||
| Page 5: Subtotal Bid for Supplemental Preventive Maintenance Tasks ($) | $0.00 | ||||||||||||||
| Page 6: Time and Material Rates | |||||||||||||||
| With respect to labor and material for repairs not covered under the routine maintenance (including emergency service), provide labor rate quote. If on-site emergency service is requested by the FACILITY, a CONTRACTOR Service Technician shall arrive on-site within two (2) hours of the FACILITY's request for an on-site CONTRACTOR Technician. Prior FACILITY approval is required for all repairs. Material markup will be fixed at 10%. Shipping costs are not to be included in the material markup. There is no reimbursement for travel time and/or travel expenses including mileage and fuel costs. | |||||||||||||||
| Straight Time is defined as an eight (8) hour day Monday thru Friday. Overtime includes all other times except hours/days indicated as Straight Time, i.e.: NY State Holidays, weekends, etc. | |||||||||||||||
| Directions: 1) Insert the Hourly Labor Rate in the Unit Cost ($) column for Straight Time, Overtime, and Training. Do not enter any pricing for the Material Allowance; 2) The Annual Cost for the Contract Year, which is equal to the Estimated Service Frequency per Year x Unit Cost is calculated automatically; 3) The Total Amount (Years 1 – 5) for Straight Time, Overtime, and Training for each Contract Year (1 through 5) is calculated automatically; 4) The Time & Material Allowance Subtotal which is equal to the sum of the Total Amount (Years 1 – 5) column (Total Material Allowance + Total Straight Time + Total Overtime + Total Training) is calculated automatically. | |||||||||||||||
| The Unit Cost for each item must be completed for each item listed (unless blocked). Do not leave any areas blank or the bid may be disqualified. Please be advised that only actual services performed may be invoiced at the Unit Costs quoted as per Appendix C of the contract. Bidders are bound by the Unit Costs provided and cannot be changed after the Bid Opening. | |||||||||||||||
| Item | Bid Unit | Est. Service Freq. Per Year | Year 1 | ||||||||||||
| Unit Cost ($) | Year 1 Annual Cost ($) | Year 2 | |||||||||||||
| Unit Cost ($) | Year 2 Annual Cost ($) | Year 3 | |||||||||||||
| Unit Cost ($) | Year 3 Annual Cost ($) | Year 4 Unit Cost ($) | Year 4 Annual Cost ($) | Year 5 | |||||||||||
| Unit Cost ($) | Year 5 Annual Cost ($) | Total Amount (Years 1-5) | |||||||||||||
| Material Allowance | LOT | 1 | $30,000.00 | $30,000.00 | $30,000.00 | $30,000.00 | $30,000.00 | $30,000.00 | $30,000.00 | $30,000.00 | $30,000.00 | $30,000.00 | $150,000.00 | ||
| HVAC Technician Straight Time | HRS. | 160 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| HVAC Technician Overtime | HRS. | 60 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| Training Rate | HRS. | 8 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| Page 6: Time and Material Allowance Subtotal ($) | $150,000.00 | ||||||||||||||
| Note: The material allowance and the number of straight time, overtime and training hours are estimated and are only used for purposes of determining the lowest responsible bidder and an estimated contract total cost. Payment will only be made on the actual number of hours for repairs and the cost of materials used. |
| Page 7: Bid Totals | |
| Directions: When finished, be sure to sign and date the bottom of the Bid Totals sheet. Only the signed original Bid Quote Sheet can be submitted with the proposal. | |
| Preventive Maintenance Task Sub-Total (Page 1) | $0.00 |
| Preventive Maintenance Task Sub-Total (Page 2) | $0.00 |
| Preventive Maintenance Task Sub-Total (Page 3) | $0.00 |
| Supplemental Preventive Maintenance Task Sub-Total (Page 4) | $0.00 |
| Supplemental Preventive Maintenance Task Sub-Total (Page 5) | $0.00 |
| Time and Material Allowance Sub-Total (Page 5) | $150,000.00 |
| TOTAL BID | $150,000.00 |
| When applicable, | |
| -The bidder’s signature below attests that they have reviewed the prevailing wage rates that apply to this solicitation. | |
| -The bidder’s signature below attests to the receipt and understanding of the questions & answers associated with this solicitation. | |
| -The bidder’s signature below attests that they will inform the OMH in writing of the name(s) of any individual(s) who will provide any service under the resulting contract who has not been off the New York State payroll for at a minimum of two years from the start date of the resulting contract. The bidder must notify the OMH of such individual(s) prior to the start of the contract or prior to that individual(s) providing any service in accordance with resulting contract. | |
| -The bidder’s signature below attests they have reviewed and understand the requirements stated in the IFB (section 17) and the OMH contract boilerplate (Appendix C) regarding the necessity to accept Electronic Payments for all invoices if awarded this contract, and certifies that it has already applied to participate in the State Comptroller’s Electronic Payment system, or will do so within 10 days of receiving notification of contract selection. | |
| -If award is to an individual: | |
| □ | The signature below attests that I have not been on the New York State payroll during the last two years. |
| OR | |
| □ | The signature below attests that I have been on the New York State payroll during the last two years and the N.Y. State Ethics Commission Approval Letter is attached. |
Name of Firm_______________________________________________________ Date _________________________
Authorized Representative (Print):_____________________________________ Authorized Signature________________________________________
&"Arial,Regular"ATTACHMENT D - BID QUOTE SHEET
HUTCHINGS PSYCHIATRIC CENTER #OMH01-C202970-3650367
File details come from the government source that posted it. Updated .