HUMPHREYS 2026 MTA Enclosure N3220526C1206 P00006.pdf

PDF 213 KB Posted

Attached to
USNS JOSHUA HUMPHREYS FY26 MTA
Solicitation number
N3220526C1206P00006
Issued by

About this file

This is an enclosure to a Justification and Authorization (J&A) document for federal contract procurement N10426C1206P00006 detailing emergent shipyard support work items required for vessel repairs.

The document identifies nine work items (CCOs - Change Control Orders) requiring shipyard support services to address American Bureau of Shipping (ABS) findings and critical system failures that must be corrected before vessel departure. These include: repairs for multiple ABS findings affecting scheduled departure and regulatory certifications (CCOs 055, 056, 058, and 067); correction of tank deck and weather deck no-sail discrepancies (CCO-072); replacement of a failing central fresh water pump mechanical seal critical to vessel operations (CCO-82); replacement of lifeboat davits (CCOs 090 and 101); expansion of temporary air conditioning to all manned spaces (CCO-100); and repair of a failed weld on the starboard 24-inch sea strainer to prevent main space flooding (CCO-102). The justification for limiting competition to the current contractor (Alabama Shipyard) cites the vessel's active overhaul status, the contractor's already-mobilized workforce, facilities, and material infrastructure. The document argues that awarding work to another contractor would necessitate duplicative mobilization and vessel access that is not feasible within the scheduled availability window, resulting in unacceptable schedule delays, increased costs, and degradation to fleet readiness. The work is necessary to maintain regulatory compliance, restore critical shipboard systems, and ensure safe return to operational service in support of fleet requirements.

View the file

Other files

File Type Posted
Modification N3220526C1206P00006 SF 30.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Enclosure to J&A No. N10426C1206P00006

WI Description

0113 CCO 055 SHIPYARD SUPPORT IS REQUIRED TO EFFECT REPAIRS REGARDING SEVERAL ABS FINDINGS

THAT UNLESS CORRECTED WILL PREVENT SHIP DEPARTING ON SCHEDULED DATE AND

ACHIEVING ANNUAL AND COI.

0113 CCO 056 SHIPYARD SUPPORT IS REQUIRED TO EFFECT REPAIRS REGARDING SEVERAL ABS FINDINGS

THAT UNLESS CORRECTED WILL PREVENT SHIP DEPARTING ON SCHEDULED DATE AND

ACHIEVING ANNUAL AND COI.

0113 CCO 058 SHIPYARD SUPPORT IS REQUIRED TO EFFECT REPAIRS REGARDING SEVERAL ABS FINDINGS

THAT UNLESS CORRECTED WILL PREVENT SHIP DEPARTING ON SCHEDULED DATE AND

ACHIEVING ANNUAL AND COI.

0192 CCO-067

SHIPYARD SUPPORT IS REQUIRED TO EFFECT REPAIRS REGARDING SEVERAL ABS FINDINGS

THAT UNLESS CORRECTED WILL PREVENT SHIP DEPARTING ON SCHEDULED DATE AND

ACHIEVING ANNUAL AND COI.

113 CCO-072 ABS DISCOVERED SEVERAL NO SAIL DISCREPANCIES ON THE TANK DECK AND WEATHER DECKS

REQUIRING CORRECTION PRIOR TO VESSEL DEPARTURE.

540 CCO-82

#2 CENTRAL FRESH WATER PUMP MECHANICAL SEAL IS FAILING. THE VESSEL ONLY HAS 2 OF

THESE CRITICAL MACHINES. MSC REDLINES DICTATE 2 OF 2 MUST BE OPERATIONAL.

0651 CCO 090

Ericsson Lifeboat davits were needed to be removed in order to replace the Humphreys lifeboat davits to possibly save time and money in contrast to performing repairs on

Humphreys lifeboat davits. This is in relation to CCO 022 which is an ABS hit on Humphreys lifeboat davit arms

011 CCO-100

WORK ITEM DID NOT CAPTURE ALL THE MANNED SPACES THAT REQUIRE TEMPORARY AC

0651 CCO-101 LIFE BOAT DAVITS REQUIRE NEW WIRE ROPE AND CHAIN ASSEMBLIES DUE TO SIGNIFICANT

DETERIORATION.

0914 CCO-102 STBD 24" SEA STRAINER HAS A FAILED WELD THAT MUST BE REPAIRED TO PREVENT MAIN

SPACE FLOODIING.Completion of the above emergent work items during the current availability is necessary to maintain regulatory compliance, restore critical shipboard systems, and ensure the vessel can safely return to operational service in support of fleet requirements. Due to the vessel being in overhaul with Alabama Shipyard, the contractor’s existing industrial workforce, facilities, and material support infrastructure are already mobilized to perform the required work. Awarding these efforts to another contractor would require duplicative mobilization and access to the vessel that is not feasible within the scheduled availability window. Accordingly, limiting the procurement to the current contractor is necessary to avoid unacceptable schedule delays, increased costs, and potential degradation to fleet readiness, thereby justifying use of the cited

File details come from the government source that posted it. Updated .