This document is a Statement of Work (SOW) for hull cleaning and zinc anode renewal for the USCGC FLORENCE FINCH, a United States Coast Guard cutter located in Astoria, Oregon. The solicitation (52000QR260001642) is a small business set-aside procurement for ship maintenance services, with a total small business size standard of 1,300 employees, to be awarded using simplified acquisition procedures and best value evaluation.
The specific work involves cleaning the vessel's underwater body, removing marine growth and debris, polishing propellers, and renewing government-furnished zinc anodes at specific locations including stern tube, sea chest grate, propeller, bow thruster, and gear case. The vessel will be available from January 13-16, 2026, with service coordination beginning December 8, 2025. The contractor must provide video documentation of underwater surfaces before and after cleaning, ensure no damage to existing coatings, and follow Coast Guard maintenance procedure cards and drawing specifications. Required components include various zinc anodes and mounting hardware with specific part numbers and estimated unit costs ranging from $1.81 to $618.85.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
U/W Body (Waterborne), Clean and Inspect, Renew Zinc Anodes
1. Scope
1.1 Intent. This work item describes the requirements for the Contractor to clean the vessel’s U/W body and to renew bolt-on zinc anodes, while the vessel is moored pier side.
1.2 Cutter, Address, Availability, and POC. USCGC FLORENCE FINCH, 1792 Marine Dr. Astoria, OR 97103.. Cutter Availability: 13-16 Jan, 2026. Cutter POC will coordinate service OOA 8 Dec 2025. MKC Matthew Schmader Phone #: (503) 490-8028, Matthew.J.Schmader@uscg.mil
1.3 Government-furnished property.
| MTI |
| ITEM DESCRIPTION |
| NSN/PN |
| QTY |
| ESTIMATED COST |
($/UNIT)
| N |
| Anode, stern tube |
| P/N: Z0020202H3 |
NIIN: 016445483
| 28 ea. |
| $11.15 |
| N |
| Nut, Self-Locking |
| P/N: 90715A145 |
NIIN: 015085774
2 Bx *24 in a bx $7.24
| N |
| Anode, Sea Chest Grate |
| P/N: GA-4 |
NIIN: 016476179
| 4 ea. |
| $21.93 |
| N |
| Screw, Prop zinc plate |
| P/N: 950756 |
NIIN: 016340210
| 8 ea. |
| $9.42 |
| N |
| Screw, Sea Chest Grate Anode, |
| P/N: 93190A634 |
NIIN: 016197182
| 4 ea. |
| $9.70 |
| N |
| Screw Cap, Stern Tube Covers |
| P/N: 90585A626 |
NIIN: 016161107
| 42 ea. |
| $1.81 |
| N |
| Zinc plate, propeller |
| P/N: 950733 |
NIIN: 016278941
| 2 ea. |
| $618.85 |
| N |
| Anode, Bow Thruster, Gear Case, Bolt On |
| P/N: 1081226 |
NIIN: 123561870
| 1 ea. |
| $64.97 |
| N |
| Anode, Bow Thruster, Tunnel, Bolt On |
| P/N: CM2000Z |
NIIN: 200126334
| 12 ea. |
| $29.46 |
2. REFERENCES
Coast Guard Drawings Coast Guard Drawing 154B WPC 111-301, Rev A, Shell Expansion Coast Guard Drawing 154B WPC 161-301, Rev -, Skegs and Stern Tubes Support Structures Coast Guard Drawing 154B WPC 562-201, Rev -, Rudder Details Coast Guard Drawing 154 WPC 565-201, Rev -, Fin Stabilizer System A & D Coast Guard Drawing 154B WPC 568-201, Rev B, Bow Thruster System A & D Coast Guard Drawing 154 WPC 997-302, Rev -, Docking Plan Coast Guard Publications Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2022, General Requirements Surface Forces Logistics Center Maintenance Procedure Card B10015.D (MPC B10015.D), 10/31/24, Insp/Cln U/W Equipment (Hull Plate) Surface Forces Logistics Center Maintenance Procedure Card B10018.D (MPC B10018.D), 5/31/23, Replace Underwater Zinc Anodes Other References None
3. REQUIREMENTS
3.1 General.
3.1.1 CIR.
None.
3.1.2 Tech Rep.
Not Applicable.
3.1.3 Protective measures. The Contractor must furnish and install all protective coverings to seal off and protect all non-affected vessel's components, equipment, and spaces near the work area against contamination during the performance of work. Upon completion of work, the Contractor must remove all installed protective measures, inspect for the presence of contamination, and return all contaminated equipment, components, and spaces to original condition of cleanliness.
3.1.4 Interferences. The Contractor must handle all interferences in accordance with SFLC Std Spec 0000, paragraph 3.3.5 (Interferences).
3.2 Requirements. The Contractor must:
3.2.1 Video recording. Submit video highlights of underwater body surfaces (e.g. bow thruster, propellers, rudders, transducers, heavily fouled hull areas, etc.) before and after cleaning.
3.2.2 Clean/inspect. Clean the U/W body surfaces free of all marine growth, debris, and all other surface contaminants in accordance with MPC B10015.D. Remove and replace sea chest grating if necessary to access/clean sea chest suction. Ensure all transducer surfaces are cleaned with only hand held brushes, without the use of power attachments. Ensure that existing u/w body coating system or non-coated surfaces do not incur any damage during cleaning process. Polish propellers. Refer to Coast Guard drawings listed in Section 2.
3.2.3 Renew anodes. Renew Government-furnished components listed below paragraph 1.2. in accordance with MPC B10018.D.