HUD_-_Davis_Bacon_4812-_contractors_guide.pdf

PDF 4 MB Posted

Attached to
Professional Architectural Services - 2nd Posting
Solicitation number
PD 25-26.002-1
Issued by
Escambia County, Florida

About this file

This file is the HUD Davis-Bacon Labor Standards Contractor's Guide, prepared by the U.S. Department of Housing and Urban Development's Office of Labor Relations in January 2012, designed to assist contractors performing work on HUD-assisted construction projects subject to Davis-Bacon prevailing wage requirements. The guide provides comprehensive instructions on compliance with federal labor standards laws, including the Davis-Bacon Act, Contract Work Hours and Safety Standards Act, Copeland Act, and Fair Labor Standards Act. The document outlines contractor responsibilities regarding prevailing wage payment, certified payroll reporting, work classifications, fringe benefits, and overtime compensation. Contractors must submit weekly certified payroll reports using DOL Form WH-347 beginning with the first week of work and continuing through project completion, with all payroll records retained for a minimum of three years after project completion. The guide emphasizes that prime contractors hold full responsibility for compliance of all subcontractors and lower-tier subcontractors, and that the Davis-Bacon wage decision applicable to each project locks in upon contract award or construction commencement with no future modifications permitted to that specific project.

The guide details wage determination procedures, including provisions for additional trade classifications and wage rates, which must be requested in writing through the contract administrator and approved by the Department of Labor. Prevailing wage rates include both basic hourly rates and fringe benefits where applicable, with employers permitted to satisfy fringe benefit obligations through approved benefit programs or direct payment to employees. Underpayments of wages trigger mandatory restitution requirements, with employers allowed 30 days to correct violations; failure to comply may result in withholding of contract payments, establishment of escrow or deposit accounts, and administrative sanctions including Department of Labor debarment for up to three years or HUD Limited Denial of Participation status. The guide identifies that falsification of certified payroll reports constitutes a federal crime subject to civil and criminal prosecution with penalties up to $1,000 and one year imprisonment per false statement, and that contract administrators conduct on-site worker interviews and payroll reviews to ensure compliance with all applicable federal labor standards.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

January 2012 Previous versions obsolete

U.S. Department of Housing and Urban Development

Labor Relations Desk Guide

LR01.DG

DAVIS-BACON

LABOR STANDARDS

A Contractor’s Guide to Prevailing Wage Requirements for Federally-Assisted Construction Projects i

INTRODUCTION

This Guide has been prepared for you as a contractor performing work on construction projects that are assisted by the Department of Housing and Urban Development and subject to Davis- Bacon prevailing wage requirements. This Guide does not address contractor requirements involved in direct Federal contracting where HUD or another Federal agency enters into a procurement contract. In this latter case, the Federal Acquisition Regulations (FAR) are appli-cable. While the guidance contained in this Guide is generally applicable to any Davis-Bacon covered project, specific questions pertaining to direct Federal contracts should be addressed to the Contracting Officer who signed the contract for the Federal agency.

Our objective here is to provide you with a guide which is simple and non-bureaucratic yet comprehensive and which will help you better understand and comply with Davis-Bacon labor standards. HUD’s Office of Labor Relations worked closely with the Department of Labor’s Wage and Hour Division to make sure that the labor standards provisions in your contract and the specifics of complying with them represent the latest information. It is the Department of Labor which has general administrative oversight of all Federal contracting agencies, such as HUD, which administer the day-to-day responsibilities of enforcing Davis-Bacon provisions in construction contracts they either fund or assist in funding.

There are three chapters in this Guide. The first chapter offers a brief description of the laws and regulations associated with Federal labor standards administration and enforcement and discusses both what’s in your contract that requires Davis-Bacon compliance and your respon-sibilities. The second chapter deals with labor standards and payroll reporting requirements.

The third chapter discusses what can happen in the event there is a dispute about the wage rates that should be (or have been) paid and any back wages that may be due.

Finally, not all HUD construction projects are covered by Davis-Bacon wage rates. For the pur-pose of this Guide, we are assuming that a determination has already been made that Davis- Bacon wage rates are applicable. Should you wish assistance in determining whether Davis- Bacon wage rates apply to a particular project or if you need other related technical assistance, please consult with the HUD Labor Relations Field staff for your area. If you don’t know which staff to contact, a list of Labor Relations field offices and their geographic areas and telephone numbers can be found on HUD’s Home Page at the address below.

Visit the Office of Labor Relations on-line:

http://www.hud.gov/offices/olr

Obtain additional copies of this Guide and other publications at our website or by telephone from HUD’s Customer Service Center at (800)767-7468.

iii

TABLE OF CONTENTS

INTRODUCTION................................................................................................................. i

CHAPTER 1LAWS, REGULATIONS, CONTRACTS
AND RESPONSIBILITIES..................................................................1-1
1-1DAVIS-BACON AND OTHER LABOR LAWS.........................................................1-1
a.The Davis-Bacon Act (DBA)................................................................................1-1
b.The Contract Work Hours and Safety Standards Act (CWHSSA).......................1-1
c.The Copeland Act (Anti-Kickback Act)................................................................1-2
d.The Fair Labor Standards Act (FLSA).................................................................1-2
1-2DAVIS-BACON REGULATIONS..............................................................................1-2
1-3CONSTRUCTION CONTRACT PROVISIONS........................................................1-2
1-4RESPONSIBILITY OF THE PRINCIPAL CONTRACTOR.......................................1-3
1-5RESPONSIBILITY OF THE CONTRACT ADMINISTRATOR..................................1-4
CHAPTER 2HOW TO COMPLY WITH LABOR STANDARDS
AND PAYROLL REPORTING REQUIREMENTS..............................2-1

SECTION - I THE BASICS

2-1THE WAGE DECISION............................................................................................2-1
a.The work classifications and wage rates.............................................................2-1
b.Posting the wage decision..................................................................................2-2
2-2ADDITIONAL “TRADE” CLASSIFICATIONS AND WAGE RATES........................2-2
a.Additional classification rules..............................................................................2-2
b.Making the request..............................................................................................2-3
c.HUD review.........................................................................................................2-3
d.DOL decision.......................................................................................................2-3
2-3CERTIFIED PAYROLL REPORTS...........................................................................2-4
a.Payroll formats....................................................................................................2-4
b.Payroll certifications............................................................................................2-4
c.“No work” payrolls...............................................................................................2-4
d.Payroll review and submission............................................................................2-5
e.Payroll retention..................................................................................................2-5
f.Payroll inspection................................................................................................2-5
2-4DAVIS-BACON DEFINITIONS.................................................................................2-5
a.Laborer or mechanic...........................................................................................2-5
b.Employee............................................................................................................2-6
c.Apprentices and trainees....................................................................................2-6
d.Prevailing wages or wage rates..........................................................................2-7
e.Fringe benefits....................................................................................................2-7
f.Overtime..............................................................................................................2-7
g.Deductions..........................................................................................................2-8
h.Proper designation of trade.................................................................................2-8
i.Site of work.........................................................................................................2-8

iv

SECTION - II REPORTING REQUIREMENT

2-5COMPLETING A PAYROLL REPORT.....................................................................2-9
a.Project and contractor/subcontractor information...............................................2-9
b.Employee information.........................................................................................2-9
c.Work classification...............................................................................................2-9
d.Hours worked......................................................................................................2-10
e.Rate of pay..........................................................................................................2-10
f.Gross wages earned...........................................................................................2-10
g.Deductions..........................................................................................................2-11
h.Net pay................................................................................................................2-11
i.Statement of compliance.....................................................................................2-11
j.Signature.............................................................................................................2-11

SECTION III - PAYROLL REVIEWS AND CORRECTIONS

2-6COMPLIANCE REVIEWS........................................................................................2-12
a.On-site interviews................................................................................................2-12
b.Project payroll reviews........................................................................................2-12
2-7TYPICAL PAYROLL ERRORS AND REQUIRED CORRECTIONS........................2-12
a.Inadequate payroll information............................................................................2-12
b.Missing identification numbers............................................................................2-12
c.Incomplete payrolls.............................................................................................2-13
d.Classifications.....................................................................................................2-13
e.Wage Rates.........................................................................................................2-13
f.Apprentices and trainees....................................................................................2-13
g.Overtime..............................................................................................................2-13
h.Computations......................................................................................................2-13
i.Deductions..........................................................................................................2-13
j.Fringe benefits....................................................................................................2-14
k.Signature.............................................................................................................2-14
l.On-site interview comparisons............................................................................2-14
m.Correction certified payroll..................................................................................2-14
2-8RESTITUTION FOR UNDERPAYMENT OF WAGES..............................................2-14
a.Notification..........................................................................................................2-14
b.Computing wage restitution.................................................................................2-15
c.Correction certified payrolls.................................................................................2-15
d.Review of correction CPR...................................................................................2-15
e.Unfound workers.................................................................................................2-15

v

CHAPTER 3LABOR STANDARDS DISPUTES, ADMINISTRATIVE
REVIEWS, WITHHOLDING, DEPOSITS AND ESCROW
ACCOUNTS, AND SANCTIONS........................................................3-1
3-1INTRODUCTION......................................................................................................3-1
3-2ADMINISTRATIVE REVIEW ON LABOR STANDARDS DISPUTES......................3-1
a.Additional classifications and wage rates............................................................3-1
b.Findings of underpayment...................................................................................3-2
3-3WITHHOLDING........................................................................................................3-2
3-4DEPOSITS AND ESCROWS...................................................................................3-3
3-5ADMINISTRATIVE SANCTIONS.............................................................................3-4
a.DOL debarment...................................................................................................3-4
b.HUD sanctions....................................................................................................3-4
3-6FALSIFICATION OF CERTIFIED PAYROLL REPORTS.........................................3-5

APPENDICIES

ACRONYMS AND SYMBOLS............................................................................................A-1 DAVIS-BACON - RELATED WEB SITES*.........................................................................A-2 HUD-4720, Project Wage Rate Sheet...............................................................................A-3 WH-347, Payroll Form/Statement of Compliance...........................................................A-4

1-1

CHAPTER 1LAWS, REGULATIONS, CONTRACTS
AND RESPONSIBILITIES

The following paragraphs describe what the labor standards laws and regulations actually say and what they mean to you on HUD projects:

1-1 DAVIS-BACON AND OTHER LABOR LAWS.

a. The Davis-Bacon Act (DBA). The Davis-Bacon Act requires the payment of prevailing wage rates (which are determined by the U.S. Department of Labor) to all laborers and mechanics on Federal government and District of Columbia construction projects in excess of $2,000. Construction includes alteration and/or repair, including painting and decorating, of public buildings or public works.

b. The Contract Work Hours and Safety Standards Act (CWHSSA). CWHSSA requires time and one-half pay for overtime (O/T) hours (over 40 in any workweek) worked on the covered project. The CWHSSA applies to both direct Federal contracts and to indirect Federally-assisted contracts except where the assistance is solely in the nature of a loan guarantee or insurance. CWHSSA violations carry a liquidated damages penalty ($10/day per violation). Intentional violations of CWHSSA standards can be considered for Federal criminal prosecution.

CWHSSA does not apply to prime contracts of $100,000 or less. In addition, some HUD projects are not covered by CWHSSA because some HUD programs only provide loan guarantees or insurance. CWHSSA also does not apply to construction or rehabilitation contracts that are not subject to Federal prevailing wage rates (e.g., Davis-Bacon wage rates, or HUD-determined rates for operation of public housing and Indian block grant-assisted housing). However, even though CWHSSA overtime pay is not required, Fair Labor Standards Act (FLSA) overtime pay is probably still applicable. (See also Labor Relations Letter SL-95-01, CWHSSA Coverage threshold for overtime and health and safety provision, available on-line at the HUD Labor Relations Library at: www.hud.gov/ offices/olr/library.cfm)

Most HUD construction work is not covered by the DBA itself since HUD seldom contracts directly for construction services. Most often, if Davis-Bacon wage rates apply to a HUD project it is because of a labor provision contained in one of HUD’s “Related Acts” such as the U. S. Housing Act of 1937, the National Housing Act, the Housing and Community Development Act of 1974, the National Affordable Housing Act of 1990, and the Native American Housing Assistance and Self-Determination Act of 1996. The Related Acts are often referred to as the Davis-Bacon and Related Acts or DBRA.

1-2

c. The Copeland Act (Anti-Kickback Act). The Copeland Act makes it a Federal crime for anyone to require any laborer or mechanic (employed on a Federal or Federally-assisted project) to kickback (i.e., give up or pay back) any part of their wages. The Copeland Act requires every employer (contractors and subcontractors) to submit weekly certified payroll reports (CPRs) and regulates permissible payroll deductions.

d. The Fair Labor Standards Act (FLSA). The FLSA contains Federal minimum wage rates, overtime (O/T), and child labor requirements. These requirements generally apply to any labor performed. The DOL has the authority to administer and enforce FLSA.

HUD will refer to the DOL any possible FLSA violations that are found on HUD projects.

1-2 DAVIS-BACON REGULATIONS.

The Department of Labor (DOL) has published rules and instructions concerning Davis-Bacon and other labor laws in the Code of Federal Regulations (CFR). These regulations can be found in Title 29 CFR Parts 1, 3, 5, 6 and 7. Part 1 explains how the DOL establishes and publishes DBA wage determinations (aka wage decisions) and provides instructions on how to use the determinations. Part 3 describes Copeland Act requirements for payroll deductions and the submission of weekly certified payroll reports.

Part 5 covers the labor standards provisions that are in your contract relating to Davis- Bacon Act wage rates and the responsibilities of contractors and contracting agencies to administer and enforce the provisions. Part 6 provides for administrative proceedings enforcing Federal labor standards on construction and service contracts. Last, Part 7 sets parameters for practice before the Administrative Review Board. These regulations are used as the basis for administering and enforcing the laws.

1-3 CONSTRUCTION CONTRACT PROVISIONS

Each contract subject to Davis-Bacon labor standards requirements must contain labor standards clauses and a Davis-Bacon wage decision. These documents are normally bound into the contract specifications.

a. The labor standards clauses. The labor standards clauses describe the responsibilities of the contractor concerning Davis-Bacon wages and obligate the contractor to comply with the labor requirements. The labor standards clauses also provide for remedies in the event of violations, including withholding from payments due to the contractor to ensure the payment of wages or liquidated damages which may be found due. These contract clauses enable the contract administrator to enforce the Federal labor standards applicable to the project. HUD has standard forms that contain contract clauses. For example, the HUD-2554, Supplementary Conditions to the Contract for Construction, which is issued primarily for FHA multifamily housing and other construction projects

DOL Regulations are available on-line on the World Wide Web:

http://www.dol.gov/dol/allcfr/Title_29.htm

1-3 administered by HUD; the HUD-4010, Federal Labor Standards Provisions, which is used for CDBG and HOME projects, and the HUD-5370, General Conditions of the Contract for Construction or the HUD-5370-EZ (construction contracts ≤$100,000) which are used for Public and Indian Housing projects.

b. Davis-Bacon Wage Decisions. The Davis-Bacon wage decision (or wage determination) is a listing of various construction work classifications, such as Carpenter, Electrician, Plumber and Laborer, and the minimum wage rates (and fringe benefits, where prevailing) that people performing work in those classifications must be paid.

Davis-Bacon wage decisions are established by the DOL for various types of construction (e.g., residential, heavy, highway) and apply to specific geographic areas, usually a county or group of counties. Wage decisions are modified from time to time to keep them current. In most cases, when the contract is awarded or when construction begins, the wage decision is “locked-in” and no future modifications are applicable to the contract or project involved.

1-4 RESPONSIBILITY OF THE PRINCIPAL CONTRACTOR

The principal contractor (also referred to as the prime or general contractor) is responsible for the full compliance of all employers (the contractor, subcontractors and any lower-tier subcontractors) with the labor standards provisions applicable to the project. Because of the contractual relationship between a prime contractor and his/her subcontractors, subcontractors generally should communicate with the contract administrator only through the prime contractor. (See Contract Administrator, below.)

To make this Guide easier to understand, the term “prime contractor” will mean the principal contractor; “subcontractor” will mean all subcontractors including lower-tier subcontractors; and the term “employer” will mean all contractors as a group, including the prime contractor and any subcontractors and lower-tier subcontractors.

HUD program labor standards forms are available on-line at:

www.hud.gov/offices/adm/hudclips/index.cfm

All current Davis-Bacon wage decisions can be accessed on-line at no cost at:

http://www.wdol.gov

1-4

1-5 RESPONSIBILITY OF THE CONTRACT ADMINISTRATOR.

The contract administrator is responsible for the proper administration and enforcement of the Federal labor standards provisions on contracts covered by Davis-Bacon requirements. We use this term to represent the person (or persons) who will provide labor standards advice and support to you and other project principals (e.g., the owner, sponsor, architect), including providing the proper Davis-Bacon wage decision (see 2-1, The Wage Decision) and ensuring that the wage decision and contract clauses are incorporated into the contract for construction. The contract administrator also monitors labor standards compliance (see 2-6, Compliance Reviews) by conducting interviews with construction workers at the job site and reviewing payroll reports, and oversees any enforcement actions that may be required.

The contract administrator could be an employee or agent of HUD, or of a city or county or public housing agency. For HUD projects administered directly by HUD staff, usually FHA-insured multifamily projects, the contract administrator will be the HUD Labor Relations field staff. But many HUD-assisted projects are administered by local contracting agencies such as Public Housing Agencies (PHAs), Indian tribes and tribally-designated housing entities (TDHEs), and States, cities and counties under HUD’s Community Development Block Grant (CDBG) and HOME programs. In these cases, the contract administrator will likely be local agency staff. In either case, the guidance for you remains essentially the same.

The DOL also has a role in monitoring Davis-Bacon administration and enforcement. In addition, DOL has independent authority to conduct investigations. A DOL investigator or other DOL representative may visit Davis-Bacon construction sites to interview construction workers or review payroll information.

2-1

CHAPTER 2HOW TO COMPLY WITH LABOR STANDARDS
AND PAYROLL REPORTING REQUIREMENTS
WHERE TO START?Now that you know you’re on a Davis-Bacon project and you know
some of the legal and practical implications, what’s next?

SECTION I - THE BASICS

2-1 THE WAGE DECISION.

Davis-Bacon labor standards stipulate the wage payment requirements for Carpenters, Electricians, Plumbers, Roofers, Laborers, and other construction work classifications that may be needed for the project. The Davis-Bacon wage decision that applies to the project contains a schedule of work classifications and wage rates that must be followed.

If you don’t have it already (and by now you should), you’ll want to get a copy of the applicable Davis-Bacon wage decision.

a. The work classifications and wage rates. A Davis-Bacon wage decision is simply a listing of different work classifications and the minimum wage rates that must be paid to anyone performing work in those classifications. You’ll want to make sure that the work classification(s) you need are contained in the wage decision and make certain you know exactly what wage rate(s) you will need to pay. Some wage decisions cover several counties and/or types of construction work (for example, residential and commercial work) and can be lengthy and difficult to read. Contact the contract administrator (HUD Labor Relations field staff or local agency staff) if you have any trouble reading the wage decision or finding the work classification(s) you need.

To make reading lengthy wage decisions easier for you, the contract administrator may prepare a Project Wage Rate Sheet (HUD-4720). This Sheet is a one-page transcript that will show only the classifications and wage rates for a particular project. A blank copy of a Project Wage Rate Sheet is provided for you in the appendix. Also, a fillable version of this form is available on-line at HUDClips (see web address in the Appendix). Contact the contract administrator monitoring your project for assistance with a Project Wage Rate Sheet.

Remember, the wage decision is contained in the contract specifications along with the labor standards clauses. See 1-3, Construction Contract Provisions.

2-2

b. Posting the wage decision. If you are the prime contractor, you will be responsible for posting a copy of the wage decision (or the Project Wage Rate Sheet) and a copy of the DOL Davis-Bacon poster titled Employee Rights under the Davis-Bacon Act (Form WH- 1321) at the job site in a place that is easily accessible to all of the construction workers employed at the project and where the wage decision and poster won’t be destroyed by wind or rain, etc. The Employee Rights under the Davis-Bacon Act poster is available in English and Spanish on-line at HUDClips (see address in the Appendix).

2-2 ADDITIONAL “TRADE” CLASSIFICATIONS AND WAGE RATES.

What if the work classification you need isn’t on the wage decision? If the work classification(s) that you need doesn’t appear on the wage decision, you will need to request an additional classification and wage rate. This process is usually very simple and you’ll want to start the request right away. Basically, you identify the classification you need and recommend a wage rate for DOL to approve for the project. There are a few rules about additional classifications; you’ll find these rules in the DOL regulations, Part 5, and in the labor clauses in your contract. The rules are summarized for you here:

a. Additional classification rules. Additional classifications and wage rates can be approved if:

1. The requested classification is used by construction contractors in the area of the project. (The area is usually defined as the county where the project is located).

2. The work that will be performed by the requested classification is not already performed by another classification that is already on the wage decision. (In other words, if there already is an Electrician classification and wage rate on the wage decision you can’t request another Electrician classification and rate.)

3. The proposed wage rate for the requested classification “fits” with the other wage rates already on the wage decision. (For example, the wage rate proposed for a trade classification such as Electrician must be at least as much as the lowest wage rate for other trade classifications already contained in the wage decision.)

And,

4. The workers that will be employed in the added classification (if it is known who the workers are/will be), or the workers’ representatives, must agree with the proposed wage rate.

The Employee Rights under the Davis-Bacon Act poster (WH-1321) replaces the Notice to all Employees. The new poster is available in English and Spanish on-line at HUDClips (see address in the Appendix).

2-3

b. Making the request. A request for additional classification and wage rate must be made in writing through the contract administrator. (If the contract administrator is a local agency, the agency will send the request to the HUD Labor Relations staff.) If you are a subcontractor, your request should also go through the prime contractor. All you need to do is identify the work classification that is missing and recommend a wage rate (usually the rate that employer is already paying to the employees performing the work) for that classification. You may also need to describe the work that the new classification will perform.

c. HUD review. The HUD Labor Relations field staff will review the requested classification and wage rate to determine whether the request meets the DOL rules outlined in paragraph 2-2(a), above. If additional information or clarification is needed, the staff will contact the prime contractor (or contract administrator for local agency projects) for more information, etc. If the Labor Relations review finds that the request meets the rules, the staff will give preliminary approval on the request and refer it to the DOL for final approval. The staff will send to you a copy of the preliminary approval/referral letter to the DOL.

If the HUD Labor Relations staff doesn’t think the request meets the rules and if agreement can’t be reached on the proper classification or wage rate for the work described, the HUD Labor Relations staff will not approve the request. In this case, the staff will send your request to the DOL with an explanation why HUD believes that the request shouldn’t be approved. The DOL still has final decision authority. You will receive a copy of the disapproval/referral letter to the DOL.

d. DOL decision. The DOL will respond to HUD Labor Relations in writing about the additional classification and wage rate request. HUD Labor Relations will notify you of the DOL decision in writing. If the DOL approves the request, the prime contractor must post the approval notice on the job site with the wage decision.

If the DOL does not approve the request, you will be notified about what classification and wage rate should be used for the work in question. You will also receive instructions about how to ask for DOL reconsideration if you still want to try to get your recommendation approved.

It’s always a good idea to talk to the contract administrator before submitting an additional classification and wage rate request. The contract administrator can offer suggestions and advice that may save you time and increase the likelihood that DOL will approve your request. Usually, the contract administrator can give you an idea about what the DOL will finally decide.

2-4

2-3 CERTIFIED PAYROLL REPORTS.

You’ll need to submit a weekly certified payroll report (CPR) beginning with the first week that your company works on the project and for every week afterward until your firm has completed its work. It’s always a good idea to number the payroll reports beginning with #1 and to clearly mark your last payroll for the project “Final.”

a. Payroll formats. The easiest form to use is DOL’s WH-347, Payroll. A sample copy of the WH-347 is included in the back of this Guide. You may access a fillable version of the WH-347 on-line at HUDClips (see web address in the Appendix). Also, the contract administrator can provide a few copies of the WH-347 that you can reproduce.

b. Payroll certifications. The weekly payrolls are called certified because each payroll is signed and contains language certifying that the information is true and correct. The payroll certification language is on the reverse side of the WH-347. If you are using another type of payroll format you may attach the certification from the back of the WH- 347, or any other format which contains the same certification language on the WH-347 (reverse).

c. “No work” payrolls. “No work” payrolls may be submitted whenever there is a temporary break in your work on the project, for example, if your firm is not needed on the project right now but you will be returning to the job in a couple of weeks. (See tip box, for “no work” payroll exemption!) However, if you know that your firm will not be working on the project for an extended period of time, you may wish to send a short note to the contract administrator to let them know about the break in work and to give an approximate date when your firm will return to the project. If you number payrolls consecutively or if you send a note, you do not need to send “no work” payrolls.

You are not required to use Payroll form WH-347. You are welcome to use any other type of payroll, such as computerized formats, as long as it contains all of the information that is required on the WH-347.

DOL’s website has Payroll Instructions and the Payroll form WH-347 in a “fillable” PDF format at this address:

www.dol.gov/whd/forms/wh347.pdf

If you number your payroll reports consecutively, you do not need to submit “no work” payrolls!

2-5

d. Payroll review and submission. The prime contractor should review each subcontractor’s payroll reports for compliance prior to submitting the reports to the contract administrator.

Remember, the prime contractor is responsible for the full compliance of all subcontractors on the contract and will be held accountable for any wage restitution that may be found due to any laborer or mechanic that is underpaid and for any liquidated damages that may be assessed for overtime violations. All of the payroll reports for any project must be submitted to the contract administrator through the prime contractor.

e. Payroll retention. Every contractor (including every subcontractor) must keep a complete set of their own payrolls and other basic records such as employee addresses and full SSNs, time cards, tax records, evidence of fringe benefit payments, for a Davis-Bacon project for at least 3 years after the project is completed. The prime contractor must keep a complete set of all of the payrolls for every contractor (including subcontractors) for at least 3 years after completion of the project.

f. Payroll inspection. In addition to submitting payrolls to the contract administrator, every contractor (including subcontractors) must make their own copy of the payrolls and other basic records available for review or copying to any authorized representative from HUD or from DOL.

2-4 DAVIS-BACON DEFINITIONS.

Before we discuss how to complete the weekly payroll forms, we need to review a couple of definitions. These definitions can help you understand what will be required of you:

a. Laborer or mechanic. “Laborers” and “mechanics” mean anyone who is performing construction work on the project, including trade journeymen (carpenters, plumbers, sheet metal workers, etc.), apprentices, and trainees and, for CWHSSA purposes, watchmen and guards. “Laborers” and “mechanics” are the two groups of workers that must be paid not less than Davis-Bacon wage rates.

1. Working foremen. Foremen or supervisors that regularly spend more than 20% of their time performing construction work and do not meet the exclusions in paragraph 2 below are covered “laborers” and “mechanics” for labor standards purposes for the time spent performing construction work.

2. Exclusions. People whose duties are primarily administrative, executive or clerical are not laborers or mechanics. Examples include superintendents, office staff, timekeepers, messengers, etc. (Contact the contract administrator if you have any questions about whether a particular employee is excluded.)

An alert prime contractor that reviews subcontractor payroll submissions can detect any misunderstandings early, prevent costly underpayments and protect itself from financial loss should underpayments occur.

2-6

b. Employee. Every person who performs the work of a laborer or mechanic is “employed” regardless of any contractual relationship which may be alleged to exist between a contractor or subcontractor and such person. This means that even if there is a contract between a contractor and a worker, the contractor must make sure that the worker is paid at least as much as the wage rate on the wage decision for the classification of work they perform. Note that there are no exceptions to the prevailing wage requirements for relatives or for self-employed laborers and mechanics.

c. Apprentices and trainees. The only workers who can be paid less than the wage rate on the wage decision for their work classification are “apprentices” and “trainees” registered in approved apprenticeship or training programs. Approved programs are those which have been registered with the DOL or a DOL-recognized State Apprenticeship Council (SAC).

Apprentices and trainees are paid wage rates in accordance with the wage schedule in the approved program.

1. Probationary apprentice. A “probationary apprentice” can be paid as an apprentice (less than the rate on the wage decision) if the DOL or SAC has certified that the person is eligible for probationary employment as an apprentice.

2. Pre-apprentice. A “pre-apprentice”, that is, someone who is not registered in a program and who hasn’t been DOL- or SAC-certified for probationary apprenticeship is not considered to be an “apprentice” and must be paid the full journeyman’s rate on the wage decision for the classification of work they perform.

3. Ratio of apprentices and trainees to journeymen. The maximum number of apprentices or trainees that you can use on the job site cannot exceed the ratio of apprentices or trainees to journeymen allowed in the approved program.

Most often, the apprentice/trainee wage rate is expressed as a series of percentages tied to the amount of time spent in the program. For example, 0-6 months: 65%; 6 months

- 1 year: 70%; etc. The percentage is applied to the journeyman’s wage rate. On Davis- Bacon projects, the percentage must be applied to the journeyman’s wage rate on the applicable wage decision for that craft.

For more information about working subcontractors, ask the contract administrator or your HUD Labor Relations Field Staff for a copy of Labor Relations Letter LR-96-01, Labor standards compliance requirements for self-employed laborers and mechanics.

Labor Relations Letters and other helpful Labor Relations publications are available at HUD’s Labor Relations web site (see the list of web site addresses in the Appendix).

2-7

d. Prevailing wages or wage rates. Prevailing wage rates are the wage rates listed on the wage decision for the project. The wage decision will list a minimum basic hourly rate of pay for each work classification. Some wage decisions include fringe benefits which are usually listed as an hourly fringe rate. If the wage decision includes a fringe benefit rate for a classification, you will need to add the fringe benefit rate to the basic hourly rate unless you provide bona fide fringe benefits for your employees.

1. Piece-work. Some employees are hired on a piece-work basis, that is, the employee’s earnings are determined by a factor of work produced. For example, a Drywall Hanger’s earnings may be calculated based upon the square feet of sheetrock actually hung, a Painter’s earnings may be based upon the number of units painted. Employers may calculate weekly earnings based upon piece rates provided the weekly earnings are sufficient to satisfy the wage rate requirement based upon actual hours, including any overtime, worked.

Accurate time records must be maintained for any piece-work employees.

If the weekly piece rate earnings are not sufficient, the employer must recompute weekly earnings based upon the actual hours worked and the rate on the wage decision for the work classification(s) involved.

e. Fringe benefits Fringe benefits can include health insurance premiums, retirement contributions, life insurance, vacation and other paid leave as well as some contributions to training funds. Fringe benefits do not include employer payments or contributions required by other Federal, State or local laws, such as the employer’s contribution to Social Security or some disability insurance payments.

f. Overtime. Overtime hours are defined as all hours worked on the contract in excess of 40 hours in any work week. Overtime hours must be paid at no less than one and one-half times the regular rate of basic pay plus the straight-time rate of any required fringe benefits.

Note that the total hourly wage rate paid to any laborer or mechanic (basic wage or basic wage plus fringe benefits) may be no less than the total wage rate (basic wage or basic wage plus fringe benefits) on the wage decision for their craft. If the value of the fringe benefit(s) you provide is less than the fringe benefit rate on the wage decision, you will need to add the balance of the wage decision fringe benefit rate to the basic rate paid to the employee. For example, if the wage decision requires $10/hour basic rate plus $5/ hour fringe benefits, you must pay no less than that total ($15/hour) in the basic rate or basic rate plus whatever fringe benefit you may provide. You can meet this obligation in several ways: you could pay the base wage and fringe benefits as stated in the wage decision, or you could pay $15 in base wage with no fringe benefits, or you could pay $12 basic plus $3 fringe benefits. You can also off-set the amount of the base wage if you pay more in fringe benefits such as by paying or $9 basic plus $6 fringe benefits; as long as you meet the total amount. The amount of the base wage that you may off-set with fringe benefits is limited by certain IRS and FLSA requirements.

2-8

g. Deductions. You may make payroll deductions as permitted by DOL Regulations 29 CFR Part 3. These regulations prohibit the employer from requiring employees to “kick-back” (i.e., give up) any of their earnings. Allowable deductions which do not require prior DOL permission include employee obligations for income taxes, Social Security payments, insurance premiums, retirement, savings accounts, and any other legally-permissible deduction authorized by the employee. Deductions may also be made for payments on judgments and other financial obligations legally imposed against the employee.

h. Proper designation of trade. You must select a work classification on the wage decision for each worker based on the actual type of work he/she performed and you must pay each worker no less than the wage rate on the wage decision for that classification regardless of their level of skill. In other words, if someone is performing carpentry work on the project, they must be paid no less than the wage rate on the wage decision for Carpenters even if they aren’t considered by you to be fully trained as a Carpenter. Remember, the only people who can be paid less than the rate for their craft are apprentices and trainees registered in approved programs.

1. Split-classification. If you have employees that perform work in more than one trade during a work week, you can pay the wage rates specified for each classification in which work was performed only if you maintain accurate time records showing the amount of time spent in each classification of work. If you do not maintain accurate time records, you must pay these employees the highest wage rate of all of the classifications of work performed.

i. Site of work. The “site of work” is where the Davis-Bacon wage rates apply. Usually, this means the boundaries of the project. “Site of work” can also include other adjacent or virtually adjacent property used by a contractor or subcontractor in the construction of the project, like a fabrication site that is dedicated exclusively, or nearly so, to the project.

Referring, again, to our example above where the wage decision requiring a $15 total wage obligation ($10 basic wage plus $5 fringe benefits) was met by paying $9 base wage plus $6 fringe benefits: Note that overtime rates must be based on one and one-half times the basic rate as stated on the wage decision. In the above example, the employer must pay for overtime: $15/hr ($9 basic + $6 fringe) plus $5 (one-half of $10, the wage decision basic rate) for a total of $20 per hour.

2-9

SECTION II - REPORTING REQUIREMENTS

2-5 COMPLETING A PAYROLL REPORT.

What information has to be reported on the payroll form? The weekly payroll form doesn’t ask for any information that you don’t already need to keep for wage payment and tax purposes. For example, you need to know each employee’s name; his or her work classification (who is working for you and what do they do?), the hours worked during the week, his or her rate of pay, the gross amount earned (how much did they earn?), the amounts of any deductions for taxes, etc., and the net amount paid (how much should the paycheck be made out for?). No more information than you need to know in order to manage your work crew and make certain they are paid properly. And, certainly, no more information than you need to keep for IRS, Social Security and other tax and employment purposes.

You are required to submit certified payrolls to illustrate and document that you have complied with the prevailing wage requirements. The purpose of the contract administrator’s review of your payrolls is to verify your compliance. Clearer and complete payroll reports will permit the contract administrator to complete reviews of your payroll reports quickly.

a. Project and contractor/subcontractor information. Each payroll must identify the contractor or subcontractor’s name and address, the project name and number, and the week ending date. Indicate the week dates in the spaces provided. Numbering payrolls is optional but strongly recommended.

b. Employee information. Effective January 18, 2009, payrolls shall not report employee addresses or full Social Security Numbers (SSNs). Instead, the first payroll on which each employee appears shall include the employee’s name and an individually identifying number, usually the last 4 digits of the employee’s SSN. Afterward, the identifying number does not need to be reported unless it is necessary to distinguish between employees, e.g., if two employees have the same name.

Employers (prime contractors and subcontractors) must maintain the current address and full SSN for each employee and must provide this information upon request to the contracting agency or other authorized representative responsible for federal labor standards compliance monitoring. Prime contractors may require a subcontractor(s) to provide this information for the prime contractor’s records. DOL has modified form WH- 347, Payroll, to accommodate these reporting requirements.

c. Work classification. Each employee must be classified in accordance with the wage decision based on the type of work they actually perform.

For many contractors, the Weekly Certified Payroll is the only Davis-Bacon paperwork you need to submit!

2-10

1. Apprentices or trainees. The first payroll on which any apprentice or trainee appears must be accompanied by a copy of that apprentice’s or trainee’s registration in a registered or approved program. A copy of the portions of the registered or approved program pertaining to the wage rates and ratios shall also accompany the first payroll on which the first apprentice or trainee appears.

2. Split classifications. For an employee that worked in a split classification, make a separate entry for each classification of work performed distributing the hours of work to each classification, accordingly, and reflecting the rate of pay and gross earnings for each classification. Deductions and net pay may be based upon the total gross amount earned for all classifications.

d. Hours worked. The payroll should show ONLY the regular and overtime hours worked on this project. Show both the daily and total weekly hours for each employee. If an employee performs work at job sites other than the project for which the payroll is prepared, those “other job” hours should not be reported on the payroll. In these cases, you should list the employee’s name, classification, hours for this project only, the rate of pay and gross earnings for this project, and the gross earned for all projects. Deductions and net pay may be based upon the employee’s total earnings (for all projects) for the week.

e. Rate of pay. Show the basic hourly rate of pay for each employee for this project. If the wage decision includes a fringe benefit and you do not participate in approved fringe benefit programs, add the fringe benefit rate to the basic hourly rate of pay. Also list the overtime rate if overtime hours were worked.

1. Piece-work. For any piece-work employees, the employer must compute an effective hourly rate for each employee each week based upon the employee’s piece-work earnings for that week. To compute the effective hourly rate, divide the piece-work earnings by the total number of hours worked, including consideration for any overtime hours.

The effective hourly rate must be reflected on the certified payroll and this hourly rate may be no less than the wage rate (including fringe benefits, if any) on the wage decision for the classification of work performed. It does not matter that the effective hourly rate changes from week-to-week, only that the rate is no less than the rate on the wage decision for the classification of work performed.

f. Gross wages earned. Show the gross amount of wages earned for work performed on this project. Note: For employees with work hours and earnings on other projects, you may show gross wages for this project over gross earnings all projects (for example, $425.40/$764.85) and base deductions and net pay on the “all projects” earnings.

Remember, the overtime rate is computed at one and one-half times the basic rate of pay plus any fringe benefits. For example, if the wage decision requires $10/hour basic plus $5/hour fringe benefits, the overtime rate would be: ($10 x 1 ½) + $5 = $20/hour.

2-11

g. Deductions. Show the amounts of any deductions from the gross earnings. “Other” deductions should be identified (for example, Savings Account or Loan Repayment). Any voluntary deduction (that is, not required by law or by an order of a proper authority) must be authorized in writing by the employee or provided for in a collective bargaining (union) agreement. A short note signed by the employee is all that is needed and should accompany the first payroll on which the other deduction appears.

h. Net pay. Show the net amount of wages paid.

i. Statement of compliance. The Statement of Compliance is the certification. It is located on the reverse side of a standard payroll form (WH-347).

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .