Attachment 6 - QASP.docx
DOCX document 88 KB Posted
- Attached to
- Stevedoring & Related Svs for Agadir & Tangier, Morocco Federal contract opportunity
- Solicitation number
- HTC71120QR005
About this file
This document contains a Quality Assurance Surveillance Plan (QASP) and Performance Requirements Summary for a stevedoring and related terminal services contract at the ports of Agadir and Tangier, Morocco. The QASP outlines performance monitoring methods including vessel inspections, visual inspections, and feedback from Transportation Movement Documents to verify contractor compliance with performance objectives. Key performance standards require 100% compliance for damage notifications, meeting timeframes, and cargo accountability. Performance is reviewed quarterly with evaluations biannually assessing Acceptable Quality Levels. Contract Discrepancy Reports may be issued for failures to meet standards. The 839th Transportation Battalion seeks to support high-tempo stevedoring and related terminal services at the ports including vessel loading and unloading, cargo receipt and staging, documentation, and security. The contractor must provide all necessary labor, equipment, and materials to perform tasks to commercial best practices standards.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attachment 2 - SOR_Amd_1.xlsx | XLSX spreadsheet | |
| HTC71120QR005001.pdf | ||
| Attachment 3 - RFQ Information Sheet .docx | DOCX document | |
| Attachment 5 - Addendums to 52.212-1 & 52.212-2.docx | DOCX document | |
| Attachment 2 - SOR.xlsx | XLSX spreadsheet | |
| Attachment 4 -Technical Worksheet (Evaluation Criteria 12-18-19 (BM).docx | DOCX document | |
| Attachment 1_PWS - Morocco Final review (BM) 12-5-19 v1.pdf | ||
| HTC71120QR005.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
HTC71120QR005/Attachment - 6 U.S. Army Military Surface Deployment and Distribution Command (SDDC)
Stevedoring & Related Terminal Services
Quality Assurance Surveillance Plan for
Agadir & Tangier, Morocco HTC71120QR005/Attachment - 6
QUALITY ASSURANCE SURVEILLANCE PLAN (QASP)
1. OBJECTIVE. This Quality Assurance Surveillance Plan (QASP) has been developed as an aid to the Government in providing effective and systematic surveillance for the Stevedoring and Related Terminal Services (S&RTS) being provided. This QASP provides the methodology by which the contractor’s performance will be monitored to determine compliance with standard performance objectives. The plan is designed so that surveillance is limited to that which is necessary to verify that the contractor is performing the services satisfactorily and relates directly to performance objectives of the Performance Work Statement (PWS). Performance objectives are those designated with corresponding performance measures and standards. Surveillance will be in accordance with the Performance Requirements Summary (PRS) at Attachment 1.
2. GOVERNMENT SURVEILLANCE.
a. The Contracting Officer will designate in writing a primary and alternate Contracting Officer Representatives (CORs) for the contract. The COR authority will be limited to administering specific technical aspects of the contract. The letter of designation will identify specific guidelines and clearly detail the limits of the COR authority.
b. Performance Monitors may be designated by the COR to monitor daily contractor performance. Monitors will be designated in writing and provided a copy of the contract and this surveillance plan. In the case of this contract, the Marine Cargo Specialist (MCS) will act as the Performance Monitors and will:
(1) Maintain a detailed knowledge of the technical requirements of the contract.
(2) Monitor and record contractors performance.
(3) Maintain complete and accurate documentation.
(4) Establish and maintain a good working relationship with the Contractor.
(5) Not make legal interpretations.
(6) Not impose tasks or performance standards not included in the contract.
(7) Not supervise or direct Contractor personnel.
(8) Not waive contract requirements.
c. Performance Monitors will notify the COR of any problem areas related to the execution of the contract. The COR is responsible for resolving performance issues. The COR will immediately notify the Administrative Contracting Officer (ACO) if satisfactory resolution cannot be reached.
d. The COR and ACO will meet quarterly with the contractor during the first year of contract performance to discuss operations and problem areas. Thereafter, meetings will be held bi-annually unless performance warrants scheduling a meeting sooner.
3. SURVEILLANCE. Surveillance of contractor performance is the method used by the Government to determine whether the contractor is effectively and efficiently complying with all terms and conditions of the contract. The functional expertise of the COR / MCS plays a critical role in adequately evaluating contractor performance. The following surveillance methods shall be used:
a. Vessel Inspection. Vessel inspection will occur when loading and discharging cargo. It shall involve direct visual observation, direct dialog with all involved parties.
b. Visual Inspection. Visual inspection will occur when documenting cargo during vessel loading and discharge, loading and securing cargo on outbound conveyances, unloading cargo from inbound conveyances, and complying with applicable installation and terminal safety and fire regulations.
c. TMD feedback. TMD feedback will occur after receipt of contractor documentation and reconciliation with government documentation. COR monitors feedback from TMD to ensure proper documentation procedures are being followed by the contractor.
A Contractor Surveillance Checklist will be used during the surveillance of contractor performance during each terminal operation (see Attachment 2).
4. PERFORMANCE REVIEWS AND EVALUATIONS.
a. The COR will conduct quarterly performance reviews and bi-annual evaluations with the contractor based on information obtained from the TMD and through the surveillance methods identified above. The Acceptable Quality Level (AQL), as identified in the PRS, will be determined during the bi-annual evaluation. Two quarters of performance data will be used for the bi-annual evaluation. Reviews and evaluations will form the basis for determining compliance with performance objectives, measures and standards. When surveillance results show good consistent performance, reviews may be adjusted to an annual basis.
b. The TMD will provide the COR with standard performance objectives deficiencies. The TMD will thoroughly document all deficiencies, identify source of information and reference the applicable PWS performance standard or contract requirement for which the deficiency applies. The TMD and COR will document performance deficiencies using the Contractor Surveillance Checklist at Attachment 2.
c. The COR will generate monthly performance reports using the Performance Requirements Summary / Contractor Surveillance Checklist. This report will identify the level to which the performance standard was achieved based on a cumulative total of all activity for the month of performance. Critical performance objectives are as follows:
See Attached Table
5. ANALYSIS OF PERFORMANCE REVIEW RESULTS. At the end of each performance evaluation period, the COR will evaluate all surveillance data to determine those performance standards that do not meet the AQL in the PRS. The COR will prepare a Contract Discrepancy Report (CDR) and issue it to the Contractor. The CDR will make reference to the performance objective and standard and state how the AQL was not met. The CDR will identify the monetary deduction to be applied, if applicable, as identified at Attachment 1. The contractor will be required to respond to the COR generated CDR within five (5) working days. The Contractor response shall be in writing and explain why the performance deviated from the AQL, how the performance will be returned to acceptable levels and how a recurrence of the problem will be prevented in the future. The COR may issue a CDR for recurring failure to meet other contract performance objectives or requirements. The contractor shall respond in accordance with requirements identified herein. A copy of the CDR will be provided to the ACO within five (5) working days after the end of the evaluation period.
6. QASP REVISIONS. Revision to this plan are the joint responsibility of the COR and ACO.
PERFORMANCE OBJECTIVE
(PWS #)
| PERFORMANCE MEASURE |
| PERFORMANCE STANDARD |
| 3.5.5 & 3.6.1 |
| Damage/Injury- Immediate notification to COR |
| 100% compliance |
4.15.1.1 5.7 The Contractor shall participate in daily operations meetings and other meetings regarding vessel loading as required.
100% compliance
Performance Standard: 100% staffing
5.9.3
| The Contractor shall receive and review cargo list and stow plan for accuracy and efficiency of terminal and vessel operations, and report discrepancies to the COR. |
| 100% Compliance |
5.10.1 6.14.1, Table 2
| The Contractor shall coordinate vessel activity with the COR/ACOR. Prior to the start of each vessel operation, the COR/ACOR will provide the Contractor with the mutually agreed upon timeframe for completion of loading of the vessel. Vessel operation completion timeframes will be determined based on such factors as cargo volume, stow factors, cargo mix and vessel type being worked. The Contractor will not be held accountable for delays in vessel operations resulting from circumstances not within the control or responsibility of the Contractor. Numerous factors are known to affect productivity, including but not limited to: weather, simultaneous vessel operations, and vessel condition. |
| 100% compliance in planning and coordination |
100% compliance in meeting timeframe
4.6, Table 1 5.11 5.11.1
| The Contractor shall load cargo on the vessel from its place of rest to point of stow aboard vessel in accordance with the approved vessel pre-stow plan furnished by the Government and within the agreed upon time frame. |
| Load Without Damages: 0% of Cargo Damaged, 1% max allowable deviation for damages under $1000, otherwise 0% deviation 0% of cargo needs to be re-stowed. Max allowable deviation is 1% |
| 5.11.2 |
| The Contractor shall secure cargo aboard vessel within the agreed upon time frame as decided during the Planning meeting. |
| 95% compliance in meeting timeframe and stowing cargo per the pre-stow plan |
95% compliance stowing cargo per the pre-stow plan
100% compliance for securing cargo aboard the vessel
| 5.25 |
| When requested, the Contractor shall provide stow location and condition of the loaded cargo to the COR at the time of loading. This includes use of GATES scanners, manually tally sheets and an “as loaded” stow drawing for each piece. |
| 100% accountability of the cargo and its location is required with zero deviation, prior to the vessel departure. |
Damages/ shortages will be entered in the tally report.
100% compliance
PERFORMANCE OBJECTIVE
(PWS #)
| PERFORMANCE MEASURE |
| PERFORMANCE STANDARD |
| 5.10.5 |
| The Contractor shall clean the vessel and surrounding area of securing materials and Contractor debris following upload of the vessel |
| 100% compliance |
4.6, Table 1, 5.20 6.4.10
| The Contractor shall transfer, reposition or re-handle cargo within the vessel or terminal, and document and report its movement, as requested by the COR/ACOR. |
| 100% compliance |
4.6 Table 1, 5.2.3
5.9.6.2 5.9.7.2 5.10.2
| The Contractor shall discharge cargo in accordance with the Discharge Plan and stage in accordance with the Staging Plan within the agreed time frame. |
| Load Without Damages: 0% of Cargo Damaged, 1% max allowable deviation for damages under $1000, otherwise 0% deviation |
0% of cargo needs to be re-stowed.
Max allowable deviation is 1% Cargo must be one hundred percent (100%) accounted for once the ship has been fully discharged. Zero deviation
5.19 Appendix C
| The Contractor shall participate with the government in conducting a reconciliation/validation of the cargo discharged with reports from GATES, SDDC Forms 288 and 290. |
| 100% compliance |
4.19.7 5.8 5.11 5.12 5.13 5.28 5.28.1
| The Contractor shall notify the COR of all discrepancies found with the cargo, to include HAZMAT (i.e. missing labels/placards, etc.). The Contractor shall clean the vessel and surrounding area of securing materials and Contractor debris following discharge. |
| Cargo must be 100% accounted for once the ship has been fully discharged Zero deviation |
| 5.24 |
| The Contractor shall unlash, unsecure, and remove cargo from modes of inland transportation to designated place of rest. Unloading also includes removing/reinstalling transporter components i.e. sideboards, rails and tarpaulins. The Contractor shall remove all labels and placards from all modes of land transport before release back to carrier. |
| Record accurate information for the cargo; 5% max allowable deviation of documentation discrepancies |
6.4.15.2
| The Contractor shall provide special equipment/supplies that will be paid out-of- pocket and reimbursed by the government upon the approval of the COR/ACOR. |
| 100% deviation from standard |
| Appendix C |
| The Contractor shall submit 100% legible invoices within ten (10) days after completed vessel operation. |
| 100% of invoices received within 10 days. Max allowable |
deviation is 2 days
| 4.20 |
| The Contractor shall establish a QCIP, which will emphasize quality control over all contract requirements. The QCIP will contain a Quality Control Inspection Checklist (QCIC), which, at a minimum, will contain all elements of the Performance Requirements Summary |
(PRS). The draft plan must be submitted to the Contracting Officer at the time of proposal submission. The Government will review and either accept or reject the QCIP within ten (10) days of receipt. The Contractor will have five (5) days to make any necessary corrections and resubmit.
No performance may commence prior to approval of the QCIP. The plan will be up- dated when requested by the Contracting Officer.
Zero deviation from standard
PERFORMANCE OBJECTIVE
(PWS #)
| PERFORMANCE MEASURE |
| PERFORMANCE STANDARD |
3.5.1
| The Contractor shall provide a qualified Contractor Environmental Compliance Officer (ECO) for HAZMAT handling who will assume command and control of the situation by securing the scene, providing incident command and control, evacuating personnel, stopping the release, containing spills, and decontaminating personnel. Request mutual aid from surrounding installations as required. |
| Zero deviation from standard |
| 5.13 |
| Cargo Accountability |
Document cargo during operations to accurately capture billing record, stow location, ITV, nested, linked and secondary loads;
Completed Scan/Tally sheet;
Document to Industry and SDDC standards and regulations 100% ITV ( Physical inventory compared to Government reports) 100% compliance
0.2% deviation for capture of accurate stow location/accurate pay codes
| 6.4.14.2 |
| Customs Services |
| Contractor is responsible for efficient processing of all AE Forms 302 with the cognizant Italian Customs Office. 100% compliance |
CONTRACTOR’S SURVEILLANCE
TYPE OF OPERATION: Truck |_| Rail |_| Vessel |_| Extra Labor |_|
| LOCATION: | DT |_| | |_| |
| DATE: | VESSEL NAME/NUMBER: |
TYPE OF GANG: Lo/Lo |_| Lash |_| Checkers |_| Extra Labor |_|
| STEVEDORE: |
| GANG HEADER: |
| 839th Rep |
VESSEL OPERATIONS
1. For Vessel Operations, did Contractor discharge or load cargo (as applicable) IAW SOW P.O. numbers (as applicable) 5.15.1, 5.14.1
YES |_| NO |_| N/A |_| COMMENTS
2. For Vessel Operations, did Contractor secure cargo IAW SOW P.O. 5.14.1
YES |_| NO |_| N/A |_| COMMENTS
3. Did the required number of stevedores arrive?
YES |_| NO |_| N/A |_| COMMENTS
4. Did the stevedores arrive on time?
YES |_| NO |_| N/A |_| COMMENTS
5. Did the stevedores have the required PPE?
YES |_| NO |_| N/A |_| COMMENTS
CARGO MANAGEMENT
6. Did Contractor maintain cargo accountability and perform documentation procedures accurately IAW SOW P.O. numbers (as applicable) 6.6.1 & 6.6.2
YES |_| NO |_| N/A |_| COMMENTS
TML OPERATIONS (TRUCK / RAIL)
7. Did Contractor receive and stage cargo including Dangerous/Hazardous/Sensitive IAW SOW P.O. numbers (as applicable) 6.7
YES |_| NO |_| N/A |_| COMMENTS
8. Did Contractor Load|_| or Unload|_| cargo for Railcars|_| or Trucks|_| IAW SOW P.O. numbers (as applicable) 6.12
YES |_| NO |_| N/A |_| COMMENTS
9. Did Contractor load conveyance with correct cargo and correct destination (no miss-shipment) IAW SOW P.O. numbers 6.12, 6.13
YES |_| NO |_| N/A |_| COMMENTS
10. For Terminal Operations (rail or truck), did Contractor secure cargo IAW SOW P.O. numbers (as applicable) 6.9.2
YES |_| NO |_| N/A |_| COMMENTS
SAFETY
11. Did Contractor follow safety regulations for equipment and cargo IAW SOW P.O. # 3.3
YES |_| NO |_| N/A |_| COMMENTS
SECURITY
12. Did Contractor follow security measures IAW SOW P.O. # 2.8.2
YES |_| NO |_| N/A |_| COMMENTS
OTHER: