Atch2_-_SOR_Blank_Tombolo_OCT14.xlsx
XLSX spreadsheet 57 KB Posted
- Solicitation number
- HTC711-15-R-R011
About this file
Attachment 2
View the file
Other files
| File | Type | Posted |
|---|---|---|
| HTC711-15-R-R011-0003.pdf | ||
| HTC711-15-R-R011-0002.pdf | ||
| HTC711-15-R-R011-0001.pdf | ||
| Atch1_-_PWS_Tombolo_Italy_23Oct14.docx | DOCX document | |
| Atch3_-_Cyber_Security.docx | DOCX document | |
| Atch4_-_Info_Sheet.docx | DOCX document | |
| HTC711-15-R-R011_Tombolo.pdf | ||
| Atch5_Invoicing_Instruction.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Comm Def and Spec
| Commodity Definitions and Specifications |
| Commodity No. 1: General cargo. Includes all items, not described elsewhere in the schedule of rates, that do not exceed 10,000 lbs per ocean shipping unit. |
Commodity No. 01A: Unitized cargo. (Packed in triwalls, on skids or pallets), or units that measure less than 35 feet in the largest dimension, or at any item so packed as to be handled primarily by material handling equipment and weighing a minimum of 1,500 lbs each package.
Commodity No. 01B: Loose cargo. Includes unitized cargo, bagged and sacked products, canned goods, beverages, up to a maximum of 1,499 lbs each package.
Commodity No. 01C: Drums and barrels. Includes all drums and barrels with an individual capacity of 55 gallons and over.
Commodity No. 02: Household goods and baggage. Includes all individually owned household goods and baggage.
Commodity No. 03: Privately owned passenger vehicles (POVs). Includes all privately owned automobiles, motorcycles, vans, pick-ups, housetrailers and recreational vehicles.
Commodity No. 04: Special cargo heavy lifts. Includes items over 10,000 lbs or measure 35 feet or more in any dimension, except military vehicles, tracked and wheeled guns, POVs, seavans, milvans and aircraft unboxed.
Commodity No. 05: Military vehicles and trailers. Includes tracked or wheeled military vehicles, guns and trailers.
Commodity No. 06: Aircraft unboxed. Includes aircraft unboxed, whole aircraft or complete fuselages with or without engines.
Commodity No. 07: Ammunition, explosives, and other hazardous cargo. Includes all ammunition, explosives and other hazardous items except small arms ammunition.
Commodity No. 08: CONEX container, empty and full. Includes all Government owned metal reusable containers of 365 or 184 cubic feet. Outside dimensions are 8'6", 6'3", 6'10.5" and 4'4", 6', 6'10.5" respectively.
Commodity No. 09: Container, commercial and military, empty and full. Includes commercial and Government owned (or leased) shipping containers which are moved via ocean transportation without bogey wheels attached i.e. lifted on and off the ship.
Commodity No. 10: Small arms ammunition. Includes all small arms ammunition.
Long Ton (LT): 1 long ton equals 2,240 US pounds.
Sched1A(Load)
| SCHEDULE OF RATES |
| Schedule 1A/Vessel Load |
| Port of Tombolo Prices in USD |
| COMMODITY | LO-LO (CONVENTIONAL) | |
| FROM LAND TRANSPORT TO VESSEL | FROM LAND TRANSPORT TO BARGE |
| EST QTY | EST RATE | EST TOTAL | EST QTY | EST RATE | EST TOTAL | ||
| A | A | A | B | B | B | ||
| 01 | GENERAL CARGO |
02 HOUSEHOLD GOODS & BAGGAGE
03 PRIVATELY OWNED PASSENGER VEHICLE
04 SPECIAL CARGO & HEAVY LIFTS
05 MILITARY VEHICLES & TRAILERS (Wheeled or Tracked)
06 AIRCRAFT UNBOXED
07 AMUNITION, EXPLOSIVES & OTHER HAZARDOUS CARGO
08 CONEX CONTAINER, EMPTY & FULL (Including TRICON, QUADCON & ISU)
| PC | PC | PC | PC | PC | PC | ||
| 09 | ISO CONTAINERS, COMMERCIAL & MILTARY FULL (Including Assembled TRICON's & QUADCON's to ISO Dimensions) | 200.00 | 0.00 | 10.00 | 0.00 |
| 10 | SMALL ARMS AMMUNITION | ||
| Totals Schedule 1A: | $0.00 |
&"-,Bold"ATTACHMENT 2 Schedule of Supplies/Services
&8SORTomboloFinalJul14
MOVE
Sched1B(Discharge)
| SCHEDULE OF RATES |
| Schedule 1B/Vessel Discharge |
| Port of Tombolo Prices in USD |
| COMMODITY | LO-LO (CONVENTIONAL) | |
| TO LAND TRANSPORT FROM VESSEL | TO LAND TRANSPORT FROM BARGE |
| EST QTY | EST RATE | EST TOTAL | EST QTY | EST RATE | EST TOTAL | ||
| A | A | A | B | B | B | ||
| 01 | GENERAL CARGO |
02 HOUSEHOLD GOODS & BAGGAGE
03 PRIVATELY OWNED PASSENGER VEHICLE
04 SPECIAL CARGO & HEAVY LIFTS
05 MILITARY VEHICLES & TRAILERS (Wheeled or Tracked)
06 AIRCRAFT UNBOXED
07 AMUNITION, EXPLOSIVES & OTHER HAZARDOUS CARGO
08 CONEX CONTAINER, EMPTY & FULL (Including TRICON, QUADCON & ISU)
| PC | PC | PC | PC | PC | PC | ||
| 09 | ISO CONTAINERS, COMMERCIAL & MILTARY FULL (Including Assembled TRICON's & QUADCON's to ISO Dimensions) | 300.00 | 0.00 | 10.00 | 0.00 |
| 10 | SMALL ARMS AMMUNITION | ||
| Totals Schedule 1B: | $0.00 |
&"-,Bold"ATTACHMENT 2 Schedule of Supplies/Services
&8SORTomboloFinalJul14
MOVE
Sched2&3(Det, Diff & XL)
| SCHEDULE OF RATES | |||||
| Schedule 2/Detention & Differentials | |||||
| Port of Tombolo Prices in EURO | |||||
| DETENTION | |||||
| DAY SHIFT | 1ST SHIFT | 2ND SHIFT | 3RD SHIFT | 4TH SHIFT |
| EST QTY | EST RATE | EST TOTAL | EST QTY | EST RATE | EST TOTAL | EST QTY | EST RATE | EST TOTAL | EST QTY | EST RATE | EST TOTAL | EST QTY | EST RATE | EST TOTAL | ||
| A | A | A | B | B | B | C | C | C | D | D | D | E | E | E | ||
| HR | HR | HR | HR | HR | HR | HR | HR | HR | HR | HR | HR | HR | HR | HR | ||
| A | WORKDAY | 200.00 | 0.00 | |||||||||||||
| B | S,S & H | 100.00 | 0.00 | |||||||||||||
| Paid for personnel detention and waiting time when not caused by the contractor | ||||||||||||||||
| Totals Schedule 2/Detention: | 0.00 | |||||||||||||||
| Port of Tombolo Prices in EURO | ||||||||||||||||
| OVERTIME DIFFERENTIAL | ||||||||||||||||
| DAY SHIFT | 1ST SHIFT | 2ND SHIFT | 3RD SHIFT | 4TH SHIFT |
| EST QTY | EST RATE | EST TOTAL | EST QTY | EST RATE | EST TOTAL | EST QTY | EST RATE | EST TOTAL | EST QTY | EST RATE | EST TOTAL | EST QTY | EST RATE | EST TOTAL | ||
| F | F | F | G | G | G | H | H | H | I | I | I | K | K | K | ||
| HR | HR | HR | HR | HR | HR | HR | HR | HR | HR | HR | HR | HR | HR | HR | ||
| A | WORKDAY | 40.00 | 0.00 | |||||||||||||
| B | S,S & H | 20.00 | 0.00 | |||||||||||||
| Paid for personnel working beyond regular working hours for a maximum of 2 hrs. unless otherwise is mutually agreed upon | ||||||||||||||||
| Totals Schedule 2/Overtime Differential: | 0.00 | |||||||||||||||
| Port of Tombolo Prices in EURO | ||||||||||||||||
| SHIFT DIFFERENTIAL | ||||||||||||||||
| DAY SHIFT | 1ST SHIFT | 2ND SHIFT | 3RD SHIFT | 4TH SHIFT |
| EST QTY | EST RATE | EST TOTAL | EST QTY | EST RATE | EST TOTAL | EST QTY | EST RATE | EST TOTAL | EST QTY | EST RATE | EST TOTAL | EST QTY | EST RATE | EST TOTAL | ||
| L | L | L | M | M | M | N | N | N | P | P | P | R | R | R | ||
| 24 | Mobile Floodlights | |||||||||||||||
| A | WORKDAY | |||||||||||||||
| B | S,S & H | 200.00 | 0.00 | |||||||||||||
| Paid in conjunction & in addition to commodity rate payment for service rendered during other than day shift | ||||||||||||||||
| Totals Schedule 2/Shift Differential: | 0.00 |
| Total Estimate Schedule 2: | 0.00 |
| SCHEDULE OF RATES | |
| Schedule 3/Extra Commodity Labor Service |
| Port of Tombolo Prices in USD | |||||
| DAY SHIFT | 1ST SHIFT | 2ND SHIFT | 3RD SHIFT | 4TH SHIFT |
| EST QTY | EST RATE | EST TOTAL | EST QTY | EST RATE | EST TOTAL | EST QTY | EST RATE | EST TOTAL | EST QTY | EST RATE | EST TOTAL | EST QTY | EST RATE | EST TOTAL | ||
| A | A | A | B | B | B | C | C | C | D | D | D | E | E | E | ||
| HR | HR | HR | HR | HR | HR | HR | HR | HR | HR | HR | HR | HR | HR | HR | ||
| A | WORKDAY | 100.00 | 0.00 | |||||||||||||
| B | S,S & H | 50.00 | 0.00 | |||||||||||||
| May NOT be paid in conjunction with commodity rate payments |
Totals Schedule 3: $0.00
&"-,Bold"ATTACHMENT 2 Schedule of Supplies/Services
&8SORTomboloFinalJul14
SHIFT
ALL TYPES LABOR
SHIFT
ALL TYPES LABOR
SHIFT
ALL TYPES LABOR
SHIFT
ALL TYPES LABOR
Sched4Equip
| SCHEDULE OF RATES |
| Schedule 4/Equipment Rental |
Port of Tombolo Prices in USD
| TYPE CODE | EQUIPMENT DESCRIPTION | RATE x HOUR | RATE x DAY | ||||
| EST QTY | EST RATE | EST TOTAL | EST QTY | EST RATE | EST TOTAL | ||
| 01 | Forklift up to 3 Tons | ||||||
| 02 | Forklift up to 5 Tons | ||||||
| 03 | Forklift up to 8 Tons | ||||||
| 04 | Forklift up to 12 Tons | ||||||
| 05 | Mobile Crane up to 100 Tons | 8.00 | 0.00 | ||||
| 06 | Mobile Crane up to 150 Tons | 16.00 | 0.00 | ||||
| 07 | Mobile Crane over 150 Tons | 16.00 | 0.00 | ||||
| 08 | Container Bridge up to 20 Tons | ||||||
| 09 | Container Bridge over 20 Tons | ||||||
| 10 | Truck, Cargo up to 2.5 Tons | ||||||
| 11 | Truck, Cargo up to 5 Tons | ||||||
| 12 | Tug Master w/o 40' Chassis | ||||||
| 13 | Tug Master with 40' Chassis | ||||||
| 14 | Ro-Ro Trailer/MAFI | ||||||
| 15 | Motorized Broomsweeper | ||||||
| 16 | Tug, 400 HP | ||||||
| 17 | Tug, 400 HP w/Firefighting Capability (Standby Only) | ||||||
| 18 | Tug, 1,000 HP | ||||||
| 19 | Tug, 1,000 HP w/Firefighting Capability (Standby Only) | ||||||
| 20 | Barge, up to 500 Tons Capacity | ||||||
| 21 | Barge, over 500 Tons Capacity | ||||||
| 22 | Motorboat, up to 100 HP (Minimum 4 Person Capacity) | ||||||
| 23 | Motorboat, over 100 HP (Minimum 4 Person Capacity) | ||||||
| 24 | Mobile Floodlights | ||||||
| 25 | Portable Compressor for Equipment 5 Tons and Above | ||||||
| 26 | Battery Charger for Equipment 5 Tons and Above | ||||||
| 27 | 20' Empty Security ISO Container | ||||||
| 28 | 40' Empty Security ISO Container | ||||||
| Note 1: | Equipment not listed above will be compensated on an out-of-pocket basis | ||||||
| Note 2: | All equipment is with operator/driver and includes fuel, lubricants and maintenance | ||||||
| Note 3: | Empty ISO containers includes necessary securing devices, positioning and re-positioning | ||||||
| Totals Schedule 4: | $0.00 |
ATTACHMENT 2
Schedule of Supplies/Services
Sched6and8
| SCHEDULE OF RATES |
| Schedule 6 - Facilities |
| (Utilization of Facilities & Related Services) |
| Tombolo Dock - Prices in USD |
| CODE | DESCRIPTION | CRITERIA | EST QTY (Units) | EST QTY (Months) | EST RATE (Cost / Unit / Month) | EST TOTAL |
| F | PORTABLE LATRINES | EACH per DAY | 8.00 | 2 | 0.00 | |
| G | TRASH CONTAINERS (Metal Min. 2 CUMT) | EACH per DAY |
| CODE | DESCRIPTION | CRITERIA | EST QTY (Meters) | EST QTY (DAYS) | EST RATE (Cost / Meter / Day) | EST TOTAL |
| H | PORTABLE FENCING | METERs per DAY | ||||
| Note 1: | Facilities/Equipment not listed above will be compensated on an out-of-pocket basis | |||||
| Note 2: | CODEs E thru H includes positioning and re-positioning | |||||
| Note 3: | CODE F (Portable Latrines) includes daily cleaning | |||||
| Totals Schedule 6: | $ - 0 |
| SCHEDULE OF RATES |
| Schedule 8/Miscellaneous |
| Tombolo Dock Prices in USD |
| CODE | DESCRIPTION | CRITERIA | |||
| A | OPERATION DISCOUNT | ||||
| 1 | Commodity 09, Schedule 1A & 1B when Empty | % | |||
| B | ADMINISTRATIVE CHARGES | ||||
| 1 | Compensation Payments Extra Port Support (6.14.6)*** | % | |||
| C | SUPPORT SERVICES | ||||
| EST QTY | EST RATE | EST TOTAL | |||
| 1 | Import Customs Document (AE Form 302) | EACH | 20.00 | 0.00 | |
| 2 | Export Customs Document (AE Form 302) | EACH | 40.00 | 0.00 | |
| 4 | DVCE's Issued (In Addition to Above for Same Container) | EACH | |||
| 5 | Customs Processing of Vessel Arrival Manifest (or Cargo List) | EACH | |||
| 6 | Revalidation/Change of Destination (AE Form 302) | EACH | |||
| 7 | Authorization to Stuff/Unstuff Container/Flatrack | EACH | |||
| 8 | Authorization to Open Container for Document Retreival | EACH | |||
| D | C M R | ||||
| E | OUT OF POCKET EXPENSES (Reimbursement of Actual Costs Disbursed as Substantiated by Submission of the Paid Invoice) | 56,250.00 | |||
| Note 1: | Compensation authorized ONLY in conjunction with Out of Pocket Payments for Extra Port Support | ||||
| Total Estimate Schedule 8: | $56,250.00 |
EXHIBIT 1 -
Schedule of Supplies/Services
TOTALS
| SCHEDULE SUMMARY: | BASE | 1ST OPT | 2ND OPT | 3RD OPT | 4th OPT | 6mo ext |
| Schedule 1A: | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Schedule 1B: | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Schedule 2: | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Schedule 3: | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Schedule 4: | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Schedule 6: | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Schedule 8: | $56,250.00 | $56,250.00 | $56,250.00 | $56,250.00 | $56,250.00 | $28,125.00 |
| CONTRACT YEAR TOTALS: | $56,250.00 | $56,250.00 | $56,250.00 | $56,250.00 | $56,250.00 | $28,125.00 |
File details come from the government source that posted it. Updated .