Atch2b_-_Livorno_6mo_Blank_Schedules_OCT14.xlsx
XLSX spreadsheet 92 KB Posted
- Solicitation number
- HTC711-15-R-R010
About this file
Attachment 2b
View the file
Other files
| File | Type | Posted |
|---|---|---|
| HTC711-15-R-R010-0003.pdf | ||
| HTC711-15-R-R010-0002.pdf | ||
| HTC711-15-R-R010-0001.pdf | ||
| Atch2a_-_Livorno_Blank_Schedules_OCT14.xlsx | XLSX spreadsheet | |
| HTC711-15-R-R010_Livorno.pdf | ||
| Atch4_-_Info_Sheet.docx | DOCX document | |
| Atch3_-_Cyber_Security.docx | DOCX document | |
| Atch5_Invoicing_Instruction.docx | DOCX document | |
| Atch1_-_Livorno_PWS_20Jun14.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sched1A(Load)
| SCHEDULE OF RATES |
| Schedule 1A/Vessel Load |
| Port of Livorno Prices in USD |
| COMMODITY | LO-LO | RO-RO | |||||||||||||||||
| FROM LAND TRANSPORT | FROM QUAY/ SHED | USING SHIP'S GEAR | FROM QUAY/SHED | ||||||||||||||||
| OPERATIONAL | TOW-AWAY | USING GOVERNMENT DRIVERS | |||||||||||||||||
| EST QTY | EST RATE | EST TOTAL | EST QTY | EST RATE | EST TOTAL | EST QTY | EST RATE | EST TOTAL | EST QTY | EST RATE | EST TOTAL | EST QTY | EST RATE | EST TOTAL | EST QTY | EST RATE | EST TOTAL | ||
| A | A | A | C | C | C | F | F | F | K | K | K | L | L | L | M | M | M | ||
| 01 | GENERAL CARGO | L/T | L/T | L/T | L/T | L/T | L/T | L/T | L/T | L/T | |||||||||
| 01A | Palettized or Unitized Cargo | 1.00 | 0.00 | 1.00 | 0.00 | 1.00 | 0.00 | ||||||||||||
| 01B | Loose Cargo | 1.00 | 0.00 | 1.00 | 0.00 | 1.00 | 0.00 | ||||||||||||
| 01C | Cargo in Drums or Barrels (55 Gal. and Over Capacity) |
02 HOUSEHOLD GOODS & BAGGAGE
| 03 | PRIVATELY OWNED PASSENGER VEHICLE |
| 03A | Up to 6,600 lbs. |
| 03B | Over 6,600 lbs. |
| 04 | SPECIAL CARGO & HEAVY LIFTS | EA | EA | EA | EA | EA | EA | EA | EA | EA |
| 04A | 10,001 - 16,500 lbs. | 1.00 | 0.00 | 1.00 | 0.00 | 1.00 | 0.00 | |||
| 04B | 16,501 - 25,000 lbs. | 1.00 | 0.00 | 1.00 | 0.00 | 1.00 | 0.00 | |||
| 04C | Over 25,000 lbs. | 1.00 | 0.00 | 1.00 | 0.00 | 1.00 | 0.00 |
| 05 | MILITARY VEHICLES & TRAILERS (Wheeled or Tracked) | EA | EA | EA | EA | EA | EA | EA | EA | EA | EA | EA | EA | EA | EA | EA | EA | EA | EA |
| 05A | 0 - 10 L/T | 1.00 | 0.00 | 1.00 | 0.00 | 1.00 | 0.00 | 1.00 | 0.00 | 1.00 | 0.00 | 1.00 | 0.00 | ||||||
| 05B | 10 - 40 L/T | 1.00 | 0.00 | 1.00 | 0.00 | 1.00 | 0.00 | 1.00 | 0.00 | 1.00 | 0.00 | 1.00 | 0.00 | ||||||
| 05C | Over 40 L/T | 1.00 | 0.00 | 1.00 | 0.00 | 1.00 | 0.00 | 1.00 | 0.00 | 1.00 | 0.00 | 1.00 | 0.00 |
06 AIRCRAFT UNBOXED
| 07 | AMUNITION, EXPLOSIVES & OTHER HAZARDOUS CARGO |
| 07A | Palletized |
| 07B | Non- Palettized |
| EA | EA | EA | EA | EA | EA | EA | EA | EA | EA | EA | EA | ||
| 08 | CONEX CONTAINER, EMPTY & FULL (Including TRICON, QUADCON & ISU) | 1.00 | 0.00 | 1.00 | 0.00 | 1.00 | 0.00 | 1.00 | 0.00 |
| EA | EA | EA | EA | EA | EA | EA | EA | EA | EA | EA | EA | ||
| 09 | ISO CONTAINERS, COMMERCIAL & MILTARY FULL (Including Assembled TRICON's & QUADCON's to ISO Dimensions) | 1.00 | 0.00 | 1.00 | 0.00 | 1.00 | 0.00 | 1.00 | 0.00 |
10 SMALL ARMS AMMUNITION
Total Estimate Schedule 1A: $0.00
&"-,Bold"Attachment 2b - Schedule of Supplies/Services
&8SORLivornoFinalOct10
MOVE
Sched1B(Discharge)
| SCHEDULE OF RATES |
| Schedule 1B/Vessel Discharge |
| Port of Livorno Prices in USD |
| COMMODITY | LO-LO | RO-RO | |||||||||||||||||
| TO LAND TRANSPORT | TO QUAY/ SHED | USING SHIP'S GEAR | TO QUAY/SHED | ||||||||||||||||
| OPERATIONAL | TOW-AWAY | USING GOVERNMENT DRIVERS | |||||||||||||||||
| EST QTY | EST RATE | EST TOTAL | EST QTY | EST RATE | EST TOTAL | EST QTY | EST RATE | EST TOTAL | EST QTY | EST RATE | EST TOTAL | EST QTY | EST RATE | EST TOTAL | EST QTY | EST RATE | EST TOTAL | ||
| A | A | A | C | C | C | F | F | F | K | K | K | L | L | L | M | M | M | ||
| 01 | GENERAL CARGO | L/T | L/T | L/T | L/T | L/T | L/T | L/T | L/T | L/T | |||||||||
| 01A | Palettized or Unitized Cargo | 1.00 | 0.00 | 1.00 | 0.00 | 1.00 | 0.00 | ||||||||||||
| 01B | Loose Cargo | 1.00 | 0.00 | 1.00 | 0.00 | 1.00 | 0.00 | ||||||||||||
| 01C | Cargo in Drums or Barrels (55 Gal. and Over Capacity) |
02 HOUSEHOLD GOODS & BAGGAGE
| 03 | PRIVATELY OWNED PASSENGER VEHICLE |
| 03A | Up to 6,600 lbs. |
| 03B | Over 6,600 lbs. |
| 04 | SPECIAL CARGO & HEAVY LIFTS | EA | EA | EA | EA | EA | EA | EA | EA | EA |
| 04A | 10,001 - 16,500 lbs. | 1.00 | 0.00 | 1.00 | 0.00 | 1.00 | 0.00 | |||
| 04B | 16,501 - 25,000 lbs. | 1.00 | 0.00 | 1.00 | 0.00 | 1.00 | 0.00 | |||
| 04C | Over 25,000 lbs. | 1.00 | 0.00 | 1.00 | 0.00 | 1.00 | 0.00 |
| 05 | MILITARY VEHICLES & TRAILERS (Wheeled or Tracked) | EA | EA | EA | EA | EA | EA | EA | EA | EA | EA | EA | EA | EA | EA | EA | EA | EA | EA |
| 05A | 0 - 10 L/T | 1.00 | 0.00 | 1.00 | 0.00 | 1.00 | 0.00 | 60.00 | 0.00 | 1.00 | 0.00 | 1.00 | 0.00 | ||||||
| 05B | 10 - 40 L/T | 1.00 | 0.00 | 1.00 | 0.00 | 1.00 | 0.00 | 15.00 | 0.00 | 1.00 | 0.00 | 1.00 | 0.00 | ||||||
| 05C | Over 40 L/T | 1.00 | 0.00 | 1.00 | 0.00 | 1.00 | 0.00 | 15.00 | 0.00 | 1.00 | 0.00 | 1.00 | 0.00 |
06 AIRCRAFT UNBOXED
| 07 | AMUNITION, EXPLOSIVES & OTHER HAZARDOUS CARGO |
| 07A | Palletized |
| 07B | Non- Palettized |
| EA | EA | EA | EA | EA | EA | EA | EA | EA | EA | EA | EA | ||
| 08 | CONEX CONTAINER, EMPTY & FULL (Including TRICON, QUADCON & ISU) | 1.00 | 0.00 | 1.00 | 0.00 | 1.00 | 0.00 | 1.00 | 0.00 |
| EA | EA | EA | EA | EA | EA | EA | EA | EA | EA | EA | EA | ||
| 09 | ISO CONTAINERS, COMMERCIAL & MILTARY FULL (Including Assembled TRICON's & QUADCON's to ISO Dimensions) | 1.00 | 0.00 | 1.00 | 0.00 | 1.00 | 0.00 | 1.00 | 0.00 |
10 SMALL ARMS AMMUNITION
Total Estimate Schedule 1B: $0.00
&"-,Bold"Attachment 2b - Schedule of Supplies/Services
&8SORLivornoFinalOct10
MOVE
Sched1C(Receipt)
| SCHEDULE OF RATES |
| Schedule 1C/Cargo Receipt |
| Port of Livorno Prices in USD |
| COMMODITY | LO-LO | RO-RO | |||||
| FROM LANDTRANSPORT TO QUAY/SHED | From Landtransport to QUAY/SHED | ||||||
| ALL | |||||||
| EST QTY | EST RATE | EST TOTAL | EST QTY | EST RATE | EST TOTAL | ||
| A | A | A | G | G | G | ||
| 01 | GENERAL CARGO | L/T | L/T | L/T | |||
| 01A | Palettized or Unitized Cargo | 1.00 | 0.00 | ||||
| 01B | Loose Cargo | 1.00 | 0.00 | ||||
| 01C | Cargo in Drums or Barrels (55 Gal. and Over Capacity) |
| 02 | HOUSEHOLD GOODS & BAGGAGE | L/T | L/T | L/T |
| 60.00 | 0.00 |
| 03 | PRIVATELY OWNED PASSENGER VEHICLE |
| 03A | Up to 6,600 lbs. |
| 03B | Over 6,600 lbs. |
| 04 | SPECIAL CARGO & HEAVY LIFTS | EA | EA | EA |
| 04A | 10,001 - 16,500 lbs. | 1.00 | 0.00 | |
| 04B | 16,501 - 25,000 lbs. | 1.00 | 0.00 | |
| 04C | Over 25,000 lbs. | 1.00 | 0.00 |
| 05 | MILITARY VEHICLES & TRAILERS (Wheeled or Tracked) | EA | EA | EA | EA | EA | EA |
| 05A | 0 - 10 L/T | 200.00 | 0.00 | 1.00 | 0.00 | ||
| 05B | 10 - 40 L/T | 85.00 | 0.00 | 1.00 | 0.00 | ||
| 05C | Over 40 L/T | 35.00 | 0.00 | 1.00 | 0.00 |
06 AIRCRAFT UNBOXED
| 07 | AMUNITION, EXPLOSIVES & OTHER HAZARDOUS CARGO |
| 07A | Palletized |
| 07B | Non- Palettized |
| EA | EA | EA | ||
| 08 | CONEX CONTAINER, EMPTY & FULL (Including TRICON, QUADCON & ISU) | 1.00 | 0.00 |
| EA | EA | EA | ||
| 09 | ISO CONTAINERS, COMMERCIAL & MILTARY FULL (Including Assembled TRICON's & QUADCON's to ISO Dimensions) | 12.00 | 0.00 |
10 SMALL ARMS AMMUNITION
Total Estimate Schedule 1C: $0.00
&"-,Bold"Attachment 2b - Schedule of Supplies/Services
&8SORLivornoFinalOct10
MOVE
Sched1D(Disposition)
| SCHEDULE OF RATES |
| Schedule 1D/Cargo Disposition |
| Port of Livorno Prices in USD |
| COMMODITY | LO-LO | RO-RO | |||||
| FROM QUAY/SHED TO LANDTRANSPORT | FROM QUAY/SHED to Landtransport | ||||||
| ALL | |||||||
| EST QTY | EST RATE | EST TOTAL | EST QTY | EST RATE | EST TOTAL | ||
| A | A | A | F | F | F | ||
| 01 | GENERAL CARGO | L/T | L/T | L/T | |||
| 01A | Palettized or Unitized Cargo | 1.00 | 0.00 | ||||
| 01B | Loose Cargo | 1.00 | 0.00 | ||||
| 01C | Cargo in Drums or Barrels (55 Gal. and Over Capacity) |
| 02 | HOUSEHOLD GOODS & BAGGAGE | L/T | L/T | L/T |
| 1.00 | 0.00 |
| 03 | PRIVATELY OWNED PASSENGER VEHICLE |
| 03A | Up to 6,600 lbs. |
| 03B | Over 6,600 lbs. |
| 04 | SPECIAL CARGO & HEAVY LIFTS | EA | EA | EA |
| 04A | 10,001 - 16,500 lbs. | 1.00 | 0.00 | |
| 04B | 16,501 - 25,000 lbs. | 1.00 | 0.00 | |
| 04C | Over 25,000 lbs. | 1.00 | 0.00 |
| 05 | MILITARY VEHICLES & TRAILERS (Wheeled or Tracked) | EA | EA | EA | EA | EA | EA |
| 05A | 0 - 10 L/T | 1.00 | 0.00 | 1.00 | 0.00 | ||
| 05B | 10 - 40 L/T | 15.00 | 0.00 | 1.00 | 0.00 | ||
| 05C | Over 40 L/T | 15.00 | 0.00 | 1.00 | 0.00 |
06 AIRCRAFT UNBOXED
| 07 | AMUNITION, EXPLOSIVES & OTHER HAZARDOUS CARGO |
| 07A | Palletized |
| 07B | Non- Palettized |
| EA | EA | EA | ||
| 08 | CONEX CONTAINER, EMPTY & FULL (Including TRICON, QUADCON & ISU) | 1.00 | 0.00 |
| EA | EA | EA | ||
| 09 | ISO CONTAINERS, COMMERCIAL & MILTARY FULL (Including Assembled TRICON's & QUADCON's to ISO Dimensions) | 12.00 | 0.00 |
10 SMALL ARMS AMMUNITION
Total Estimate Schedule 1D: $0.00
&"-,Bold"Attachment 2b - Schedule of Supplies/Services
&8SORLivornoFinalOct10
MOVE
Sched1E(StuffUnstuff)
| SCHEDULE OF RATES |
| Schedule 1E/Cargo Stuffing/Unstuffing |
| Port of Livorno Prices in USD |
| COMMODITY | STUFFING/UNSTUFFING | |
| FROM/TO QUAY | FROM/TO WAREHOUSE |
| EST QTY | EST RATE | EST TOTAL | EST QTY | EST RATE | EST TOTAL | ||
| C | C | C | K | K | K | ||
| 01 | GENERAL CARGO | L/T | L/T | L/T | L/T | L/T | L/T |
| 01A | Palettized or Unitized Cargo | 1.00 | 0.00 | 70.00 | 0.00 | ||
| 01B | Loose Cargo | 1.00 | 0.00 | 1.00 | 0.00 | ||
| 01C | Cargo in Drums or Barrels (55 Gal. and Over Capacity) |
| 02 | HOUSEHOLD GOODS & BAGGAGE | L/T | L/T | L/T |
| 60.00 | 0.00 |
| 03 | PRIVATELY OWNED PASSENGER VEHICLE |
| 03A | Up to 6,600 lbs. |
| 03B | Over 6,600 lbs. |
| 04 | SPECIAL CARGO & HEAVY LIFTS | EA | EA | EA | EA | EA | EA |
| 04A | 10,001 - 16,500 lbs. | 1.00 | 0.00 | 1.00 | 0.00 | ||
| 04B | 16,501 - 25,000 lbs. | 1.00 | 0.00 | 1.00 | 0.00 | ||
| 04C | Over 25,000 lbs. | 1.00 | 0.00 | 1.00 | 0.00 |
| 05 | MILITARY VEHICLES & TRAILERS (Wheeled or Tracked) | EA | EA | EA | EA | EA | EA |
| 05A | 0 - 10 L/T | 1.00 | 0.00 | 1.00 | 0.00 | ||
| 05B | 10 - 40 L/T | 3.00 | 0.00 | 1.00 | 0.00 | ||
| 05C | Over 40 L/T |
06 AIRCRAFT UNBOXED
| 07 | AMUNITION, EXPLOSIVES & OTHER HAZARDOUS CARGO |
| 07A | Palletized |
| 07B | Non- Palettized |
08 CONEX CONTAINER, EMPTY & FULL (Including TRICON, QUADCON & ISU)
09 ISO CONTAINERS, COMMERCIAL & MILTARY FULL (Including Assembled TRICON's & QUADCON's to ISO Dimensions)
10 SMALL ARMS AMMUNITION
Total Estimate Schedule 1E: $0.00
&"-,Bold"Attachment 2b - Schedule of Supplies/Services
&8SORLivornoFinalOct10
MOVE
Sched1F(Transfer)
| SCHEDULE OF RATES |
| Schedule 1F/Cargo Transfer |
| Port of Livorno Prices in USD |
COMMODITY TRANSFER BETWEEN DIFFERENT AREAS OF THE PORT
| OPERATIONAL | TOW-AWAY | ||||||
| EST QTY | EST RATE | EST TOTAL | EST QTY | EST RATE | EST TOTAL | ||
| A | A | A | C | C | C | ||
| 01 | GENERAL CARGO | ||||||
| 01A | Palettized or Unitized Cargo | ||||||
| 01B | Loose Cargo | ||||||
| 01C | Cargo in Drums or Barrels (55 Gal. and Over Capacity) |
02 HOUSEHOLD GOODS & BAGGAGE
| 03 | PRIVATELY OWNED PASSENGER VEHICLE |
| 03A | Up to 6,600 lbs. |
| 03B | Over 6,600 lbs. |
| 04 | SPECIAL CARGO & HEAVY LIFTS |
| 04A | 10,001 - 16,500 lbs. |
| 04B | 16,501 - 25,000 lbs. |
| 04C | Over 25,000 lbs. |
| 05 | MILITARY VEHICLES & TRAILERS (Wheeled or Tracked) | EA | EA | EA | EA | EA | EA |
| 05A | 0 - 10 L/T | 1.00 | 0.00 | 1.00 | 0.00 | ||
| 05B | 10 - 40 L/T | 1.00 | 0.00 | 1.00 | 0.00 | ||
| 05C | Over 40 L/T | 1.00 | 0.00 | 1.00 | 0.00 |
06 AIRCRAFT UNBOXED
| 07 | AMUNITION, EXPLOSIVES & OTHER HAZARDOUS CARGO |
| 07A | Palletized |
| 07B | Non- Palettized |
08 CONEX CONTAINER, EMPTY & FULL (Including TRICON, QUADCON & ISU)
09 ISO CONTAINERS, COMMERCIAL & MILTARY FULL (Including Assembled TRICON's & QUADCON's to ISO Dimensions)
10 SMALL ARMS AMMUNITION
Total Estimate Schedule 1F: $0.00
&"-,Bold"Attachment 2b - Schedule of Supplies/Services
&8SORLivornoFinalOct10
MOVE
Sched2(Det&Diff)
| SCHEDULE OF RATES |
| Schedule 2/Detention & Differentials |
| Port of Livorno Prices in USD | |||||
| DETENTION | |||||
| DAY SHIFT | 1ST SHIFT | 2ND SHIFT | 3RD SHIFT | 4TH SHIFT |
| EST QTY | EST RATE | EST TOTAL | EST QTY | EST RATE | EST TOTAL | EST QTY | EST RATE | EST TOTAL | EST QTY | EST RATE | EST TOTAL | EST QTY | EST RATE | EST TOTAL | |||
| A | A | A | B | B | B | C | C | C | D | D | D | E | E | E | |||
| HR | HR | HR | HR | HR | HR | HR | HR | HR | HR | HR | HR | HR | HR | HR | |||
| A | WORKDAY | 15.00 | 0.00 | 1.00 | 0.00 | 1.00 | 0.00 | ||||||||||
| B | SATURDAY | 1.00 | 0.00 | 1.00 | 0.00 | 1.00 | 0.00 | 1.00 | 0.00 | ||||||||
| C | SUNDAY | 1.00 | 0.00 | 1.00 | 0.00 | 1.00 | 0.00 | 1.00 | 0.00 | ||||||||
| D | HOLIDAY | 1.00 | 0.00 | 1.00 | 0.00 | 1.00 | 0.00 | 1.00 | 0.00 | ||||||||
| Paid for personnel detention and waiting time when not caused by the contractor | |||||||||||||||||
| 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | ||||||||||||
| Port of Livorno Prices in USD | |||||||||||||||||
| OVERTIME DIFFERENTIAL | |||||||||||||||||
| DAY SHIFT | 1ST SHIFT | 2ND SHIFT | 3RD SHIFT | 4TH SHIFT |
| EST QTY | EST RATE | EST TOTAL | EST QTY | EST RATE | EST TOTAL | EST QTY | EST RATE | EST TOTAL | EST QTY | EST RATE | EST TOTAL | EST QTY | EST RATE | EST TOTAL | |||
| F | F | F | G | G | G | H | H | H | I | I | I | K | K | K | |||
| HR | HR | HR | HR | HR | HR | HR | HR | HR | HR | HR | HR | HR | HR | HR | |||
| A | WORKDAY | 1.00 | 0.00 | 1.00 | 0.00 | 1.00 | 0.00 | ||||||||||
| B | SATURDAY | 1.00 | 0.00 | 1.00 | 0.00 | 1.00 | 0.00 | 1.00 | 0.00 | ||||||||
| C | SUNDAY | 1.00 | 0.00 | 1.00 | 0.00 | 1.00 | 0.00 | 1.00 | 0.00 | ||||||||
| D | HOLIDAY | 1.00 | 0.00 | 1.00 | 0.00 | 1.00 | 0.00 | 1.00 | 0.00 | ||||||||
| Paid for personnel working beyond regular working hours for a maximum of 2 hrs. unless otherwise is mutually agreed upon | |||||||||||||||||
| 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | ||||||||||||
| Port of Livorno Prices in USD | |||||||||||||||||
| SHIFT DIFFERENTIAL | |||||||||||||||||
| DAY SHIFT | 1ST SHIFT | 2ND SHIFT | 3RD SHIFT | 4TH SHIFT |
| EST QTY | EST RATE | EST TOTAL | EST QTY | EST RATE | EST TOTAL | EST QTY | EST RATE | EST TOTAL | EST QTY | EST RATE | EST TOTAL | EST QTY | EST RATE | EST TOTAL | |||
| L | L | L | M | M | M | N | N | N | P | P | P | R | R | R | |||
| HR | HR | HR | HR | HR | HR | HR | HR | HR | HR | HR | HR | HR | HR | HR | |||
| A | WORKDAY | 1.00 | 0.00 | 1.00 | 0.00 | ||||||||||||
| B | SATURDAY | 1.00 | 0.00 | 1.00 | 0.00 | 1.00 | 0.00 | 1.00 | 0.00 | ||||||||
| C | SUNDAY | 1.00 | 0.00 | 1.00 | 0.00 | 1.00 | 0.00 | 1.00 | 0.00 | ||||||||
| D | HOLIDAY | 1.00 | 0.00 | 1.00 | 0.00 | 1.00 | 0.00 | 1.00 | 0.00 | ||||||||
| Paid in conjunction & in addition to commodity rate payment for service rendered during other than day shift | |||||||||||||||||
| 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | ||||||||||||
| Total Estimate Schedule 2: | $0.00 | 0.00 |
&"-,Bold"Attachment 2b - Schedule of Supplies/Services
&8SORLivornoFinalOct10
SHIFT
ALL TYPES LABOR
SHIFT
ALL TYPES LABOR
SHIFT
ALL TYPES LABOR
Sched3(ExtraLabor)
| SCHEDULE OF RATES |
| Schedule 3 |
| Extra Labor Rates Applicable to Services not covered by Commodity Rates |
| Port of Livorno Prices in USD |
DAY SHIFT 1ST SHIFT 2ND SHIFT 3RD SHIFT 4TH SHIFT
| EST QTY | EST RATE | EST TOTAL | EST QTY | EST RATE | EST TOTAL | EST QTY | EST RATE | EST TOTAL | EST QTY | EST RATE | EST TOTAL | EST QTY | EST RATE | EST TOTAL | ||
| A | A | A | B | B | B | C | C | C | D | D | D | E | E | E | ||
| HR | HR | HR | HR | HR | HR | HR | HR | HR | HR | HR | HR | HR | HR | HR | ||
| A | WORKDAY | 175.00 | 0.00 | 25.00 | 0.00 | 10.00 | 0.00 | |||||||||
| B | SATURDAY | 3.00 | 0.00 | 3.00 | 0.00 | 3.00 | 0.00 | 2.00 | 0.00 | |||||||
| C | SUNDAY | 3.00 | 0.00 | 3.00 | 0.00 | 3.00 | 0.00 | 2.00 | 0.00 | |||||||
| D | HOLIDAY | 1.00 | 0.00 | 1.00 | 0.00 | 1.00 | 0.00 | 1.00 | 0.00 |
Total Estimate Schedule 3: $0.00
&"-,Bold"Attachment 2b - Schedule of Supplies/Services
&8SORLivornoFinalOct10
SHIFT
ALL TYPES LABOR
Sched4Equip
| SCHEDULE OF RATES |
| Schedule 4/Equipment Rental |
Port of Livorno Prices in USD
| TYPE CODE | EQUIPMENT DESCRIPTION | RATE x HOUR | RATE x DAY | ||||
| EST QTY | EST RATE | EST TOTAL | EST QTY | EST RATE | EST TOTAL | ||
| 01 | Forklift up to 3 Tons | 8.00 | 0.00 | ||||
| 02 | Forklift up to 5 Tons | 2.00 | 0.00 | ||||
| 03 | Forklift up to 8 Tons | 1.00 | 0.00 | ||||
| 04 | Forklift up to 12 Tons | 1.00 | 0.00 | ||||
| 05 | Container Bridge up to 20 Tons | 1.00 | 0.00 | ||||
| 06 | Container Bridge over 20 Tons | 1.00 | 0.00 | ||||
| 07 | Truck, Cargo up to 2.5 Tons | 1.00 | 0.00 | ||||
| 08 | Truck, Cargo up to 5 Tons | 1.00 | 0.00 | ||||
| 09 | Tug Master w/o 40' Chassis | 1.00 | 0.00 | ||||
| 10 | Tug Master with 40' Chassis | 1.00 | 0.00 | ||||
| 11 | Ro-Ro Trailer/MAFI | 1.00 | 0.00 | ||||
| 12 | Motorized Broomsweeper | 1.00 | 0.00 | ||||
| 13 | Portable Compressor for Equipment 5 Tons and Above | 1.00 | 0.00 | ||||
| 14 | Battery Charger for Equipment 5 Tons and Above | 1.00 | 0.00 | ||||
| 15 | 20' Empty Security ISO Container | 1.00 | 0.00 | ||||
| 16 | 40' Empty Security ISO Container | 60.00 | 0.00 | ||||
| Note 1: | Equipment not listed above will be compensated on an out-of-pocket basis | ||||||
| Note 2: | All equipment is with operator/driver and includes fuel, lubricants and maintenance | ||||||
| Note 3: | Empty ISO containers includes necessary securing devices, positioning and re-positioning | ||||||
| Total Estimate Schedule 4: | $0.00 |
Attachment 2b - Schedule of Supplies/Services
&8SORLivornoFinalOct10
Sched5&6
| SCHEDULE OF RATES |
| Schedule 5/Storage |
Port of Livorno Prices in USD
| CODE | COMMODITY | RATE per DAY per PC | RATE per LT per DAY | ||||||
| EST QTY (Pieces) | EST QTY (Days) | EST RATE | EST TOTAL | EST QTY (LT) | EST QTY (Days) | EST RATE | EST TOTAL | ||
| A | OPEN STORAGE | ||||||||
| 1 | Military Vehicles & Trailers (Wheeled or Tracked) | 1.00 | 1.00 | 0.00 | |||||
| 2 | Container, Commercial & Military (Empty & Full) | 1.00 | 1.00 | 0.00 | |||||
| 3 | Special Cargo & Heavy Lifts (Over 25,000 lbs Only) | 1.00 | 1.00 | 0.00 |
| B | CLOSE STORAGE (Shed or Warehouse) | |||
| 1 | Special Cargo & Heavy Lifts | 1.00 | 1.00 | 0.00 |
| 2 | General Cargo (NOS) & HHG's | 78.00 | 1.00 | 0.00 |
| 3 | Lashing Gear (Government Owned) | 1.00 | 1.00 | 0.00 |
| C | FREE STORAGE (Open & Closed) | |
| 1 | All Commodities | |
| Note 1: | Compensation authorized ONLY after 8 days free time (including discharge day) | |
| Total Estimate Schedule 5: | $0.00 | |
| SCHEDULE OF RATES | ||
| Schedule 6 - Facilities | ||
| (Utilization of Facilities & Related Services) | ||
| Port of Livorno - Prices in USD |
| CODE | DESCRIPTION | CRITERIA | EST QTY (SQMT) | EST QTY (DAYS) | EST RATE (Cost / SQMT / Day) | EST TOTAL |
| A | OPEN STAGING HARD STAND | |||||
| 1 | Exclusive Use in Port Area UP TO 60000 SQM | SQMT per DAY | 500.00 | 1 | 0.00 | |
| B | OPEN STAGING HARD STAND | |||||
| 1 | Exclusive Use Outside Port Area | SQMT per DAY | ||||
| C | WAREHOUSE (Bonded/Sterile Exclusive Use) | |||||
| 1 | From 0 to 1,500 SQMT | SQMT per DAY | 1.00 | 1 | 0.00 | |
| 2 | From 1,501 to 3,000 SQMT | SQMT per DAY | 1.00 | 1 | 0.00 | |
| 3 | Over 3,000 SQMT (1,500 SQM) | SQMT per DAY | 1.00 | 1 | 0.00 | |
| D | OFFICE SPACE (Permanent) | |||||
| 1 | 20 SQMT | SQMT per DAY | ||||
| 2 | 35 SQMT | SQMT per DAY | ||||
| E | OFFICE SPACE (Portable) | |||||
| 1 | 20 SQMT | UNIT per DAY | ||||
| 2 | 35 SQMT | UNIT per DAY |
| CODE | DESCRIPTION | CRITERIA | EST QTY (Units) | EST QTY (Months) | EST RATE (Cost / Unit / Month) | EST TOTAL |
| F | PORTABLE LATRINES | EACH per DAY | 4.00 | 1 | 0.00 | |
| G | TRASH CONTAINERS (Metal Min. 2 CUMT) | EACH per DAY |
| CODE | DESCRIPTION | CRITERIA | EST QTY (Meters) | EST QTY (DAYS) | EST RATE (Cost / Meter / Day) | EST TOTAL |
| H | PORTABLE FENCING | METERs per DAY | ||||
| Note 1: | Facilities/Equipment not listed above will be compensated on an out-of-pocket basis | |||||
| Note 2: | CODEs E thru H includes positioning and re-positioning | |||||
| Note 3: | CODE F (Portable Latrines) includes daily cleaning | |||||
| Total Estimate Schedule 6: | 0.00 |
Attachment 2b - Schedule of Supplies/Services
Sched7&8
| SCHEDULE OF RATES |
| Schedule 7/Lumber & Related Services |
Port of Livorno Prices in USD
| CODE | DESCRIPTION (HxWxL) (HeightxWidthxLength in CM) | CRITERIA | EST QTY | EST RATE | EST TOTAL |
| A | LUMBER (Dunnage Grade) | ||||
| 1 | 2X8 | xCUMT | 1.00 | 0.00 | |
| 2 | 2X16 | xCUMT | 1.00 | 0.00 | |
| 3 | 5X10 | xCUMT | 1.00 | 0.00 | |
| 4 | 10X10 | xCUMT | 1.00 | 0.00 | |
| B | PLYWOOD | ||||
| 1 | 1.2X122X244 | xEA | 1.00 | 0.00 | |
| 2 | 1.9X122X244 | xEA | 1.00 | 0.00 | |
| C | NYLON LASHING (Hooked w/Ratchet Minimum 8 Meter Trap Length) | ||||
| 1 | 3 Ton | xEA | 1.00 | 0.00 | |
| 2 | 5 Ton | xEA | 1.00 | 0.00 | |
| 3 | 10 Ton | xEA | 1.00 | 0.00 | |
| D | OTHER | ||||
| 1 | Chock Blocks | xEA | 1.00 | 0.00 | |
| 2 | Trailer Support Stands, Iron/Steel | xEA | 1.00 | 0.00 | |
| 3 | Trailer Support Stands, Lumber | xEA | 1.00 | 0.00 | |
| E | LUMBER RECLAMATION | ||||
| 1 | All Types | xCUMT | 1.00 | 0.00 | |
| Note 1: | All Lumber must be no less than 2 meters long in bubdles of the same size and length | ||||
| Note 2: | All wood products must be free of bark and treated against insects IAW applicable law(s) | ||||
| Note 3: | All Nylon Lashings must bare the International Strength Test certificate and be no less than 8 meters in length |
Total Estimate Schedule 7: 0.00
| SCHEDULE OF RATES |
| Schedule 8/Miscellaneous |
| Port of Livorno Prices in USD |
| CODE | DESCRIPTION | CRITERIA | |||
| A | OPERATION DISCOUNT | ||||
| 1 | Commodity 09, Schedule 1A & 1B when Empty | % | |||
| B | ADMINISTRATIVE CHARGES | ||||
| 1 | Compensation Payments Extra Port Support (6.14.6)*** | % | |||
| C | SUPPORT SERVICES | ||||
| EST QTY | EST RATE | EST TOTAL | |||
| 1 | Import Customs Document (AE Form 302) | EACH | 50.00 | 0.00 | |
| 2 | Export Customs Document (AE Form 302) | EACH | 25.00 | 0.00 | |
| 3 | Sanitary Inspection to Container (Including 1st DVCE) | EACH | 1.00 | 0.00 | |
| 4 | DVCE's Issued (In Addition to Above for Same Container) | EACH | 1.00 | 0.00 | |
| 5 | Customs Processing of Vessel Arrival Manifest (or Cargo List) | EACH | 1.00 | 0.00 | |
| 6 | Revalidation/Change of Destination (AE Form 302) | EACH | 1.00 | 0.00 | |
| 7 | Authorization to Stuff/Unstuff Container/Flatrack | EACH | 1.00 | 0.00 | |
| 8 | Authorization to Open Container for Document Retreival | EACH | 1.00 | 0.00 | |
| D | C M R | ||||
| E | OUT OF POCKET EXPENSES (Reimbursement of Actual Costs Disbursed as Substantiated by Submission of the Paid Invoice) | 28,125.00 | |||
| Note 1: | Compensation authorized ONLY in conjunction with Out of Pocket Payments for Extra Port Support | ||||
| Total Estimate Schedule 8: | $28,125.00 |
ATTACHMENT 2b - Schedule of Supplies/Services
TOTALS
| SCHEDULE SUMMARY: | 6 Month Ext. |
| Schedule 1A: | $0.00 |
| Schedule 1B: | $0.00 |
| Schedule 1C: | $0.00 |
| Schedule 1D: | $0.00 |
| Schedule 1E: | $0.00 |
| Schedule 1F: | $0.00 |
| Schedule 2: | $0.00 |
| Schedule 3: | $0.00 |
| Schedule 4: | $0.00 |
| Schedule 5&6: | $0.00 |
| Schedule 7&8: | $28,125.00 |
| TOTAL: | $28,125.00 |
File details come from the government source that posted it. Updated .