This is a Performance Work Statement (PWS) for integrated laundry and dry-cleaning services supporting the Medical Logistics Department at Brooke Army Medical Center (BAMC), located at JBSA Fort Sam Houston, Texas. The contractor shall provide all personnel, equipment, supplies, facilities, transportation, and supervision necessary to perform bulk-linen laundry, piece-work laundry, and dry-cleaning services, with the Government providing only designated loading/unloading areas, access to facilities, and specified materials such as laundry bags. Services include receipt, pick-up, transportation, processing, cleaning, drying, finishing, packaging, delivery, and re-performance of deficient work, along with comprehensive records management and accountability tracking. The estimated annual workload includes approximately 3,000,000 pounds of bulk laundry and specified piece-work items such as 7,000 duty-uniform pants, 6,000 duty-uniform shirts, 12,000 coats, and various linens including tablecloths, curtains, and flags.

The contractor must meet a 24-hour turnaround time for routine laundry and dry-cleaning items and maintain an Acceptable Quality Level (AQL) of at least 95% compliance with cleanliness, finish, packaging, and labeling standards. Scheduled pick-up and delivery occur daily at BAMC Building 3600, with normal operating hours from 7:00 A.M. to 3:00 P.M., seven days per week, excluding federally recognized holidays unless otherwise authorized. The contractor must submit a Quality Control Plan within 30 days of award, designate a Contract Manager within seven days of commencement, and notify the Contracting Officer's Representative within 24 hours of any issues affecting service performance. All contractor personnel must comply with security and access requirements, including background investigation coordination through BAMC's Security Manager, e-QIP completion, and proof of U.S. citizenship or valid immigration documentation. The PWS emphasizes infection control compliance with 29 CFR 1910.1030 bloodborne-pathogen requirements and CDC guidance, mandating strict segregation of soiled and clean textiles during transport and processing with proper vehicle and cart sanitation protocols.

View the file

Other files

File Type Posted
PWS_Laundry.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PERFORMANCE WORK STATEMENT

(PWS)

INTEGRATED LAUNDRY AND DRY CLEANING SERVICES

MEDICAL LOGISTICS DEPARTMENT

PART 1 GENERAL INFORMATION

1 General: This is a non-personal services contract. Contractor personnel are not subject, either by the contract terms or by the manner of contract administration, to the supervision and control usually prevailing in relationships between the Government and its employees. The Contractor is responsible for supervision, scheduling, and management of its personnel and for contract performance.

1.1 Description of Services/Introduction: The Contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items necessary to perform integrated healthcare laundry, piece-work laundry, and dry-cleaning services for the Medical Logistics Department, except for those items identified in Part 3. Services include receipt, accountability, pick-up, transportation, processing, cleaning, drying, finishing, packaging, delivery, re-performance of deficient work, and associated records management for bulk linen and approved piece-work items.

1.2 Background: The Medical Logistics Department requires reliable laundry support to sustain healthcare operations. The Contractor shall protect the cleanliness, availability, accountability, and condition of Government-owned textiles and other authorized articles throughout the service cycle.

1.3 Objective(s): The objective of this contract is to provide timely, hygienic, accountable, and quality-controlled laundry and dry-cleaning services that support the operational needs of the Medical Logistics Department. The Contractor shall meet the performance standards in this PWS, the Performance Requirements Summary (PRS), and the applicable Technical Exhibits.

1.4 Scope: The Contractor shall provide combined bulk-laundry and piece-work laundry/dry-cleaning services, including scheduled pick-up and delivery. The Contractor shall establish and maintain a records system sufficient to control and account for all work performed. The Contractor shall perform all services in accordance with applicable federal, state, local, installation, and healthcare-facility requirements. Specific workload, item, packaging, and schedule requirements are contained in Technical Exhibits C and D and Attachment 1.

1.5 General Information

1.5.1 Quality Control Plan (QCP): Within 30 calendar days after award, the Contractor shall submit a written QCP to the Contracting Officer (KO) through the Contracting Officer’s Representative (COR). The QCP shall describe the Contractor’s methods for monitoring and documenting performance, preventing recurrence of deficiencies, handling customer complaints, maintaining laundry accountability records, verifying transport sanitation, controlling contamination risks, and correcting nonconforming services. The Contractor shall update the QCP when material changes are proposed or when directed by the KO.

1.5.2 Notification of Potential Issues: The Contractor shall notify the COR within 24 hours after identifying an actual or potential condition that may adversely affect service performance, patient-care support, laundry availability, Government property, or the Contractor’s ability to meet the approved schedule. The Contractor shall provide a written report within seven calendar days describing the issue, interim actions, corrective action, and expected resolution.

1.5.3 Recognized Holidays: Routine services shall not be required on federally recognized holidays unless specified in Technical Exhibit D or otherwise authorized by the KO. Deliverables due on a federal holiday are due on the preceding workday unless otherwise agreed in writing.

1.5.4 Operating Hours and Service Schedule: The Contractor shall conduct scheduled services during the hours and days identified in Technical Exhibit D.

Normal Hours of Operation. Normal duty hours for the purpose of this contract are 7:00 A.M. to 3:00 P.M. Monday through Sunday.

Recognized Holidays. The contractor shall not be required to pick up and deliver laundry on all officially recognized federal holidays. The following is a list of legal federal holidays as referred to elsewhere in the contract and PWS:

New Year’s Day, January 1st Martin Luther King’s Birthday, 3rd Monday in January Presidents’ Day, 3rd Monday in February Memorial Day, last Monday in May Independence Day, July 4th Labor Day, 1st Monday in September Columbus Day, 2nd Monday in October Veteran’s Day, November 11th Thanksgiving Day, 4th Thursday in November Christmas, December 25th

The following pick-up and delivery chart specifies regular pick-up and delivery points for this contract. All pick-ups and deliveries shall be accomplished as stated below (military time):

Delivery Location Delivery Day Delivery Time Pick Up Location Pick Up Day Pick Up Time

Bldg. 3600
Sunday
0800
Bldg. 3600
Sunday
0830
Bldg. 3600
Monday
0800
Bldg. 3600
Monday
0830
Bldg. 3600
Tuesday
0800
Bldg. 3600
Tuesday
0830
Bldg. 3600
Wednesday
0800
Bldg. 3600
Wednesday
0830
Bldg. 3600
Thursday
0800
Bldg. 3600
Thursday
0830
Bldg. 3600
Friday
0800
Bldg. 3600
Friday
0830
Bldg. 3600
Saturday
0800
Bldg. 3600
Saturday
0830

Brooke Army Medical Center Bldg. 3600 room L26-5

1.5.5 Government Quality Assurance: The Government may conduct surveillance and inspect services and deliverables to determine compliance with the PWS and PRS. Government surveillance does not relieve the Contractor of responsibility for quality control.

1.6 Security and Access Requirements

1.6.1 The work under this contract is unclassified. The Contractor shall comply with applicable installation access, physical-security, identification, vehicle-registration, and force-protection requirements. Contractor personnel and vehicles are subject to installation entry controls and search requirements.

1.6.2 The Contractor shall safeguard Government property and any Government information encountered during performance. At the close of each work period, the Contractor shall secure Government-furnished work areas, equipment, and materials in its custody or control.

1.6.3 The Contractor shall ensure personnel have any required installation access credentials before performance and shall promptly report changes in personnel or access eligibility to the COR.

Security Requirements. Unaccompanied access to BAMC is not authorized without written consent from Government personnel. Contractor’s personnel shall wear picture identification. BAMC will provide a picture identification badge that shall be worn at all times when on Government property.

Investigation Requirements. The contractor providing service under this contract is required to initiate and document the new employee’s Electronic Questionnaires for Investigations Processing (e-QIP) and coordinate or validate through the BAMC Security Manager’s Office all background investigation requirements needed for employment at BAMC, or in BAMC organizations. Clearances will be validated using the Joint Personnel Adjudication System (JPAS) when a new employee begins in-processing after contract is awarded. The SF 85P Questionnaire for Public Trust Positions is to be completed and printed and electronic copies (downloaded from internet program) are to be hand carried to the BAMC Security Manager prior to performance. The Contractor shall have proof of U.S. citizenship (certified copy of birth certificate or naturalization papers) or a valid U.S. Immigration Form 1-151 and Alien Registration Card ("Green Card"). As a minimum, the contractor providing service requiring operating government-furnished workstations that have access to Department of Defense e-mail and requiring unescorted entry to a restricted area/Controlled Areas, must successfully complete a National Agency Check (NAC). The contractor shall coordinate and schedule appointments with the BAMC Security Manager prior to performance. The BAMC security manager will initiate the Request for Personnel Security Action, review the security questionnaire and request a Local File Check from the Provost Marshall prior to scheduling an appointment with the Security Specialists to submit the e-QIP for processing. This security questionnaire must be completed and processed by the BAMC Personnel Security Office prior to contract performance. The contractor is responsible for monitoring the coordination and completion of the scheduled appointment date and time with the Security Manager.

1.7 Contract Manager

1.7.1 The Contractor shall designate a Contract Manager and an alternate in writing to the KO through the COR no later than seven calendar days before commencement of services. The Contract Manager and alternate shall have authority to act for the Contractor on routine contract-performance matters and shall be available during Contractor support hours. The Contractor shall notify the KO through the COR in writing of changes within seven calendar days.

PART 2 DEFINITIONS AND ACRONYMS

2.1 Definitions

2.1.1 Clean: Finished articles that are dry; free of visible soil, lint, and objectionable odors; and processed without damage to fabric or article integrity.

2.1.2 Contaminated Laundry: Soiled laundry or textiles that require handling and processing in accordance with applicable healthcare infection-control and occupational-safety requirements.

2.1.3 Contracting Officer (KO): The Government official with authority to enter into, administer, or terminate the contract and make related determinations and findings.

2.1.4 Contracting Officer’s Representative (COR): A Government employee designated in writing by the KO to perform specified technical or administrative functions within the limits of the designation.

2.1.5 Defective Service: A service output that does not meet a PWS performance standard.

2.1.6 Dry Cleaning: Cleaning of authorized articles using an appropriate solvent process and finishing methods, including pre-spotting when required.

2.1.7 Laundering: Cleaning and treatment of soiled fabric items by mechanical action, water and appropriate agents, followed by applicable drying, ironing, pressing, folding, or packaging.

2.1.8 Quality Control (QC): The Contractor’s measures to ensure products and services meet contract requirements.

2.1.9 Re-performance: Correction, re-cleaning, reprocessing, or replacement of nonconforming services or products at no additional cost to the Government.

2.2 Acronyms

Acronym
Meaning
COR
Contracting Officer’s Representative
KO
Contracting Officer
PWS
Performance Work Statement
QCP
Quality Control Plan
QC
Quality Control
PRS
Performance Requirements Summary
OSHA
Occupational Safety and Health Administration
CDC
Centers for Disease Control and Prevention
PPE
Personal Protective Equipment

PART 3 GOVERNMENT PROPERTY AND SERVICES

3 Government Property and Services: Government-furnished property and services are limited to those expressly identified in this PWS, Technical Exhibits, or other contract documents.

3.1 Facilities: The Government will provide access to designated loading/unloading and exchange areas, as available and as required for contract performance.

Pick-up and delivery at Brooke Army Medical Center (BAMC), Bldg. 3600, 3551 Roger Brooke Drive, JBSA Fort Sam Houston, Texas 78234-6200 Clean linen delivered to room L29-13 Soiled linen Picked up from L-25-04

3.2 Equipment: Government-owned scales and other Government-furnished equipment, if provided, shall be identified in Attachment 1 or other contract documentation. The Contractor shall use Government-furnished equipment only as authorized and shall report damage, loss, or malfunction promptly to the COR.

3.3 Materials: The Government may provide laundry bags and plastic bags when specified in Attachment 1. All other materials necessary for performance shall be Contractor furnished unless expressly stated otherwise.

3.4 Utilities: The Government will provide available utilities at Government loading/unloading or work areas when required for performance. The Contractor shall use utilities conservatively. Utility outages or Government facility closures shall be addressed in accordance with the contract and approved continuity procedures.

PART 4 CONTRACTOR-FURNISHED PROPERTY AND SERVICES

4.1 General: The Contractor shall furnish all personnel, vehicles, laundry-processing capability, facilities, supplies, materials, equipment, carts, packaging, supervision, and services necessary to perform this PWS, except as expressly identified as Government furnished.

4.2 Vehicles: The Contractor shall ensure all vehicles used for this contract are properly registered, licensed, insured, clean, and maintained. Clean and soiled articles shall not be transported in the same vehicle at the same time. A vehicle that has hauled soiled textiles shall be cleaned and sanitized as necessary before hauling clean articles.

4.3 Carts and Transport Containers: The Contractor shall provide carts or containers necessary to transport laundry safely. Clean and soiled laundry shall be segregated. Carts used for clean laundry shall be clean and protected against contamination. If a cart previously used for soiled laundry is used for clean laundry, it shall be thoroughly cleaned and disinfected before clean use and equipped with a clean liner and cover.

4.4 Packaging Materials: The Contractor shall furnish clear, durable packaging materials sufficient to protect finished articles from contamination, damage, and degradation during storage and transit. Packaging requirements for bulk items are specified in Technical Exhibit C.

4.5 Personnel: The Contractor shall provide personnel who are trained and competent to perform assigned work safely and in accordance with this PWS. The Contractor is responsible for workforce management, supervision, scheduling, leave, and replacement personnel.

PART 5 SPECIFIC TASKS

5.1 Integrated Laundry and Dry-Cleaning Services

5.1.1 The Contractor shall receive, pick up, process, clean, dry, finish, package, and return bulk linen, piece-work laundry, and authorized dry-cleaning items in accordance with Technical Exhibits C and D and Attachment 1. The Contractor shall handle all soiled laundry as contaminated laundry and shall use procedures that prevent cross-contamination of clean articles.

5.1.2 Turnaround Time: Unless otherwise specified for an item category or service location in Technical Exhibit D, the Contractor shall return routine laundry and dry-cleaning items no later than the next business day after receipt. [DECISION REQUIRED: Confirm whether a 24-hour turnaround applies to all service categories or whether separate routine/urgent turnaround standards are required.] Applies to all categories.

5.1.3 Pick-up and Delivery: The Contractor shall provide scheduled pick-up and delivery in accordance with Technical Exhibit D. At each exchange, the Contractor and Government representative shall verify the applicable count or weight and sign the tracking record. The Contractor shall provide the Government a completed copy of the record at pick-up and delivery. Unresolved discrepancies shall be referred to the KO through the COR.

5.1.4 Accountability: For bulk laundry, the Contractor shall use a tracking record that identifies, as applicable, service location, cart or container identifier, tare weight, total weight, net weight, pick-up/delivery date and time, and signatures. For piece-work or dry-cleaning items, the Contractor shall use a tracking ticket that identifies nomenclature, size when applicable, quantity, and pick-up/delivery date and time. The Contractor shall maintain production and accountability records for the period required by the contract.

5.1.5 Lost, Damaged, or Found Property: The Contractor shall promptly return all personal or Government property found in laundry. The Contractor shall report lost or damaged Government property to the COR. The Contractor shall correct or replace property lost or damaged due to Contractor action or omission at no additional cost to the Government, subject to KO direction and applicable contract terms.

5.2 Processing, Quality, and Re-performance

5.2.1 The Contractor shall process laundry using methods and formulas that produce hygienically clean articles without avoidable damage. The Contractor shall remove visible soil, spots, stains, lint, tape, and adhesives when removal can be accomplished without changing color or damaging the article.

5.2.2 Finished articles shall be dry, free of objectionable odors, free of excess soap or bleach residue, and free of lint, scorch marks, tears, or other avoidable processing damage. Colors shall be bright and clear. Tumbled work shall be completely dry and soft.

5.2.3 Flatwork and ironed articles shall be machine finished or pressed, as applicable, so surfaces are smooth and free of rough-dry areas, wrinkles, tails, and unintended creases. Pressed work shall meet generally accepted commercial industry standards.

5.2.4 The Contractor shall sort, fold, bundle, wrap, seal, and label finished bulk-laundry items by type, size, and color as specified in Technical Exhibit C. Bundles containing fewer than the stated quantity shall be marked with the actual quantity. The Contractor shall protect finished work from contamination, wrinkling, and damage during storage and transit.

5.2.5 Any item or service found not to meet this PWS shall be re-performed at no additional cost to the Government. The Contractor shall take prompt corrective action to address nonconforming services or products and prevent recurrence.

5.3 Infection Control and Safety

5.3.1 The Contractor shall handle, transport, process, and package contaminated laundry in accordance with applicable healthcare infection-control requirements and occupational-safety requirements. The Contractor shall maintain physical separation between soiled and clean textiles and shall control contamination risks during collection, transit, processing, storage, and delivery.

5.3.2 The Contractor shall comply with applicable bloodborne-pathogen requirements, including 29 CFR 1910.1030, and shall furnish appropriate personal protective equipment and training to Contractor personnel.

5.4 Contractor Management Reporting

5.4.1 The Contractor shall maintain and make available upon request records supporting service volume, pickup and delivery, weights or counts, discrepancies, deficient-service re-performance, lost/damaged articles, customer complaints, and corrective actions. [DECISION REQUIRED: Confirm report frequency, format, recipients, and any required monthly workload or invoice-support report.]

PART 6 APPLICABLE PUBLICATIONS

6.1 Applicable Publications (Current Editions): The following authorities and guidance are referenced for performance. The Contractor shall comply with applicable versions as incorporated into the contract or otherwise required by law or regulation.

6.1.1 29 CFR 1910.1030, Bloodborne Pathogens.

6.1.2 Centers for Disease Control and Prevention guidance addressing environmental infection control and linen/laundry management in healthcare facilities.

6.1.3 FAR 52.245-1, Government Property, when incorporated in the contract.

6.1.4 Applicable installation access, safety, security, environmental, and records-management requirements.

PART 7 ATTACHMENT AND TECHNICAL EXHIBIT LISTING

7.1 Technical Exhibit A: Performance Requirements Summary (PRS).

7.2 Technical Exhibit B: Deliverables Schedule.

7.3 Technical Exhibit C: Bulk Laundry Identification, Packaging, and Method of Finish.

7.4 Technical Exhibit D: Pick-up and Delivery Schedule.

7.5 Attachment 1: Estimated Workload Data and Government-Furnished Property/Services.

TECHNICAL EXHIBIT A PERFORMANCE REQUIREMENTS SUMMARY

The PRS identifies critical performance objectives and minimum acceptable performance standards. The PRS does not relieve the Contractor of responsibility for all PWS requirements.

Performance Objective
Reference
Acceptable Quality Level (AQL)
Method of Surveillance
Maintain accountability for received and returned laundry.
PWS 5.1.3–5.1.4
100% of exchanges documented; unresolved discrepancies reported.
100% inspection of sampled tracking records.
Meet approved turnaround time.
PWS 5.1.2
At least 95% of routine items returned within the approved turnaround time each month.
Periodic inspection of tracking records.
Provide hygienically clean, finished articles.
PWS 5.2.1–5.2.4
At least 95% of inspected finished items meet applicable cleanliness, finish, packaging, and labeling standards each month.
Random sampling and customer feedback.
Prevent cross-contamination during transport and handling.
PWS 4.2–4.3; 5.3
100% compliance with segregation and clean-transport requirements.
Periodic inspection.
Correct nonconforming services.
PWS 5.2.5
100% of substantiated deficiencies corrected at no additional cost.
Review of corrective-action records.
Submit required management reports and notifications.
PWS 1.5.2; 5.4
100% submitted by required time and in required format.
100% inspection.

TECHNICAL EXHIBIT B DELIVERABLES SCHEDULE

Deliverable
Frequency
Copies
Medium/Format
Submit To
B.001 – Quality Control Plan (PWS 1.5.1)
Within 30 calendar days after award; revised as needed.
One
Electronic, editable format.
KO through COR
B.002 – Potential Issue Report (PWS 1.5.2)
Verbal within 24 hours; written within seven calendar days.
One
Electronic, editable format.
COR
B.003 – Contract Manager and Alternate Designation (PWS 1.7.1)
No later than seven calendar days before commencement; updates within seven calendar days after change.
One
Electronic, editable format.
KO through COR
B.004 – Service Accountability/Management Report (PWS 5.4.1)
[DECISION REQUIRED: Confirm frequency.]
One
Electronic, editable format.
COR

TECHNICAL EXHIBIT C BULK LAUNDRY IDENTIFICATION, PACKAGING, AND METHOD OF FINISH

The routine packaging and finishing requirements below apply to the listed bulk-laundry categories. The Government may identify additional item-specific requirements in Attachment 1. The Contractor shall not mix different colors or sizes within a bundle when separate sorting is required.

Item Category
Standard Packaging/Finish
Identification
Patient linen, towels, blankets, and similar bulk textiles
Fold, bundle, and wrap/seal in clear protective material unless otherwise specified.
Identify item type; identify size/color when applicable; mark actual quantity when less than standard bundle quantity.
Operating room apparel, gowns, and scrubs
Fold, bundle, sort by size/color, and wrap/seal as specified in Attachment 1.
Identify item type, size, color, and actual quantity when less than standard bundle quantity.
Flatwork and ironed items
Machine finish or press; fold or hang as applicable; package to prevent creasing and contamination.
Identify item type, size/color when applicable, and actual quantity.
Piece-work and dry-cleaning items
Finish, bundle, wrap, or place on hanger as applicable to item type and approved service instructions.
Tracking ticket must identify nomenclature, quantity, and any special handling.

TECHNICAL EXHIBIT D PICK-UP AND DELIVERY SCHEDULE

The schedule below is a completion aid and shall be finalized before solicitation release. The Contractor shall maintain adequate capacity to perform all approved scheduled services.

Service Location
Service Category
Pick-up Day/Time
Delivery Day/Time
Turnaround
Brooke Army Medical center building 3600
Bulk laundry
Monday through Sunday
0800
24 hours
Brooke Army Medical center building 3600
Piece-work laundry/dry cleaning
Monday through Sunda]
0800
24 hours
Brooke Army Medical center building 3600
Special/contingency service
Monday through Sunday
0800
24 hours

ATTACHMENT 1 ESTIMATED WORKLOAD DATA AND GOVERNMENT-FURNISHED PROPERTY/SERVICES

This attachment shall be completed with current requirement-specific data before solicitation release. Estimated quantities are not guaranteed unless the resulting contract expressly states otherwise.

Category
Estimated Quantity
Unit
Notes/Required Data
Bulk laundry
3,000,000
Pounds
Include routine and surge assumptions; identify facility/location if multiple.
Piece-work laundry/ Dry cleaning
Pant, Duty Uniform – 7,000 each

Shirt, Duty Uniform – 6,000 each Coats – 12,000 each Robe, Chaplain – 30 each Tablecloths – 3,500 each Napkins – 350 each Table skirts – 300 each Curtain, Cubicle – 5,000 each Flags – 50 each Streamers – 100 each Miscellaneous (includes belts, straps, cover, pouches and cuffs) – 2,500 each

Items
Identify item types, estimated annual quantities, and special processing needs.
Government-furnished materials/equipment
All linen and laundered items
N/A
Identify bags, plastic bags, scales, loading areas, and any Government-furnished equipment.

(END OF PWS)