Questions and Answers

ITEM NO 0001 (2) ATS, 400a, 208v, 3 pole NEMA 3R - Pricing for ATS's, Please confirm (Yes - price each ATS as separate line item in the quote) There is a unit price and an extended price if you do the extended price I'll just divide it by two.

ITEM NO 0002 Preparing to delete and amend.

ITEM NO 0003 (1) ATS Transfer Switch System Installation, FFP Installation, commissioning, startup test services. - This is factory authorized startup for both ATS's? Please confirm (We need commissioning, start-up test to make sure the ATSs are functioning properly in case of power loss.)

ITEM NO 0004 (1) ALL Cable and wires, FFP The ATSs (on the outside of the box) will require quick connection type to connect CAM cables (refer to picture attached on FBO). The quick-connect CAM cables will be used in the following configuration: Generator 1 to ATS 1, ATS 1 to LEX PDP

Generators 2 to ATS 2, ATS 2 to Coffin PDP The cables from the 1200 amp panel to the ATSs are required as well. - I was told by Hoon that the only cable/wire we were required to supply/install are the feeders from the 1200a panel to the ATS's and the control cables from the ATS's to the Generators. This line item appears to request pricing on the cables from Generator 1 to ATS 1, ATS 1 to LEX PDP and Generator 2 to ATS 2, ATS 2 to Coffin PDP, Please clarify - correct. Vendor provides the cables/wires from the 1200a panel to the ATS's and the control cables from the ATS's to the Generators. All cam-lok cables are provided by AFMESA.