STATEMENT OF WORK

Front Alignment Lift The United States Secret Service has a requirement to procure a Front End Alignment Lift for special purpose vehicles. The current four poster lift is insufficient to accommodate the various types of heavily weighted vehicles and takes up too much floor space. Snap-on John Bean Alignment equipment is currently in use and the procurement of a scissor lift shall be procured as BRAND NAME or Equal in order to insure compatibility and continuity of existing equipment at the facility located in Washington D.C.

SPECIFICATION

SNAP-ON JOHN BEAN Alignment Rack Model # SOEC-25-28-R-M; 25K HD-SCFR-HYD-EO Recessed RN or Equal

In order for an item to be considered an “EQUAL” item, it must contain the following characteristics or features:

Shall be capable of interfacing with Snap-on John Bean Alignment Rack without additional modification.

Lifting Capacity should be up to 25K HD Scissor Lift Alignment Lift should accept Wheelbase from 114” to 180” Full Suspension.

Runway Length should be 23 FT Lifting Time 65 Seconds Lowering Time 65 seconds Maximum is to be up to 72” in Height Maximum Lowered Height is at 10” Front & Rear Air Hydraulic Rolling Bridge Jacks at 15K Front & Rear Lighting Kits Two Pair to be 110 Volts Four 110 Volt Receptacle mounted to outside corners of Lift Electrical Installation for Electrical Features Add a recess in the runways, Includes Slip Plates The Runway Cut outs should fit the existing Turn Tables (John Bean Turn Tables)

Installation of New Lift and De-Installation of Current Lift The installation of the Lift is required. The Existing Lift will be de-installed by the contractor but will be left at the site for future use (i.e., contractor will not need to remove the old lift from the site.)

Period of Performance Completion of installation shall be 60 days after Receipt of Order.

Delivery U.S. Secret Service Washington DC (Exact location to be disclosed after contract award.)